World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Document of The World Bank, International Development Association, and International Finance Corporation Public Disclosure Authorized FOR OFFICIAL USE ONLY Report No: 64299-NP PROJECT APPRAISAL DOCUMENT ON A PROPOSED INTERNATIONAL DEVELOPMENT ASSOCIATION CREDIT IN THE AMOUNT OF SDR 26.1 MILLION (US$40.0 MILLION EQUIVALENT) AND A PROPOSED GRANT IN THE AMOUNT OF SDR 4.0 MILLION (US$6.0 MILLION EQUIVALENT) Public Disclosure Authorized TO NEPAL AND ON A PROPOSED INTERNATIONAL FINANCE CORPORATION FINANCING CONSISTING OF: AN “A” LOAN IN THE AMOUNT OF UP TO US$19.3MILLION AND A CANADA CLIMATE CHANGE PROGRAM (CCCP) SENIOR LOAN IN THE AMOUNT OF UP TO US$19.3 MILLION WITH INTERNATIONAL FINANCE CORPORATION ACTING AS IMPLEMENTING ENTITY OF THE CCCP Public Disclosure Authorized TO KABELI ENERGY LIMITED IN NEPAL FOR THE KABELI-A HYDROELECTRIC PROJECT April 19, 2014 Sustainable Development Department Infrastructure & Natural Resources Department Nepal Country Management Unit Climate Business Department Public Disclosure Authorized South Asia Region International Finance Corporation This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Exchange Rate Effective = December, 2013 Currency Unit = Nepalese Rupees (NPR) US$ 1 = 99.0 NPR US$ 1 = 0.65018 SDR FISCAL YEAR July 16 – July 15 ABBREVIATIONS AND ACRONYMS BOOT Build, Own, Operate, Transfer ISN IDA/IFC Interim Strategy Note BPC Butwal Power Company Limited KAHEP Kabeli-A Hydroelectric Project CCCP Canada Climate Change Program kcal Kilocalorie CIA Cumulative Impact Assessment KEL Kabeli Energy Limited CO2 Carbon Dioxide km Kilometer DA Designated Account kW Kilo Watt DDC District Development Committee kWh kilo Watt-hour DfID Department for International Development LRMC Long-run Marginal Cost DOED Department of Electricity Development MJ Mega Joule EA Environmental Assessment MOE Ministry of Energy EMP Environmental Management Plan MOF Ministry of Finance EIA Environmental Impact Assessment MW Mega Watt EIRR Economic Internal Rate of Return MWh Mega Watt-hour FIDIC Federation Internationale des Ingenieurs- NEA Nepal Electricity Authority Conseils FIRR Financial Internal Rate of Return NCB National Competitive Bidding GAAP Governance and Accountability Action Plan PAP Project-affected Persons g/kWh Gram per kilo Watt-hour PDA Project Development Agreement Gurans Gurans Energy Limited PIC Public Information Center HIDCL Hydroelectricity Investment and Development POE Panel of Experts Company Limited IBN Investment Board of Nepal PS IFC Performance Standards on Environmental and Social Sustainability ICB International Competitive Bidding RCIA Rapid Cumulative Impacts Assessment ICP Informed Consultation and Participation RCLAP Resettlement Compensation and Livelihood Assistance Plan IDA International Development Association SA Social Assessment IDC Interest During Construction SAP Social Action Plan IFC International Finance Corporation TOR Terms of Reference InfraCo InfraCo Asia Himalayan Hydro Pte. Ltd. VDC Village Development Committee Asia IPVCDP Indigenous People Vulnerable Community VEC Valued Environmental and Social Development Plan Component International Development Association (IDA) International Finance Corporation (IFC) Regional Vice President: Philippe Le Houerou Vice President: Karin Finkelston Country Director: Johannes C. M. Zutt Regional Director: Serge Devieux Sector Director: John H. Stein Industry Director: Anita M. George Sector Manager: Julia Bucknall Manager: Sumeet Thakur Task Team Leader: Jie Tang Team Leader: Andre S. Van Hoeck ii NEPAL KABELI-A HYDROELECTRIC PROJECT TABLE OF CONTENTS Page I. STRATEGIC CONTEXT .............................................................................................................. 1 A. Country Context ........................................................................................................................... 1 B. Sectoral and Institutional Context ................................................................................................ 1 C. Higher Level Objectives to which the Project Contributes .......................................................... 6 II. PROJECT DEVELOPMENT OBJECTIVE(S)/GLOBAL ENVIRONMENT OBJECTIVE(S) ........................................................................................................................................... 7 A. Project Development Objective(s) ............................................................................................... 7 B. Project Beneficiaries .................................................................................................................... 7 C. PDO Level Results Indicators ...................................................................................................... 7 III. PROJECT DESCRIPTION ........................................................................................................... 7 A. Project Components ..................................................................................................................... 7 B. Project Cost and Financing .......................................................................................................... 8 C. Lessons Learned and Reflected in the Project Design ................................................................. 