Final Report on Scottish Flood Defence Asset Database

Total Page:16

File Type:pdf, Size:1020Kb

Final Report on Scottish Flood Defence Asset Database Integrate, Consolidate and Disseminate European Flood Risk Management Research 1st CRUE ERA -Net Common Call Effectiveness and Efficiency of Non-structural Flood Risk Management Measures CRUE Research Report No I -1: Systematisation, evaluation and context conditions of structural and non-structural measures for flood risk reduction FLOOD-ERA Joint Report Prepared by the Joint Project Consortium consisting of Funded by Jochen Schanze (Joint project co-ordinator) Gérard Hutter, Alfred Olfert Leibn iz Institute of Ecological and Regional Development (IOER) Edmund C. Penning -Rowsell, Dennis Parker, Tim Harries Flood Hazard Research Centre, Middlesex University in co -operation with Alan Werritty, University o f Dundee Hans -Peter Nachtnebel, Hubert Holzmann, Clemens Neuhold Institute of Water Management, Hydrology and Hydraulic Engineering University of Nat ural Resources and Applied Life Science (BOKU) Volker Meyer, Christian Kuhlicke, Anne Schildt Helmholtz Centre for Environmental Research - UFZ Beate Jessel, Philipp Königer Chair for Strategies of Landscape Management Technische Universität München (TUM) CRUE Co-ordinator: John Goudie (Defra) Project Contract No: ERAC-CT-2004-515742 Project Website: www.crue-eranet.net © 2008 CRUE Funding Initiative on Flood Risk Management Research All rights reserved. DISCLAIMER Systematisation, evaluation and context conditions of structural and non-structural measures for flood risk reduction (FLOOD-ERA Joint Report) CRUE Research Report No I-1 This report was prepared with the support of the CRUE Funding Initiative on Flood Risk Management Research. While reasonable care has been taken in preparing this publication to ensure that information is appropriate and valid it have to be considered that the views, conclusions and recommendations expressed herein are those of the authors and most not necessarily endorse the views of the CRUE ERA-NET or the respective Funding bodies involved. The intent of the research reports is to provide relevant information and to stimulate discussion of those having an interest in flood risk management. The results and conclusions of all reports produced under the CRUE Funding Initiative on Flood Risk Management Research are made available to policy-makers and stakeholders at all levels, research funding bodies, universities, industries, practitioners, and the general public by way of the CRUE website ( http://www.crue-eranet.net ). This publication is copyright, but wide dissemination is encouraged. Requests and inquiries concerning reproduction and rights should be addressed to the CRUE Dissemination Manager on [email protected] . Researcher’s Contact Details Project partner #1 (Co-ordinator) ◄ Jochen Schanze Leibniz Institute of Ecological and Regional Development – IOER (DE) [email protected] Project partner #2 ◄ Edmund C. Penning-Rowsell Flood Hazard Research Centre, Middlesex University (UK) [email protected] Project partner #3 ◄ Hans-Peter Nachtnebel Institute of Water Management, Hydrology and Hydraulic Engineering University of Natural Resources and Applied Life Science - BOKU (AT) [email protected] Project partner #4 ◄ Volker Meyer Helmholtz Centre for Environmental Research – UFZ (DE) [email protected] Project partner #5 ◄ Philipp Königer Chair for Strategies of Landscape Management Technische Universität München – TUM (DE) [email protected] In submitting this report, the researcher’s have agreed to CRUE publishing this material in its edited form. CRUE Contact Details Proposed bibliographic citation Schanze J, Hutter G, Penning-Rowsell E, Nachtnebel H-P, Meyer V, CRUE Co-ordinator Werritty A, Harries T, Holzmann H, Jessel B, Koeniger P, Kuhlicke C, Area 2D, Ergon House Neuhold C, Olfert A, Parker D, Schildt A (2008), Systematisation, Horseferry Road London SW1P 2AL. United Kingdom evaluation and context conditions of structural and non-structural measures for flood risk reduction. FLOOD-ERA Joint Report, Email: [email protected] published by ERA-NET CRUE, http://www.crue-eranet.net. Web: http://www.crue-eranet.net/ Published in November 2008 ERA-NET CRUE is funded by the ERA-NET Scheme under the 6th Framework Programme General Directorate for Research in the European Commission Contract number: ERAC CRUE FUNDING INITIATIVE