An Overview of the Impact of Mining and Mineral

Total Page:16

File Type:pdf, Size:1020Kb

An Overview of the Impact of Mining and Mineral MINING, MINERALS AND SUSTAINABLE DEVELOPMENT PROJECT, SOUTHERN AFRICA AN OVERVIEW OF THE IMPACT OF MINING AND MINERAL PROCESSING OPERATIONS ON WATER RESOURCES AND WATER QUALITY IN THE ZAMBEZI, LIMPOPO AND OLIFANTS CATCHMENTS IN SOUTHERN AFRICA Peter Ashton 1, David Love 2, Harriet Mahachi 3 and Paul Dirks 3 1 CSIR-Environmentek, P.O. Box 395, Pretoria 0001, South Africa 2 Geology Department 3 Mineral Resources Centre University of Zimbabwe, PO Box MP167, Mount Pleasant, Harare, Zimbabwe WATER ENVIRONMENT & FORESTRY TECHNOLOGY MINERAL RESOURCES CENTRE GEOLOGY DEPARTMENT UNIVERSITY OF ZIMBABWE UNIVERSITY OF ZIMBABWE August 2001 MINING, MINERALS AND SUSTAINABLE DEVELOPMENT PROJECT, SOUTHERN AFRICA AN OVERVIEW OF THE IMPACT OF MINING AND MINERAL PROCESSING OPERATIONS ON WATER RESOURCES AND WATER QUALITY IN THE ZAMBEZI, LIMPOPO AND OLIFANTS CATCHMENTS IN SOUTHERN AFRICA COPYRIGHT RESERVED This technical report documents an assignment that was carried out for the Mining, Minerals and Sustainable Development (SOUTHERN AFRICA) Project [MMSD(SA)] and remains the property of MMSD(SA). However, the intellectual property and insights acquired during the execution of this assignment remain vested in the authors of this report. No part of this report may be reproduced in any manner without written permission from MMSD(SA). When used as a reference, this report should be cited as: Ashton, P.J., D. Love, H. Mahachi, P.H.G.M. Dirks (2001). An Overview of the Impact of Mining and Mineral Processing Operations on Water Resources and Water Quality in the Zambezi, Limpopo and Olifants Catchments in Southern Africa. Contract Report to the Mining, Minerals and Sustainable Development (SOUTHERN AFRICA) Project, by CSIR- Environmentek, Pretoria, South Africa and Geology Department, University of Zimbabwe, Harare, Zimbabwe. Report No. ENV-P-C 2001-042. xvi + 336 pp. ii AN OVERVIEW OF THE IMPACT OF MINING AND MINERAL PROCESSING OPERATIONS ON WATER RESOURCES AND WATER QUALITY IN THE ZAMBEZI, LIMPOPO AND OLIFANTS CATCHMENTS IN SOUTHERN AFRICA EXECUTIVE SUMMARY The original Terms of Reference for this study (Research Topic 4) were extremely broad and required an overview of all mining impacts on the biophysical environment throughout southern Africa. Though this objective was desirable, and would provide an excellent background for management strategies in each of the SADC countries, it was unrealistic in view of the time and budget constraints. Therefore, the main focus of this research topic was restricted to water resources, in particular water quality, and attention confined to three key river basins, namely the Zambezi, Limpopo and Olifants basins. Whilst the revised Terms of Reference remain challenging, they represent a compromise that enabled a useful body of work to be produced. The Project Team who conducted the investigation and report writing for Research Topic 4 comprised the following individuals: • Dr Peter Ashton – CSIR-Environmentek, South Africa – Research Co-ordinator and Project Manager; • Mr David Love – Mineral Resources Centre, University of Zimbabwe – Principal Investigator; • Professor Paul Dirks – Mineral Resources Centre, University of Zimbabwe – Project Supervisor and Reviewer (Zimbabwe sector); and • Ms Harriet Mahachi – Mineral Resources Centre, University of Zimbabwe – Assistant Investigator. This report provides an overview of the impacts that mining and mineral processing activities have had, or are likely to have, on the water resources (in particular, water quality aspects) of the Zambezi, Limpopo and Olifants river basins. The report is the output of a collaborative research process involving scientists from CSIR- iii Environmentek, South Africa, and the Mineral Resources Centre of the University of Zimbabwe, and forms part of the MMSD SOUTHERN AFRICA project. The report has been structured into eight sections to provide a logical framework for synthesis of the information and to facilitate transfer of insights, conclusions and recommendations to stakeholders. The different types of typical chemical and physical impacts associated with diverse mining and mineral processing operations are described to provide an overview of the specific types of impacts that are normally associated with the mining or processing of specific minerals. In several cases, it was difficult to determine the specific impact exerted by a mining operation, because the impact(s) also depended on the degree of management control exerted during mining. Based on defined criteria, the impacts of mining and mineral processing operations were classified into high, medium and low impacts. These descriptors were then used to describe the scale and variety of impacts linked to mining activities