8 IV. IMPLEMENTATION .................................................................................................................... 9 A. Institutional and Implementation Arrangements .......................................................................... 9 B. Results Monitoring and Evaluation ............................................................................................ 11 C. Sustainability .............................................................................................................................. 11 V. KEY RISKS AND MITIGATION MEASURES ....................................................................... 12 A. Risk Ratings Summary Table .................................................................................................... 12 B. Overall Risk Rating Explanation ............................................................................................... 13 VI. APPRAISAL SUMMARY ........................................................................................................... 13 A. Economic and Financial Analysis .............................................................................................. 13 B. Technical .................................................................................................................................... 13 C. Financial Management ............................................................................................................... 13 D. Procurement ............................................................................................................................... 14 E. Social (including safeguards and performance standards) ......................................................... 15 F. Environment (including safeguards and performance standards) .............................................. 17 G. Other Safeguards Issues ............................................................................................................. 18 iii Annex 1: IDA’s Results Framework and Monitoring ........................................................................... 19 Annex 2: Detailed Project Description .................................................................................................... 22 Annex 3: Implementation Arrangements ............................................................................................... 29 Annex 4: Operational Risk Assessment Framework (ORAF)- IDA funding ...................................... 41 Annex 5: Implementation Support Plan ................................................................................................. 46 Annex 6: Technical and Contracting Aspects of the Project ................................................................ 48 Annex 7: Environmental and Social Aspects of the Project .................................................................. 57 Annex 8: Economic and Financial Analysis ........................................................................................... 83 Annex 9: Governance and Accountability Action Plan (GAAP) .......................................................... 89 Annex 10: Strengths, Risks and Issues .................................................................................................... 94 Annex 11: Statement of IFC’s Held and Disbursed Portfolio ............................................................... 96 Map ......................................................................................................................................................... 97 iv PAD DATA SHEET Nepal Kabeli-A Hydroelectric Project (P122406) PROJECT APPRAISAL DOCUMENT SOUTH ASIA SASDE Report No.: PAD761 . Basic Information Project ID Lending Instrument EA Category Team Leader P122406 Specific Investment A - Full Assessment Jie Tang Loan Project Implementation Start Date Project Implementation End Date 31-July-2014 30-Dec-2019 Expected Effectiveness Date Expected Closing Date 30-Sep-2014 30-Dec-2019 Joint IFC Joint Level Joint Project - involving co-financing with IFC Yes (loan, equity, budget,
Recommended publications
  • Social Safeguard Due Diligence Report
    Rural Connectivity Improvement Project (RRP NEP 48218) Social Safeguard Due Diligence Report Project Number: 48218-003 July 2017 Nepal: Rural Connectivity Improvement Project Prepared by Department of Local Infrastructure Development and Agricultural Roads for the Asian Development Bank. This social safeguard due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. RURAL CONNECTIVITY IMPROVEMENT PROJECT NEPAL Social Safeguards Due Diligence Report July 2017 Prepared by PPTA Consultants On behalf of Department of Local Infrastructure Development and Agricultural Roads (DOLIDAR) Table of Contents Chapter 1 –Introduction .............................................................................................................. 1 1.1 Project Description .............................................................................................. 1 Chapter 2 - Due Diligence of Social Safeguards ........................................................................ 7 2.1 Methodology used to carry out the due diligence ...............................................
