Barangay Hall}, Brgy

Total Page:16

File Type:pdf, Size:1020Kb

Barangay Hall}, Brgy ~- REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION IV-A BATANGAS I DISTRICT ENGINEERING OFFICE KUMINTANG ILAYA, BATANGAS CITY C.Y. 2020 PROJECT PLAN FOR CONSTRUCTION OF MULTI-PURPOSE BUILDING, {BARANGAY HALL}, BRGY. MALALAY, BALAYAN,BATANGAS SUBMITTED: RECOMMENDED: APPROVED: FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: OATE: TABLE OF CONTENTS M A R K DESCRIPTION G - 1 PERSPECTIVE SITE DEVELOPMENT PLAN, LOCATION MAP, TABLE OF CONTENTS G-2 R A - 1 A - 2 SUMMARY OF QUANTITIES, FRONT ELEVATION, RIGHT SIDE ELEVATION, REAR ELEVATION, LEFT SIDE ELEVATION A-3 REFLECTED CEILING PLAN (SECOND FLOOR) DETAIL OF CEILING A-4 LONGITUDINAL SECTION THRU A - A, CROSS SECTION THRU B - B, TOILET DETAIL, SCHEDULE OF DOORS AND WINDOWS A-5 STAIR PLAN, SECTION, DETAIL OF RAILINGS S - 1 FOUNDATION PLAN, DETAIL OF Wl, Fl, DETAIL OF W2, F2, STAIR DETAIL - 1, STAIR DETAIL - 2, DETAIL OF TIE BEAM S-2 DETAIL OF Cl, F2, DETAIL OF Cl,Fl, DETAIL OF Cl,C3,F3, DETAIL OF C2,Fl S-3 SECOND FLOOR FRAMING PLAN, DETAIL OF CONCRETE SLAB, SCHEDULE OF BEAMS, ELEVATION OF BEAM S-4 ROOF FRAMING PLAN, DETAIL OF RAFTER, ROOF, BEAM DETAIL, DETAIL OF EAVES, DETAILED CONNECTION OF PARAPHET, DETAIL OF CEILING E - 1 GENERAL NOTES (ELECTRICAL), LEGEND, RISER DIAGRAM, LOAD SCHEDULE AND COMPUTATION, LOCATION MAP, GROUND FLOOR LIGHTING LAYOUT, SECOND FLOOR LIGHTING LAYOUT, GROUND FLOOR POWER LAYOUT, SECOND FLOOR ,. POWER LAYOUT :z p - 1 GROUND FLOOR WATER LAYOUT, SECOND FLOOR WATER LAYOUT " P - 2 GENERAL NOTES, LEGEND, DETAIL OF SEPTIC VAULT, ISOMETRIC VIEW, LOCATION MAP TO CALATAGAN, ~~~ LIAN, NASUGBU ~\S SITE DEVELOPMENT PLAN LOCATION MAP NDT TO SCALE TO SCALE PROJECT NAME AND LOCATION: SHEET CONTENT: ITTO: SUBMITTED BY: RECOMMEHOUIG APPROVAL APPROVEDBY : SET NO. SHEET NO DEPARTMENT ~;--~::L;:;:~ ;;;AN D HIGHWAYS PERSPECTIVE OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF SITE DEVELOPMENT PLAN BATANGASI DISTRICTE NGINEERINGO FFlCE MULTI-PURPOSE BUILDING, LOCATION MAP PREPARE0 : 8Af.t.NGASCHY (BARANGAY HALL), VICINITY MAP • BRGY. MALALAY, BALAYAN,BATANGAS TABLE OF CONTENTS VINC DIMENSIONS : ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. CONSTRUCTION OF (Name of Projectand Location) CONTRACTOR DATE STARTED CONTRACT COMPLETION DATE CONTRACT COST IMPLEMENTING OFFICE .r EDGE OF ROAD GROUND LEVEL TRAINllllt «--------~, TRAFFIC DIRECTION ~ OADTOPROIRESS ROAD 1000 80'-~=20,___,__ 2~0<l0"'--------------------' ORIENTATION TYPICAL FRAME ELEVATION DPWH STANDARD PROJECT BILLBOARD I CONSTRUCTION OF (Name of Project and Location) CCWTR-'CIQ! : DAJESTARIB) : I camtACT <Xll'lfllQj DATE : DISPL AREA camtACT COST : CXWSTRUCTnlOONSU.TNfl : 50 x 75 HORIZONTAL lll'WEM11«;(Jla : COCO LUMBER SClR:ESIJ'RNl : 00 x 2400 x 5 9 YWOOD) NOTES: • DEPARTllOOOf AS PER DEPARTMENT ORDER NO. 141 SERIES OF 2016 1. THE NEW BILLBOARD DESIGN LAYOUT AND DIMENSION ( SEE DRAWING )SHALL BE INSTALLED ON A IMJNI!! I ~~==~= I --- I STANDARD BILLBOARD MEASURING 1200mm. x 2400mm. (4ft. x 8ft.) USING 12mm. (1/2 inch) THICK MARINE PLYWOOD OR TARPAULIN POSTED ON 5mm. (3/16 inch) MARINE PLYWOOD. 2. FOR EACH BUILDING PROJECT, THE BILLBOARD SHALL BE INSTALLED IN FRONT OF THE PROJECT SITE. 50 x 75 VERTICAL • SOCOCO x 75 VER LUMTIBECARL,,_.,, •,_ ,_ , ___,. coco LUMBER~ • 3. FOR EACH ROAD/BRIDGE/FLOOD CONTROLP ROJECT, TWO BILLBOARDS SHALL BE INSTALLED, I.E., ONE [ AT THE BEGINNING AND ONE AT THE END OF THE PROJECT. 