GBRA Interim Feasibility Study TRN – Blanco/San Marcos Unsteady Modeling

BLANCO/SAN MARCOS UNSTEADY MODELING TECHNICAL REPORT NOTEBOOK

TABLE OF CONTENTS

EXECUTIVE SUMMARY

INTRODUCTION

TOPOGRAPHY DEVELOPMENT  LiDAR Data Sources  Coordinate Systems

HYDROLOGIC METHODOLOGY HYDRAULIC METHODOLOGY  Surveys  Model Geometry  Overflows  Flow Data  Calibration

MODEL RESULTS  Profiles and Floodplain Delineation  Conclusion

REFERENCES LIST OF TABLES  Table 1 – LiDAR Data Source  Table 2 – Survey Locations for Blanco and San Marcos Rivers  Table 3 – 1% Annual Chance Overflows  Table 4 – Unsteady vs. Effective 1% ACE Flood Elevation Comparison

APPENDIX A: SUPPORTING DOCUMENTS  Tier 1 Maps  Tier 1 Parameters  Tier 2 Maps  Tier 2 Parameters  Tier 3 Maps  Tier 3 Parameters

APPENDIX B: MODEL RESULTS  Tier 1 Flow Tables  Tier 1 Results Comparisons  Tier 2 Flow Tables  Tier 2 Results Comparisons  Tier 3 Flow Tables  Tier 3 Results Comparisons

i GBRA Interim Feasibility Study TRN – Blanco/San Marcos Unsteady Modeling

APPENDIX C: QUALITY ASSURANCE  Halff QC Forms Tier 1  Corps QC Forms Tier 1  Halff QC Forms Tier 2  Corps QC Forms Tier 2  Halff QC Forms Tier 3  Corps QC Forms Tier 3

APPENDIX D: DIGITAL DATA

ii GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

EXECUTIVE SUMMARY Frequent flooding is a problem throughout the Lower Guadalupe-Blanco Watershed and especially in the City of San Marcos at the of the Blanco and San Marcos Rivers. To address this issue of flooding and backwater conditions at this confluence and better equip the City of San Marcos, the U.S. Army Corps of Engineers (USACE) has agreed to improve the modeling completed under Phases 1 and 2 of the Guadalupe Blanco River Authority (GBRA) Interim Feasibility study that included the development of hydrologic and hydraulic models with an unsteady hydraulic model for the Blanco/San Marcos confluence. The study limits on the Blanco River extend from 5100 feet upstream of Five Mile Dam near the Blanco Vista subdivision down to the confluence with the and from 840 feet upstream of Lime Kiln Road to 2900 feet downstream of the Blanco River confluence on the San Marcos River. The Blanco River basin is approximately 435 square miles at its confluence with the San Marcos River near the City of San Marcos.

Hydrograph inflows and hydraulic geometry for the unsteady model were taken from existing hydrologic and hydraulic models previously developed under Phases 1 of the GBRA Interim Feasibility Study. Lateral weirs were added to the unsteady model at overflow locations to determine the amount of overland flow leaving the Blanco River system. These overflow areas were modeled with simplified hydraulic models to determine flooding impacts in those adjacent overland areas. The modeling resulted in updated and more accurate flows and water surface elevations for the 2, 5, 10, 25, 50, 100, 250, and 500-yr storm events and established the backwater effects of the Blanco River flooding on the San Marcos River as a result of interconnected overland flows. The resulting hydraulic data can be used to analyze various flood reduction alternatives such as a Blanco River bypass channel along Bypass Creek.

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

INTRODUCTION

The US Army Corps of Engineers (USACE) Lower Guadalupe River Basin Interim Feasibility Study is a multi-phase basin-wide study to define flood risk and flood reduction alternatives. During Phase 1 of the study, steady-state hydraulic models were developed of the Blanco River from the Hays/Blanco County line down to the confluence with the San Marcos River and the San Marcos from the Blanco River confluence down to the confluence with the Guadalupe River. Survey data was also captured and added to the Phase 1 San Marcos River study. Flow data utilized in the Phase 1 hydraulic models was the result of an interpolation between USACE gage analyses at the Kyle and Luling gages. During Phase 2 of the study, a steady–state hydraulic model was developed of the San Marcos River from its headwaters down to the confluence with the Blanco River through the City of San Marcos including new survey data and flows from a new detailed hydrology model of the Upper San Marcos watershed. Survey data was also captured and added to the Blanco River hydraulic model through the City of San Marcos. At the request of the City of San Marcos and USACE, the interpolation methodology utilized for the Blanco flows was revised to produce more reasonable flows through the city. A technical memo documenting the revised gage analysis interpolation is provided in Appendix A

Large historical storm events on the Blanco River have shown a significant backwater impact on the San Marcos River due to overflows from the Blanco River flowing into the San Marcos River downstream of Interstate 35. A steady-state hydraulic model cannot replicate the dynamic nature of this interaction between the San Marcos and Blanco Rivers during flood events. Therefore, USACE contracted with Halff Associates to develop an unsteady hydraulic model of the Blanco and San Marcos River confluence area to better understand the overflows from the Blanco River and the backwater impact on the San Marcos River.

The Blanco River reach included in the unsteady hydraulic model extends from 5100 feet upstream of Five Mile Dam near the Blanco Vista subdivision down to the confluence with the San Marcos River. The San Marcos River reach extends from 840 feet upstream of Lime Kiln Road to 2900 feet downstream of the Blanco River confluence. The Blanco watershed drains 435 sq. mi. and the Upper San Marcos watershed drains 95 sq. mi. The unsteady model reaches are illustrated in Figure 1. Modeled overflows from the Blanco River are indicated by the arrows and overflow areas are shown as red lines. This report includes documentation of topography, hydrology, and hydraulics associated with the newly developed unsteady model.

1

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

1

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

TOPOGRAPHY DEVELOPMENT

LiDAR Data Sources The primary source of topographic data used in this study was developed from the 2007-2008 CAPCOG and TNRIS LiDAR data. LAS files are the standard open format for storing LiDAR point records. The LAS file format (binary file format) is an alternative to proprietary systems or a generic ASCII file interchange system used by many companies that obtain LiDAR. Halff Associates generated a basin-wide bare earth terrain dataset using the LiDAR described in Table 1. In association with the Phase 1 and 2 studies, Halff Associates used the terrain dataset to generate 10 ft. by 10 ft. digital elevation models (DEMs) for the hydrologic studies and 3 ft. by 3 ft. digital DEMs for hydraulic studies.

Table 1: LiDAR Data Source Approximate Year Horizontal Source & Footprint County Flown Accuracy Contact (sq mi) Bastrop 2008 0.70m CAPCOG 65 2007 1.40m CAPCOG 750 Caldwell 2008 0.70m CAPCOG 150 Comal 2011 0.61m FEMA 600 DeWitt 2012 0.51m USACE 50 Fayette 2008 0.70m CAPCOG 120 2008 1.40m CAPCOG 10 Guadalupe 2007 1.40m CAPCOG 90 2011 0.61m FEMA 600 Gonzales 2009 1.00m TNRIS 1200 2008 0.70m CAPCOG 750 Hays 2003 1.70m COA 130 2011 0.61m FEMA 25 Victoria 2006 1.40m FEMA 650

Coordinate Systems The standard coordinate system used for the GBRA area is North American Datum (NAD) 83 (1993) State Plane Coordinates, South Central (Zone 4204) presented in US Survey Feet with a Vertical Datum set to North American Vertical Datum of 1988.

3

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

HYDROLOGIC METHODOLOGY

The hydrologic inputs for the unsteady modeling were derived from two previously created hydrology models. The San Marcos River hydrographs were taken from the Upper San Marcos watershed hydrology model originally developed under Phase 2 of the GBRA Feasibility Study. Details of the Upper San Marcos hydrology model can be found in the Phase 2 Technical Report Notebook, dated May 2015 included with the digital data in Appendix D. The Blanco River hydrographs were extracted from a model that was originally developed under Phase 1 of the GBRA Feasibility Study. This Phase 1 basin-wide model focused on the entire Lower Guadalupe River Basin and only contains six sub-basins representing the Blanco River watershed. Further details of the development of the Phase 1 hydrology model can be found in the Phase 1 Hydrology Technical Report Notebook, dated March 2014, included with the digital data in in Appendix D. The USACE Fort Worth District incorporated this model into their Corps Water Management System (CWMS) platform for the Guadalupe River Basin and improved the calibration of the Blanco River portion of the model by further adjusting losses, lag time and peaking factor. USACE Fort Worth District did not include areal reduction in their updated Blanco model. Therefore, areal reduction was not applied to San Marcos inflows as well. Details of the adjustments made by USACE can be found in the technical memo included in Appendix A. Both the Phase 2 Upper San Marcos and USACE adjusted Blanco hydrology models are included with the digital data in Appendix D as well.

HYDRAULIC METHODOLOGY

Hydraulic methods used for this study are in accordance with the national, state and local standards. The River Analysis System (HEC-RAS) Version 4.1.0 unsteady model was used to calculate water surface profiles for the study streams. The following is a summary of data sources, assumptions, and procedures used to create new unsteady HEC-RAS models for the study area. Further details of all methodology and assumptions can also be found in the Hydraulic Modeling Notebook in Appendix A. The unsteady hydraulic model developed for this study is located with the digital data in Appendix D.

Surveys

Field surveys of bridges/culverts along the San Marcos and Blanco Rivers within the unsteady study area were conducted from May 2014 through July 2014. Additional survey was performed in August 2015 in the right overbank of cross-sections 36596 to 43417 to capture the impact of fill applied at that location since the last LiDAR update (see Figure 2). The survey data was collected using data capture standards set by FEMA as specified in the current Guidelines and Standards for Flood Risk Analysis and Mapping. Electronic files including shapefiles and field notes for the Blanco River surveys are included on the DVD in Appendix D. The San Marcos River survey data is included in the Phase 2 Hydrology and Hydraulics Technical Report Notebook (TRN). A summary of Blanco and San Marcos River survey locations is provided in Table 2 below.