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Nepal Orthodox Tea: Analysis of Industry, Production, and Market Potential
    Nepal Orthodox Tea: Analysis of industry, production, and market potential By Rudra Bahadur Baral M.S., University of Hohenheim, Germany, 2008 A THESIS submitted in partial fulfillment of the requirements for the degree MASTER OF SCIENCE Department of Agricultural Economics Collage of Agriculture KANSAS STATE UNIVERSITY Manhattan, Kansas 2019 Approved by: Major Professor Dr. Aleksan Shanoyan Copyright © Rudra Baral 2019. Abstract This study covers industry analysis, financial analysis and market analysis of Nepal orthodox tea. It aims to evaluate the industry forces, analyze the financial performance of firms, and assess market potential. The study is based on field survey, key informants’ interviews, and participant observation in combination with data from secondary sources. The financial information of 65 tea processing firms was collected using standard financial formats. The production and trade related statistical data were obtained from National Tea and Coffee Development Board Nepal, Trade and Export Promotion Center Nepal, FAOSTAT, International Trade Center and STATISTA. The results of industry analysis indicate that in general, tea processors have low bargaining power against input suppliers and tea buyers. The processing industry was found to be less attractive for new entrants. The threat of substitutes was found to be low. But there is intense internal competition among processing firms for resources and markets. Limited and inefficient production, low economies of scale, unorganized supply chain system, limited access to global market are the major binding constraints identified by this study. The results of the financial analysis found positive returns of investment and increasing returns to scale. However, the average capacity utilization of the processing firms is found to be 33 percent.
    [Show full text]
  • Master Plan of Agricultural Marketing in Eastern Development Region of Nepal
    MASTER PLAN OF AGRICULTURAL MARKETING IN EASTERN DEVELOPMENT REGION OF NEPAL Final Report Submitted To Government of Nepal Ministry of Agricultural Development Department of Agriculture Agri. Business Promotion & Marketing Development Directorate (ABPMDD) Harihar Bhawan, Lalitpur Submitted By: Business Promotion Research and Communication Pvt. Ltd., (BPRC) Putalisadak, Kathmandu, Nepal Tel # 0977-01-4442853/4436617, Fax # 0977-01-4436617 Post Box # 19006, Email # [email protected] July 2017 (Ashad, 2074) Preface BPRC is pleased to undertake this Study "Master Plan of Agri-Marketing in Eastern Development Region of Nepal". BPRC expresses its gratitude to Agri Business Promotion and Marketing Development Directorate (ABPMDD) to having entrusted this important task. It also expresses gratitude to Mr. Laxman Prasad Paudel, Program Director and his team for expert guidance and for providing suggestions throughout the study period and report writing. BPRC is also thankful to ABDMDD team for their valuable, constructive comments and suggestions which were provided during Inception report and draft report presentations. We also express graduate to Senior Agriculture Marketing Officers Mr. Rajendra Prasad Pradhan and Mr. Puspa Raj Shahi for providing necessary instructions during final report preparation. BPRC acknowledges with gratitude the contribution made by study team of the project, with their valuable contribution the project was successfully brought to its conclusion. BPRC is most grateful to Mrs. Naina Dhakal, Team Leader for the successful execution of this project and for steering the whole tasks of conducting field study till its conclusion. In addition, BPRC conveys its appreciation to the contribution made by Chief and SMS of District Agriculture Development Offices, Agro-Vets, Traders, Wholesalers, Representative of District Development Committee, Member of Market Management Committee, Commercial Farmers Representatives and Agri-Cooperatives etc.
    [Show full text]
  • Global Initiative on Out-Of-School Children
    ALL CHILDREN IN SCHOOL Global Initiative on Out-of-School Children NEPAL COUNTRY STUDY JULY 2016 Government of Nepal Ministry of Education, Singh Darbar Kathmandu, Nepal Telephone: +977 1 4200381 www.moe.gov.np United Nations Educational, Scientific and Cultural Organization (UNESCO), Institute for Statistics P.O. Box 6128, Succursale Centre-Ville Montreal Quebec H3C 3J7 Canada Telephone: +1 514 343 6880 Email: [email protected] www.uis.unesco.org United Nations Children´s Fund Nepal Country Office United Nations House Harihar Bhawan, Pulchowk Lalitpur, Nepal Telephone: +977 1 5523200 www.unicef.org.np All rights reserved © United Nations Children’s Fund (UNICEF) 2016 Cover photo: © UNICEF Nepal/2016/ NShrestha Suggested citation: Ministry of Education, United Nations Children’s Fund (UNICEF) and United Nations Educational, Scientific and Cultural Organization (UNESCO), Global Initiative on Out of School Children – Nepal Country Study, July 2016, UNICEF, Kathmandu, Nepal, 2016. ALL CHILDREN IN SCHOOL Global Initiative on Out-of-School Children © UNICEF Nepal/2016/NShrestha NEPAL COUNTRY STUDY JULY 2016 Tel.: Government of Nepal MINISTRY OF EDUCATION Singha Durbar Ref. No.: Kathmandu, Nepal Foreword Nepal has made significant progress in achieving good results in school enrolment by having more children in school over the past decade, in spite of the unstable situation in the country. However, there are still many challenges related to equity when the net enrolment data are disaggregated at the district and school level, which are crucial and cannot be generalized. As per Flash Monitoring Report 2014- 15, the net enrolment rate for girls is high in primary school at 93.6%, it is 59.5% in lower secondary school, 42.5% in secondary school and only 8.1% in higher secondary school, which show that fewer girls complete the full cycle of education.
