Initial Environmental Examination Initial Environmental Examination July 2019 PHI: Integrated Natural Resources and Environmental Management Project Rehabilitation of Potable Water Supply System Level II in Barangay Campongaraya, Ganassi, Lanao del Sur Prepared by the Municipality of Ganassi, Province of Lanao del Sur for the Department of Environment and Natural Resources and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 01 July 2019) The date of the currency equivalents must be within 2 months from the date on the cover. Currency unit – peso (PhP) PhP 1.00 = $ 0.01955 $1.00 = PhP 51.043 ABBREVIATIONS ADB Asian Development Bank BDC Barangay Development Council BUB Bottom-Up Budgeting CNC Certificate of Non-Coverage CSC Construction Supervision Consultant CSO Civil Society Organization DED Detail Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DSWD Department of Social Welfare and Development ECA Environmentally Critical Area ECC Environmental Compliance Certificate ECP Environmentally Critical Project EHSM Environmental Health and Safety Manager EIA Environmental Impact Assessment EIS Environmental Impact Statement EMB Environmental Management Bureau ESS Environmental Safeguards Specialist GAD Gender and Development IEE Initial Environmental Examination INREMP Integrated Natural Resources and Environment Management Project IP Indigenous People IROW Infrastructure Right of Way LGU Local Government Unit LPRAT Local Poverty Reduction Action Team MDC Municipal Development Council MPN Most Probable Number NAAQ National Ambient Air Quality Guidelines NCB National Competitive Bidding NECA Non-Environmental Critical Area NECP Non-Environmental Critical Project NIA National Irrigation Administration NPCO National Project Coordinating Office NRIMP National Road Improvement and Management Program NRM Natural Resources Management OCM Overhead, Contingencies and Miscellaneous PAGASA Philippine Atmospheric Geophysical and Astronomical Services Administration PDR Project Description Report PMIC Project Management Implementation Consultant PPMO Provincial Project Management Offices PMU Project Management Unit POs Peoples’ Organizations i PRECIS Providing Regional Climates for Impact Studies PSA Philippine Statistics Authority PWD Persons with Disability RC Reinforced Concrete RCPC Reinforced Concrete Pipe Culvert RPCO Regional Project Coordinating Offices REA Rapid Environmental Assessment ROW Right of Way SB Sangguniang Bayan SBD Standard Bidding Document SEMS Social and Environmental Management Systems SPMU Sub-Project Management Unit SPS Safeguard Policy Statement SSS Social Safeguards Specialist TA Technical Assistance TDS Total Dissolved Solids TOR Terms of Reference TSP Total Suspended Particulates WMA Watershed Management Area WMC Watershed Management Council WMPCO Watershed Management and Project Coordination Offices ii WEIGHTS AND MEASURES ˚C – degree centigrade ha – Hectare km – kilometer m – meter m asl – meter above sea level mm – Millimetre mg/L – milligram per liter mg/Nm3 – milligram per normal cubic meter ppt – parts per thousand μg/Nm3 – microgram per normal cubic meter µS/cm – microSiemens/cm % – Percent NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. iii TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................... 1 I. INTRODUCTION ................................................................................................................. 3 II. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK ................................................ 3 A. Environmental Clearance Requirements 3 1. ADB Safeguard Policy ......................................................................................... 3 2. National Laws....................................................................................................... 4 III. DESCRIPTION OF THE PROJECT .................................................................................... 5 A. Overview 5 B. Project Location 6 C. Project Development Plan 9 1. Project Components ............................................................................................ 9 2. Description of the Project Phases ..................................................................... 12 D. Manpower Requirements 12 E. Project Cost 13 F. Project Duration and Schedule 13 IV. DESCRIPTION OF THE ENVIRONMENT ........................................................................ 15 A. Climate 15 B. Elevation and Slope 15 C. Soil 16 D. Land Cover 16 E. Water Resources 16 F. Water Quality 18 G. Terrestrial Flora and Fauna 18 H. Socio-Economic Conditions 19 1. Population .......................................................................................................... 19 2. Health and Sanitation ........................................................................................ 19 3. Water Supply...................................................................................................... 19 4. Education ........................................................................................................... 20 5. Minor and Major Occupation ............................................................................. 21 6. Tourism .............................................................................................................. 