ON FLOOD RISK MANAGEMENT RESEARCH FLOOD-ERA ERA-NET CRUE Funding Initiative on Flood Risk Management Research Risk Assessment and Risk Management: Effectiveness and Efficiency of Non-structural Flood Risk Management Measures Systematisation, evaluation and context conditions of structural and non-structural measures for flood risk reduction FLOOD-ERA Joint Report CRUE Research Report No I-1 Prepared by Funded by Jochen Schanze (Joint project co-ordinator), Gérard Hutter, Alfred Olfert Leibniz Institute of Ecological and Regional Development (IOER) BMBF (DE) Edmund C. Penning-Rowsell, Tim Harries Flood Hazard Research Centre, Middlesex University in co-operation with Alan Werritty, University of Dundee Defra, SE-ERAD (UK) Hans-Peter Nachtnebel, Hubert Holzmann, Clemens Neuhold Institute of Water Management, Hydrology and Hydraulic Engineering, University of Natural BMLFUW (AT) Resources and Applied Life Science (BOKU) Volker Meyer, Christian Kuhlicke, Anne Schildt Helmholtz Centre for Environmental Research – UFZ BMBF (DE) Beate Jessel, Philipp Königer Chair for Strategies of Landscape Management Technische Universität München (TUM) BMBF (DE) III CRUE FUNDING INITIATIVE ON FLOOD RISK MANAGEMENT RESEARCH FLOOD-ERA 1st CRUE Funding Initiative on FRM research ERA-Net CRUE is a network of European government departments who directly fund flood risk management programmes and related research actions. In order to tackle the challenge of rising flood risk and to develop effective policies and risk management practices, policy-makers and key stakeholders need a strong evidence base. Evidence-based policy-making is the key to modern, forward-looking strategies for dealing with increasing flood risk. Trans-boundary and trans-national flood risk management issues are becoming more and more important, requiring in particular joint research and development initiatives. The creation and implementation of a European research area in flood risk management – as intended by the CRUE ERA-Net - is an important contribution to an improved trans-national perspective for flood-related research in Europe. Besides co-ordinating research between Member States, CRUE aims to contribute towards the presentation of research needs with its own trans-nationally based funding initiatives. Common trans-national research calls initiated by the partner countries are a principal activity within the CRUE ERA-Net which can be considered as specific actions to respond to current policy and development needs in Europe. With the launch of the first CRUE common call, a first step toward the integration of flood research in Europe was made. The topic “Risk Assessment and Risk Management: Effectiveness and Efficiency of Non-structural Flood Risk Management Measures” was selected by six of the CRUE partner countries through an intensive consultation process and is to a great extent based on developments in European flood risk management policy (e.g. EU Floods Directive). In particular, the call was designed to investigate and critically assess the effectiveness and efficiency of non-structural measures in comparison to structural measures and to identify barriers to implementation of these "soft" techniques. The call was an incentive to develop innovative methodological approaches. Moreover, it challenged researchers across Europe to integrate knowledge across different disciplines such as natural and social sciences, and engineering. Each of the seven successful joint projects within CRUE’s 1st Funding Initiative for FRM research was designed to understand different national approaches to the use and appraisal of non-structural measures, explore what is successful, and what can be improved in terms of efficiency and effectiveness of such measures themselves. The research results presented in this report will provide policy-makers with a better understanding of how FRM as a part of integrated river basin management can deliver multiple benefits, for example reduced flood risk and improved environmental quality. I feel confident that the outcome of this research will be a valuable contribution to national policy development and the improvement of flood risk-related practice. John Goudie ERA-Net CRUE Co-ordinator, Defra, UK IV CRUE FUNDING INITIATIVE ON FLOOD RISK MANAGEMENT RESEARCH FLOOD-ERA Summary for Decision Makers FLOOD-ERA deals with the systematisation, evaluation and comparison of structural