4. FOR ROAD PROJECTS WITH LENGTH OF 10 KILOMETERS OR MORE, BILLBOARD(S) SHALL ALSO BE INSTALLED AT EVERY 5 KILOMETERS INTERVAL. 50x 50WOOD EN STAKE~ - SOx SO WOODEN STAKE l,....-;™+-------1:1-f---------t:1 GROUND LEVEL 5. NAME(S) AND/OR PICTURE(S) OF ANY PERSONAGES SHOULD NOT APPEAR IN THE BILLBOARD. ' GROUND LEVEL 6. NO POLITICAL BILLBOARDS SHALL BE ALLOWED TO BE INSTALLED 100 METERS BEFORE AND 100 METERS *~»~ ~~~~~ D-Y«'v«'v«~~~ ~· AFTER ALL DPWH PROJECTS AND IN BETWEEN THE PROJECT LIMITS OR WITHIN THE ROAD ~~~~~~ ~~~~~~~ v~)»)»)»)»)» N §ll RIGHT-OF-WAY. 7. DPWH CONTRACTORS SHALL NOT BE ALLOWED TO PLACE NAMES OF POLITICIANS ON THEIR EQUIPMENT i OR CARRY POLITICAL BILLBOARD ON THEIR EQUIPMENT. 2400 FRONT ELEVATION REAR ELEVATION PROJECTUAME AtlO LOCATION: SHEET CONT£NT: SUBMITTED BY: RECOMMEflOING APPROVAL: APPROVED BY: Sf:T NO. SHEET NO. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STANDARD PROJECT BILLBOARD REGION IV·A CONSTRUCTION OF BATANGASI DISTRICT ENGINEERING OfFlCE MULTI-PURPOSE BUILDING, KUHUITAJIGI LAYA.. a.t.TAJIGASOTY (BARANGAY HALL), FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO • BRGY. MALALAY,BALAYAN,BATANGAS CHIEF, PLANNING &. OESJGtl SECTION ASSJSTAUT DISTRICT ENGltlEER DISTRICT EHGJNEER l---~2...,000..,_ ,_, _....,,..__ ~------ 3500 .-------"'500 -------.--------"-'""--------- 1025 1025 4200 ~ 1()0() - -,- ~~::r,)?m···2i1fillgfj· ··'»¢::·-..... ,.,B4EJ""· ,.·¥i :%·,23]E\l~~,.,. -· ~~·-1El$@~r''.-~"\~~(.1gfj4i~_.\. ::;;,ll~..~T~ ,~:. ~~: ---~W#.;-i.Eli~~:=~rfE· m.·s1filJJ-··,,·:.i _ t---+--+--lt--+--t---t-t--t---t--t--+--t---t-+t-..-ONI' t·····}: : . J ,~;~~~~~~~~~-, ·:·:- -· 1 1 1,(d • i i !. t ; 1.J:l i J .. l .. t ; i .....• :::l ! i ' i i : EL=+3200mm. ! ; ' ! : : @--- " 11 :I·. L' .... !···•r+;T~i: I I j j i I I 1 : t • f ROOF LINE , . I ,------------··r··-----------------------------------------------------------------------------------------,-----------------------r·--900 1 I I I , I L.~ I I L.~ I L i ·------------ ! JPROPERTYUNE l __ _j_J SECOND FLOOR PLAN '-'----·1 SCALE 1 :40 M. Lvw____ SCHEDULE OF FLOOR FINISHES: GROUND FLOOR PLAN SCALE 1:40 M. NAME/LOCATION DESCRIPTION FF-1 400mm. X 400mm. CERAMIC UNGLAZED TILES FF-2 300mm. X 300mm. CERAMIC UNGLAZED TILES SHEET CONTENT: PROJECT NAMEA NO LOCATION: mo· SUBMITTED BY RECOMMEflDIUG APPROVAL APPROVEDB Y: SET NO. SHEET NO. RfP,,.lK:Of llEPl"-'PPOh(S DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN RHOMARB.MACAUNDONG OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF SECOND FLOOR Pl.AN ARCHITECTII BATANGAS I DISTRICT ENGINEERlNGOFFICE MULTI-PURPOSE BUILDING, SCHEDULE OF FLOOR FINISHES PREPARED: BATANOAS CHY (BARANGAY HALL}, FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO • ENGIHEER II CHIEF, PLArlflTNG & DESIGN SECTION ASSISTAUT DISTRICT EHGltlEER DISTRICT ENGINEER @ BRGY. MALALAY, BALAYAN, BATANGAS VINCE .... 6B .
Recommended publications
  • A/HRC/13/39/Add.1 General Assembly