22 7. Income and Expenditure .................................................................................... 22 8. Present Transport System ................................................................................. 22 V. ANTICIPATED IMPACTS AND MITIGATION MEASURES ............................................. 23 A. Methodology 23 B. Assessment of the Impacts 23 C. Design/Pre-Construction Phase Considerations 24 D. Construction Phase Environmental Impacts 25 E. Operation Phase Environmental Impacts 27 VI. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION ................... 28 A. Stakeholder Consultations 28 B. Information Disclosure 28 VII. GRIEVANCE REDRESS MECHANISM ............................................................................ 29 VIII. OUTLINE ENVIRONMENTAL MANAGEMENT PLAN ............................................... 30 A. Environmental Mitigation Plan 30 B. Environmental Monitoring 34 1. Environmental Effects Monitoring ...................................................................... 34 2. Environmental Compliance Monitoring .............................................................. 34 C. EMP Implementation Arrangements 36 D. Monitoring and Reporting System 37 IX. CONCLUSIONS AND RECOMMENDATIONS ................................................................. 38 iv LIST OF TABLES Table 1. Summary of Applicable Environmental Regulations ................................................... 5 Table 2. Manpower requirements ............................................................................................ 13 Table 3. Project Cost Estimates .............................................................................................. 14 Table 4. Indicative Subproject Implementation Schedule ....................................................... 14 Table 5. Results of Water Quality Assessment in the Campongaraya Creek. ...................... 18 Table 6. List of Existing Major Source of Water in the Municipality ........................................ 19 Table 7. Public and Private Primary Level School, 2015 ........................................................ 20 Table 8. Public and Private Secondary Level School in Ganassi, 2015 ................................ 21 Table 9. Arabic School (Madrasah), 2015 ............................................................................... 21 Table 10. Employed and unemployed status of the municipality ............................................ 21 Table 11. Public Transportation fare, 2015 ............................................................................. 22 Table 12. Summary of Environmental Impact Screening ....................................................... 23 Table 13. Summary of the Public Consultation of the Rehabilitation of Potable Water Supply System Level II ........................................................................................................ 28 Table 14. Environmental Mitigating Plan ................................................................................. 30 Table 15. Environmental Monitoring Plan ............................................................................... 34 Table 16. Environmental Compliance Monitoring ................................................................... 35 Table 17. Implementation Arrangements ................................................................................ 36 LIST OF FIGURES Figure 1: Photographs Showing the Existing Conditions of the Water Source, and Pipelines 6 Figure 2. Location of the Proposed Water System Subproject at Barangay Campongaraya .. 7 Figure 3. Location of the Water Source,
Recommended publications
  • Quarterly Report
    MARAWI RESPONSE PROJECT (MRP) Quarterly Report FY 2020 3rd Quarter – April 1, 2020 to June 30, 2020 Submission Date: July 31, 2020 Cooperative Agreement Number: 72049218CA000007 Activity Start Date and End Date: August 29, 2018 – August 28, 2021 Submitted by: Plan International USA, Inc. This document was produced for review by the United States Agency for International Development Philippine Mission (USAID/Philippines). PROJECT PROFILE USAID/PHILIPPINES Program: MARAWI RESPONSE PROJECT (MRP) Activity Start Date and August 29, 2018 – August 28, 2021 End Date: Name of Prime Plan USA International Inc. Implementing Partner: Cooperative Agreement 72049218CA00007 Number: Names of Ecosystems Work for Essential Benefits (ECOWEB) Subcontractors/Sub Maranao People Development Center, Inc. (MARADECA) awardees: IMPL Project (IMPL) Major Counterpart Organizations Geographic Coverage Lanao del Sur, Marawi City, Lanao del Norte & Iligan City (cities and or countries) Reporting Period: April 1, 2020 to June 30, 2020 2 CONTENTS PROJECT PROFILE .................................................................................................................................... 2 CONTENTS ............................................................................................................................................... 3 ACRONYMS ............................................................................................................................................. 4 1. EXECUTIVE SUMMARY ....................................................................................................................