in each of the sub-catchments. Within the time and budget constraints of this Research Topic, it was not possible to collect high quality quantitative data for each of the three river basins. Indeed, it was difficult to obtain water quality data for Botswana, Malawi, Mozambique and Zambia and there was some sensitivity regarding possible misinterpretation of the few data available for South Africa and Zimbabwe. Nevertheless, despite these constraints, it was possible to estimate the extent and variety of historical and current mining and mineral processing operations within each sub-catchment for each river basin. This information allowed the Project Team to derive qualitative or semi-quantitative estimates of the probable extent of any impacts on water resources and water quality, based on existing information and professional judgement. These were described briefly in terms of both their potential severity and the spatial scale of the area they would be likely to affect. In addition to this system of qualitative descriptions, attention was also paid to evaluating whether or not a series of impacts within a single sub-catchment could interact or combine to exert a greater, cumulative effect on water resources and water quality. In some cases, the cumulative effect of a group of otherwise relatively “low-” or “medium-scale” impacts from individual mines in a single catchment can be seen as a dramatic increase in both the severity and extent of adverse impacts exerted on catchment water resources and other water users. In such cases, remediation often requires concerted management attention from the mines concerned, as well as the relevant water authorities. Wherever possible, available water quality data were used to substantiate descriptions of impacts. Data for mining operations located in Zimbabwe and South Africa were restricted to those mining operations that had achieved a minimum production specific to each commodity. This process of selection was not possible for other basin states due to the scarcity of data; all mining operations identified for the Angola, Botswana, Malawi, Mozambique, Namibia and Tanzania sectors of the Zambezi and Limpopo basins were located on appropriate maps. For all three of the river basins, numerous mining operations have been closed, abandoned or not proceeded beyond initial prospecting and feasibility assessments. Unless these operations were likely to have a significant impact on water resources and water quality in their immediate vicinity, these operations were not dealt with. The study has confirmed the diverse array of mining and mineral processing activities that take place in the Zambezi, Limpopo and Olifants basins. The extent and severity of the impacts is dependent on the commodity iv exploited, the size of the facility, the climatic region in which the facility is situated and the efficiency and effectiveness of management control. The variety and extent of impacts in the three river basins has been segmented into the individual sub-catchments making up each basin. The overall impacts within each basin are then summarized for clarity. Several generic and specific conclusions were formed on the basis of the material examined during this study and are reported in Section 6. Based on these conclusions and the supporting information, specific recommendations have been listed in Section 7. These recommendations (Table 7.1) are listed here for convenience. v TABLE OF CONTENTS Page Executive Summary............................................................................................................................ i Table of Contents .............................................................................................................................. v List of Figures .................................................................................................................................... ix List of Tables...................................................................................................................................... x Acknowledgements .......................................................................................................................... xv 1. INTRODUCTION AND BACKGROUND INFORMATION................................................................ 1 1.1 Introduction .............................................................................................................................. 1 1.2 Terms of Reference ................................................................................................................. 2 1.3 Approach to the project............................................................................................................ 3 1.3.1 Project team................................................................................................................