4

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

5

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

Table 2: Survey Locations for Blanco and San Marcos Rivers Study HEC‐RAS Survey Date Stream Location Station Type Surveyed San Marcos Cape Rd. 13635 Structure May‐2014 River I 35 NB Frontage Rd. 16966 Structure May‐2014 I 35 17126 Structure May‐2014 I 35 SB Frontage Rd. 17203 Structure May‐2014 Cheatham St. 19013 Structure May‐2014 Amtrak Railroad Bridge 20191 Structure May‐2014 Railroad D/S SH 80 21617 Structure May‐2014 SH 80 21734 Structure May‐2014 Pedestrian Bridge 125 ft. U/S SH 80 21859 Structure Jun‐2014 Pedestrian Bridge 399 ft. U/S SH 80 22133 Structure Jun‐2014 Pedestrian Bridge 619 ft. D/S Aquarena Springs Dr. 23323 Structure May‐2014 Pedestrian Bridge 384 ft. D/S Aquarena Springs Dr. 23558 Structure May‐2014 Aquarena Springs Dr. 23942 Structure May‐2014 Laurel St. 27341 Structure May‐2014 Pedestrian Bridge 373 ft. U/S Laurel St. 27714 Structure May‐2014 Bert Brown Rd. 28460 Structure May‐2014 Lime Kiln Rd. 29520 Structure May‐2014 Blanco River Martindale Rd. 11840 Structure Jul‐2014 SH 80 16737 Structure Jul‐2014 Railroad U/S SH80 19148 Structure Jul‐2014 Uhland Rd. 24444 Structure Jul‐2014 Culvert upstream of I‐35 34774 Structure Jul‐2014 Post Rd. 44960 Structure Jul‐2014 Railroad U/S Post Rd. 45093 Structure Jul‐2014 Five Mile Dam 47432 Structure Jul‐2014

High water marks from the May 2015 flood event were surveyed in coordination with GBRA using similar data capture standards in early June 2015. The surveyed high water marks were used for calibration of the unsteady hydraulic model. Figure 3 shows the locations of these high water marks.

Model Geometry

The unsteady model geometry developed for this study was created by combining the Phase 2 San Marcos River hydraulic geometry with the Phase 1 Blanco River hydraulic geometry. The combined model was truncated at the upstream unsteady study limit and a junction was added at the confluence of the Blanco and San Marcos Rivers. A small portion of the San Marcos River downstream of the Blanco and San Marcos River confluence was also added to establish a more accurate downstream tailwater estimate for the unsteady model. Several small updates were made to the hydraulic geometry to stabilize the unsteady model including the addition of pilot channels interpolated between cross-sections with survey data. A detailed description of

6

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

7

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling all updates made to the incorporated hydraulic geometry is included in the modeling notebook in Appendix A.

Blanco River Overflows

When the Blanco River reaches flood stage several natural overflows occur that were added to the unsteady model as lateral weirs to determine the dynamic overflow of the system. These overflows are illustrated in Figure 1 and occur just upstream of I-35 on the right bank, between I- 35 and SH 80 on the left bank into the Bypass Creek watershed, and finally downstream of SH 80 to the confluence on the right bank into the San Marcos River. Weirs were delineated in HEC-GeoRAS along the high points through the overflow areas using the DEM developed as discussed above. The overflows to Bypass Creek watershed and the San Marcos River were modeled with three separate weirs each in the model. The three lateral weirs representing the overflow to the Bypass Creek watershed calculate overflows into the Bypass Creek mainstem as well as the two Bypass Creek tributaries. For the overflows to the San Marcos River, two lateral weirs represent overflow upstream of Martindale Rd. and one lateral weir represents overflows downstream of Martindale Rd. The overflows to Bypass Creek were sent out of the system, but they can be used in the future as inflows to the Bypass Creek hydraulic models. The overflows to the San Marcos River were tailwater connected to the appropriate San Marcos River cross-sections. The overflow upstream of I-35, near the Wayside commercial development, eventually re-enters the Blanco River further downstream via an underpass and culvert crossing. Table 3 summarizes the 100-yr overflow amounts at each location.

Table 3: 1% Annual Chance Overflows 1% Annual Overflow Location Chance Flow Upstream of I-35 7900 cfs Bypass Mainstem 11900 cfs Bypass Tributary 2 24900 cfs Bypass Trubitary 1 11700 cfs Upstream SH 80 100 cfs Downstream SH 80 (Blanco Gardens) 5900 cfs Downstream of Martindale Rd. 2900 cfs Upstream of Confluence 7800 cfs

Simplified steady state hydraulic models were created for the overflow upstream of I-35 as well as the overflows from the Blanco to the San Marcos River. These simple models were developed to determine the extents of flooding in these overflow areas since they are not included in the unsteady model. Due to the depth of flooding ranging from 1-3 ft. for the overflows from the Blanco River to San Marcos River, these areas should be designated as shallow flooding zones with base flood elevations available from the overflow models.

Flow Data

Inflow hydrographs for the unsteady model were extracted from the models from the Phase 1 and 2 studies described above in the hydrologic methodology section. For the San Marcos inflows, the hydrographs were linked directly to the hydrology model DSS output file. Sub-basin flows were considered to be uniform lateral inflows and tributaries were entered as lateral inflows. The inflow hydrograph at the upstream end of the San Marcos River was taken from the hydrology model junction just downstream of the Sink Creek confluence. Blanco River

8

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling hydrographs were extracted from the USACE adjusted Blanco hydrology model and entered into the unsteady model manually. The upstream inflow hydrograph reflects the flow at the Kyle gage junction. The proportional hydrograph from the sub-basin downstream of the Kyle gage was entered as a uniform lateral inflow.

Calibration

The unsteady hydraulic model results were compared to known high water marks from May 2015 flood event. The estimated flow for the May 2015 flood event at the Kyle gage is 180,000 cfs which falls between 1% and 0.4% annual chance peak events. Therefore the model was calibrated as closely as possible to place the May 2015 high water marks slightly above the 1% annual chance water surface elevations. Some of the high water marks were difficult to calibrate to due to their distance from the main channel and the dynamic affect of an observed event versus a hypothetical frequency flow event. The calibration consisted of adjusting the lateral weir coefficients so that the 1% annual chance water surface profile was slightly below the May 2015 high water marks elevations. This resulted in higher weir coefficients for the overflows to Bypass Creek. However, the overflows to Bypass Creek were not inconsistent in proportion to those that occurred during the 2015 flood event.

MODEL RESULTS

Profiles and Floodplain Delineation

Profiles for 50%, 20%, 10%, 4%, 2%, 1%, 0.4%, and 0.2% annual chance events (ACE) were created for both the Blanco and San Marcos Rivers. Profile panels showing the unsteady model results including the overflow model area are provided in Appendix B. A comparison of the 1% ACE profiles of the GBRA (Phase1) steady state, GBRA unsteady, and FEMA effective models is presented in Figures 4 and 5. 1% ACE flow and water surface elevation comparisons at key locations are provided in Table 4. In most locations, there was an increase in flood elevations due to the modeled peak flows in the current study being higher than the regression flows used in the effective study. The reach between SH 80 and Martindale Rd. is the only location where the effective elevations are slightly higher. This is likely due to different overflow modeling procedures between the current unsteady and effective models.

Table 4: Unsteady vs. Effective 1% ACE Flow and Flood Elevation Comparison 1% ACE Flows (cfs) 1% ACE Flood Elevations (ft.) Stream Location Unsteady Effective Unsteady Effective Cape Rd. 22800 10780 572.7 570.7 Upstream of I‐35 15600 N/A 572.8 570.7 San Cheatham St. 16000 N/A 572.9 570.7 Marcos SH 80 10800 7860 574.0 570.7 Aquarena Springs Dr. 11000 6920 576.2 573.0 Lime Kiln Rd. 12200 N/A 585.9 584.0 Martindale Rd. 109400 N/A 582.6 583.0 SH 80 118100 N/A 586.4 587.0 Uhland Rd. 137700 N/A 598.5 597.0 Blanco I‐35 157900 124680 612.4 609.0 Post Rd. 165000 N/A 626.6 626.0 Five Mile Dam 165300 N/A 633.0 630.0

9

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

The existing conditions 0.2% and 1% ACE Floodplains were delineated using HEC-RAS output data from the unsteady and overflow hydraulic models and GIS tools. The HEC-RAS water surface elevation results for the 0.2% and 1% frequencies were converted to water surface DEMs. These water surface DEMs were intersected with the ground surface DEM to create floodplains for each model area. The floodplains, depth grids, and water surface elevation grids were merged together is such a way that the controlling water surface was represented. For example, the San Marcos River floodplain elevations control on the San Marcos side, overflow elevation control from that point over to the Blanco side where the Blanco elevations control. Floodplain delineations were plotted on hydraulic work maps with additional GIS data including LiDAR contours and aerial photos. Hydraulic work map indices and hydraulic work maps containing the existing conditions 1% and 0.2 % ACE floodplains are included in Appendix B.

Conclusion

The results of the unsteady hydraulic analysis of the Blanco/San Marcos confluence have defined the effects of the Blanco River backwater on the San Marcos River floodplain providing accurate base flood elevations for regulatory purposes. Differences between effective and unsteady flood elevations are the results of updated hydrology models and LiDAR topography data. Updated flood extents have been provided for the Blanco and San Marcos Rivers as well as the key overflow areas upstream of I-35 and downstream of SH 80. The overflows into the Bypass Creek watershed can be used in future updates to the modeling and mapping along Bypass Creek and its tributaries and are not included as part of this study effort.

10

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

11

GBRA Interim Feasibility Study TRN – Phase 2 Blanco/San Marcos Unsteady Modeling

12

Appendix A Supporting Documents

USACE Blanco Hydrology Memo

Documentation for FEMA Flood Recovery Model for the Blanco River July 2015

I. INTRODUCTION Since early 2014, the USACE Fort Worth District has been participating in a nationwide USACE effort known as CWMS (Corps Water Management System) Implementation. This effort includes developing basin‐wide models to assist USACE water managers with decision making during flood events. Some of the models being developed include HEC‐HMS, HEC‐ResSim, HEC‐RAS, and HEC‐FIA. These models are developed separately and later implemented into a single interface that allows water managers to obtain observed and forecasted precipitation and estimate lake level, potential economic damages, and potential risk to human lives.

Since the CWMS implementation effort was initiated, numerous conversations between the USACE and other water resources agencies have taken place to find ways to partner and best utilize the models that have been developed. In early 2015 the Fort Worth District completed the CWMS implementation effort for the Guadalupe River Basin. More information on the CWMS model development is given in the final report for the Guadalupe River Basin (USACE, 2014).

Shortly after that, the devastating flood events of May 2015 occurred. During the flood, the Guadalupe CWMS HEC‐HMS and HEC‐RAS models were used to forecast pool elevations at and to estimate flood inundation on the Guadalupe River downstream of the dam. The Blanco River experienced some of the most severe flooding as a result of this storm. As part of the flood recovery effort, the CWMS HEC‐HMS model for the Guadalupe River Basin was utilized to develop new flood frequency estimates for the Blanco River.

STUDY AREA The study area is the Blanco River Basin. The Blanco River basin includes approximately 436 square miles above the confluence with the San Marcos River near San Marcos, Texas. The watershed intersects Kendall, Blanco, Hays, and Comal County. The watershed is approximately 50 miles long and 9 miles wide and flows from West to East. A figure showing the Blanco River Basin is below. Austin, TX

Wimberley, TX Kyle, TX

Canyon Lake

Figure 1 – Blanco River Basin Map

The CWMS model for the Guadalupe River Basin included the Guadalupe River drainage area above Victoria, TX. This model contained significantly more drainage area than was necessary to develop flow frequency estimates for the Blanco River. For this reason the model was trimmed of the unnecessary elements. The final HEC‐HMS subbasin map for the Blanco River basin is shown below.