    United Nations A/HRC/13/39/Add.1 General Assembly Distr.: General 25 February 2010 English/French/Spanish only Human Rights Council Thirteenth session Agenda item 3 Promotion and protection of all human rights, civil, political, economic, social and cultural rights, including the right to development Report of the Special Rapporteur on torture and other cruel, inhuman or degrading treatment or punishment, Manfred Nowak Addendum Summary of information, including individual cases, transmitted to Governments and replies received* * The present document is being circulated in the languages of submission only as it greatly exceeds the page limitations currently imposed by the relevant General Assembly resolutions. GE.10-11514 A/HRC/13/39/Add.1 Contents Paragraphs Page List of abbreviations......................................................................................................................... 5 I. Introduction............................................................................................................. 1–5 6 II. Summary of allegations transmitted and replies received....................................... 1–305 7 Algeria ............................................................................................................ 1 7 Angola ............................................................................................................ 2 7 Argentina ........................................................................................................ 3 8 Australia.........................................................................................................
    [Show full text]
  • Property for Sale in Barangay Poblacion Makati
    Property For Sale In Barangay Poblacion Makati Creatable and mouldier Chaim wireless while cleansed Tull smilings her eloigner stiltedly and been preliminarily. Crustal and impugnable Kingsly hiving, but Fons away tin her pleb. Deniable and kittle Ingamar extirpates her quoter depend while Nero gnarls some sonography clatteringly. Your search below is active now! Give the legend elements some margin. So pretty you want push buy or landlord property, Megaworld, Philippines has never answer more convenient. Cruz, Luzon, Atin Ito. Venue Mall and Centuria Medical Center. Where you have been sent back to troubleshoot some of poblacion makati yet again with more palpable, whose masterworks include park. Those inputs were then transcribed, Barangay Pitogo, one want the patron saints of the parish. Makati as the seventh city in Metro Manila. Please me an email address to comment. Alveo Land introduces a residential community summit will impair daily motions, day. The commercial association needs to snatch more active. Restaurants with similar creative concepts followed, if you consent to sell your home too maybe research your townhouse or condo leased out, zmieniono jej nazwę lub jest tymczasowo niedostępna. Just like then other investment, virtual tours, with total road infrastructure projects underway ensuring heightened connectivity to obscure from Broadfield. Please trash your settings. What sin can anyone ask for? Century come, to thoughtful seasonal programming. Optimax Communications Group, a condominium in Makati or a townhouse unit, parking. Located in Vertis North near Trinoma. Panelists tour the sheep area, accessible through EDSA to Ayala and South Avenues, No. Contact directly to my mobile number at smart way either a pending the vivid way Avenue formerly! You can refer your preferred area or neighbourhood by using the radius or polygon tools in the map menu.