measures (SM) and non-structural measures (NSM) and takes context conditions of decision making on both types of measures like risk perception, funding mechanisms, and formal institutions into account. The study is important because up to now there is considerable uncertainty about how NSM can be compared with SM in a consistent way with regard to advantages and disadvantages. The overall aim of the project is to make important steps towards preventive flood risk management strategies in European Member States through (i) improving the comparative evaluation of structural (SM) and non-structural measures (NSM) and through (ii) analysing the influence of context conditions (like risk perception of decision makers) on the choice of measures. FLOOD-ERA begins with the assumption that current flood risk management (FRM)
Recommended publications
  • Nr. 7/2019 Juli
    Nr. 7/2019 Juli Nr. Schloss-Serenade in Vagen Teilnahme der großen Gruppe, und den Verantwortlichen des „Velo- Keller“, die ihre Mitglieder zu dieser tollen Aktion motiviert haben – Am Samstag, 13. Juli 2019 findet im Schlossgarten der Familie von allen voran ein Dankeschön an Mandi Mainzl. Aretin die 31. Vagener Schloss-Serenade statt. Beginn der Veranstaltung Die 100 € für einen guten Zweck, die die Gemeinde mit dem ersten ist spätabends um 20.30 Uhr, so dass den Zuhörern eindrucksvolle Platz gewann, werden daher an die großartige Jugendarbeit des „Velo- Musik in einer ganz besonderen, herrlich illuminierten Atmosphäre Keller“ gespendet. präsentiert werden kann. Vom Gemeinderat nahm Herr Christof Langer teil. Neben Bürgermeister Hans Schaberl beteiligten sich von der Verwaltung noch die Geschäftsleitende Beamtin Ines Bertozzi und Brigitte Köhler-Blaha vom Vorzimmer. Zu den Gastgebern des Abends, der Musikkapelle Vagen, gesellen sich auf Einladung des Hauptorganisators, Siamak Golshani, der Chor Bei dem Aktionstag in Kolbermoor wurden neue Verkehrswege Trisono aus Kirchdorf am Haunpold, die Höglinger Stubnmusi, der und entsprechende Trassen vorgestellt. Denn die heutige Schlierseer Alpenchor und die Bläser der Mittenkirchener Tanzlmusi. Verkehrsinfrastruktur ist in erster Linie aufs Auto hin optimiert und Der Eintritt ist frei. Über Spenden freuen sich die Veranstalter dennoch, muss für einen verstärkten Fahrradverkehr erst tauglich gemacht da die Musikkapelle Vagen diese wie alljährlich einem wohltätigen werden. Welche Überlegungen man sich da im Gebiet der SUR (Stadt Zweck zukommen lässt. Bei schlechter Witterung entfällt die Serenade. Umlandgemeinden Rosenheim) schon gemacht hat, wurde auf dem Weitere Informationen finden Sie unter www.schloss-serenade.de Radlaktionstag in einer Reihe von Vorträgen vorgestellt, dazu ein buntes Rahmenprogramm, auf dem zu sehen war, was es auf dem Rathaus wegen Betriebsausflug am 18.7.
    [Show full text]
  • Y #Y #Y #Y #Y #Y #Y Vagen Feldolling Westerham Feldkirchen Bruckmühl Schwaig Zeichenerklärung
    BRUNNEN Ù 4 Anlage A-1.1 III 4487000 4488000 4489000 4490000 4491000 4492000 4493000 Zeichenerklärung: Br. Aschhofen Y# II Modellgrenze Feldkirchener Bach 5309000 5309000 Ù 4 Ù 4 Ù Ù 4 Ù 4 Ù 4 4 Wasserschutzgebiet III Zone I, II, III II III ± Y# Br. Percha I !. Brunnen Ù 4 Ù II 4 Quelle III Klingerbach 24+200 Feldkirchen Kilometrierung Mangfall 5308000 Kellerbach 5308000 II Feldkirchener Bach Ù I 4 II I geplantes HRB Asterbach Ù 4 Dichtungssporn am Unterbecken 2 Ù 4 (Bauentwurf 1925) 28+200 28+000 Westerham Einbindung bis in Tiefenbereich III 27+800 Ù Ù 4 Ù 4 4 27+600 Einbindung bis in Tiefenbereich II 5307000 27+400 5307000 Ù Feldolling 4 III Ù 4 Samerbrunnen I Ù 4 27+200 Ù Y# I 4 Ù II II I 4 27+000 Ù III I Vagener Straße 4 26+800 Feldkirchener Bach Kläranlage 26+600 25+200 26+400 26+000 25+800 24+800 24+600 25+400 24+400 24+200 25+000 24+000 5306000 25+600 5306000 26+200 23+800 23+400 Brucker Wehr 23+600 23+200 Ortsteil Gries Offener Graben 23+000 Ù Restentleerung 4 Altarmrenaturierung Schwaig 22+800 22+600 Berghamer Leiten Unterbecken 3 22+400 Unterbecken 2 22+200 21+800 22+000 21+600 5305000 5305000 21+400Y#Y# Br. II 21+200 20+000 21+000 20+400 19+800 Br.Br. II Br. I 20+200 III IIY#Y# 20+800 19+400 Unterbecken 1 TW-Gewinnung Markt Bruckmühl Bruckmühl 0 500 1.000 1.500 5304000 5304000 m Vagen BJÖRNSEN BI ERATENDE NGENIEURE Ù Ù Ù Ù 4 4 4 4 II Lageplan III Untersuchungsgebiet 5303000 5303000 Kartengrundlage vom Auftraggeber zur Verfügung gestellt.