Figure 2 – Blanco River HMS Schematic II. DATA AND METHODOLOGY

MODELING METHODS The Blanco River HMS model contains 6 subbasins totaling about 436 square miles. The subbasins were delineated using the HEC‐GeoHMS program and utilized 30 meter National Elevation Dataset (NED) terrain data. The Blanco River HMS model uses the following methods.

 Losses – Initial and Constant  Transform – Snyder Unit Hydrograph  Baseflow – Recession  Routing – Modified Puls  Computation Interval – 15 minutes

INITIAL PARAMETERS A list of model parameters as well as the source of for the initial estimates is given below.

 Initial Deficit, Maximum Deficit, and Constant Loss Rate – The USACE Fort Worth District equations for losses in the NUDALLAS program were used. These equations utilize estimates of percent sand in the soil to develop initial deficit and constant loss rates. The 25‐YR losses were used as a starting point. The loss method was later converted from “Deficit and Constant” to “Initial and Constant” for this analysis. Percent sand estimates were obtained from NRCS SSURGO data.  Impervious Percentage – The % impervious values were developed based on the 2006 National Land Cover Dataset (NLCD) percent developed impervious dataset.  Snyder Transform Parameters – The time to peak and peaking coefficients were developed from the USACE Fort Worth District urban curves based on watershed characteristics extracted from HEC‐GeoHMS as well as percent sand values taken from NRCS SSURGO data.  Baseflow Parameters – Initial baseflow parameters were taken from the existing USACE HEC‐1 Guadalupe River Forecasting Model.  Routing (Modified Puls) – Modified‐Puls routing data was extracted from the Blanco river HEC‐ RAS model (dated Dec 2012) from the Lower Guadalupe River Feasibility Study performed by Halff Associates. The Guadalupe CWMS implementation effort began Dec. 2013.

CALIBRATION Following the initial parameter estimates, simulations were made using NEXRAD precipitation data obtained from the West Gulf River Forecast Center. The model parameters were adjusted to improve the models ability to simulate historical events. The initial deficit, constant loss rate, and lag times were adjusted during calibration. The peaking coefficients, baseflow parameters, and routing parameters were not adjusted between events.

Overall the model appears to simulate historical events reasonably well. The peak flows for the 2002 event was the exception to this. It can be observed however that the timing and shape of the hydrographs are represented well. It is likely additional refinement of the initial and constant losses would improve the relationship between the simulated and observed hydrographs. It would also be worth comparing the NEXRAD precipitation to surrounding gages. The resulting hydrograph comparisons can be seen below. Where figures for the Kyle gage do not exist, the USGS was not recording data for that event.

1998 CALIBRATION RESULTS

90,000 80,000 Computed Flow ‐ 83,200 cfs 70,000 Observed Flow ‐ 82,700 cfs 60,000 (cfs) 50,000 Computed Flow 40,000 Observed Flow

Discharge 30,000 20,000 10,000 0 17‐Oct‐98 18‐Oct‐98 19‐Oct‐98 20‐Oct‐98 Date

Figure 3 ‐ 1998 Hydrograph Results for Blanco at Wimberley Gage

2002 CALIBRATION RESULTS

90,000 80,000 Computed Flow ‐ 56,100 cfs Observed Flow ‐ 78,500 cfs 70,000 60,000 Computed Flow (cfs) 50,000 Observed Flow 40,000

Discharge 30,000 20,000 10,000 0 29‐Jun‐02 1‐Jul‐02 3‐Jul‐02 5‐Jul‐02 7‐Jul‐02 9‐Jul‐02 Date

Figure 4 ‐ 2002 Hydrograph Results for Blanco at Wimberley Gage 60,000

50,000 Computed Flow ‐ 56,900 cfs Observed Flow ‐ 51,900 cfs 40,000 (cfs)

30,000 Computed Flow

Observed Flow Discharge 20,000

10,000

0 29‐Jun‐02 1‐Jul‐02 3‐Jul‐02 5‐Jul‐02 7‐Jul‐02 9‐Jul‐02 Date

Figure 5 ‐ 2002 Hydrograph Results for Blanco nr Kyle Gage

2004 CALIBRATION RESULTS

35,000

30,000

25,000 Computed Flow ‐ 33,300 cfs Observed Flow ‐ 33,700 cfs (cfs)

20,000 Computed Flow 15,000

Discharge Observed Flow 10,000

5,000

0 14‐Nov‐04 16‐Nov‐04 18‐Nov‐04 20‐Nov‐04 Date

Figure 6 ‐ 2004 Hydrograph Results for Blanco at Wimberley Gage 40,000 Computed Flow ‐ 35,200 cfs 35,000 Gage data is missing Observed Flow ‐ 34,000 cfs starting 16 Nov. Peak 30,000 flow is USGS 25,000 reported peak. Computed Flow (cfs)

20,000 Observed Flow

Discharge 15,000

10,000

5,000

0 13‐Nov‐04 15‐Nov‐04 17‐Nov‐04 19‐Nov‐04 21‐Nov‐04 23‐Nov‐04 25‐Nov‐04 Date

Figure 7 ‐ 2004 Hydrograph Results for Blanco nr Kyle Gage

FINAL PARAMETERS After the initial parameter estimates were made and the calibration process was completed, final parameters were established. The final lag times were developed by averaging the lag times from the calibration events. The losses were developed using the USACE Fort Worth District Method for determining losses based on percent sand. This method produces a different set of loss rates for each storm frequency. The initial and constant losses for the 2‐YR through 50‐YR were increased uniformly through the watershed for each given frequency in order to have a better correlation with the most current frequency curve estimated from the USGS gage record (Asquith, 2015). This was done because of the increased confidence level in the frequency curve, particularly for the more common recurrence intervals (2‐10‐YR). The 25‐ and 50‐YR losses were adjusted to create a smooth transition between the 100‐YR to the 10‐YR values. The final relationship between the Blanco River HMS model and the USGS frequency curve can be seen in the results section. The final HMS model parameters are located in the tables below.

Subbasin 2‐YR 5‐YR 10‐YR 25‐YR 50‐YR 100‐YR 500‐YR Blanco_S010 1.77 1.88 1.73 1.37 1.02 0.78 0.52 LittleBlanco_S010 1.77 1.88 1.73 1.37 1.02 0.78 0.52 Blanco_S020 1.72 1.83 1.68 1.33 1.00 0.77 0.51 CypressCr_BR_S010 1.73 1.84 1.69 1.34 1.00 0.77 0.51 Blanco_S030 1.73 1.83 1.69 1.34 1.00 0.77 0.51 Blanco_S040 1.89 2.00 1.82 1.45 1.07 0.80 0.54 Table 1 ‐ Initial Losses

Subbasin 2‐YR 5‐YR 10‐YR 25‐YR 50‐YR 100‐YR 500‐YR Blanco_S010 0.23 0.23 0.21 0.17 0.12 0.08 0.06 LittleBlanco_S010 0.23 0.23 0.21 0.17 0.12 0.08 0.06 Blanco_S020 0.23 0.22 0.21 0.17 0.12 0.07 0.05 CypressCr_BR_S010 0.23 0.22 0.21 0.17 0.12 0.07 0.05 Blanco_S030 0.23 0.22 0.21 0.17 0.12 0.07 0.05 Blanco_S040 0.24 0.24 0.22 0.18 0.13 0.08 0.06 Table 2 ‐ Constant Losses

Subbasin Lag (Hr) Cp Blanco_S010 5.4 0.7813 LittleBlanco_S010 3.7 0.7813 Blanco_S020 6.2 0.7813 CypressCr_BR_S010 5.1 0.7813 Blanco_S030 4.7 0.7813 Blanco_S040 5 0.7813 Table 3– Transform Parameters

Initial Discharge Recession Ratio to Subbasin (cfs/sq mi) Constant Peak Blanco_S010 0.2 0.92 0.03 LittleBlanco_S010 0.2 0.92 0.03 Blanco_S020 0.2 0.92 0.03 CypressCr_BR_S010 0.2 0.92 0.03 Blanco_S030 0.2 0.89 0.03 Blanco_S040 0.3 0.89 0.05 Table 4 – Baseflow Parameters

PRECIPITATION The precipitation used in the Blanco River HMS model was obtained from the Lower Guadalupe River Basin Feasibility Study. The study utilized frequency precipitation estimates previously developed by the USGS (Asquith and Rousell, 2004). 5‐minute duration rainfall was developed by extrapolating the data from the 15‐minute and 30‐minute durations. The rainfall table can be seen below.

Recurrence Interval Duration 2‐yr 5‐yr 10‐yr 25‐yr 50‐yr 100‐yr 250‐yr 500‐yr 5min 0.7 0.94 1.09 1.33 1.56 1.83 2.18 2.53 15min 1.07 1.41 1.66 2.02 2.33 2.69 3.23 3.71 1hr 1.83 2.41 2.82 3.41 3.9 4.45 5.29 6.01 2hr 2.30 3.07 3.61 4.39 5.06 5.8 6.94 7.93 3hr 2.41 3.29 3.94 4.87 5.68 6.59 8 9.25 6hr 2.73 3.68 4.38 5.39 6.27 7.27 8.82 10.2 12hr 3.14 4.26 5.08 6.27 7.31 8.49 10.32 11.95 1day 3.60 5.1 6.18 7.67 8.9 10.23 12.15 13.75 Table 5 ‐ Frequency Point Rainfall Depths (inches)

III. RESULTS The simulated 100‐YR peak discharge at the Wimberley and Kyle gages are 168,000 and 162,000 cfs respectively. The simulated discharge decreases between the two gages due to a combination of peak attenuation due to river routing as well as the difference in timing between the peak from the Wimberly gage and the local subbasin above the Kyle gage. Due to the uniform rainfall assumption, the local subbasin above Kyle peaks before the main peak arrives from the Wimberley gage. The final discharges as well as the discharges for the USGS frequency curve can be seen in the tables below. The comparison between the final HMS frequency curves and the USGS frequency curves is also show below.

Description 2‐YR 5‐YR 10‐YR 25‐YR 50‐YR 100‐YR 500‐YR Below conf. with Little Blanco River 12800 32800 52500 81200 106000 132000 192000 At Blanco River at Wimberley Gage 12500 36200 60900 98200 132000 168000 248000 At Blanco River near Kyle Gage 10500 32900 56700 93200 127000 162000 242000 Above conf. with San Marcos River 8100 26500 47800 78600 109000 142000 220000 Table 6 – Summary of Discharges Table from HEC‐HMS

Description 2‐YR 5‐YR 10‐YR 25‐YR 50‐YR 100‐YR 500‐YR At Blanco River at Wimberley Gage 8080 25700 44900 78600 111000 149000 262000 At Blanco River near Kyle Gage 9270 29800 51400 88100 122000 160000 268000 Table 7 – Discharges for USGS Frequency Curve

Figure 8 ‐ Frequency Curve – Blanco River at Wimberley, TX

Figure 9 ‐ Frequency Curve – Blanco River near Kyle, TX IV. RECOMMENDATIONS The CWMS model for the Guadalupe River Basin was developed with limited funds and with a focus of estimating lake levels and flows at USACE control points along the Guadalupe River. There is likely room to improve the parameter estimates with additional calibration, particularly in the routing reach between the Wimberley and Kyle gages. The validity of the routing through this reach can be verified or improved by using the blending option within a forecast simulation. The observed hydrograph can be blended at Wimberley and the routing effects better compared to observed data.