Recommended publications
  • Issue Number 1, 2016
    Issue Number 1, 2016 A sub-regional UNESCO-ICH project Supported by the Flanders Government SAICH NEWS Senior officials, consultants and coordinators of the SAICH Platform Prof. David J. Simbi Mr. Damir Dijakovic Dr. Thokozile Chitepo Vice Chancellor, Regional Cultural Advisor, Permanent Secretary, Ministry of Rural Development, Promotion and Preservation Chinhoyi University of UNESCO Regional Office of National Cultural Heritage, Zimbabwe Technology for Southern Africa Mr. Stephen Chifunyise Dr. Marc Jacobs Mr. Lovemore Mazibuko UNESCO ICH Expert/ UNESCO ICH Expert/ UNESCO ICH Expert/ Consultant Flanders Government Consultant Representative Prof. Herbert Chimhundu Prof. Jacob Mapara Dr. Manase K. Chiweshe Coordinator Associate Coordinator Associate Coordinator SAICH Platform SAICH Platform SAICH Platform Editor-in-Chief Cover Page Professor Herbert Chimhundu Event: Great Limpopo Cultural Trade Fair, Location: Boli Muhlanguleni, Editor Chiredzi, Zimbabwe, Photograph by: Mr. Eugene Ncube Professor Jacob Mapara Contacts Contributors SAICH Platform Dr Manase K. Chiweshe Chinhoyi University of Technology Ms Varaidzo Chinokwetu P. Bag 7724, Ms Jacqueline Tanhara Chinhoyi Design Off Harare-Kariba Highway Mr. Eugene Ncube Zimbabwe Printing Telephone: +2636727496 CUT Printing Press E-mail: [email protected] | [email protected] SAICH NEWS SAFEGUARDING SAICH NEWS Participating Countries ParticipatingParticipating Countries Countries Participating Countries ParticipatingParticipatingParticipating CountriesCountries Countries BotswanaParticipatingBotswana
    [Show full text]
  • Forecasting Tourists Arrivals at Chinhoyi Caves Recreational Park in Zimbabwe Using SARIMA Model
    International Tourism and Hospitality Journal 1(2): 1-10 (2018) Print ISSN: 2616-518X Online ISSN: 2616-4701 RPA ITHJ Journals International Tourism and Hospitality Journal Journal Homepage: https://rpajournals.com/ithj Forecasting Tourists Arrivals at Chinhoyi Caves Recreational Park in Zimbabwe Using SARIMA Model Tendai Makoni*1, Delson Chikobvu2 Bongani Maphosa3 Great Zimbabwe University, Zimbabwe1,3 University of the Free State, South Africa2 Abstract Forecasting tourist arrivals and volatility for Chinhoyi Caves Recreational Parks using SARIMA-GARCH models are vital for decision and planning purposes. The monthly data from the Zimbabwe Parks and Wildlife Management Authority (ZIMPARKS) for the period January 2010 to December 2016 was used. The time series plot indicated mixed fluctuations in tourist arrivals and exhibited seasonality. The series became stationary after a logarithmic transformation and a seasonal difference. The Akaike Information Criteria (AIC) and the Bayesian Information Criterion was used in selecting the best model and a SARIMA(1,0,1)(1,1,0)12 model fitted well to the data. The residuals of the model confirmed to all tests. Accuracy measures like the mean absolute error (MAE) and the mean absolute percentage error (MAPE) supported the model and an out of sample for the next 24 months (2017 to 2018) were done. From the forecasts, an increase in tourist arrivals was noted. The results imply the need for enough accommodation facilities in and around the recreational centre. Keywords: Tourist arrivals, ARIMA models, SARIMA models, time series plot 1 *Corresponding author: Tendai Makoni ; Email: [email protected] Submission Date: 9 June 2018 Acceptance Date: 17 June 2018 Introduction Forecasting is a key tool for planning and decision-making in modern business organisations, according to Thoplan (2014).
    [Show full text]
  • (Ports of Entry and Routes) (Amendment) Order, 2020
    Statutory Instrument 55 ofS.I. 2020. 55 of 2020 Customs and Excise (Ports of Entry and Routes) (Amendment) [CAP. 23:02 Order, 2020 (No. 20) Customs and Excise (Ports of Entry and Routes) (Amendment) “THIRTEENTH SCHEDULE Order, 2020 (No. 20) CUSTOMS DRY PORTS IT is hereby notifi ed that the Minister of Finance and Economic (a) Masvingo; Development has, in terms of sections 14 and 236 of the Customs (b) Bulawayo; and Excise Act [Chapter 23:02], made the following notice:— (c) Makuti; and 1. This notice may be cited as the Customs and Excise (Ports (d) Mutare. of Entry and Routes) (Amendment) Order, 2020 (No. 20). 2. Part I (Ports of Entry) of the Customs and Excise (Ports of Entry and Routes) Order, 2002, published in Statutory Instrument 14 of 2002, hereinafter called the Order, is amended as follows— (a) by the insertion of a new section 9A after section 9 to read as follows: “Customs dry ports 9A. (1) Customs dry ports are appointed at the places indicated in the Thirteenth Schedule for the collection of revenue, the report and clearance of goods imported or exported and matters incidental thereto and the general administration of the provisions of the Act. (2) The customs dry ports set up in terms of subsection (1) are also appointed as places where the Commissioner may establish bonded warehouses for the housing of uncleared goods. The bonded warehouses may be operated by persons authorised by the Commissioner in terms of the Act, and may store and also sell the bonded goods to the general public subject to the purchasers of the said goods paying the duty due and payable on the goods.