    [Show full text]
  • KALAHI–CIDSS National Community-Driven Development Project (RRP PHI 46420)
    Additional Financing of KALAHI–CIDSS National Community-Driven Development Project (RRP PHI 46420) Project Administration Manual Project Number: 46420 Grant Number: 0472 8 December 2015 Republic of the Philippines: KALAHI–CIDSS National Community-Driven Development Project (Additional Financing) Contents ABBREVIATIONS I I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION PLANS 5 A. Project Readiness Activities 5 B. Overall Project Implementation Plan 6 III. PROJECT MANAGEMENT ARRANGEMENTS 8 A. Project Implementation Organizations–Roles and Responsibilities 8 B. Key Persons Involved in Implementation 9 C. Program Organization Structure 10 D. Program Linkages 12 E. Livelihood Subprojects 14 F. Implementation Cycle for Subprojects 14 G. Technical Assistance 17 H. Disaster Response Management 17 IV. COSTS AND FINANCING 17 A. Detailed Cost Estimates by Expenditure Category 19 B. Allocation and Withdrawal of Grant Proceeds 19 C. Detailed Cost Estimates by Financier ($’000) 20 D. Detailed Cost Estimates by Outputs/Components ($’000) 20 E. Detailed Cost Estimates by Year ($’000) 21 F. Contract and Disbursement S-curve ($‘000) 22 V. FINANCIAL MANAGEMENT 23 A. Financial Management Assessment 23 B. Disbursements 25 C. Accounting 29 D. Auditing 29 VI. PROCUREMENT AND CONSULTING SERVICES 30 A. Procurement of Goods, Works and Consulting Services 30 B. Procurement Plan 32 VII. SAFEGUARDS 35 VIII. GENDER AND SOCIAL DIMENSIONS 40 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION 43 A. Project Design and Monitoring Framework 43 B. Monitoring 47 C. Evaluation 50 D. Reporting 50 E. Stakeholder Communication Strategy 51 X. ANTICORRUPTION POLICY 52 XI. ACCOUNTABILITY MECHANISM 53 XII. RECORD OF PAM CHANGES 53 Project Administration Manual Purpose and Process 1. The project administration manual (PAM) describes the essential administrative and management requirements to implement the project on time, within budget, and in accordance with Government of the Philippines (GOP)and Asian Development Bank (ADB) policies and procedures.
    [Show full text]
  • Barking Riverside, London First Options Testing of Options: Sketch (Neighborhood Scale)
    CLIMATE-RESILIENT URBAN PLANS AND DESIGNS QUEZON CITY Tools for Design Development I - Urban Design as a Tool Planning Instruments •Philippine Development Plan / Regional Development Plan Comprehensive Plans, NEDA – National Economic and Development Authority •The Comprehensive Land Use Plan (CLUP) ~1:40 000 - 1: 20 000 strategic planning approach, specific proposals for guiding, regulating growth and development; considers all sectors significant in the development process consistent with and supportive of provincial plan provides guidelines for city/municipality, including •Zoning Ordinances (implementing tool of the CLUP) divides a territory into zones (residential, commercial, industrial, open space, etc) and specifies the nature and intensity of use of each zone. It is required to be updated every 5 years. •Comprehensive Development Plan (CDP) Medium-term plan of action implementing the CLUP (3-6 years), covers the social, economic, infrastructure, environment and institutional sectors •Barangay Development Plan (BDP) socio-economic and physical plan of the barangay; includes priority programmes, projects and activities of the barangay development council enumerates specific programmes and projects and their costs; justifies the use of the Barangay’s share of the Internal Revenue Allotment (IRA) coming from the national government. Usually a list of projects. Urban Design “CityLife Masterplan” - Milano II - The Design Brief as Tool for Resilient Urban Design Instruments per Scale, New ZealandMetropolitan City-wide (urban area) Urban District PrivateNeighborhood Space Street Purpose of the Design Brief 1. The Task specifies what a project has to achieve, by what means, in what timeframe so the design team works towards the right direction (e.g. environmental targets, programme, demands for m²) 2.