V. REFERENCES Asquith, William H., Roussel, M.C., Atlas of Depth‐Duration Frequency of Precipitation Annual Maxima for Texas; U.S. Geological Survey Scientific Investigations Report 2004‐5041; 2004

Asquith, William H. “Peak‐streamflow frequency analysis for two stream gages along the Blanco River,” Technical Memorandum, July 7, 2015.

USACE. “Corps Water Management System (CWMS) Final Report for the Guadalupe River Watershed.” November 2014.

Modeling Notebook

4030 West Braker Lane, Ste 450 Austin, Texas 78759 (512) 25-8184 Fax (512) 252-8141

Hydraulic Project Notebook Army Corp of Engineers

Project: USACE – San Marcos Unsteady Modeling AVO: 28411E Entry # : 1 Subject : Unsteady Model Build Overview Notes : Portions of two (2) existing steady flow HEC‐RAS 4.1 hydraulic models were used to develop the San Marcos Unsteady Model:  GBRA Phase 1 Blanco River – XS range “51519‐528”  GBRA Phase 2 Tier 1 San Marcos River – XS range “29849‐645” A new HEC‐RAS 4.1 project was created and these model geometries were imported into a single geometry and joined with a junction. A small reach was then created in GeoRAS and added downstream of the junction. ALL of the existing model properties were carried into the new project geometry. A GeoRAS project was created with the existing models’ spatial files to modify the HEC‐RAS model for unsteady flow analysis.

Entry # : 2 Subject : Flow Boundary Conditions Notes : Flow data was developed using two (2) existing HMS 3.5 hydrology models and applied to the most upstream cross‐sections of the reaches via Flow Hydrographs, individual cross‐sections via Lateral Inflow Hydrographs or across a range of cross‐sections via Uniform Lateral Inflow Hydrographs. San Marcos River flows were linked to the Upper San Marcos Watershed DSS file. The Blanco River Flow Hydrograph was developed by using the aerially reduced Blanco_nr_Kyle junction flow combined with the portion of subbasin Blanco_S040 (62.17%) that is contributing to the most upstream XS. The lower portion of subbasin Blanco_S040 (37.83%) was applied uniformly across the range of XS that make up the Blanco portion of the model DS of XS 51519. The reach downstream of the junction did not receive any additional inflow.

 GBRA Phase 1 Blanco Watershed – USACE updated parameters (MANUAL) – . Blanco_nr_Kyle & Blanco_S040 (62.17%) – Flow Hydrograph – XS “51519” . Blanco_S040 (37.83%) – Uniform Lateral Inflow Hydrograph – XS “49825‐528”

 GBRA Phase 2 Tier 1 Upper San Marcos Watershed (DSS) – . J_USM0650 – Flow Hydrograph – XS “29849” . USM0660 – Uniform Lateral Inflow Hydrograph – XS “28068‐24259” . J_USM0700 – Lateral Inflow Hydrograph – XS “24075” . USM0710 – Uniform Lateral Inflow Hydrograph – XS “22866‐21633” . USM0720 – Uniform Lateral Inflow Hydrograph – XS “21580‐21121” . J_USM0320 – Lateral Inflow Hydrograph – XS “21010” . USM0730 – Uniform Lateral Inflow Hydrograph – XS “20848‐20261” . USM0740 – Uniform Lateral Inflow Hydrograph – XS “20125‐19701”

Page 1 of 5 4030 West Braker Lane, Ste 450 Austin, Texas 78759 (512) 25-8184 Fax (512) 252-8141

. USM0750 – Uniform Lateral Inflow Hydrograph – XS “19701‐19080” . USM0760 – Uniform Lateral Inflow Hydrograph – XS “18942‐17289” . USM0770 – Uniform Lateral Inflow Hydrograph – XS “16901‐14852” . J_USM1000_DIV_USM0910 – Uniform Lateral Inflow Hydrograph – XS “14260‐13995” . USM1010 – Uniform Lateral Inflow Hydrograph – XS “12981‐10233” . USM1020 – Uniform Lateral Inflow Hydrograph – XS “9083‐6303” . USM1030 – Uniform Lateral Inflow Hydrograph – XS “5582‐4678” . USM1040 – Uniform Lateral Inflow Hydrograph – XS “3546‐645”

Entry # : 3 Subject : Downstream Boundary Condition Notes : The boundary condition in the GBRA Phase 1 Blanco model was initially set to a known water surface taken from the upstream end of the GBRA Phase 1 San Marcos model. Unsteady models can use normal depth or a rating curve as downstream boundaries, but cannot use individual known water surfaces. A rating curve was developed from the GBRA San Marcos model, but produced instabilities and erroneous results. It decided to use normal depth with a channel slope that matched closely the known water surface boundary condition from the GBRA steady model and also produce stable and smooth profiles at the downstream end. A slope of 0.0007 was used for the normal depth calculation and appears to produce reasonable results.

Entry # : 4 Subject : XS Addition, Removal, and Realignment Notes : One (1) XS was added to the San Marcos River model: XS “197”. This XS was added to assist in stability across the junction and to aid in future mapping tasks.

One (1) XS was moved and realigned from station 19064 to 19080. This XS was moved because the LOB was catching high ground near Cheatham Rd. and causing instabilities in the area. Survey was applied.

Two (2) XS were added to the Blanco River model: XS “34877 & 34672”. These were added to help ease the contraction/expansion associated with Low Water Crossing “34804”.

Six (6) XS were removed from the Blanco model XS “33792‐33569” when the I‐35 bridge group was merged from three (3) bridges to one (1) bridge. The three bridges are very similar and were consolidated to one to simplify and stabilize the model.

Several XS were adjusted on both reaches for varying reasons:

 San Marcos River – . XS 21633 – ROB lengthened for containment. . XS 16901 – LOB lengthened to account for flow moving through I‐35. . XS 14852 – ROB lengthened and adjusted for containment.

Page 2 of 5 4030 West Braker Lane, Ste 450 Austin, Texas 78759 (512) 25-8184 Fax (512) 252-8141

. XS 14260 – ROB lengthened and adjusted for containment.

 Blanco River – . XS 36216 – LOB adjusted to minimize extraneous length across I‐35. . XS 35560 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 34976 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 34804 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 34744 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 34546 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 34329 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 33875 – ROB clipped to LS 36215. LOB adjusted to minimize extraneous length across I‐35. . XS 33455 – LOB clipped to LS 33454. . XS 32463 – LOB clipped to LS 33454. . XS 30842 – LOB clipped to LS 33454. . XS 29773 – LOB clipped to LS 33454. . XS 28252 – LOB clipped to LS 33454 & LS 28251. . XS 27514 – LOB clipped to LS 28251. . XS 26704 – LOB clipped to LS 26704. . XS 26397 – LOB clipped to 26397. . XS 26035 – LOB clipped to 26035. . XS 24970 – LOB clipped to LS 28251. . XS 24463 – LOB clipped to LS 28251. . XS 24416 – LOB clipped to LS 28251. . XS 23170 – LOB clipped to LS 28251. . XS 22597 – LOB clipped to LS 28251 & LS 22596. . XS 21940 – LOB clipped to LS 22596. . XS 19842 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 19697 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 19298 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 19205 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 19108 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 18581 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 17898 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 16930 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 16821 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 16623 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 16294 – ROB clipped to high ground to maintain spatial separation between reaches. . XS 15068 – ROB clipped to LS 16293. . XS 14438 – ROB clipped to LS 16293 & LS 14437. LOB adjusted for containment. . XS 13802 – ROB clipped to LS 14437. . XS 13166 – ROB clipped to LS 14437. . XS 12057 – ROB clipped to LS 14437. . XS 11884 – ROB clipped to LS 14437. . XS 11785 – ROB clipped to LS 14437. . XS 11589 – ROB clipped to LS 14437. . XS 11447 – ROB clipped to LS 14437. . XS 10815 – ROB adjusted and clipped to LS 14437. . XS 09545 – ROB clipped to LS 14437. . XS 08190 – ROB clipped to LS 14437. . XS 05849 – ROB clipped to LS 14437. . XS 04774 – ROB clipped to LS 14437.

Page 3 of 5 4030 West Braker Lane, Ste 450 Austin, Texas 78759 (512) 25-8184 Fax (512) 252-8141

. XS 03366 – ROB clipped to LS 14437. . XS 00528 – ROB clipped to LS 14437. LOB adjusted to maintain separation between reaches.

Entry # : 5 Subject : Interpolated Channel Invert Elevations Notes : Irregularities in the ground surface were causing instabilities within the unsteady model. Channel invert elevations were linearly interpolated between surveyed channel inverts and used to dampen the instabilities.

Entry # : 6 Subject : Lateral Structures (Blanco River) Notes : Six (6) Lateral Structures exist in the Blanco reach of the unsteady model. These are necessary to represent overflow in three (3) significant areas – Wayside, Bypass Creek and Tribs Watershed, and San Marcos River. Weir coefficients were adjusted in an effort to calibrate with respect to May 2015 flood high water marks. A rating curve was used at LS 16293 to account for right overbank flow at SH 80 also leaving through the Blanco Gardens overflow area.