    [Show full text]
  • July Dashboard
    JULY 2019 ISSUE NO. 60 MINDANAO DISPLACEMENT DASHBOARD Maguindanao. Country representative of UNHCR Philippines visited the IDPs in Talitay. @ UNHCR/ Tanghal DISPLACEMENT OVERVIEW DISPLACEMENT IN JULY In July 2019, a total number of 4,348 families (21,740 individuals) were displaced in Mindanao due to natural disaster (1,340 individuals) armed conflict (19,840 individuals), and clan feuds (560 individuals). Out of 21,740 individuals 4,348 displaced throughout the month, 16% (3,410 individuals) have returned to their Families homes by the end of July, leaving 84% (18,330 individuals) still displaced by the end of the reporting period. As of the 31st of July, a total number of 34,011 families (169,017 individuals) are 21,740 currently displaced in Mindanao. Those displaced can be classified into three Individuals main groups, depending on the length of displacement: Group A: 3,666 families (18,330 individuals) remain displaced out of 4,597 CIVILIAN CASUALTIES families displaced within the month; From January to July 2019 Group B: 1,415 families (6,697 individuals) remain displaced, and have been protractedly displaced for more than 30 days but less than 180 days; and 24 Persons dead Group C: 28,930 families (143,990 individuals) remain displaced and have been protractedly displaced for more than 180 days. Those classified under Group C are concentrated in five main areas: 31 Persons injured Zamboanga City: 653 families (3,544 individuals) still displaced due to Zamboanga siege in September 2013. LOCATIONS Lanao del Sur & Lanao del Norte: 26,276 families (131,380 individuals) still Breakdown of displaced individuals by region displaced due to Marawi siege in May 2017.
    [Show full text]
  • Philippines: Marawi Armed-Conflict 3W (As of 18 April 2018)
    Philippines: Marawi Armed-Conflict 3W (as of 18 April 2018) CITY OF Misamis Number of Activities by Status, Cluster & Number of Agencies EL SALVADOR Oriental 138 7,082 ALUBIJID Agencies Activities INITAO Number of CAGAYAN DE CLUSTER Ongoing Planned Completed OPOL ORO CITY (Capital) organizations NAAWAN Number of activities by Municipality/City 1-10 11-50 51-100 101-500 501-1,256 P Cash 12 27 69 10 CCCM 0 0 ILIGAN CITY 571 3 Misamis LINAMON Occidental BACOLOD Coord. 1 0 14 3 KAUSWAGAN TAGOLOAN MATUNGAO MAIGO BALOI POONA KOLAMBUGAN PANTAR TAGOLOAN II Bukidnon PIAGAPO Educ. 32 32 236 11 KAPAI Lanao del Norte PANTAO SAGUIARAN TANGCAL RAGAT MUNAI MARAWI MAGSAYSAY DITSAAN- CITY BUBONG PIAGAPO RAMAIN TUBOD FSAL 23 27 571 53 MARANTAO LALA BUADIPOSO- BAROY BUNTONG MADALUM BALINDONG SALVADOR MULONDO MAGUING TUGAYA TARAKA Health 79 20 537 KAPATAGAN 30 MADAMBA BACOLOD- Lanao TAMPARAN KALAWI SAPAD Lake POONA BAYABAO GANASSI PUALAS BINIDAYAN LUMBACA- Logistics 0 0 3 1 NUNUNGAN MASIU LUMBA-BAYABAO SULTAN NAGA DIMAPORO BAYANG UNAYAN PAGAYAWAN LUMBAYANAGUE BUMBARAN TUBARAN Multi- CALANOGAS LUMBATAN cluster 7 1 146 32 SULTAN PICONG (SULTAN GUMANDER) BUTIG DUMALONDONG WAO MAROGONG Non-Food Items 1 0 221 MALABANG 36 BALABAGAN Nutrition 82 209 519 15 KAPATAGAN Protection 61 37 1,538 37 Maguindanao Shelter 4 4 99 North Cotabato 7 WASH 177 45 1,510 32 COTABATO CITY TOTAL 640 402 6,034 The boundaries, names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations Creation date: 18 April 2018 Sources: PSA