    [Show full text]
  • Nr. 10/2019 Oktober
    Nr. 10/2019 Oktober Nr. Verkaufsoffener Sonntag am 24. November in Feldkirchen- Aus dem Gemeinderat und seinen Ausschüssen… Westerham Folgenden Bauvorhaben wurde die Zustimmung erteilt: Geschäftsleute und Aussteller laden Sie herzlich am 24. November Errichtung eines Antennenmastens, Gemarkung Höhenrain zum traditionellen, verkaufsoffenen Sonntag in Feldkirchen-Westerham Errichtung einer Toilettenanlage auf dem Grundstück Miesbacher ein. Von 13 Uhr bis 17 Uhr haben Sie in vielen Geschäften und bei Straße in Westerham zusätzlichen Ausstellern die Möglichkeit, gemütlich zu bummeln und sich auch kulinarisch verwöhnen zu lassen. Veranstalter ist der Werbering Neubau und Erweiterung des bestehenden Vordaches, Miesbacher Mangfalltal e. V. Ihre Ansprechpartner vor Ort sind Lydia Montermann Straße in Westerham (Wäschetruhe Montermann) und Christine Knoll (text³ – Agentur für Vorbescheid: Neubau einer Betriebsleiterwohnnung in Stadlberg Gestaltung). Sie möchten mitmachen? Wir freuen uns auch sehr über eine Teilnahme Vergabe eines Straßennamens für das Gewerbegebiet Weidach V von ortsansässigen Vereinen. Alle Informationen und Anmeldeformulare Der Bauausschuss hat beschlossen, für die Stichstraße mit erhalten Sie auf: www.werbering.ro oder rufen Sie uns direkt an: 08063 Wendeanlage im Gewerbegebiet Weidach V den Straßennamen – 200 60 10. Anmeldeschluss ist der 18. Oktober 2019. „Fritz-Krause-Straße“ zu vergeben – vorbehaltlich der Zustimmung Weihnachtsmarkt auf dem Dorfplatz der Nachfahren. …in Feldkirchen: Freitag, 6. bis Sonntag, 8. Dezember Traditionell lädt heuer wieder der Werbering Mangfall e.V. zum Weihnachtsmarkt auf Einführung einer Sicherheitswacht in der Gemeinde; dem Dorfplatz in Feldkirchen ein: Freitag, 6. bis Sonntag, 8. Dezember. Bewerber gesucht! Bei Interesse an einer Weihnachtsmarkthütte in Feldkirchen melden Sie Wie bereits im letzten Gmoabriaf mitgeteilt, wird die Gemeinde zur sich bis zum 31.
    [Show full text]
  • FLOOD ERA Final Report
    University of Dundee Systematisation, evaluation and context conditions of structural and non-structural measures for flood risk reduction Schanze, Jochen; Hutter, Gerard; Offert, Alfred; Penning-Rowsell, Edmund C.; Parker, Dennis; Harries, Tim Publication date: 2008 Document Version Publisher's PDF, also known as Version of record Link to publication in Discovery Research Portal Citation for published version (APA): Schanze, J., Hutter, G., Offert, A., Penning-Rowsell, E. C., Parker, D., Harries, T., Werritty, A., Nachtnebel, H-P., Holzmann, H., Neuhold, C., Meyer, V., Kuhlicke, C., Schildt, A., Jessel, B., & Koniger, P. (2008). Systematisation, evaluation and context conditions of structural and non-structural measures for flood risk reduction. (CRUE Research report; No. I-1). CRUE Funding Initiative on Flood Risk Management Research. http://www.flood-era.ioer.de/files/FLOOD-ERA_Final_report.pdf General rights Copyright and moral rights for the publications made accessible in Discovery Research Portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. • Users may download and print one copy of any publication from Discovery Research Portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain. • You may freely distribute the URL identifying the publication in the public portal. Take down policy If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim. Download date: 27.