 LS 36215 – XS “36216‐33875” – Allows for overflow from just upstream of I‐35 into Wayside via tailwater (TW) connection XS “28252‐26397”. In the current effective model this area is modeled as split‐flow. This area may be covered by future 2D modeling and was therefore not modeled in detail with a split flow reach.  LS 33454 – XS “33455‐28252” – Allows for overflow from just downstream of I‐35 into Bypass Creek and Tribs Watershed via Out of the System connection.  LS 28251 – XS “28252‐22597” – Allows for overflow into Bypass Creek and Tribs Watershed via Out of the System connection.  LS 22596 – XS “22597‐19205” – Allows for overflow into Bypass Creek and Tribs Watershed via Out of the System connection.  LS 19107 – Allows for overflow into Bypass Creek and Tribs Watershed via Out of the System connection.  LS 16293 – XS “16294‐14438” – Allows for overflow into San Marcos River via TW connection XS “16901”.  LS 14437 – XS “14438‐528” – Allows for overflow into San Marcos River via TW connection XS “12224”.  LS 11784 – Allows for overflow into San Marcos River via TW connection. Entry # : 7 Subject : I‐35 Bridge ‐ BR “33676” (Blanco River) Notes : I‐35 was modeled using three (3) bridges in the GBRA Phase 1 steady flow model. It included an upstream frontage road, a main multi‐lane main road, and a downstream frontage road. The

Page 4 of 5 4030 West Braker Lane, Ste 450 Austin, Texas 78759 (512) 25-8184 Fax (512) 252-8141

Phase 1 model used TxDOT as‐built plans and was verified with spot survey points. Because the bridge group low chord elevations were relatively the same and for unsteady stability purposes the I‐35 bridge group was modeled as a single bridge. Entry # : 8 Subject : Low Water Crossing – IS “34804” (Blanco River) Notes : IS “34804” was originally a culvert group in the GBRA Phase 1 model with two (2) 5 ft diameter culverts. The unsteady model was having difficulties balancing calculations through the culverts and was producing unreasonable results. For this reason the culverts were removed and replaced with an inline structure. Since this structure is relatively small compared to the I‐35 bridge just downstream, it is assumed that it has little impact on the 1% and higher floods. Entry # : 9 Subject : Post Rd. Bridge – BR “44960” (Blanco River) Notes : Post Rd. Bridge was originally a culvert in the GBRA Phase 1 model. It was changed to a bridge based on imagery, field photos and, survey.

Entry # : 10 Subject : Ineffective Flow Areas near I‐35 (Blanco River) Notes : Normal ineffective flow areas were emplaced in the LOB for XS “35560‐34329” upstream of I‐35. There is a section of these XS that is skewed to flow where they parallel I‐35 that should not be counted as effective flow. Stability was added to the model by accounting for this portion of skew with an ineffective flow.

Entry # : 11 Subject : Ineffective Flow Areas and Blocked Obstructions near SH‐80 (San Marcos River) Notes : A railroad exists on the LOB of the San Marcos River that runs from upstream of the San Marcos section of the model and intersects SH‐80; XS “29672‐21764”. It was determined that flow getting over the railroad does not come back in downstream as effective flow. This area has many small drainage channels and blocked obstructions were emplaced throughout at the adjacent grade elevations. The top of the railroad extending to the extreme LOB was modeled with permanent ineffective areas to block out the flow conveyance in the area. Jowers Center and Strahan Coliseum were also blocked out of flow conveyance and storage between the channel and railroad for XS “23767‐ 22866” via elevated blocked obstructions.

Page 5 of 5

Appendix B Profiles and Workmaps

ELEVATION IN FEET (NAVD 88) 510 520 530 540 550 560 570 580 590 600 610 0020 0040 0060 0080 001001001200 11000 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 0

528

3368 lnoRvrEitn lo rfls-Panel 1 Blanco RiverExisting Flood Profiles- STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM

4774

5849 CO RIVERCO

8190

9545

10815 Bridge Ground 10% WS 4% WS 1% WS 0.2% WS 11447 11589 11785 11884 Martindale Road 0 ELEVATION IN FEET (NAVD 88) 520 530 540 550 560 570 580 590 600 610 620 20 30 40 50 60 70 80 90 00 10 2 21000 20000 19000 18000 17000 16000 15000 14000 13000 12000

12057

13166

13802

14438

15068 lnoRvrEitn lo rfls-Panel 2 Blanco RiverExisting Flood Profiles-

STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM 16294

16623 SH 80 16821 16930

17898

18581

CO RIVERCO 19108 RailRoad 19205 19298

19697 19842 20055

20378

20942

0020024000 23000 2000 21940

22597

23170 Bridge Ground 10% WS 4% WS 1% WS 0.2% WS ELEVATION IN FEET (NAVD 88) 530 540 550 560 570 580 590 600 610 620 630 40 50 60 70 80 90 00 10 20 30 3 33000 32000 31000 30000 29000 28000 27000 26000 25000 24000

Uhland Rd. 24416 24463 24579

24970

26035

26397

26704

27514 lnoRvrEitn lo rfls-Panel 3 Blanco RiverExisting Flood Profiles-

28252 STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM

29773

30842 CO RIVERCO

32463

33455 I-35

0030036000 35000 4000 33875

34329 34548 34672 34744 Private Road 34804 34877 34976 WS 10% WS Structure Inline Barrel Culvert Bridge Ground 4% WS 1% WS 0.2% WS

35560 ELEVATION IN FEET (NAVD 88) 550 560 570 580 590 600 610 620 630 640 650 60 70 80 90 00 10 20 30 40 50 4 45000 44000 43000 42000 41000 40000 39000 38000 37000 36000

36659

37568

38880 lnoRvrEitn lo rfls-Panel 4 Blanco RiverExisting Flood Profiles- STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM

41167

42245 CO RIVERCO

43417

44333

Post Rd. 44925 45035 Railroad 45149 45248 0040048000 47000 6000 46001

Inline Structure Inline Bridge Ground 10% WS 4% WS 0.2% WS 1% WS 47018

Five Mile Dam 47380 47447 47602 ELEVATION IN FEET (NAVD 88) 570 580 590 600 610 620 630 640 650 660 670 80 90 00 10 20 30 40 50 60 70 5 57000 56000 55000 54000 53000 52000 51000 50000 49000 48000

48429

49825

51519 lnoRvrEitn lo rfls-Panel 5 Blanco RiverExisting Flood Profiles- STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM CO RIVERCO 0050060000 59000 8000 Ground 10% WS 4% WS 1% WS 0.2% WS ELEVATION IN FEET (NAVD 88) 520 530 540 550 560 570 580 590 0020 0040 0060 0080 0010000 9000 8000 7000 6000 5000 4000 3000 2000 1000 0

197

645

2455 a acsRvrEitn lo rfls-Panel 1 San MarcosRiver Existing ProfilesFlood -

3546 STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM

4678

5582 CO RIVERCO

6303

7059

8115

8660

9083 Ground 10% WS 4% WS 0.2% WS 1% WS ELEVATION IN FEET (NAVD 88) 520 530 540 550 560 570 580 590 00 10 20 30 40 50 60 70 80 90 2 19000 18000 17000 16000 15000 14000 13000 12000 11000 10000

10233

11243

11789

12224

12981 a acsRvrEitn lo rfls-Panel 2 San MarcosRiver Existing ProfilesFlood -

STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLANC WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM 13488 Cape Rd. 13597 13646 13832 13995

14260

14852 O RIVERO

16221

16901 I-35 NB Frontage 17014 I-35 Main Lanes 17172 I-35 SB Frontage 17289

17715 17858 Pedestrian Bridge 17892

18494

18798 18942 Cheatham St. 19080 19195 19285

Bridge Ground 4% WS 1% WS 10% WS 0.2% WS 19440

19701 0000 ELEVATION IN FEET (NAVD 88) 530 540 550 560 570 580 590 600 00 10 20 30 40 50 60 70 80 90 3 29000 28000 27000 26000 25000 24000 23000 22000 21000 20000

20125 Railroad 20261 20368

20848 21010 21121

Railroad 21580 21649 SH 80 21764 21829 Pedestrian Bridge 21883 21967 22030 22102 Pedestrian Bridge 22153 22250

22561

22866

23042 Panel 3 San MarcosRiver Existing ProfilesFlood -

Pedestrian Bridge 23297 23395 STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLANC WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM 23535 Pedestrian Bridge 23582 23767 Aquarena Springs Dr. 23885 23988 24075 24259

Spring Lake Dam 24504

25029 O RIVERO

26278

27018

27306 Laurel St. 27374 27464

27686 Golf Cart Path 27734 27893 28068

28325 Golf Cart Path 28411 28509 Bert Brown Rd. 28544 28623 28789

29134 Inline Structure Inline Bridge Barrel Culvert Ground 10% WS 4% WS 1% WS 0.2% WS

29450 Lime Kiln Rd. 29550 29672 29849 0000 ELEVATION IN FEET (NAVD 88) 580 590 600 610 620 630 0 0010 0020 0030 0040 5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0

150

320

456

745 771 858

1196 Overflow (Upstream A ofI-35) ExistingFlood Profile

1717 STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM

2210

2734 CO RIVERCO Panel 1 s -

3258

3695

4196

Barrel Culvert Ground 1% WS 0.2% WS 4689 ELEVATION IN FEET (NAVD 88) 560 565 570 575 580 585 590 0 0010 0020 0030 0040 0050 6000 5500 5000 4500 4000 3500 3000 2500 2000 1500 1000 500 0

376

945

1214

1487 Overflow (Blanco B Gardens) Existing ProfilesFlood

1808

STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM 2159

2505

2791

3019

3318

CO RIVERCO 3611 -Panel 1 -

3926

4220

4517

4814

5074

5345 Ground 1% WS 0.2% WS ELEVATION IN FEET (NAVD 88) 565 570 575 580 585 0010 0020 0030 0040 5000 4500 4000 3500 3000 2500 2000 1500 1000

1150

1506

1873 Overflow toRd. C (Martindale Confluence) ExistingF

STREAM DISTANCE IN FEET ABOVE CONFLUENCE WITH BLAN WITH CONFLUENCE ABOVEFEET IN DISTANCESTREAM 2431

2935 odPoie Panel 1 lood Profiles - CO RIVERCO 3442

3959

4393 Ground 1% WS 0.2% WS GBRA Interim Feasibility Study - Phase 2 Blanco Unsteady Modeling

Key to Features

Stream Centerline Watershed Boundary SMRBR01 Hays County Boundary Workmap Panel

r e i v R c o lan B INDEX SMRBR02 San Marcos / Blanco River 0.2% and 1% S an ACE Floodplains M a rc os R iver ® 0 2,500 5,000 10,000

Feet Feet SMRBR1 ® 750 0.2%and 1% RAS XS Cutlines StreamCenterline Limit ofStudy Surveyed Halff Structures Non-Surveyed Structures Surveyed XS Natural Overflow 10ft contours ACE0.2%Floodplain Detailed Shallow Study- Phase 2 ACEFloodplains 0 1,500 3,000 PANEL Key toFeatures 1% ACEFloodplain 1% GBRA Interim GBRA Feasibility