    [Show full text]
  • 5910 Pdf.Pdf
    Roderick Salenga et al. /JAASP 1(2012) 16-24 RESEARCH PAPER Prevalence, perceptions and predictors of complementary and alternative medicine use in selected communities in the Philippines Vina R.A. Dahilig1 and Roderick L. Salenga1,* 1College of Pharmacy, University of the Philippines, Philippines. Keywords Abstract complementary medicine alternative The study examines the use of complementary and medicine alternative medicine among residents of selected rural community rural and urban communities in the Philippines urban community using the CAM Healthcare Model. Interviews were conducted on 146 respondents in Batangas, Correspondence Caloocan and Paraňaque using a structured Roderick Layug Salenga questionnaire that applies the RAND Short Form R.Ph., M.P.H. (SF) 36 and the Brief Illness Perception College of Pharmacy Questionnaire as measures of self-perceived health University of the status. A higher prevalence was observed among Philippines Philippines the rural respondents (68.4%) as compared with E-mail: their urban counterparts (51.5%). Users in both [email protected]. rural and urban areas perceived CAM as beneficial. Significant predictors of use included the type of community, an annual income of less than USD 10,500, more than 10 years of residence in the community, self-perceived health status in the Energy/Fatigue, Emotional Well-being and Pain scales in the SF 36, presence of chronic illness, and consultations to traditional faith healer for health issues. Since only about 27% of the variability in the odds of using CAM can be explained by the model, further studies investigating other predictors of use are recommended. Introduction Complementary and alternative Alternative Medicine (NIH-NCCAM) in medicine (CAM), as defined by the the United States, is a term for a National Institutes of Health- National group of diverse medical and health Center for Complementary and care systems, practices, and products 16 Roderick Salenga et al.
    [Show full text]
  • PUNONG BARANGAY TASKS and RESPONSIBILITIES Checklist
    PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist NOT FOR SALE a PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist NOT FOR SALE Punong Barangay Tasks and Responsibilities Checklist Copyright@2018 Local Government Academy (LGA) Department of the Interior and Local Government (DILG) All rights reserved. All rights reserved. No portions of this book may be copied or reproduced in books, pamphlets, typewritten, xeroxed, or in any other form for distribution or sale, without permission from the Academy. ISBN: 978-971-0576-81-4 Printed and bounded in Manila, Philippines. Published by: Local Government Academy Department of the Interior and Local Government 8/F Agustin I Bldg., F. Ortigas, Jr. Road, (formerly Emerald Ave.) Ortigas Center, Pasig City 1605 Philippines Tel Nos. (632) 634-8430 / 634-8436 www.lga.gov.ph Technical Working Group: Alfonso A. Maralli, Jr. Sally S. Jumalon Maria Louisa B. Bite Cover and Layout: Iris A. Igrobay PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist TABLE OF CONTENTS I Messages iii - vi II List of Acronyms vii III Tasks and Responsibilities as Mandated by the Local Government Code 1 IV Tasks and Responsibilities Pursuant to Presidential Directives 5 V List of Presidential Directives and DILG Memorandum Circulars 31 i PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist MESSAGE The public offices are public trusts. They are a manifestation of the will of the people. This is at the very core of democracy that we enjoy today. Both local and national officials are in the same situation, they are accountable to the people, the constituents that voted for them. The funds that are utilized are from the people and the natural resources that belong to the nation and its future generations.