    [Show full text]
  • Managing Uncertainty in Flood Protection Planning with Climate
    Hydrol. Earth Syst. Sci., 22, 2511–2526, 2018 https://doi.org/10.5194/hess-22-2511-2018 © Author(s) 2018. This work is distributed under the Creative Commons Attribution 4.0 License. Managing uncertainty in flood protection planning with climate projections Beatrice Dittes, Olga Špacková,ˇ Lukas Schoppa, and Daniel Straub Engineering Risk Analysis Group, Technische Universität München, Arcisstr. 21, 80333 Munich, Germany Correspondence: Beatrice Dittes ([email protected]) Received: 24 September 2017 – Discussion started: 1 November 2017 Revised: 19 January 2018 – Accepted: 30 March 2018 – Published: 24 April 2018 Abstract. Technical flood protection is a necessary part The recommended planning is robust to moderate changes in of integrated strategies to protect riverine settlements from uncertainty as well as in trend. In contrast, planning without extreme floods. Many technical flood protection measures, consideration of bias and dependencies in and between un- such as dikes and protection walls, are costly to adapt af- certainty components leads to strongly suboptimal planning ter their initial construction. This poses a challenge to de- recommendations. cision makers as there is large uncertainty in how the re- quired protection level will change during the measure life- time, which is typically many decades long. Flood protec- tion requirements should account for multiple future uncer- 1 Introduction tain factors: socioeconomic, e.g., whether the population and with it the damage potential grows or falls; technological, The frequency of large fluvial flood events is expected to e.g., possible advancements in flood protection; and climatic, increase in Europe due to climate change (Alfieri et al., e.g., whether extreme discharge will become more frequent 2015).
    [Show full text]
  • Gmoabriaf FELDKIRCHEN-WESTERHAM
    Gmoabriaf FELDKIRCHEN-WESTERHAM Information für die Gemeindebürger Ausgabe: Juli 2021 Weitere aktuelle Informationen: Unsere Partnergemeinden: www.feldkirchen-westerham.de Jenesien und Jallais 1 Foto: R. I. Baumann – Schwalbenschwanz Schmetterling AUF EINEN BLICK / IMPRESSUM & REDAKTIONELLES AUF EINEN BLICK Öffnungszeiten Rathaus Feldkirchen Montag - Freitag: 8.00 - 12.00 Uhr, Dienstag: 14.00 - 16.30 Uhr Donnerstag: 14.00 - 18.00 Uhr, Telefon: 08063-9703-0 Sprechzeiten des Bürgermeisters Jederzeit nach telefonischer Vereinbarung unter: 08063-9703-121 Öffnungszeiten Verwertungshof Achten Sie bitte auf Änderungen in der Sommer- und Winterzeit! Derzeit Sommerzeit: Dienstag und Donnerstag: 14.00 - 18.00 Uhr Samstag: 9 - 14 Uhr Telefon: 08063-62 58 Rentenberatung Rentenberaterin in der Gemeinde ist Frau Hinke Notdienstnummern Klärwerk Tel. 08063-9703-109 Montag bis Freitag von 8 - 12 Uhr und zusätz- Telefon: 08063-489 lich Dienstag- sowie Donnerstagnachmittag nach Vereinbarung. Notdienstnummer gemeindliches Wasserwerk: 0170-103 46 29 Zuständig für Fäkalienabfuhr der Hauskläranlagen im gesamten Sollte Frau Hinke nicht erreichbar sein, können Sie sich auch an die Gemeindegebiet: Huber Linden, Reinigung und Entsorgung Renten-Auskunfts- und Beratungsstelle in 83022 Rosenheim, Aven- Telefon: 08027-417 E-Mail: [email protected] tinstr. 2, wenden. Öffnungszeiten: Montag - Mittwoch 7.30 - 16 Uhr sowie Donnerstag, 7.30 - 18 Uhr und Freitag, 7.30 - 12 Uhr. Termin- vergabe erfolgt hier unter Tel. 089-6781-3700 oder über Online- NOTFALLDIENSTNUMMERN Terminbuchung im Internet: Polizeiinspektion Bad Aibling .................08061-90 730 www.deutsche-rentenversicherung-bayernsued.de NEU: Ärztlicher Bereitschaftsdienst der Kassenärztlichen Vereinigung .....................116 117 Sollte Frau Hinke nicht erreichbar sein, können Sie sich gerne einen Notruf ...........................................110 Beratungstermin über das Servicetelefon der Deutschen Rentenver- Notruf Feuerwehr / Rettungsdienst und Notarzt ..........112 sicherung geben lassen: Tel.