San San Marcos Blanco / River

Blanco Unsteady Modeling

0 0 8 0

0 6 6 6 5 0

7

7 0 0 0

6 8 0

6 7

6 7 6 7

6 R 6

6 0 e

s

8 t

0

0 A 6

4 r 7

e 6 a 6

0

8

0

5 0

6 6

1 0 0

6 4 4

U 0 nna 4 6

me 6 6

d Street 0

5 0

6

0 7

0

7 3

0 0 6

6

6 5 6

6 6 0

0 6 0 4

6 6 7

6

0 4 6

0

6 0

6

1 0

6 4

5 6 0

7

2 0

6

C

4

0

h

a

m

4 8

6

0 p 0

i 6 0 o 0 5 n 4 6 9 4

6 40 8 6 0 P 6

4 r 6 0 0 4 e

m

0 7 6 0 0 3 1 6 0 i

e 7

6 6 4 4 r

6 6

6 0

0 67

0

7

6

6

P

6 a

0 9 U

1 r n

a n

0 a m m 1

0 e

1 o

0 5 d 6

u S 6

n 6 t

r 0 6 e 5 t et 0 0

9 5

1 4 0

6 0 6 2 0

5 6 6 7

0 4 0

7 6

4 0 6

4 5 6

6 6

8 6 0 6

0 7 0

4

E 6 6

6 0 4 6

E

x

4 x i 0

t 0

i

6

t

2 7

0 0 2 4 0 67 0

6 6

1 7 0 8

0 6 7

620 5 0 8 2 6

0 9

62 0

4 0 9

8 6

4 6

0 7

2 6 0

0 8

6

0 0

5 6 6

7

7 0 6

H 0

3 0

3 0

6 a

4 6 0

5 6

0 y

3 6

6 s

3

6

0

C

6

0

o 5

3 u

0 6 n 6 63

t 3 630 y

0 0

8 9 1

0 3

4 6

8 0 3 1 4 6

3 Ya 0 6 3 rr 1 0 1 in 4 gt 6 7 0 on

7 3 5

30 6 4

4 4 6 0 4 3 6

0

0

0 0

7 3

4 3 3 6 6 4 6 6 0 3 4 0 6 7 3

6

0 4

0

0 2

0

6

7

0 O

6

l

3 6

d 7

Technolo 1 S 6 gy

Hays 4

Cou t

nty 1 a 3

36 g

0 4

e

4

c

0

6

o

a 3

c

6 h

0

9 5

0 0

0

6

0 0 2 6

9 9

0 6

9 0 3 1 6

4 7

4

0

2 0 6 6 7 1 5 700 0

5 0 2 0 0

4 6 5 2 7 0 7

2

0 245 6 4 42

0 7 8 0

5 4 2 0

0 0

2 2 7 6 5 9

45 6 6 6

0

0

B 590 1

2 la 0

n 7 7 c

3 o 7 R iv

0 er Ra 0

9 nc

7 h 4

6

0 7 0 6

0 5

7 6

9 6 0

1 0

7 1 0

6 90 4

1

7 3

6 7

0 6 0 0 9 8

R 6 3 5

6 e s

t 0

H

A 5

0 a

r 6 r

8 0 e r

i

a

s

7 7

7 0 H

0 8

0 8 i l

8 l

3 3

9 0

6

7 6

0 0

4 7 0 7 1 5

6 0 6 7 7 6 8

6 3

0 3 0 620

7

6 9

7

6 5

0

0 6 H

P

8

1 6 o

e 0 r

6 3 s 6 a N 2

e

N c

o

6 o s

rt h r h

h p

t

o

B o

h in

G t

e f

0 l

o

o a

B

r s 4 r

k d e

7 0 S s

n

a e

d o

3 d P n d

i 0

l s

e m a 3 R n

u o

7 7

n G

0

r

0

e

2

0 P

e

A

9

l

4

6 a h n

0 a 5 m l

7 e

L 0 2 b

r r a 0 4 7 e S m

7 Si e a S lv f 3 erp o ea o k g ut 8 o hp 7 oi 0 4 v 630 nt 71 5 ia

4 dera

0 Ban

0 3 4

7 1

0 0 6

0

2 5

0 7 3

1 7 8 7

7 6 9 0 5 2 6 37 3 7 0 4

0 68 3 0

0 0

C 7

9 1 o

6

6 u

n

600

t

0 y

0

R

R 0 0

7

a

0 6

d m

2 5

8

5 p

1 0 I

7 3

H 6 5

2 0

3 7

0 5 0

U 1 0 nna 6

m 6 ed Stre

et

0

0

9

9 0

0

0

6 5

0

5 0

0

3 7 1

0 9 7

1

0

7 5

4 6

3

6 3

4

1

7

4

0 7 6

U 7 7

n 4

0 n 0 0 a 3 8 6 m e 5

4 2 d S

tre

7 7 et 0

7

5

0

0

0 7

1

1 5

7

7 0 8

5

0

H 0 58 0 e 8

r 5 0 n

0 0

61 a 6 n

7 d

5

e Salinas z 0

0

1

1 S 6 a

Carlson 0 li

0 n

6 as 0 8

0

8 5

6 0 5

P 0

0 e 2

4 8 Sa tu li 8 5 n 1 70 n 3 30 as i 0

7 a y 6 0 s

Dai 24 0

1 3 6 7 Iri

In s 5

dia 5 0 n 4

Bl 3 0

9 a P n 3

k 0

a e

0 6 t

i 6

n W

4 0 t o 3 7 7 9 o 2

b dr

6 o 1

r se u

6

s h

0 0

0 5 L

1 il 0

9 6 y

7 7

6 M

5

0 R a r

1 iv k 0 e e r t 6 R 8

id 5

ge 0 9

0 5

0

0 7 0 2 5 2 8 8 2 2 0 5 1 1

6 6 5 6

0 B

0 710 oot

9 h 4 2 1 5

6 7 H

6 2 arr 0 i

0 s 0 H

7 0 0 i 0 ll

8 2 6

6 6

C 0

0 0

o

7

0 0 1 6 u

6 1

n

6 0

0 6

t

0 7 y

6 0 0 0 5

1 R 2 o

0 0 6 a 0

6 6

0 d

0

6 1

6 6

1

B 4 r 0 i 7

a 6 E

rwo 2

d od 0 g

1 0 e 6 m 7

Bri 0 a

o r Me 5

n 3 ad Ha

0 o ckb

0 t w erry

6

0

8

9

5 0

6 7 9 E

6 3 6 2

x

i 0 t

2 7

0 0 5 3

0 6 6 P 2 5

B

E 0 C

repe e

0

a Myrtl

6 e c U s

0 9 C a n

y la n

6 r n

0 em 0 a

on m

6 t 0

9 e

1

5 d

r

0 6 S U

7 t nn 9 r a

0 e me

4 e 9

2 e d 7 S

0 v t tr

5 ee

i 4 0 6 t

2 0

9 60

R

6

5 0

1 M 9

4 o

5 os

4 s c

0 2 0

c 8

l 5

8 if

f 2

n 3 7

0 0 6 6

G 3

8 o

a

rd 4 0 U

5

on 0 1 n 0 4 0 l n

2 a

2 m

6 6 e

9 0 W 0 d

0 re B S

59 9 n tre

5 H R G 9 5 e

ave ayn t n a a

5 ld

r o y Feet SMRBR2 ® 750 0.2%and 1% RAS XS Cutlines StreamCenterline Limit ofStudy Surveyed Halff Structures Non-Surveyed Structures Surveyed XS Natural Overflow 10ft contours ACE0.2%Floodplain Detailed Shallow Study- Phase 2 ACEFloodplains 0 1,500 3,000 PANEL Key toFeatures 1% ACEFloodplain 1% H

e GBRA Interim GBRA Feasibility r n

a San Marcos Blanco / River Blanco Unsteady Modeling n Unna d med Street e z n rlso