    [Show full text]
  • Cg";"Lr–1 S.N. Application ID User ID Roll No बिज्ञापन नं. तह पद उम्मेदव
    cg";"lr–1 S.N. Application ID User ID Roll No बिज्ञापन नं. तह पद उ륍मेदवारको नाम लऱगं जꅍम लमतत सम्륍मलऱत हुन चाहेको समूह थायी न. पा. / गा.वव.स-थायी वडा नं, थायी म्ज쥍ऱा नागररकता नं. 1 85994 478714 24001 24/2075/76 9 Senior Manager ANIL NIROULA Male 2040/01/09 खलु ा Biratnagar-5, Morang 43588 2 86579 686245 24002 24/2075/76 9 Senior Manager ARJUN SHRESTHA Male 2037/08/01 खलु ा Bhadrapur-13, Jhapa 1180852 3 28467 441223 24003 24/2075/76 9 Senior Manager ARUN DHUNGANA Male 2041/12/17 खलु ा Myanglung-2, Tehrathum 35754 4 34508 558226 24004 24/2075/76 9 Senior Manager BALDEV THAPA Male 2036/03/24 खलु ा Sikre-7, Nuwakot 51203 5 69018 913342 24005 24/2075/76 9 Senior Manager BHAKTA BAHADUR KHATRI CHATRI Male 2038/12/25 खलु ा PUTALI BAZAR-14, Syangja 49247 6 89502 290954 24006 24/2075/76 9 Senior Manager BIKAS GIRI Male 2034/03/15 खलु ा Kathmandu-31, Kathmandu 586/4042 7 6664 100010 24007 24/2075/76 9 Senior Manager DINESH GAUTAM Male 2036/03/11 खलु ा Nepalgunj-12, Banke 839 8 62381 808488 24008 24/2075/76 9 Senior Manager DINESH OJHA Male 2036/12/15 खलु ा Biratnagar Metropolitan-12, Morang 1175483 9 89472 462485 24009 24/2075/76 9 Senior Manager GAGAN SINGH GHIMIRE Male 2033/04/26 खलु ा MAIDAN-3, Arghakhanchi 11944/3559 10 89538 799203 24010 24/2075/76 9 Senior Manager GANESH KHATRI Male 2028/07/25 खलु ा TOKHA-5, Kathmandu 4/2161 11 32901 614933 24011 24/2075/76 9 Senior Manager KHIL RAJ BHATTARAI Male 2039/08/08 खलु ा Bhaktipur-6, Sarlahi 83242429 12 70620 325027 24012 24/2075/76 9 Senior Manager KRISHNA ADHIKARI Male 2038/03/23 खलु ा walling-10,
    [Show full text]
  • Inception Report
    TA – 7984 NEP May, 2014 Mainstreaming Climate Change Risk Management in Development 1 Main Consultancy Package (44768-012) USAI VULNERABILITY ASSESSMENT REPORT PANCHTHAR DISTRICT Prepared by ICEM – International Centre for Environmental Management METCON Consultants APTEC Consulting Prepared for Ministry of Science, Technology and Environment, Government of Nepal Environment Natural Resources and Agriculture Department, South Asia Department, Asian Development Bank Version A Draft for Comment MOSTE | Mainstreaming climate change risk management in development | USAI – Paachthar District – VA Report ACRONYMS ADB Asian Development Bank AF Adaptation Fund AP Adaptation Planning CC Climate Change cm Centimeter 0C Centigrade DDC District Development Committee DEWATS Decentralized Wastewater Treatment Systems DI Ductile Iron DWSS Department of Water Supply and Sewerage GI Galvanized Iron GIZ Deutsche Gesellschaft für Internationale Zusammenarbeit GON Government of Nepal HDPE High Density Poly Ethylene Km Kilometer LPS Liters per Second M Meter M&E Monitoring & Evaluation MH Manhole MoH Ministry of Health MoSTE Ministry of Science, Technology and Environment NPR Nepali Rupees NRW Non-Revenue Water O&M Operation & Maintenance RCC Reinforced Concrete Construction RR Random Rubble STP Sewage Treatment Plant TA Technical Assistance TDC Town Development Committee ToR Terms of Reference VA Vulnerability assessment VDC Village District Committee UNEP United Nations Environment Programme USAI Water Supply and Sanitation WB World Bank WC Water Closet
    [Show full text]
  • RESETTLEMENT ACTION PLAN (RAP) for ANGLE TOWERS of the KABELI CORRIDOR 132 Kv TRANSMISSION LINE Public Disclosure Authorized PROJECT (KCTLP)