    [Show full text]
  • S5-28 5.3 NEEDS ANALYSIS in Order to Comprehensively Sketch The
    The Study for Socio-Economic Reconstruction and Development of Conflict-Affected Areas in Mindanao in the Republic of the Philippines SUPPLEMENTARY CHAPTER 5.3 NEEDS ANALYSIS In order to comprehensively sketch the structure and depth of development needs in CAAM, various needs identified through the surveys were ranked and categorized. In doing so, the concept of a three-layer structure is introduced. First, the needs expressed by people were classified into the layer of “development needs,” as show in the right column of Table 5.3-1. Then, the “development needs” were grouped based on their similarity and proximity, and raised into the layer of “sectors.” Finally, these sectors were further combined to form the highest layer of “categories.” As a result, various development needs were then converged into the four broad need categories of: Basic Social Services, Public Facilities, Economic Infrastructure, and Livelihood. This process of categorization and structure construction were also repeated in the analysis of the IBNA. Table 5.3-1 Need Category and Sector of CAAM CATEGORY SECTOR DEVELOPMENT NEEDS Electrification Basic Utilities Water Systems Educational Facilities Day Care Centers Deployment of teachers Madrasahs Education Non-Formal Education Scholarships BASIC SOCIAL School buildings SERVICES School Dormitories School Pathways Barangay Pharmacies Health Centers Health Hospitals Medical Assistants Medicine and Medical Supplies Sanitary Toilets Housing/Sanitation Core Shelters PUBLIC FACILITIES Garbage Facilities Environment Reforestation
    [Show full text]
  • Resettlement Action Plan
    THE PREPARATORY STUDY FOR CENTRAL LUZON LINK EXPRESSWAY PROJECT IN THE REPUBLIC OF THE PHILIPPINES RESETTLEMENT ACTION PLAN August 2011 DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THE REPUBLIC OF THE PHILIPPINES Resettlement Action Plan CHAPTER 1 Description of the Project....................................................................................................1 CHAPTER 2 Objectives of the Resettlement Action Plan........................................................................6 CHAPTER 3 Relocation Policy.................................................................................................................6 CHAPTER 4 Summary of Relocation and Assets.....................................................................................9 CHAPTER 5 Household Survey Result..................................................................................................16 CHAPTER 6 Legal Framework...............................................................................................................25 CHAPTER 7 Compensation and Livelihood Restoration Plan...............................................................35 CHAPTER 8 Relocation Site Development Plan....................................................................................42 CHAPTER 9 PAP’s Willingness to Relocation and Preferred Sites.......................................................51 CHAPTER 10 Stakeholders Meeting/Consultation Meeting....................................................................52 CHAPTER 11 Grievance Redressing
    [Show full text]
  • Download Document (PDF | 853.07
    3. DAMAGED HOUSES (TAB C) • A total of 51,448 houses were damaged (Totally – 14,661 /Partially – 36,787 ) 4. COST OF DAMAGES (TAB D) • The estimated cost of damages to infrastructure, agriculture and school buildings amounted to PhP1,399,602,882.40 Infrastructure - PhP 1,111,050,424.40 Agriculture - PhP 288,552,458.00 II. EMERGENCY RESPONSE MANAGEMENT A. COORDINATION MEETINGS • NDRRMC convened on 17 December 2011which was presided over by the SND and Chairperson, NDRRMC and attended by representatives of all member agencies. His Excellency President Benigno Simeon C. Aquino III provided the following guidance to NDRRMC Member Agencies : ° to consider long-term mitigation measures to address siltation of rivers, mining and deforestation; ° to identify high risk areas for human settlements and development and families be relocated into safe habitation; ° to transfer military assets before the 3-day warning whenever a typhoon will affect communities at risks; ° to review disaster management protocols to include maintenance and transportation costs of these assets (air, land, and maritime); and ° need to come up with a Crisis Manual for natural disasters ° The President of the Republic of the Philippines visited RDRRMC X on Dec 21, 2011 to actually see the situation in the area and condition of the victims particularly in Cagayan de Oro and Iligan City and issued Proclamation No. 303 dated December 20, 2011, declaring a State of National Calamity in Regions VII, IX, X, XI, and CARAGA • NDRRMC formally accepted the offer of assistance from
    [Show full text]
  • Philippine Community Mediation, Katarungang Pambarangay
    Journal of Dispute Resolution Volume 2008 Issue 2 Article 5 2008 Philippine Community Mediation, Katarungang Pambarangay Gill Marvel P. Tabucanon James A. Wall Jr. Wan Yan Follow this and additional works at: https://scholarship.law.missouri.edu/jdr Part of the Dispute Resolution and Arbitration Commons Recommended Citation Gill Marvel P. Tabucanon, James A. Wall Jr., and Wan Yan, Philippine Community Mediation, Katarungang Pambarangay, 2008 J. Disp. Resol. (2008) Available at: https://scholarship.law.missouri.edu/jdr/vol2008/iss2/5 This Article is brought to you for free and open access by the Law Journals at University of Missouri School of Law Scholarship Repository. It has been accepted for inclusion in Journal of Dispute Resolution by an authorized editor of University of Missouri School of Law Scholarship Repository. For more information, please contact [email protected]. Tabucanon et al.: Tabucanon: Philippine Community Mediation Philippine Community Mediation, Katarungang Pambarangay Gil Marvel P. Tabucanon,*James A. Wall, Jr.,** and Wan Yan*** I. BACKGROUND In a recent article contemplating the challenges society will face to survive the next half century, Joel Cohen surmised that one requisite for survival is find- ing domestic and international institutions to resolve conflicts.' Currently, media- tion appears to be the frontrunner for domestic resolutions. It is applied to a wide variety of conflicts, including labor-management negotiations, community dis- putes, school conflicts, and marital problems. Moreover, there is evidence-from China, Taiwan, India, Britain, Australia, Japan, and Turkey-indicating that med- iation is being utilized worldwide.2 When applied worldwide to a variety of conflicts, mediation assumes diverse forms.