Ca 0 0

8 0 U 0 5 n

6 na

0 m 0 ed 6 S 1 tre

6 3 e 6 0 t

4 1 73 0

2 6 297 9

3 5

0 0 Harris Hill 0

7 8

1

5 5 Pe 0 6 A

t 6

u y 5 ir

0 n is p 0 6 ia a 5 o

7 D

4 2 rt

3 4 0 0

Ir 7

is 8 0 8 3 5

0 5

0 7 0 0

3 7 C

5

0 I 5

9 ndian B 0

lan o M

ke 8 6 t

6 u

5

a

n

r

P

t

k

y

a e

S

t i

Wood R

0 ros

e t n

a

9 R o

t i

v t b

6 e a

r R e

r

d

id

u

0

g H e

0

1 s

L w 2 6

h il 1 y y

0 1

6 2 5 6 2 28 7 2 514 5 1

27 0

2

6 0

1

0 0 Unnamed

6 Street 0

1

0 6

6 5

6 0

0

0 7 8

6 0 5

A 0

0

v

6

0

0 e

0

n 8 6 6 5

Unname u

d Street e

G

4 F

70 rry Raynaldo W ire Booth 26 Hackbe 0 0 7 U e

n s

1 5 n t Briarwood a 6 me

P d E e S

c

0 t x r

Briar Meadow a e

i e

7 t rtle n Unnam

0 y t ed Str

e M eet 1s

2 rep t

6 C

0

0 0

6

3 0 6 B

3

0 7 6

6 639

8 2

6 Unnamed

0 Street

4

0

5 0

6 E 3

0

0 6 0

0 A d 5

26 0

0 r 8

g 6 6 n 5

1 0

0 e o l 0

0 d

6 m 6

6

6 5

o 0

6

n 8

t 6 G

0 0 a Bog

7 ie

5 r

6 y

6 0

U

7

E n

n

a

a Clarem 5

0 ont m

s

e

0 d y

0

0

8 S

0 9 t 6

5 r

5 e

9 0 e t 0 7 9 4 6 4 2

6

C

U

0 U

0

o

h

2 Un

n

0 n

9 a u l 9 m 5 6

a e

i d S

t t n

n ree e

5 t

t d d

0 y

9 M 7

o 5

4 0

sscl 2

if 6 f 1 4

4 6

2 A

U q

3 6 4

4

2 u

n Quail Creek Countr

0 y Cl

7 ub a

n 1 3

2

8 r

M a

7 e

3

0 m

2 i

n

l

l 0

e

0 a 0 4 0 9 0 7 d 1 6 9 2 U 5 nna

2 m S e 2 6 d Street 0

rdon o 620 S

G p 59

t r

r

i

n e

Mill 0 9 e 0

r 0 5 0

g e

Wr 7 t s

en Haven 5

8 2 2 0

4

9 5 U

0

5

2 5 6 9 0 et

n e 0 Str

2 ed n

5 Unnam

a

0 m

0 1

0 0 0 P

8 Spring 0 e

6

d 6 1 5 o t 8

e

s Stre S

6 amed 5

t Unn

t 0

r 0

e 8

7 5 0 e

t 6 5

0

L Uhland 0 5

o 9 7

5 5 c

R

k

a

h

1 W

S st

m 0

0 8 a 5 0

e 8

e

r

p

g 5

s 0 t

0 0

0

u t

6

6 9

i

1 0

n

0

7 6 1 5

5

0 p 6 8

5

5 7

am 590 0

R 0

5

2nd 0 7 5

0 9 0 6

1 2 5 0 9

84 0 9 7 9 0 1 5

5 205 5

E

4 19 7

x s

i 0

0

v 5

3 0

9 a

i 0

4 D t

6

8 9

0 9 1

9

2 3 2 5 0 1 rd 0 5

6 0

0 9 6 5 5

550 9 5 9 0

2 2 0

6

20 50 580 9 5 6 0 94 4 2 6 580

Eastwood

0

0

0

0

8 9

97 7

6 5

90 5 9

1 5 0 5

0

0 9 6 5 9

8 7 8

2

8 6

0

6 8 Meiners Unnamed St

reet 0

8 5 6 Jackson 5

0 98 5 0 28623 S 192

7 Z e

un l 0 k 0 4 e i

r U

54 a

28 8

h 5 n 5 5 n

2832 5 68 6 1 a 0 8 8 m

28 6 Warden 08 85

1 e

0 7 191 R

d 0 2 Unn a

ame 6 d St 98 m re S

et 78 M

8 1 0 0 6 p t

i r

5

l

0 e

1 i U

4 0

4 t

e

a 3 n 6

7 9 Mecey t 6 n

7 r

3 5 0

9 7 4 Unname y a d m

8 2 0 Stre

0 et 6 E

27 7 e 8 0 d

3 x 5

7 2

i S

5

t

6 6 t

r

2 e

0

0 e 0

t

6

8 6

4 5 5 0

737 0

2 T

0 9

6

h 0

9

0 o

5

5 5 1 8

6 r

0 7 p 4 6 1 3 9 0 0 5 2

65 0 0 e

27018 6 8

4 6

S 0 3

0 p

2 0 3 r

i 0

8

8 n g

1 2

t 6

0 o

0

5

5 O

w 1

0

9 6 2

8 l

1 7 6 0 n d 7 1

5

M

6 0 623 6 a

16 5

8 r

0

5 0 ti

5 9 n

8 5 d L 3

a

4

4 l

a 9 5

0 2 e

0

5 16 7

u 9

0 9

r 5 7

9

8 3 e

4

7 5

E 9 l 2 6 6

2 9

d 2 2 0

0 5 0 0 Ha

rper

J 4 4 0

0 8 8 1

7 L 2 0

A 8 6

5 5

6 0

l S G L 9

t 0

N 8

5

a o C 5

t 5

e

n 0 6 a

r 7 0

w 0 V g 0 l

e a

t 6

i 0 8 7

6 0 5 s e 6

e re 0 9

t 5 0 81 5

a 8 n 6 L 7

5 w 5

6 5 o 8 3 0 8

o

o 3

8 2 0 o 6

p 0 4

8 d

9 8 5

0

8 5 4

0 5

2 3

8 1 8 8

0 0

5 2 8 0 0 7

5 5

5

0

4 3 8

Unnam 0 0

ed Stre 6

e 6

t 7 8 5

3

5 5

5 5

0 8 T 5 0 8

8 5

Bugg ra

4 8 0 0 i

0 l 0 0 8 0 8

5 3 0 0

4 8 8 0 8

2 2 8 5

2 1 4 9

5 5 0

5

8 5

5

4 L 9 5 6 1 0 6

2 8 1 5 8 i

5 3 5 0 0

5 0 n 1 6

8 0 5 0 P 2 d 6 0 5

9 3 8

0

e a

0 q 2 1 1

3 5

2 2 0

6

1 u 0 3 2 5 4

e 6

2

6 s 0 0

2 Drivew 5

4 ay 6 2

1 6 0 0 8 9 8 5 6 5 0 5 9 7 0 1

2 5 580

s 0 8 0 8 4

m S 8

o 5 7 1 0 7

s 1

t 0 s 1 5 6

e a S

2 ta 5

S 4 7 2 cy 8 0 P 5 0

t 5 5

e 1 7

l 2

2 7 5

e 7 8 H

6 1 0 0 9

0

a 9

2 7 5

a

0 4 5 s 5

2 B M 2 4

y oni a 7 7 ca 5

0 3 a

4 n

n 3 1 1

r 0 0 2

8 2

t e

1 5 b 0 1 7 0 1 0 8 7

5 5 6 s 5 4 3

a 5 4 5

2 M A

2 r drian 5

6

8 0 a 4 r

0 0 e F 0 0 4

0 8 9 5 r

i 0

7 7

8

2 e 1 e

e

6 1 1 8 4

0 0 7 0

l

8 5 d C 0

d hr

5 isto 0 p v 5 2 her 4 8

6 8 0

0 0 i 8 4

0 t 1 2 5

7 58 i 1 0 1 1 5

1 h 5

0 5

R 2

6 2 1 1 9 8 0

7

8 9

R

2 5 o

5 Seth 0 5 5 5

6 a 2 7 5

2 4 0

7 5 50

0

n 2 2

o

1 0

o

R

6 7 5 0

7 1 9 0 0 8

k 5

o

8 6 c

0 0

N e a 1

7 5 8

5 1 8 8

0 n

n o 6

8 8 1 6

o 6 0 r

2 5 a 4

m

5 5 8 l

a 2 4 7 0 5

5 B 5 5 W 1 k

a 3 2

0

l 0

o 0

9 1 1 o

9 8 0 0 4 0 0 d

9 8 5 4

M 1 0 Bl 5 5 5 i 5 s o ss 8 o 2 5 4

n 2 2 1 V 5 an 0

C 8 R essa

i 8

o 2 v P

4 8 i 0 8 e 5 n 9

1 ra Unna r c m 0

0 0 e

1 Sherb d S i

0 arb 5 tr

0 e v

h 1 et

C

2 6 8

o a 7 4 8 h 5 0 t

8 5 0 e e 5

5 4

2

a

9 5

V 0

5 C U

t 7

a 7

N h 7

a n o

v 5

5 a 0

r n ro a

i 1

v 1 n

e m 6 S

1 M 5

e ar

y 0 4

C 0 w

s 5 r

0 m

5 s 0

M 2

s

a 5

7 0 0

i

i 7 t 7

E 6 a 0 A y

y t 5 5 7 0

5 5

L dw 4 h 5

l 0 40

l 6 5

B e 5

6 7 Trail a n 0 2 0

J r 2 5 d 5 P

G 5 7

a

0 M

a S 3 t

0 5

r

a

0 0 G

c y 4

n 8

G 8

a 0

R

7

A 5

r G 8

e

r 5 i n 4

i 3 6

u v

s 0 h

a t 56 o

o 0

e 5

d e

n

n

0 a C 1 r e la 5

i i

0 re 8

l o 9

2 u

P p 1 9

6 4

a

6 e 7

7 t 1

6 4 6

G 2 8 8

5

3 6

a 9

r 5 0 5

8 4 r 7

1 4

4 0

i

s 1

o 9 8 7 3

4 2 1

2 1

n 0

1 4 5

1 3 1

2 1 8

r 4 0

9 1 0

e 1 1 5 2 4 4 v A

1 8 i

5 v r 0

5

R 1 o e

7 9 7 v 0 c 2

0

0 i

s 995 0

4

7 c 3 R

5 5 4

F 5 9 a

5 0 8

0 r o s 5

3 5

e 8 R

3 5 o

d 8

8 5 An 6 c c i 0

e m 5

Mary 6 r 1 1 al Shelter a r

i n a 5

r c 4

3 0 0 c

0 5 k 6 M 4

C F s 0 0 h n

a G 8 5

e b 5 5 a o 4 9

N l u 8 1 S

m r

t 1 6

o 5

n rg o a 3

r 5 e v

th n r 0 Mc e c M 8

h

K 0 0

e 7 i 54 3

e 3 4

F n

e 9 5

M 0

oore lt 1 G

n a 3

0

r

H e 0 0

o

3

r 8

0

v 0

8

S 2 u 6

5 8

H e

J t 5 6

c 0

a 5 a

0 0 4

h c

r

0 0 5 0

k 4

v 0 i

6 4 1

s 0 C m 5

e 6

8

o 5

Sh 5

ad 5

y y e

a

4

n

n n

5 0

N V

a 0

n 4 c 0

e 5 5 t

0 0

a

r 0

S 4

l e 6

l 4 4 a 4

e 0

0 5

S 4 n 5

5

0 6 y 5 0 5

t 6

B a 2 P

lanc e 0 o An

5

5 0 4

G t t

7

e 4 m

0

Herndon 0 5

0 e r

L 0 c

o 7 0

5 6k 5

4

o 4 y 7 t

4 v

4

o o 5 5

e

p 5 0

5 1 n

5 8 0 0 0 i 8 7

2 5 0 6 o 5 7

6 0

J 1 0 a

ckm 0 an 5 4 0 7 H 5 5 0

u 0 4

0 ll

6 5

6 0

2 Joh 6 4 0

n 5

s 0 0

6 0 4 5

4 0 3 0 7

2 0 C 7

5 7

8 6

o 5

6 8

5 0 Luc 0 4

k m 0 k 5 8 0 5 8 5

a 4 e 8 1 3 40

E R 5

ndicot c 5

t 0 5 e 5 0

0 0 h

a 1 r 0

8 o

i 8

8 8 l

8 r 0

5

o 5 5 5 C 0 0 7

0 2 0 6

5 6 a

0 Lucia 0 5 no 0 F 2

d lores 8 7 5 0

L s 8

9 5

T 6

e

5

0 a

w 0

g 5

m

H

E 8 0 i 8 8

Tra 5

v s

is 0

is p

n

R

a

e 5 L

i 5

i

y

8

S

o

n c 0

a 59

0 h

s

o

s

a

r

7 o r

5

5 e

e

w 0 l

C 0

R D

t

R d

e R

i 0 p I i

0 0

r o

l

1

h u

v 8

o

a l

i

o

e u

v

r 8 1

8 il

6 3

S r

a 5

e n

r 6

5 5 n

0 r 5

o t

y

g a H

0 2

M o

itc d

h w i

ell 6 l

Nimitz 0 8

0 l

0

s

D M o

9 0

5 9 9 0

a l e

5 Monter 9 0 i r ey 5

l 5 a l

J 1

o e hns 0 5

on d 0 i 2

y 8

6 5

0 F

7 6 0 8

5 0 a 0

Jo 0 M

hnso 8

5

n r 0 W 9

9 r

8

c

k 5 i J

8 M s

A u 5

5

5 M a

e F l e 5 r

l e

i

a i

a

z s

s e 0

r 0

d

h

t

t

e 0

i r 9

H

n 0

H

r 6

a 5

a 0 L 0 Ru

C y iz

t

u G

c s

Wilson 8 6 t

r h 0

h 0

a 5 0

y 3

e

e v 6

9 r 2 r 0

r e y

K P 5 l arke 6

r 0

o 0 0

i 0 64 n t 6

6 0

g P 5 U

a

i

Ellis 6 n c

n

a

g a

s

r 0 Ebony 0 m

8 s

5 e

4 0 o

u d 4

6

S 6

0

t

P r 0 1

e

B 0

is O e

hop akdale 6 3

t

0 0

8 0 6 0

9

0 0 6 5

0

8 5 5

Olive 6

5 6

O

M

v

i

r e

a

r

l

L

o

o

o

m

k a

Appendix C Quality Assurance

Detailed Analysis Blanco San Marcos Unsteady Hydraulics QM Checklist Blanco and San Marcos Rivers