    [Show full text]
  • Chapter 3 Socio Economic Profile of the Study Area
    CHAPTER 3 SOCIO ECONOMIC PROFILE OF THE STUDY AREA 3.1 SOCIAL CONDITIONS 3.1.1 Demographic Trend 1) Population Trends by Region Philippine population has been continuously increasing from 48.1million in 1980, 76.3 million in 2000 to 88.5million in 2007 with 2.15% of annual growth rate (2000-2007). Population of both Mindanao and ARMM also showed higher increases than national trend since 2000, from 18.1 in 2000 to 21.6 million in 2007 (AAGR: 2.52%), and 2.9 in 2000 to 4.1million in 2007 (AAGR: 5.27%), respectively. Population share of Mindanao to Philippines and of ARMM to Mindanao significantly increased from 23.8% to 24.4% and 15.9% to 24.4%, respectively. 100,000,000 90,000,000 Philippines Mindanao 80,000,000 ARMM 70,000,000 60,000,000 50,000,000 40,000,000 30,000,000 20,000,000 10,000,000 0 1980 1990 1995 2000 2007 Year Source: NSO, 2008 FIGURE 3.1.1-1 POPULATION TRENDS OF PHILIPPINES, MINDANAO AND ARMM Population trends of Mindanao by region are illustrated in Figure 3.1.1-2 and the growth in ARMM is significantly high in comparison with other regions since 1995, especially from 2000 to 2007. 3 - 1 4,500,000 IX 4,000,000 X XI 3,500,000 XII XIII ARMM 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000 1980 1990 1995 2000 2007 year Source NSO, 2008 FIGURE 3.1.1-2 POPULATION TRENDS BY REGION IN MINDANAO As a result, the population composition within Mindanao indicates some different features from previous decade that ARMM occupies a certain amount of share (20%), almost same as Region XI in 2007.
    [Show full text]
  • Rice Suitability Map Province of Lanao Del
    123°50' 124°0' 124°10' 124°20' 124°30' 124°40' 124°50' 8°20' 8°20' Province of Misamis Oriental R E P U B L I C O F T H E P H I L I P P I N E S D E P A R T M E N T O F A G R I C U LT U R E BUREAU OF SOIL S AND WATER M ANAGEMENT I l i g a n B a y Elliptical Road Cor. Visayas Ave., Diliman, Quezon City RICE SUITABILITY MAP ( Key Rice Areas ) PROVINCE OF LANAO DEL SUR ° SCALE 1:135,000 8°10' 0 1 2 3 4 5 6 7 8 9 8°10' Province of Lanao del Norte Kilometers Projection : Transverse Mercator Datum : Luzon 1911 LEGEND DISCLAIMER : All political boundaries are not authoritative SUITABILITY LIMITING FACTORS AREA DESCRIPTION RATING Moderate Marginal Severe ha % S1 Highly Suitable - - - 544 2.14 S2d d - - 3,710 14.60 S2d S2df S2df d,f - - 10,445 41.10 S2df S2dxf Kapai S2d S2dx d,x - - 897 3.53 S2df S2d S2dxf Moderately Suitable d,x,f - - 1,905 7.50 S2f f - - 1,058 4.16 S2d S2x x - - 1,072 4.22 S2df S2xf x,f - - 3,837 15.10 Saguiaran S3x d x - 467 1.84 Marginally Suitable S2df S3x d,f x - 1,478 5.81 TOTAL. 25,414 100.00 Province of Bukidnon S2df MARAWI S2dx 8°0' Note: Piagapo Highly Suitable (S1) - with none to slight limitations for any given use.