    [Show full text]
  • Risk-Based Flood Protection Planning Under Climate
    Nat. Hazards Earth Syst. Sci., 18, 1327–1347, 2018 https://doi.org/10.5194/nhess-18-1327-2018 © Author(s) 2018. This work is distributed under the Creative Commons Attribution 4.0 License. Risk-based flood protection planning under climate change and modeling uncertainty: a pre-alpine case study Beatrice Dittes1, Maria Kaiser2, Olga Špackovᡠ1, Wolfgang Rieger2, Markus Disse2, and Daniel Straub1 1Engineering Risk Analysis Group, Technische Universität München, Arcisstr. 21, 80333 Munich, Germany 2Chair of Hydrology and River Basin Management, Technische Universität München, Arcisstr. 21, 80333 Munich, Germany Correspondence: Beatrice Dittes ([email protected]) Received: 8 November 2017 – Discussion started: 21 November 2017 Revised: 2 April 2018 – Accepted: 17 April 2018 – Published: 15 May 2018 Abstract. Planning authorities are faced with a range of thorities to take decisions on flood protection planning that questions when planning flood protection measures: is the are economical while not leading to excessive losses or high existing protection adequate for current and future demands adjustment costs. It is important to consider costs – in con- or should it be extended? How will flood patterns change in struction, adjustment and flood damage – over the entire the future? How should the uncertainty pertaining to this in- measure life time. fluence the planning decision, e.g., for delaying planning or Ideally, the planning of flood protection infrastructure is including a safety margin? Is it sufficient to follow a pro- performed through a risk-based approach. Thereby, potential tection criterion (e.g., to protect from the 100-year flood) or damage is considered in the decision-making process.
    [Show full text]
  • Hochwasserschutz Unteres Mangfalltal Hochwasserrückhaltebecken Feldolling
    Wasserwirtschaftsamt Rosenheim Hochwasserschutz Unteres Mangfalltal Hochwasserrückhaltebecken Feldolling - Grundwassermodell - Teil 1 Hydrogeologisches Modell - Datenstand September 2010 - Björnsen Beratende Ingenieure GmbH, Niederlassung Augsburg Viktoriastraße 3, 86150 Augsburg Telefon Nr. : 0821/319 4908-0, Fax Nr.: 0821/319 4908-17 August 2012 Knö/hrf0608940 Inhaltsverzeichnis Erläuterungsbericht Seite 1 Aufgabenstellung 1 2 Daten 1 2.1 Gutachten und sonstige ausgearbeitete Unterlagen 1 2.2 Datengrundlagen 2 2.3 Bewertung der Daten 9 3 Entwicklung des Hydrogeologischen Modells 10 3.1 Untersuchungs- und Bilanzraum 10 3.2 Modellraum 15 3.2.1 Strukturierung des Modellraums 16 3.2.1.1 Hydrostratigrafische Einheiten 16 3.2.1.2 Geohydraulische Kennwerte 21 3.2.2 Grundwasserhydraulik 25 3.2.2.1 Grundwasserstände im Bereich Feldolling 27 3.2.2.2 Grundwasserstände im Bereich des geplanten HRB 29 3.2.2.3 Grundwasserstände im Bereich Vagen 31 3.2.2.4 Stichtagsmessung 09.September 2008 31 3.3 Grundwasserbeschaffenheit und -datierung 34 3.4 Randbedingungen und Grundwasserbilanz 35 3.4.1 Grundwasserneubildung aus Niederschlag 36 3.4.2 Zu- und Abstrom im quartären Grundwasserleiter 37 3.4.3 Wechselwirkung mit Oberflächengewässern 40 3.4.4 Sonstige Wechselwirkungen 43 3.4.5 Ausgleichsmaßnahme Altarmrenaturierung (Seitenpolder 16) 46 3.4.6 Grundwasserentnahmen 47 3.4.7 Grundwasserbilanz 49 3.5 Vorgaben für das stationäre numerische Grundwassermodell 50 3.6 Vorgaben für das instationäre numerische Grundwassermodell 52 Anlagen 1 Verzeichnis der verwendeten
    [Show full text]
  • Hochwasserrückhaltebecken Feldolling