    RESETTLEMENT ACTION PLAN (RAP) FOR ANGLE TOWERS of the KABELI CORRIDOR 132 kV TRANSMISSION LINE Public Disclosure Authorized PROJECT (KCTLP) Submitted to Kabeli Corridor 132kV Transmission Line Project, Transmission Line I substation Construction Department, Transmission and System Operation Nepal Electricity Authority (NEA) Public Disclosure Authorized Public Disclosure Authorized Prepared by Nepal Environmental & Scientific Services, Pvt. Ltd. (NESS) GPO Box 7301 Kathmandu, Nepal Public Disclosure Authorized (Jitjung Marga-26, Thapathali) Phone: 424.4989/424.1001, Fax: 422.6028 [email protected], www.ness.com.np December, 2011 Executive Summary The Kabeli Corridor 132 kV Transmission Line Project (KCTLP) is part of the Government of Nepal's Kabeli Power Generation Project under development by the Nepal Electricity Authority (NEA). The project is funded through the Nepal Power Development Project (NPDP) under a loan from the World Bank/IDA. The KCTLP is located in Nepal's Eastern Development Region within Mechi and Koshi Zones and passes through four districts: Terathum of Mechi Zone, and Panchthar, lIam and Jhapa of Koshi Zone (Figure 1). The transmission line (TL) corridor is 83.74 km in length, crossing 25 VDCs in the four districts. They are (from north to south) one VDC in Terathum District (Chattedhunga), 10 VDCs of Pachthar District (Amarpur, Shubhang, Bharapa, Phidim, Chokmagu, Siwa, Nawamidanda, Imbung, Pauwasartap and Chilingden), 13 VDCs of lIam District (Phakphok, Chamaita, Ektappa, Mangalbare, Sangarumba, Siddhithumka, Soyak, Godak, Chisapani, Danabari, Mahamai, Bajho and Chulachulij, and one VDC of Jhapa District (Lakhanpur). At Lakhanpur, near the city of Damak on the East-West Highway, the transmission lines will link into the national electricity supply grid.
    [Show full text]
  • Ÿþm I C R O S O F T W O R
    Preparation of District Environment Profile – Ilam Final Report PART I Situation Profile 1.1 Introduction Ilam is one of the easternmost districts lying in the Mechi zone in the Eastern Development Region (EDR) of Nepal. It shares its eastern border with the Darjeeling district of West Bangal state of India. To the north lies Panchthar district, to the south Morang district and Jhapa district of Mechi zone. It extends from 26040’N to 27008’N parallels of latitude and from 87040’ to 88010’ east meridians of longitude in global position. The total area of the district is 1703 sq. km. with 50 km from the east to the west extension and 38kmfrom to the north to the south. Mechi highway passes through the Ilam district headquarter. It crosses this district from south Jhapa border to northwest border (Ranke) with Panchthar district. This highway connects this district with strtgic road net work (SRN). Similarly, it joins this district toward north with Panchthar and further north with Taplejung district. It is divided into 45 VDCs, two municipalities. Those are divided into 11 Ilakas and three electoral constituencies.The headquarter of Ilam district is in Ilam municipality GIS Map 1.1: Location Map of Ilam District Eco TRANS Consult and Shrestha Consultant (Pvt.) Ltd. (JV) Page | 1 Preparation of District Environment Profile – Ilam Final Report GIS Map 1.2: Administrative Division of Ilam district Eco TRANS Consult and Shrestha Consultant (Pvt.) Ltd. (JV) Page | 2 Preparation of District Environment Profile – Ilam Final Report 1.1.1 General Background Different infrastructural, socio-cultural or the economic development activities are being conducted at the high pace within Ilam district.