    [Show full text]
  • MIDLANDS STATE UNIVERSITY APPROVAL FORM The
    MIDLANDS STATE UNIVERSITY APPROVAL FORM The undersigned certify that they have supervised, read and recommend to the Midlands State University for acceptance of dissertation entitled: Violation of Children `s rights by Varemba cultural practise in Mberengwa District 1980-2013 submitted by Nokuthula Bula-Bula in partial fulfillment of the requirements for the Bachelor of Arts in History and International studies Honours Degree Signature of Student........................................................................................................................... Signature of Supervisor...................................................................................................................... Signature of the Chairperson............................................................................................................. Signature of the Examiner(s)............................................................................................................. 1 DECLARATION I, Bula-bula Nokuthula (R103446R), certify that this dissertation submitted in partial fulfillment of the requirement for the Bachelor of Arts honours degree in History and International Studies at Midlands State University has not been submitted for a degree at any other University, and that it is entirely my work. Student’s name Nokuthula.L Bula-Bula Signature ……………………………… Date ........../......../............ 2 ACKNOWLEDGEMENT I would like to thank the almightys God who gave me the wisdom and knowledge to accomplish the work. My appreciation is
    [Show full text]
  • Mopane Woodlands and the Mopane Worm: Enhancing Rural Livelihoods and Resource Sustainability
    Mopane Woodlands and the Mopane Worm: Enhancing rural livelihoods and resource sustainability Final Technical Report Edited by Jaboury Ghazoul1, Division of Biology, Imperial College London Authors and contributors Mopane Tree Management: Dirk Wessels2, Member Mushongohande3, Martin Potgeiter7 Domestication Strategies: Alan Gardiner4, Jaboury Ghazoul Kgetsie ya Tsie Case Study: John Pearce5 Livelihoods and Marketing: Jayne Stack6, Peter Frost7, Witness Kozanayi3, Tendai Gondo3, Nyarai Kurebgaseka8, Andrew Dorward9, Nigel Poole5 New Technologies: Frank Taylor10, Alan Gardiner Choice experiments: Robert Hope11, Witness Kozanayi, Tendai Gondo Mopane worm diseases: Robert Knell12 Start and End Date 1 May 2001 – 31 January 2006 DFID Project Reference Number R 7822 Research Programme Forestry Research Programme (FRP) Research Production System Forest Agriculture Interface 1 Also ETH Zürich, Department of Environmental Sciences, ETH Zentrum CHN, Universitätstrasse 16, Zürich 8092, Switzerland 2 Department of Botany, university fo the North, South Africa 3 Forest Commission, Harare, Zimbabwe 4 Veld Products Research and Development, Gabarone, and Division of Biology, Imperial College London 5 Kgetsie ya Tsie, Tswapong Hills, Botswana 6 Imperial College London and University of Zimbabwe, Project Co-ordinator 7 Institute of Environmental Studies 8 Southern Alliance for Indigenous Resources 9 Imperial College London, Centre for Environmental Policy. 10 Veld Products Research and Development 11 University of Newcastle 12 Queen Mary College, University of London 1 Contents Executive Summary 3 Background 3 Project Purpose 6 Research Activities Section 1. Mopane tree ecology and management 7 Section 2.1 Mopane worm productivity and domestication 18 Section 2.2 Mini-livestock: Rural Mopane Worm Farming at the Household Level 34 Section 3. A case study of the Kgetsie ya Tsie community enterprise model for managing and trading mopane worms 59 Section 4.