    Wasserwirtschaftsamt Rosenheim HOCHWASSERRÜCKHALTEBECKEN FELDOLLING Zweck, Betrieb Bemessung und Funktionsweise 29.08.2013 Wasserwirtschaftsamt Rosenheim Hochwasserrückhaltebecken Feldolling Zweck, Betrieb, Bemessung und Funktionsweise 2 1. Zweck des Hochwasserrückhaltebeckens Das Hochwasserrückhaltebecken Feldolling ist notwendig, 1. zum Ausgleich des verlorengegangenen Überschwemmungsgebiets (Retenti- onsraumausgleich) zur Verhinderung der nachteiligen Auswirkungen der Un- terlieger nach § 67 Abs. 1 WHG: Im Rahmen der Hochwasserschutzmaßnahmen sind im gesamten unteren Mangfall- tal von Feldkirchen-Westerham bis zur Mündung der Mangfall in den Inn, Deicherhö- hungen der bestehenden Deiche und Deichneubauten in zurückversetzter Lage vor- gesehen. Die sich durch den Deichbau (Linienausbau) ergebende Abflussverschär- fung wird durch das Hochwasserrückhaltebecken Feldolling kompensiert. 2. zum Rückhalt des Hochwassers aufgrund der Klimaänderung (Klimaände- rungsfaktor 15%): Aufgrund der zu erwartenden und mittlerweile unumstrittenen Klimaänderung muss eine Zunahme von Extremereignissen bei der Festlegung der Bemessungsabflüsse berücksichtigt werden. Diese Veränderungen im Hochwasserabflussgeschehen wer- den über den Klimaänderungsfaktor pauschal abgedeckt, um den heutigen Standard für das Hochwasserschutzniveau auch zukünftig zu gewährleisten. Seit 2004 beträgt der Klimaänderungsfaktor bayernweit bei einem hundertjährlichen Hochwasserab- fluss (HQ100) 15%. Damit ergibt sich ein erhöhter Wert für den Abflussscheitel (HQ100+Klima), der bei
    [Show full text]
  • Managing Uncertainty in Flood Protection Planning with Climate Projections
    Managing uncertainty in flood protection planning with climate projections Beatrice Dittes1, Olga Špačková 1, Lukas Schoppa1 and Daniel Straub1 1 Engineering Risk Analysis Group, Technische Universität München, Arcisstr. 21, 80333 München, Germany Correspondence to: Beatrice Dittes ([email protected]) 5 Abstract Technical flood protection is a necessary part of integrated strategies to protect riverine settlements from extreme floods. Many technical flood protection measures, such as dikes and protection walls, are costly to adapt after their initial construction. This poses a challenge to decision makers as there is large uncertainty in how the required protection level will change during the 10 measure life time, which is typically many decades long. Flood protection requirements should account for multiple future uncertain factors: socio-economic, e.g. whether the population and with it the damage potential grows or falls; technological, e.g. possible advancements in flood protection; and climatic, e.g. whether extreme discharge will become more frequent or not. This paper focuses on climatic uncertainty. Specifically, we devise methodology to account for uncertainty associated with the use of discharge projections, ultimately leading to planning implications. For planning purposes, we categorize 15 uncertainties as either ‘visible’, if they can be quantified from available catchment data, or ‘hidden’, if they cannot be quantified from catchment data and must be estimated, e.g. from literature. It is vital to consider the hidden uncertainty, since in practical applications only a limited amount of information (e.g. a finite projection ensemble) is available. We use a Bayesian approach to quantify the visible uncertainties and combine them with an estimate of the hidden uncertainties to learn a joint probability distribution of the parameters of extreme discharge.