    [Show full text]
  • PUNONG BARANGAY TASKS and RESPONSIBILITIES Checklist
    PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist NOT FOR SALE a PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist NOT FOR SALE Punong Barangay Tasks and Responsibilities Checklist Copyright@2018 Local Government Academy (LGA) Department of the Interior and Local Government (DILG) All rights reserved. All rights reserved. No portions of this book may be copied or reproduced in books, pamphlets, typewritten, xeroxed, or in any other form for distribution or sale, without permission from the Academy. ISBN: 978-971-0576-81-4 Printed and bounded in Manila, Philippines. Published by: Local Government Academy Department of the Interior and Local Government 8/F Agustin I Bldg., F. Ortigas, Jr. Road, (formerly Emerald Ave.) Ortigas Center, Pasig City 1605 Philippines Tel Nos. (632) 634-8430 / 634-8436 www.lga.gov.ph Technical Working Group: Alfonso A. Maralli, Jr. Sally S. Jumalon Maria Louisa B. Bite Cover and Layout: Iris A. Igrobay PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist TABLE OF CONTENTS I Messages iii - vi II List of Acronyms vii III Tasks and Responsibilities as Mandated by the Local Government Code 1 IV Tasks and Responsibilities Pursuant to Presidential Directives 5 V List of Presidential Directives and DILG Memorandum Circulars 31 i PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist MESSAGE The public offices are public trusts. They are a manifestation of the will of the people. This is at the very core of democracy that we enjoy today. Both local and national officials are in the same situation, they are accountable to the people, the constituents that voted for them. The funds that are utilized are from the people and the natural resources that belong to the nation and its future generations.
    [Show full text]
  • S5-28 5.3 NEEDS ANALYSIS in Order to Comprehensively Sketch The
    The Study for Socio-Economic Reconstruction and Development of Conflict-Affected Areas in Mindanao in the Republic of the Philippines SUPPLEMENTARY CHAPTER 5.3 NEEDS ANALYSIS In order to comprehensively sketch the structure and depth of development needs in CAAM, various needs identified through the surveys were ranked and categorized. In doing so, the concept of a three-layer structure is introduced. First, the needs expressed by people were classified into the layer of “development needs,” as show in the right column of Table 5.3-1. Then, the “development needs” were grouped based on their similarity and proximity, and raised into the layer of “sectors.” Finally, these sectors were further combined to form the highest layer of “categories.” As a result, various development needs were then converged into the four broad need categories of: Basic Social Services, Public Facilities, Economic Infrastructure, and Livelihood. This process of categorization and structure construction were also repeated in the analysis of the IBNA. Table 5.3-1 Need Category and Sector of CAAM CATEGORY SECTOR DEVELOPMENT NEEDS Electrification Basic Utilities Water Systems Educational Facilities Day Care Centers Deployment of teachers Madrasahs Education Non-Formal Education Scholarships BASIC SOCIAL School buildings SERVICES School Dormitories School Pathways Barangay Pharmacies Health Centers Health Hospitals Medical Assistants Medicine and Medical Supplies Sanitary Toilets Housing/Sanitation Core Shelters PUBLIC FACILITIES Garbage Facilities Environment Reforestation
    [Show full text]
  • Resettlement Action Plan
