TOBOLSK-POLYMER propane dehydrogenation and polypropylene production complex LOCATION OF THE TOBOLSK-POLYMER COMPLEX
THE COMPLEX IS ADVANTEGOUSLY LOCATED AT THE HUB OF THE OIL WEST SIBERIAN PETROCHEMICAL CLUSTER AND GAS FIELDS AND THE MAIN ROUTES CONNECTING SIBERIA WITH THE WESTERN PART OF THE COUNTRY
TOBOLSK-NEFTEKHIM
TOBOLSK-POLYMER
PROPANE POLYPROPYLENE DEHYDROGENATION (DHP) PRODUCTION: 510 KTPA 500 KTPA
1 PROJECT SCALE
ONE OF THE BIGGEST PROPYLENE LINDE AG (GERMANY) COUNTRIES INVOLVED IN THE PROJECT EPC contractor for PP plant PRODUCERS (BY DHP UNIT CAPACITY)* . ITALY . BELGIUM . GERMANY . UNITED KINGDOM Pl Propylene USA 658 000 tpa . RUSSIA . CZECH REPUBLIC INEOS (United Kingdom) Tobolsk- . INDIA . SPAIN PP licensor RF 510 000 tpa . NETHERLANDS . MEXICO Polymer . USA . CHINA Saudi Saudi . TURKEY . JAPAN 450 000 tpa TOBOLSK-POLYMER Polyolefins Co. Arabia . SWITZERLAND . UAE . FRANCE . SWEDEN Propanchem Spain 400 000 tpa . KOREA . AUSTRIA . MALAYSIA . DENMARK . SINGAPORE FLUOR Petronas Malaysia 300 000 tpa (Netherlands) project management EQUIPMENT AND MATERIAL contractor THE BIGGEST PP PRODUCER (BY PP SUPPLIERS** UNIT CAPACITY)* UOP (USA) 12% DHP licensor Tobolsk- RF 500 000 tpa Polymer Shenhua China 500 91% MAIRE TECNIMONT SPA (Italy) Ningmei 88% EPC contractor for DHP plant Shenhua China 500 Ningmei 9% Saudi Ibn Zahr 500 EQUIPMENT MATERIALS Arabia Chandra Asri Indonesia 480 RUSSIAN PRODUCERS INTERNATIONAL PRODUCERS PC
EQUIPMENT Total PC Belgium 480 CONSTRUCTION BANKS AND DESIGN AND
AND INSTALLATION FINANCIAL SURVEY
** Ratio in value terms >298 5 48 11 companies * Projects that are already operational companies organisations companies
PRODUCERS WORK INSTITUTIONS WORK 2 DELIVERY OF LARGE-SCALE EQUIPMENT
. 18 VESSELS, 992 RAILWAY CARS, AND 1,957 TRUCKS HAVE DELIVERED EQUIPMENT AND MATERIALS TO THE FACILITY FROM OVER
20 COUNTRIES TOBOLSK-POLYMER
. THE FACILITY’S LARGEST COLUMN IS 96M HIGH, HAS A DIAMETER OF 10.5 M, WEIGHS 1,086 TONNES AND ~31 817 km TOOK 6 HOURS TO BE ~16 749 km INSTALLED
~29 131 km
. ALL EQUIPMENT IS DESIGNED TO BE FULLY OPERATIONAL AT −52ºС, THE LOWEST TEMPERATURE EVER RECORDED IN TOBOLSK EQUIPMENT FOR PP UNIT
EQUIPMENT FOR DHP UNIT
3 PROJECT CAPEX AND FINANCING
PROJECT CAPEX ~ BANKING SYNDICATE RUB 60 BLN
DEAL MANAGEMENT CREDIT LINES FINANCING $1 441 млн1) AGREEMENT
PROJECT FINANCING TOBOLSK VEB POLYMER