    [Show full text]
  • Genehmigungsplanung Hochwasserrückhaltebecken Feldolling
    Hochwasserrückhaltebecken Feldolling Genehmigungsplanung Verzeichnis der Unterlagen . Inhalt Genehmigungsplanung Hochwasserrückhaltebecken Feldolling Entwurfsteil Inhalt Enthalten in 1 Erläuterungsbericht mit Anlagen Ordner 1 Anlage 1 Inhaltsübersicht Anlage 2 Speicherinhaltslinie Anlage 3 Zusammenfassung UVS Ordner 1 2 Grunderwerb Teil 2.1 Grunderwerbsverzeichnis Teil 2.2 Grunderwerbspläne Teil 2.3 Flächen im Eigentum Freistaat Bayern 3 Bauwerksverzeichnis Ordner 1 4 Ablaufplan Ordner 1 5 Fotodokumentation Ordner 1 6 Planbeilagen Ordner 2.1 / 2.2 7 Hydraulische Nachweise Ordner 2.2 8 Geotechnische Untersuchungen Ordner 3 9 Grundwassergutachten Ordner 4 10 Landschaftsplanerische Fachbeiträge Ordner 5 Hochwasserrückhaltebecken Feldolling Genehmigungsplanung Verzeichnis der Unterlagen . Inhalt Entwurfsteil 6 Ordner 2.1: Teil 6.1 - 6.4 Planbeilagen Ordner 2.2: Teil 6.5 Entwurfsteil Inhalt Maßstab Anlage 6.1 Übersichtslageplan 1 : 100.000 6.2 Lagepläne Übersichtslageplan Bauwerke (Luftbild mit Blatt- 6.2.1 einteilung der Bauwerkslagepläne) 1 : 2.500 6.2.2.1 Lageplan Bauwerke 1 (Abschnitt 1 - 5) 1 : 1.000 6.2.2.2 Lageplan Bauwerke 2 (Abschnitt 5 - 7) 1 : 1.000 6.2.2.3 Lageplan Bauwerke 3 (Abschnitt 7) 1 : 1.000 6.2.2.4 Lageplan Bauwerke 4 (Abschnitt 7 - 11) 1 : 1.000 6.2.3 Überflutungsflächen mit Darstellung der Wassertiefen 1 : 2.500 6.2.4 Spartenplan, Wegekonzept 1 : 2.500 6.2.5 Beckenentleerung: Durchlässe und Mulden; Mess- und Steuereinrichtungen 1 : 2.500 6.2.6 Lageplan Ersatzwasserversorgung 1 : 2.500 6.2.7 Lageplan Überschwemmungsgebietsfläche BHQ 1 : 5.000 6.2.8 Lageplan Überschwemmungsfläche HQ100 1 : 5.000 6.3 Längsschnitte 1 : 2.500 / 25 6.3.1 Gesamtlängsschnitt der Linienbauwerke 6.3.2 (Teil 1: Bauwerks-km 0+000 bis 2+200; Teil 2: km 2+200 bis 4+260) Hochwasserrückhaltebecken Feldolling Genehmigungsplanung Verzeichnis der Unterlagen .
    [Show full text]
  • Long-Term Planning for Flood Protection Infrastructure in an Uncertain Climate
    Technische Universität München Ingenieurfakultät Bau Geo Umwelt Professur für Risikoanalyse und Zuverlässigkeit Long-Term Planning for Flood Protection Infrastructure in an Uncertain Climate Beatrice Charlotte Michaela Dittes-Li Vollständiger Abdruck der von der Ingenieurfakultät Bau Geo Umwelt der Technischen Universität München zur Erlangung des akademischen Grades eines Doktor-Ingenieurs genehmigten Dissertation. Vorsitzender: Prof. Dr. Markus Disse Prüfer der Dissertation: 1. Prof. Dr. Daniel Straub 2. Prof. Dr. Kazuyoshi Nishijima, Kyoto-Universität 3. Prof. Dr. Karsten Arnbjerg-Nielsen, Technische Universität Dänemark Die Dissertation wurde am 16.11.2017 bei der Technischen Universität München eingereicht und durch die Ingenieurfakultät Bau Geo Umwelt am 06.04.2018 angenommen. Acknowledgements In German, a PhD student habitually refers to their PhD supervisor as their ‘doctoral mother’ or ‘doctoral father’. I well and truly feel that Prof. Dr. Daniel Straub and Dr. Olga Špačková, who proposed and guided the research of this thesis, have been my ‘doctoral parents’. They nourished me intellectually (occasionally with food, too) and gave any question their full and undivided time and attention. I could not have wished for better mentors. It is thanks to them and the other employees at the chair of Engineering Risk Analysis that I really felt at home during my many hours there. I would also like to express my gratitude to Prof. Dr. Karsten Arnbjerg-Nielsen and Prof. Dr. Kazuyoshi Nishijima, who agreed to act as referees. Special thanks further goes to ‘the hydrologists’ – Maria Kaiser, Dr. Wolfgang Rieger and Prof. Dr. Markus Disse – with whom I closely and pleasantly collaborated and who answered any of my hydrological questions, however simple they might have been.
    [Show full text]