    [Show full text]
  • Bulawayo City Mpilo Central Hospital
    Province District Name of Site Bulawayo Bulawayo City E. F. Watson Clinic Bulawayo Bulawayo City Mpilo Central Hospital Bulawayo Bulawayo City Nkulumane Clinic Bulawayo Bulawayo City United Bulawayo Hospital Manicaland Buhera Birchenough Bridge Hospital Manicaland Buhera Murambinda Mission Hospital Manicaland Chipinge Chipinge District Hospital Manicaland Makoni Rusape District Hospital Manicaland Mutare Mutare Provincial Hospital Manicaland Mutasa Bonda Mission Hospital Manicaland Mutasa Hauna District Hospital Harare Chitungwiza Chitungwiza Central Hospital Harare Chitungwiza CITIMED Clinic Masvingo Chiredzi Chikombedzi Mission Hospital Masvingo Chiredzi Chiredzi District Hospital Masvingo Chivi Chivi District Hospital Masvingo Gutu Chimombe Rural Hospital Masvingo Gutu Chinyika Rural Hospital Masvingo Gutu Chitando Rural Health Centre Masvingo Gutu Gutu Mission Hospital Masvingo Gutu Gutu Rural Hospital Masvingo Gutu Mukaro Mission Hospital Masvingo Masvingo Masvingo Provincial Hospital Masvingo Masvingo Morgenster Mission Hospital Masvingo Mwenezi Matibi Mission Hospital Masvingo Mwenezi Neshuro District Hospital Masvingo Zaka Musiso Mission Hospital Masvingo Zaka Ndanga District Hospital Matabeleland South Beitbridge Beitbridge District Hospital Matabeleland South Gwanda Gwanda Provincial Hospital Matabeleland South Insiza Filabusi District Hospital Matabeleland South Mangwe Plumtree District Hospital Matabeleland South Mangwe St Annes Mission Hospital (Brunapeg) Matabeleland South Matobo Maphisa District Hospital Matabeleland South Umzingwane Esigodini District Hospital Midlands Gokwe South Gokwe South District Hospital Midlands Gweru Gweru Provincial Hospital Midlands Kwekwe Kwekwe General Hospital Midlands Kwekwe Silobela District Hospital Midlands Mberengwa Mberengwa District Hospital .
    [Show full text]
  • Dam Synchronisation and Flood Releases in the Zambezi River Basin Project Annex 4
    Doc No: FR – MR Transboundary Water Management in SADC Transboundary Water Management in SADC DAMDAM SYNCHRONISATION SYNCHRONISATION AND AND FLOOD FLOOD RELEASES RELEASES IN IN THETHE ZAMBEZI ZAMBEZI RIVER RIVER BASIN BASIN PROJECT PROJECT Final Report Executive Summary 31 March 2011 Annex 4 RecommendationsSWRSD Zambezi Basin Jointfor Venture Investments 31 March 2011 SWRSD Zambezi Basin Joint Venture This report is part of the Dam Synchronisation and Flood Releases in the Zambezi River Basin project (2010-2011), which is part of the programme on Transboundary Water Management in SADC. To obtain further information on this project and/or progamme, please contact: Mr. Phera Ramoeli Senior Programme Officer (Water) Directorate of Infrastructure and Services SADC Secretariat Private Bag 0095 Gaborone Botswana Tel: +267 395-1863 Email: [email protected] Mr. Michael Mutale Executive Secretary Interim ZAMCOM Secretariat Private Bag 180 Gaborone Botswana Tel: +267 365-6670 or +267 365-6661/2/3/4 Email: [email protected] DAM SYNCHRONISATION AND FLOOD RELEASES IN THE ZAMBEZI RIVER BASIN: ANNEX 4 OF FINAL REPORT Table of Contents TABLE OF CONTENTS.............................................................................................................................. III LIST OF TABLES ........................................................................................................................................ VI LIST OF FIGURES ....................................................................................................................................