    [Show full text]
  • A Study of Organic Tea Cultivation: a Case Study of Sankhejung Vdc, Ilam District, Nepal
    A STUDY OF ORGANIC TEA CULTIVATION: A CASE STUDY OF SANKHEJUNG VDC, ILAM DISTRICT, NEPAL A Thesis Submitted to Central Department of Rural Development Faculty of Humanities and Social Sciences in Partial Fulfilment of the requirements for the Degree of Master of Arts in Rural Development Submitted by ICHCHHA RAM ACHARYA Exam Roll No. : 281007 Regd. No.: 7-1-1-703-2001 Central Department of Rural Development Tribhuvan University, Kirtipur Kathmandu, Nepal February, 2017 1 DECLARATION I hereby declare that the thesis entitled A Study of Organic Tea Cultivation : A Case Study of Sankhejung VDC of Ilam District submitted to the Central Department of Rural Development, Tribhuvan University is entirely my original work prepared under the guidance and supervisor of my supervisor. I have made due acknowledgement to all ideas and information borrowed from different sources in the course of preparing this thesis. The result of this thesis have not been presented or submitted anywhere else for the award of any degree or for any other purpose. I assure that no part of the content of this thesis has been published in any from before. Ichchha Ram Acharya TU Reg. No: 7-1-1-703-2001 Date: i RECOMMENDATION LETTER This thesis entitled A Study of Organic Tea Cultivation: A Case Study of Sankhejung VDC of Ilam District has been prepared by Mr. Ichchha Ram Acharya under my guidance and supervision. I hereby forward this thesis to the evaluation committee for final evaluation and approval. ............................... Mr. Subhash Jha Supervisor Date: ii APPROVAL SHEET This thesis entitled A Study of Organic Tea Cultivation: A Case Study of Sankhejung VDC of Ilam District submitted by Ichchha Ram Acharya in partial fulfilment of the requirements for the Master’s Degree (MA) in Rural Development has been approved by the evaluation committee.
    [Show full text]
  • Request for Proposals
    Request for Proposals Title of Consulting Services: Preparation of Rural Municipal Profile of Phakphok Thum RMCP Ilam RFP no.: 01/075-76 Phakphokthum Rural Municipality Amchok, llam 2075 Rural Municipal Profile 1 Contents Request for Proposals .................................................................................................................................................... 1 Section 2. Information to Consultants .................................................................................................................. 4 Section 2. Information to Consultants .................................................................................................................. 5 Section 3. Technical Proposal - Standard Forms .............................................................................................. 13 Section 4. Financial Proposal - Standard Forms ............................................................................................... 20 Section 5 Terms of Reference .......................................................................................................................... 23 Terms of Reference for .................................................................................................. Error! Bookmark not defined. Preparation of Municipality Transport Master Plan ........................................................ Error! Bookmark not defined. I. Form of Contract ..............................................................................................................................
    [Show full text]
  • Resource Analysis of Chyuri (Aesandra Butyracea) in Nepal
    Micro Enterprise Development Programme - MEDEP GON/MOICS/UNDP – NEP/08/006 Resource Analysis of Chyuri (Aesandra butyracea) in Nepal Micro-Enterprise Development Programme (MEDEP-NEP 08/006) Kathmandu, Nepal June 2010 Copyright © 2010 Micro-Enterprise Development Programme (MEDEP-NEP 08/006) UNDP/Ministry of Industry, Government of Nepal Bakhundole, Lalitpur PO Box 815 Kathmandu, Nepal Tel +975-2-322900 Fax +975-2-322649 Website: www.medep.org.np Author Surendra Raj Joshi Reproduction This publication may not be reproduced in whole or in part in any form without permission from the copyright holder, except for educational or nonprofit purposes, provided an acknowledgment of the source is made and a copy provided to Micro-enterprise Department Programme. Disclaimer The views and opinions expressed in this document are those of the author and do not necessarily reflect those of MEDEP or the Ministry of Industry. The information contained in this publication has been derived from sources believed to be reliable. However, no representation or warranty is given in respect of its accuracy, completeness or reliability. MEDEP does not accept liability for any consequences/loss due to use of the content of this publication. Note on the use of the terms: Aesandra butyracea is known by various names; Indian butter tree, Nepal butter tree, butter tree. In Nepali soe say Chyuri ad others say Chiuri. ACKNOWLEDGMENTS This study was carried out within the overall framework of the Micro-Enterprise Development Programme (MEDEP-NEP 08/006) with an objective to identify the geographical and ecological coverage of Chyuri tree, and to estimate the resource potentiality for establishment of enterprises.
    [Show full text]