Detailed Analysis Hydraulics QM Checklist

Stream Name: Blanco and San Marcos Level of Study: Zone AE with Floodway Zone AE Enhanced Approximate Flood Events: 50% 10% 4% 2% 1% 0.2% Modeler’s Name: Caleb Bolin Reviewer’s Name: Angela Wright QM Folder Path: W:\Citrix\28000s\28411E\QAQC\Hydraulics [All submitted QM Data should be able to be found in the QM Folder.] SUBMITTED ITEMS: [Data submitted for each checkpoint should be carried through each subsequent checkpoint.] HEC-RAS Project File Path: W:\Citrix\28000s\28411E\QAQC\Hydraulics\HEC-RAS\SM ArcMAP Project File Path: N:\28000s\28411E\QAQC\Hydraulics\MXD's\Blanco_Unsteady_QAQC.mxd Checkpoint I: Cross Section Layout GeoRAS geodatabase Study stream centerlines Topographic data Imagery Q3 or current floodplains Watershed location Any previous study work maps Road network for names Checkpoint II: RAS Geometry Flowpaths Channel bank points Field survey data Bridge record plans Stationing assumptions and calculations Manning’s n-values assumptions Checkpoint III: HEC-RAS Model Preliminary floodplain runs Discharge points locations N-values shapefile Check RAS output N-value table Any record plans needed Descriptions of assumptions Descriptions of special situations Checkpoint IV: Floodway Model Included Not included Floodway points Floodway lines

Halff Associates, Inc. Page 1 of 6 Printed

Detailed Analysis Blanco San Marcos Unsteady Hydraulics QM Checklist Blanco and San Marcos Rivers

I. CROSS SECTION LAYOUT: Modeler’s Initials: CB Date Submitted: 7/8/2015 Reviewer’s Initials: ALW Date Reviewed: 7/15/2015 Modeler’s Initials: CB Date Responded: 7/20/2015 STATISTICAL DATA: HEC-RAS Multiple Profile Plan Name:

TECHNICAL REVIEW: Cross sections extend beyond the assumed limits of all floodplains Cross sections are contained within the drainage area basins Cross sections extend to the limits of the drainage area basins, if spilling Cross sections are reasonably perpendicular to flow The location of the 4 bridge cross sections is reasonable The spacing between cross sections is reasonable Transitions, constrictions, and expansions on the floodplain are reasonable REVIEW COMMENTS: 1. Blanco XS 43230 – 33455 – XS should be shortened to not include the area east of I-35 or blocked obstructions should be used. The ineffective areas allow water to get in this area and be used a storage when it is not available 2. Blanco XS 26397 – 20055- XS should be shortened to not include the west side of I- 35 or blocked out similar to comment #1. I would suggest shortened XS. They also cross a railroad and water can typically not cross railroad embankments 3. Take a look at the current effective FEMA maps. Your cross sections are crossing almost every BFE at the confluence. What you thought was perpendicular to the channel the previous modeler did not. Double check your assumptions. If this was ever used for regulatory reasons you could be changing some BFE’s by your cross section alignment. 4. Should the San Marcos XS be extended to the lateral structure in the downstream portion of Reach 1 to account for the shallow flow and storage in the AH flood zone. 5. San Marcos cross sections that have areas of ineffective flow in the overbanks due to long cross sections may need to be reevaluated and shortened or a block obstruction used. This could be over estimating the storage in the cross sections. 6. XS in GeoRAS layer labeled 30179 San Marcos is not in the model. Remove from GeoRAS layer.

RESPONSE TO COMMENTS: 1. At the crest elevation of I-35 it does appear that flow may extend to the east side at these XS for very high flows. Blocks on the east side were placed or adjusted to the crest elevation of I-35. 2. Agree. Went with blocked obstruction to save time. 3. Noted. We agree that our analysis is appropriate for this study. 4. Cross-sections are in containment in this area. 5. Blocked Obs and Perm Ineffectives were used in this area. 6. XS removed from GeoRAS

Halff Associates, Inc. Page 2 of 6 Printed

Detailed Analysis Blanco San Marcos Unsteady Hydraulics QM Checklist Blanco and San Marcos Rivers

II. RAS GEOMETRY: Modeler’s Initials: CB Date Submitted: 7/8/2015 Reviewer’s Initials: ALW Date Reviewed: 7/15/2015 Modeler’s Initials: CB Date Responded: 7/20/2015 TECHNICAL REVIEW: Top of bank at reasonable locations Bridge geometry corresponds to surveys or record plans Bridge geometry assumptions documented Bridge skew utilized appropriately Contraction and expansion coefficients are reasonable Use of ineffective flow areas is reasonable Manning’s n-values are reasonable Survey is incorporated into all cross sections properly Flow paths are reasonable Flow paths are located at the centroid of flow based on preliminary mapping Reach lengths across junctions are appropriate No crossing profiles Profile of flowline is reasonable REVIEW COMMENTS: 1. Add notes and descriptions to everything 2. Add notes to cross sections explaining blocked obstructions 3. XS 13802 - Manning’s N value of 0.6 should probably be 0.06 4. Lots of places were horizontal manning’s n-values do not align with the bank station 5. Maybe comment 5 will fix this but your weighted manning’s n for the channel on XS 19842 is 0.1. That is very high for the channel. Also at XS 49825. There is an area of weighted manning’s n values of 0.025 between XS 34877 to 36216. Is this correct? 6. Junction length and reach lengths don’t seem right at the junction. Double check all. 7. Blanco River Lateral Structure 36215 – DFIRM shows this area as a split flow region. I think the long cross sections from XS 30842 downstream to 20378 are over estimating storage by not being a separate split flow model. 8. Blanco XS 45093 Bridge – Piers need to be extended to the top of the bridge. Ineffective area is inside the bridge opening and should be moved out. Piers look different in field survey. HTab curve is a bit jagged. You may need to recalculate and use a lower maximum headwater to get better curves in your range of flows. 9. Blanco XS 44960 Post Rd – I think this is a bridge and not culverts. A 33 ft span on a box culvert is something I have not seen before. I also would model this as a bridge with piers because you have natural ground on the bottom of the channel and not concrete. There are also no wingwall on this structure. 10. Add a description to any ineffective areas that are set to permanent. Example XS 35660. If this is supposed to be representing a building in the floodplain then I think you should use a blocked obstruction instead. The ineffective area will count as storage in your unsteady model. 11. Culvert 34799 Private Drive – I could not find pictures or field notes for this. I looked into the hydraulic jump you referenced on the QC email. I would suggest removing the culverts and modeling the private drive as an inline structure. The unsteady model is causing the jump when it tries to put some flow through the culvert. I did a quick test and this seemed to fix the crazy jumps you are seeing. The minimum flows in the model are always well above the road and the culvert will most likely be maxed out at all times. Open the Stage and Flow Hydrograph for 34779. The headwater is out of the HTAB curve. If you keep the culverts you will have to fix this.

Halff Associates, Inc. Page 3 of 6 Printed

Detailed Analysis Blanco San Marcos Unsteady Hydraulics QM Checklist Blanco and San Marcos Rivers

12. Bridge 33676 I-35 – What is the dip in the low chord. I didn’t see this is in field pictures but I don’t think it had all of the bridge either. Only 10 piers are shown in the downstream bridge and 11 are shown in the upstream 13. Culvert 24444 –8.667 feet is too specific. Round to whole numbers for culverts. Culverts are usually constructed with typical shapes. 14. Bridge 16737 Hwy 80 – Ineffective area is inside the bridge opening. 15. San Marcos – 19013 Bridge – The headwater is outside of the HTAB curve. Double check your HTAB curve and all other assumptions. 16. San Marcos 17875 Ped Bridge is also outside of the HTAB curve

RESPONSE TO COMMENTS: 1. Notes and hydraulic notebook have been updated. 2. Notes have been added. 3. N-value corrected. 4. N-Values adjusted to bank stations 5. 0.1 n-values corrected and 0.025 n-values updated to appropriate values. 6. Junction lengths were updated and override downstream reach length of upstream XS. 7. This area may be modeled in the future with a 2D model. For now we are just taking flow out with the weir and placing it back in downstream where is comes back in normally. Area west of I-35 was blocked out in XS downstream of I-35. 8. Adjusted ineffective areas and top of piers. Checked pier locations vs. survey and they appear to be correct. Pier widths were estimated from aerial photos. Aerial photos and field notes confirm that widths vary accordingly. 9. Post Rd. changed to a bridge. 10. Descriptions added. 11. Culvert switched to inline structure. 12. The dip in low chord is reflected on the I-35 plan sheets. The 11th pier on the downstream side is blocked by natural embankment on the right. The bridge abutment is sort of cut into the natural embankment downstream. 13. These dimensions were hand measured in the field. This particular culvert is old and could have non-standard dimensions. Rounded to nearest tenth. 14. Adjusted right ineffective area at downstream XS. 15. We are getting reasonable results and will further investigate. 16. We are getting reasonable results and will further investigate.

Halff Associates, Inc. Page 4 of 6 Printed

Detailed Analysis Blanco San Marcos Unsteady Hydraulics QM Checklist Blanco and San Marcos Rivers

III. HEC-RAS MODEL REVIEW: Modeler’s Initials: CB Date Submitted: 7/8/2015 Reviewer’s Initials: ALW Date Reviewed: 7/15/2015 Modeler’s Initials: CB Date Responded: 7/22/2015 TECHNICAL REVIEW: Discharge locations are appropriate and reasonable Discharge values agree with hydrology Discharge values are rounded appropriately Starting boundary conditions are reasonable Cross section geometry extends beyond the limits of all floodplains Manning’s n values are reasonable Contraction and expansion coefficients are appropriate Ineffective flow top widths Bridge and culvert layouts are complete and correctly placed Special feature (weir, overflow, split flow) layouts are complete and correctly placed Profiles are smooth and do not cross Left and right flow paths are appropriate for preliminary floodplains No ineffective areas inside the channel banks unless necessary No permanent ineffective areas (unless using unsteady RAS) Critical water surface elevations have been resolved Entrance loss coefficients are appropriate Check-RAS has been run Errors, warnings, and special notes have been addressed REVIEW COMMENTS: 1. Has or will the model be calibrated to the recent storm events? 2. I don’t have your report but you should add a note about the selection of the 6,000 cfs base flow 3. Flow on XS 21010 is not referencing the DSS and is only a table. 4. Flow from 14260 to 13995 – This is a diversion flow. Where is the diversion from?

RESPONSE TO COMMENTS: 1. When we get a hydrograph of the 2015 flood we will run it through the model. 2. Lowered initial flow to minimum required to stabilize the model. This value will be adjusted for other frequencies Flow hydrograph switched back to DSS. 3. Flow now references the DSS. 4. This is not a diversion. It is the inflow from Willow Springs Creek. The confluence with San Marcos River is just upstream of Cape Rd.

Halff Associates, Inc. Page 5 of 6 Printed

Appendix D Digital Data