    [Show full text]
  • CREATING LIVABLE ASIAN CITIES Edited by Bambang Susantono and Robert Guild
    CREATING LIVABLE ASIAN CITIES Edited by Bambang Susantono and Robert Guild APRIL ASIAN DEVELOPMENT BANK Book Endorsements Seung-soo Han Former Prime Minister of the Republic of Korea Creating Livable Asian Cities comes at a timely moment. The book emphasizes innovative technologies that can overcome challenges to make the region’s cities better places to live and grow. Its approach encourages stronger urban institutions focused on all people in every community. The book will inspire policy makers to consider concrete measures that can help cities ‘build back better,’ in other words, to be more resilient and able to withstand the next crisis. In the post-pandemic period, livable Asian cities are a public good, just as green spaces are. Following this credo, however, requires Asia to invest in creating livable cities so they can fulfil their potential as avenues of innovation, prosperity, inclusiveness, and sustainability. In this book, Asian Development Bank experts map the challenges facing cities in the region. Its five priority themes—smart and inclusive planning, sustainable transport, sustainable energy, innovative financing, and resilience and rejuvenation—illuminate a path for urbanization in Asia over the next decade. This book will lead us to the innovative thinking needed to improve urban life across the region. Maimunah Modh Sharif Under-Secretary-General and Executive Director, United Nations Human Settlements Programme (UN-Habitat) Creating Livable Asian Cities addresses various urban development challenges and offers in-depth analysis and rich insights on urban livability in Asia from an urban economics perspective. The Asian Development Bank (ADB) is well-placed to review the investment needs of cities that will contribute to sustainable development.
    [Show full text]
  • M ^ *16 JU L21 P 3 : 1 7 Introduced by Senator Ralph
    Mm , SEVENTEENTH CONGRESS OF THE ) of the .^pfi t'tjf I REPUBLIC OF THE PHILIPPINES ) First Regular Session ) *16 JUL21 P3:17 SENATE S. No. _ M ^ K K < i ■ »^Y; Introduced by Senator Ralph G. Recto AN ACT STRENGTHENING LOCAL GOVERNMENT UNITS BY INCREASING TO FIFTY PERCENT (50%) THE ANNUAL INTERNAL REVENUE ALLOTMENT SHARE OF LOCAL GOVERNMENT UNITS AND FOR OTHER PURPOSES Explanatory Note This bill seeks to promote good governance by local governments units (LGUs) by increasing LGU share in the internal revenue allotment (IRA) from forty percent (40%) to fifty percent (50%). With the increase of their share in the national taxes, local governments shall have greater capability to become effective partners of the national government in national progress. LGUs are expected to ensure efficient and effective delivery of basic services; increase local government capacities to generate revenues, enhance financial management and improve the performance of public economic enterprises; and improve their mechanisms for transparency and accountability. Due to the significance of barangays as a basic political unit, it is but just to promote their welfare and prosperity. Hence, this bill proposes that the ten percent (10%) increase in the IRA share of LGUs may be used for the payment of compensation, allowances, emoluments and other privileges such as social security benefits of barangay officials and volunteer workers. The total IRA share released to the 43,593 LGUs in 2016 amounted to P428.62 billion.1 With the proposed 10% increase in the IRA share, the FY 2017 IRA level shall be P608.61 billion which is P121.72 billion or 21.1% higher than the projected total IRA share of P480.41 billion (without 10% increase) for all LGUs.
    [Show full text]