CREDIT AGRICOLE CIB DEUTSCHE BANK . Global Coordinator and Documentation Agent for the financing. . Hermes Facility Agent, SACE Facility Agent and Hermes Agent . Commercial Facility Agent for the two Commercial Loan Facilities
NAMED DEAL OF THE YEAR 2010 BY INTERNATIONAL INTESA SANPAOLO SPA FINANCIAL PUBLICATIONS: PROJECT FINANCE MAGAZINE AND TRADE FINANCE MAGAZINE . SACE Agent and Italian Paying Agent
1) Including $1,220 mln ECA backed financing – 13.5 years, and $221 – commercial installment loan - 9 years
4 RUSSIAN POLYPROPYLENE (PP) MARKET
PP CONSUMPTION* PP USE* FINAL PP PRODUCTS
2012, kg per capita 2012
RUSSIA 5%3%
6 6% THREAD
38% TUPPERWARE 18% FOOD PACKAGING
EASTERN EUROPE 14.2
TOPS
USA 17
30% HCSPIPES
CAR CAR BUMPERS
BOTTLE
PACKING FIBRES WESTERN EUROPE 18 FILMS PIPES PP PLATES (INCL. GEO MATERIALS)
OTHER CHAIRS
HOUSEHOLD
APPLIANCES DAIPER LININGS DAIPER
SIBUR’S SALES NETWORK SIBUR’S SALES NETWORK
SIBUR’S INTERNATIONAL OFFICES (EXPORT BASIC POLYMER SALES DIVISION): OFFICES:
. MOSCOW . MOSCOW . VIENNA . NIZHNY NOVGOROD . SHANGHAI . EKATERINBURG . TIANJIN . ROSTOV ON DON . QINGDAO . SAINT PETERSBURG . GUANGZHOU . NOVOSIBIRSK/TOMSK . KIEV . ISTANBUL
5 * Source: MRC Plast ECOLOGICAL PRESERVATION
CUTTING EDGE TECHNOLOGICAL SOLUTIONS MINIMISE THE PROJECT’S ENVIRONMENTAL IMPACT
THE PROJECT’S ENVIRONMENTAL IMPACT IS MONITORED . ADVANCED FILTRATION SYSTEM KEEPING VIRTUALLY ALL BY ERM EURASIA, AN INTERNATIONAL SUSTAINABILITY EMISSIONS BELOW THE AUTHORISED LEVEL
CONSULTANCY . FACILITY LOCATED 10 KM TO THE NORTH-EAST OF TOBOLSK
. CONTRACT SIGNED BY 2022 . WIND ROSE: FOR MOST OF THE YEAR THE WIND DIRECTION IS
AWAY FROM THE CITY . BIANNUAL AUDITS DURING CONSTRUCTION AND ANNUAL AUDITS AFTER
COMMISSIONING . FACILITY EQUIPPED WITH CLOSED LOOP WASTEWATER
TREATMENT SYSTEM (ZERO DISCHARGE TO RIVERS, LAKES, . CONTINUOUS AUTOMATIC AIR QUALITY MONITORING BY THE STATION IN SWAMPS OR ANY OTHER BELOW/ABOVEGROUND WATER TOBOLSK RESERVOIRS)
. REGULAR LABORATORY TESTING PLANNED FOR AIR EMISSIONS . WASTE TREATMENT FACILITIES DESIGNED WITH RESERVE AT THE BOUNDARY OF THE FACILITY’S SANITARY PROTECTION ZONE CAPACITY TO CONTAIN OVERSPILL
ENVIRONMENTAL MONITORING DATA IS REGULARLY SUBMITTED TO THE TYUMEN REGION’S ROSPRIRODNADZOR OFFICE (FEDERAL SERVICE FOR THE SUPERVISION OF NATURAL RESOURCES) AND THE TYUMEN GOUVERNMENT’S NATURAL RESOURCES AND ENVIRONMENTAL MANAGEMENT DEPARTMENT 6