    THE PREPARATORY STUDY FOR CENTRAL LUZON LINK EXPRESSWAY PROJECT IN THE REPUBLIC OF THE PHILIPPINES RESETTLEMENT ACTION PLAN August 2011 DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THE REPUBLIC OF THE PHILIPPINES Resettlement Action Plan CHAPTER 1 Description of the Project....................................................................................................1 CHAPTER 2 Objectives of the Resettlement Action Plan........................................................................6 CHAPTER 3 Relocation Policy.................................................................................................................6 CHAPTER 4 Summary of Relocation and Assets.....................................................................................9 CHAPTER 5 Household Survey Result..................................................................................................16 CHAPTER 6 Legal Framework...............................................................................................................25 CHAPTER 7 Compensation and Livelihood Restoration Plan...............................................................35 CHAPTER 8 Relocation Site Development Plan....................................................................................42 CHAPTER 9 PAP’s Willingness to Relocation and Preferred Sites.......................................................51 CHAPTER 10 Stakeholders Meeting/Consultation Meeting....................................................................52 CHAPTER 11 Grievance Redressing
    [Show full text]
  • Download Document (PDF | 853.07
    3. DAMAGED HOUSES (TAB C) • A total of 51,448 houses were damaged (Totally – 14,661 /Partially – 36,787 ) 4. COST OF DAMAGES (TAB D) • The estimated cost of damages to infrastructure, agriculture and school buildings amounted to PhP1,399,602,882.40 Infrastructure - PhP 1,111,050,424.40 Agriculture - PhP 288,552,458.00 II. EMERGENCY RESPONSE MANAGEMENT A. COORDINATION MEETINGS • NDRRMC convened on 17 December 2011which was presided over by the SND and Chairperson, NDRRMC and attended by representatives of all member agencies. His Excellency President Benigno Simeon C. Aquino III provided the following guidance to NDRRMC Member Agencies : ° to consider long-term mitigation measures to address siltation of rivers, mining and deforestation; ° to identify high risk areas for human settlements and development and families be relocated into safe habitation; ° to transfer military assets before the 3-day warning whenever a typhoon will affect communities at risks; ° to review disaster management protocols to include maintenance and transportation costs of these assets (air, land, and maritime); and ° need to come up with a Crisis Manual for natural disasters ° The President of the Republic of the Philippines visited RDRRMC X on Dec 21, 2011 to actually see the situation in the area and condition of the victims particularly in Cagayan de Oro and Iligan City and issued Proclamation No. 303 dated December 20, 2011, declaring a State of National Calamity in Regions VII, IX, X, XI, and CARAGA • NDRRMC formally accepted the offer of assistance from
    [Show full text]
  • Chapter 11 Possible Capital Investment for the Study
    CHAPTER 11 POSSIBLE CAPITAL INVESTMENT FOR THE STUDY AREA 11.1 PAST CAPITAL INVESTMENT Past capital investment for the road sector is shown in Table 11.1-1. DPWH-National Quite high growth rate for the road sector investment was recorded from 2005 to 2009 at 40.7% per annum. Allocation to Region X, Region XII and Road Project within ARMM Region X ----------------------------------- 1.8% - 6.1% of National Road Budget Region XII --------------------------------- 0.7% - 4.3% of National Road Budget Road Projects within ARMM ----------- 1.3% - 3.6% of National Road Budget DPWH-ARMM Allocation to infrastructure has been constant and no increase was made from 2006 to 2008. Allocation to a road sector from infrastructure budget is decreasing. Allocation of infrastructure budget to a road sector of mainland provinces ranged from 36% to 38%. 