    [Show full text]
  • Ecological Changes in the Zambezi River Basin This Book Is a Product of the CODESRIA Comparative Research Network
    Ecological Changes in the Zambezi River Basin This book is a product of the CODESRIA Comparative Research Network. Ecological Changes in the Zambezi River Basin Edited by Mzime Ndebele-Murisa Ismael Aaron Kimirei Chipo Plaxedes Mubaya Taurai Bere Council for the Development of Social Science Research in Africa DAKAR © CODESRIA 2020 Council for the Development of Social Science Research in Africa Avenue Cheikh Anta Diop, Angle Canal IV BP 3304 Dakar, 18524, Senegal Website: www.codesria.org ISBN: 978-2-86978-713-1 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage or retrieval system without prior permission from CODESRIA. Typesetting: CODESRIA Graphics and Cover Design: Masumbuko Semba Distributed in Africa by CODESRIA Distributed elsewhere by African Books Collective, Oxford, UK Website: www.africanbookscollective.com The Council for the Development of Social Science Research in Africa (CODESRIA) is an independent organisation whose principal objectives are to facilitate research, promote research-based publishing and create multiple forums for critical thinking and exchange of views among African researchers. All these are aimed at reducing the fragmentation of research in the continent through the creation of thematic research networks that cut across linguistic and regional boundaries. CODESRIA publishes Africa Development, the longest standing Africa based social science journal; Afrika Zamani, a journal of history; the African Sociological Review; Africa Review of Books and the Journal of Higher Education in Africa. The Council also co- publishes Identity, Culture and Politics: An Afro-Asian Dialogue; and the Afro-Arab Selections for Social Sciences.
    [Show full text]
  • Environmental Impacts of Natural and Man-Made Hydraulic Structures
    International Journal of Application or Innovation in Engineering & Management (IJAIEM) Web Site: www.ijaiem.org Email: [email protected], [email protected] Volume 3, Issue 1, January 2014 ISSN 2319 - 4847 Environmental Impacts of Natural and Man-Made Hydraulic Structures-Case Study Middle Zambezi Valley, Zimbabwe Samson Shumba1, Hodson Makurira2, Innocent Nhapi3 and Webster Gumindoga4 1-4Department of Civil Engineering, University of Zimbabwe, P.O Box MP167 Mount Pleasant, Harare, Zimbabwe ABSTRACT The Mbire District in northern Zimbabwe lies in the Lower Middle Zambezi catchment between the man- made Kariba and Cahora Bassa dams. The district is occasionally affected by floods caused by overflowing rivers and, partly, by backwaters from the downstream Cahora Bassa hydropower dam. This flooding affects soil properties due to rapid moisture fluxes and deposition of fine sediments and nutrients. Despite the hazards associated with the floods, the riparian communities benefit from high moisture levels and the nutrients deposited in the floodplains. The residual moisture after flooding events enables the cultivation of crops just after the rainfall season with harvesting taking place around July-August. These periods are outside the normal rainfed agricultural season elsewhere in Zimbabwe where such flooding is not experienced. This study sought to investigate the soil moisture and nutrient dynamics in relation to natural and man-made flood occurrence in the Middle Zambezi valley of Zimbabwe. Twelve trial pits were dug using manual methods along four transects at three different study sites across the floodplain during the period April 2011 to May 2012. At each trial pit, three soil samples were collected at depths of 0.2 m, 0.5 m and 1.2 m and these were analysed for moisture content, nutrient status, pH, texture and electrical conductivity.
    [Show full text]
  • MASHONALAND EAST PROVINCE - Basemap