11 - 1 TABLE 11.1-1 PAST INVESTMENT FOR ROAD SECTOR Unit: Million Pesos Average Annual Growth 2005 2006 2007 2008 2009 Rate (%) Remarks 05‐09 06‐09 06‐08 19,193 24,884 31,127 45,962 75,428 TOTAL 40.7% 44.7% 35.9% (100%) (100%) (100%) (100%) (100%) 829 701 569 1,879 4,622 Region X 53.7% 87.5% 63.7% DPWH‐National (4.3%) (2.8%) (1.8%) (4.1%) (6.1%) 235 183 1,238 1,995 2,207 (Note‐1) Region XII 75.0% 129% 230% (1.2%) (0.7%) (4.0%) (4.3%) (2.9%) Projects within ARMM (National 328 568 1,653 1,179 Basically for Foreign‐ ‐‐‐124% assisted Projects within Road) (1.3%) (1.8%) (3.6%) (1.6%) ARMM 11 -2 650 650 650 Infrastructure ‐ ‐‐‐0% (100.0%) (100.0%) (100.0%) National ‐ 0 12 0 ‐‐‐‐ Road Local Road Mainland ‐
    [Show full text]
  • April 2019 Dashboard Draft 190607
    APRIL 2019 ISSUE NO. 57 MINDANAO DISPLACEMENT DASHBOARD Maguinadanao. Displaced families receiving core relief items including plastics tarps, blankets and kitchen sets. @ UNHCR/ Kulat DISPLACEMENT OVERVIEW DISPLACEMENT IN APRIL In April 2019, a total number of 1,080 families (4,619 individuals) were displaced in Mindanao due to armed conflict (1,969 individuals), clan feuds (712 individuals), and crimes and violence (1,938 individuals). Out of 4,619 1,080 individuals displaced throughout the month, 96% have returned to their Families homes at the end of April, leaving 4% (200 individuals) still displaced at the end of the reporting period. As of the 30th of April, a total number of 27,143 families (132,586 4,619 individuals) are currently displaced in Mindanao. Those displaced can be Individuals classified into three main groups, depending on the length of displacement: CIVILIAN CASUALTIES Since January to April 2019 Group A: 60 families (200 individuals) remain displaced out of 1,080 families in the course of April; 9 Persons dead Group B: 11,040 families (53,836 individuals) remain protractedly displaced for more than 30 but less than 180 days; and Group C: 16,043 families (78,550 individuals) remain protractedly 13 displaced for more than 180 days. Those classified under Group C are Persons injured concentrated in four main areas: LOCATIONS Lanao Del Sur & Lanao Del Nortre: 14,012 families (68,378 individuals) Breakdown of displaced individuals by region still displaced due to Marwari siege in May 2017. Northern Mindanao: 1,243 families (6,261 individuals) still displaced due to Severe Thunder Storm Vinta (Temblin)in December 2017 72,101 individuals 54% BARMM BARMM Zamboanga City: 546 families (2,724 individuals) still displaced due to 40% 52,819 individuals REGION 10 REGION 10 Zamboanga siege in 2013.
    [Show full text]
  • Income Classification Per DOF Order No. 23-08, Dated July 29, 2008 MUNICIPALITIES Classification NCR 1
    Income Classification Per DOF Order No. 23-08, dated July 29, 2008 MUNICIPALITIES Classification NCR 1. Pateros 1st CAR ABRA 1 Baay-Licuan 5th 2 Bangued 1st 3 Boliney 5th 4 Bucay 5th 5 Bucloc 6th 6 Daguioman 5th 7 Danglas 5th 8 Dolores 5th 9 La Paz 5th 10 Lacub 5th 11 Lagangilang 5th 12 Lagayan 5th 13 Langiden 5th 14 Luba 5th 15 Malibcong 5th 16 Manabo 5th 17 Penarrubia 6th 18 Pidigan 5th 19 Pilar 5th 20 Sallapadan 5th 21 San Isidro 5th 22 San Juan 5th 23 San Quintin 5th 24 Tayum 5th 25 Tineg 2nd 26 Tubo 4th 27 Villaviciosa 5th APAYAO 1 Calanasan 1st 2 Conner 2nd 3 Flora 3rd 4 Kabugao 1st 5 Luna 2nd 6 Pudtol 4th 7 Sta. Marcela 4th BENGUET 1. Atok 4th 2. Bakun 3rd 3. Bokod 4th 4. Buguias 3rd 5. Itogon 1st 6. Kabayan 4th 7. Kapangan 4th 8. Kibungan 4th 9. La Trinidad 1st 10. Mankayan 1st 11. Sablan 5th 12. Tuba 1st blgf/ltod/updated 1 of 30 updated 4-27-16 Income Classification Per DOF Order No. 23-08, dated July 29, 2008 13. Tublay 5th IFUGAO 1 Aguinaldo 2nd 2 Alfonso Lista 3rd 3 Asipulo 5th 4 Banaue 4th 5 Hingyon 5th 6 Hungduan 4th 7 Kiangan 4th 8 Lagawe 4th 9 Lamut 4th 10 Mayoyao 4th 11 Tinoc 4th KALINGA 1. Balbalan 3rd 2. Lubuagan 4th 3. Pasil 5th 4. Pinukpuk 1st 5. Rizal 4th 6. Tanudan 4th 7. Tinglayan 4th MOUNTAIN PROVINCE 1. Barlig 5th 2. Bauko 4th 3. Besao 5th 4.