    MASHONALAND EAST PROVINCE - Basemap Mashonaland Central Karanda Chimandau Guruve MukosaMukosa Guruve Kamusasa Karanda Marymount Matsvitsi Marymount Mary Mount Locations ShinjeShinje Horseshoe Nyamahobobo Ruyamuro RUSHINGA CentenaryDavid Nelson Nyamatikiti Nyamatikiti Province Capital Nyakapupu M a z o w e CENTENARY Mazowe St. Pius MOUNT DARWIN 2 Chipuriro Mount DarwinZRP NyanzouNyanzou Mt Darwin Chidikamwedzi Town 17 GoromonziNyahuku Tsakare GURUVE Jingamvura MAKONDE Kafura Nyamhondoro Place of Local Importance Bepura 40 Kafura Mugarakamwe Mudindo Nyamanyora Chingamuka Bure Katanya Nyamanyora Bare Chihuri Dindi ARDA Sisi Manga Dindi Goora Mission M u s e n g e z i Nyakasoro KondoKondo Zvomanyanga Goora Wa l t o n Chinehasha Madziwa Chitsungo Mine Silverside Donje Madombwe Mutepatepa Nyamaruro C o w l e y Chistungo Chisvo DenderaDendera Nyamapanda Birkdale Chimukoko Nyamapanda Chindunduma 13 Mukodzongi UMFURUDZI SAFARI AREA Madziwa Chiunye KotwaKotwa 16 Chiunye Shinga Health Facility Nyakudya UZUMBA MARAMBA PFUNGWE Shinga Kotwa Nyakudya Bradley Institute Borera Kapotesa Shopo ChakondaTakawira MvurwiMvurwi Makope Raffingora Jester H y d e Maramba Ayrshire Madziwa Raffingora Mvurwi Farm Health Scheme Nyamaropa MUDZI Kasimbwi Masarakufa Boundaries Rusununguko Madziva Mine Madziwa Vanad R u y a Madziwa Masarakufa Shutu Nyamukoho P e m b i Nzvimbo M u f u r u d z i Madziva Teacher's College Vanad Nzvimbo Chidembo SHAMVA Masenda National Boundary Feock MutawatawaMutawatawa Mudzi Rosa Muswewenhede Chakonda Suswe Mutorashanga Madimutsa Chiwarira
    [Show full text]
  • Zimbabwe Rural Electrification Study
    Zimbabwe Rural Electrification Study ESM228 Energy Sector Management Assistance Programme Report 228/00 EJol AD March 2000 JOINT UNDP / WORLD BANK ENERGY SECTOR MANAGEMENT ASSISTANCE PROGRAMME (ESMAP) PURPOSE The Joint UNDP/World Bank E nergy Sector Management Assistance Programme (ESMAP) is a special global technical assistance program run as part of the World Bank's Energy, Mining and Telecommunications Department. ESMAP provides advice to governments on sustainable energy development. Established with the support of UNDP and bilateral official donors in 1983, it focuses on the role of energy in the development process with the objective of contributing to poverty alleviation, improving living conditions and preserving the environment in developing countries and transition economies. ESMAP centers its interventions on three priority areas: sector reform and restructuring; access to modern energy for the poorest; and promotion of sustainable energy practices. GOVERNANCE AND OPERATIONS ESMAP is governed by a Consultative Group (ESMAP CG) composed of representatives of the UNDP and World Bank, other donors, and development experts from regions benefiting from ESMAP's assistance. The ESMAP CG is chaired by a World Bank Vice President, and advised by a Technical Advisory Group (TAG) of four independent energy experts that reviews the Programme's strategic agenda, its work plan, and its achievements. ESMAP relies on a cadre of engineers, energy planners, and economists from the World Bank to conduct its activities under the guidance of the
    [Show full text]
  • Alluvial Aquifers in the Mzingwane Catchment: Their Distribution, Properties, Current Usage and Potential Expansion
    Physics and Chemistry of the Earth 31 (2006) 988–994 www.elsevier.com/locate/pce Alluvial aquifers in the Mzingwane catchment: Their distribution, properties, current usage and potential expansion William Moyce a,*, Pride Mangeya a, Richard Owen a,d, David Love b,c a Department of Geology, University of Zimbabwe, P.O. Box MP167, Mt. Pleasant, Harare, Zimbabwe b WaterNet, P.O. Box MP600, Mt. Pleasant, Harare, Zimbabwe c ICRISAT Bulawayo, Matopos Research Station, P.O. Box 776, Bulawayo, Zimbabwe d Minerals Resources Centre, University of Zimbabwe, P.O. Box MP167, Mt. Pleasant, Harare, Zimbabwe Abstract The Mzingwane River is a sand filled channel, with extensive alluvial aquifers distributed along its banks and bed in the lower catch- ment. LandSat TM imagery was used to identify alluvial deposits for potential groundwater resources for irrigation development. On the false colour composite band 3, band 4 and band 5 (FCC 345) the alluvial deposits stand out as white and dense actively growing veg- etation stands out as green making it possible to mark out the lateral extent of the saturated alluvial plain deposits using the riverine fringe and vegetation . The alluvial aquifers form ribbon shaped aquifers extending along the channel and reaching over 20 km in length in some localities and are enhanced at lithological boundaries. These alluvial aquifers extend laterally outside the active channel, and individual alluvial aquifers have been measured with area ranging from 45 ha to 723 ha in the channels and 75 ha to 2196 ha on the plains. The alluvial aquifers are more pronounced in the Lower Mzingwane, where the slopes are gentler and allow for more sediment accumulation.
    [Show full text]