PURCHASE ORDERS > $25,000 AWARDED UNDER DELEGATION

Total Page:16

File Type:pdf, Size:1020Kb

PURCHASE ORDERS > $25,000 AWARDED UNDER DELEGATION Transit Services PURCHASE ORDERS > $25,000 AWARDED UNDER DELEGATION OF AUTHORITY FOR THE PERIOD JANUARY 01,2020 TO JUNE 30, 2020 Document 1 Professional/ Follow-on/ Item # PO Service Description Amount Vendor Non Competitive Rationale Consulting Services Amendment 1 45084092 Business Support Services Professional Operations and Maintenance Services for the City's Stage 1 Confederation Line Light Rail Transit PE A STV CANADA CONSULTING INC. project requirements. $ 9 19,805.79 TORONTO ON 2 45089379 Safety, Compliance, Training Professional Services to provide Train the Trainer training and Cognitive Driver Assessments for Transportation PE DRIVEABLE ASSESSMENT CENTRES INC & Development Services. $ 40,041.90 EDMONTON AB Section 22(1)(h) - Professional Services < $50,000 3 45089812 Safety, Compliance, Training Labor, equipment, materials and consumables to load, transport and dispose of various solid and liquid waste TOMLINSON ENVIRONMENTAL SERVICE LTD & Development materials from City of Ottawa and OC Transpo locations to approved processing facilities. $ 1 67,018.40 OTTAWA ON 4 45089959 Safety, Compliance, Training Professional environmental engineering services undertake stormwater pond testing and reporting at 735 PE EXP SERVICES INC & Development Industrial Avenue, 813 Industrial Avenue and 1660 St. Laurent Boulevard. $ 29,346.35 OTTAWA ON 5 45077181 Transit Customer Systems & Dedicated server hosting services for OC Transpo web site. E IWEB TECHNOLOGIES INC Planning $ 25,141.38 MONTREAL QC Section 22(1)(a) - Proprietary Rights 6 45079366 Transit Customer Systems & Provide modifications to HASTUS 2016 software for Transportation Services. PE A GIRO INC Planning $ 54,950.40 MONTREAL QC 7 45080214 Transit Customer Systems & Lost and Found Management and Client Services for OC Transpo. A HEARTWOOD HOUSE Planning $ 2 75,126.53 OTTAWA ON 8 45081945 Transit Customer Systems & Professional project management services for the Fare Management Systems project for Transportation PE A IBM CANADA LIMITED Planning Services. $ 60,445.44 OTTAWA ON 9 45084394 Transit Customer Systems & Print and delivery of process colour service timetables for Transportation Services. E TRICO EVOLUTION Planning $ 61,056.00 OTTAWA ON 10 45085380 Transit Customer Systems & Professional IT services for a senior technology infrastructure architect to complete the integration of the PE IBISKA TELECOM INC Planning onboard customer-facing systems in new transit operations. $ 223,668.48 OTTAWA ON 11 45085844 Transit Customer Systems & Annual software Licence for Trapeze PASS-Web and PASS-WebCare Sotware products for the Para Transpo A TRAPEZE SOFTWARE ULC Planning Service. $ 2 72,465.45 MISSISSAUGA ON Section 22(1)(a) - Proprietary Rights 12 45085859 Transit Customer Systems & Supply 100,000 PRESTO cards for the PRESTO Automated Fare Collection System. A METROLINX Planning $ 5 08,800.00 TORONTO ON Section 22(1)(a) - Proprietary Rights 13 45086558 Transit Customer Systems & Supply and deliver PRESTO school board cards for the PRESTO automated fare collection system for A METROLINX Planning Transportation Services. $ 9 7,689.60 TORONTO ON Section 22(1)(a) - Proprietary Rights 14 45087094 Transit Customer Systems & All labour, equipment and materials to remove and dispose of the concrete slab at Parliament Station and to A JWK UTILITIES AND SITE SERVICES LTD Planning provide additional work to power the Bayview Station shelter on the O-Train Line 1. $ 97,528.37 CARP ON 15 45087707 Transit Customer Systems & Supply and deliver paddles and headways books for Transit Customer Systems and Planning. E TRICO EVOLUTION Planning $ 35,913.60 OTTAWA ON 16 45087811 Transit Customer Systems & OPTIC software 2018-2020 for Transit Customer Systems and Planning A MINISTRY OF FINANCE Planning $ 5 3,951.36 OSHAWA ON Section 22(1)(e) - Security or Confidentiality Matters 17 45088722 Transit Customer Systems & Professional IT Services of a Technical Writer for the Integrated Transit Management system project PE A PLANIT SEARCH INC Planning $ 50,810.80 TORONTO ON Section 22(1)(d) - Absence of competition for technical or other reason 18 45088829 Transit Customer Systems & All labour, equipment and materials for the construction of 10 footings for enhanced backlit station bus stop DW BUILDING RESTORATION SERVICES IN Planning signs at O-Train Line 1 stations. $ 1 77,185.63 OTTAWA ON 19 45088885 Transit Customer Systems & On-site services, hardware support and software maintenance and system support services for the Intelligent PE A CLEVER DEVICES ULC CANADA Planning Transportation (ITS) System installed on transit buses for Transit Customer Systems and Planning. $ 3 ,376,303.18 TORONTO ON Section 22(1)(a) - Proprietary Rights 20 45089356 Transit Customer Systems & Professional IT services for a senior database analyst and developer. PE TIREE CONSULTING INC Planning $ 2 10,270.45 OTTAWA ON 21 45089389 Transit Customer Systems & Professional engineering services to undertake an independent safety assessment of the Transitway Station PE PARSONS INC Planning Design. $ 99,613.92 TORONTO ON 22 45089416 Transit Customer Systems & Professional Engineering services to undertake a Transit Corridor Analysis on Woodroffe Avenue to improve PE DILLON CONSULTING LIMITED Planning reliability. $ 87,437.28 OTTAWA ON 23 45089548 Transit Customer Systems & Supply and install Platform Boarding Decals at 13 O-Train Stations. SIGNS.CA VISUAL COMMUNICATION Planning $ 2 56,856.49 OTTAWA ON Section 22(1)(f) - Special Circumstance 24 45089556 Transit Customer Systems & Professional services to implement, maintain and support a Secure Network and Mobile Device Management PE FSET INC Planning solution for the Transit Special Constable Unit. $ 5 51,035.84 KENORA ON Section 22(1)(d) - Absence of competition for technical or other reason Page 1 of 4 Transit Services PURCHASE ORDERS > $25,000 AWARDED UNDER DELEGATION OF AUTHORITY FOR THE PERIOD JANUARY 01,2020 TO JUNE 30, 2020 Document 1 Professional/ Follow-on/ Item # PO Service Description Amount Vendor Non Competitive Rationale Consulting Services Amendment 25 45089565 Transit Customer Systems & Supply and deliver one IVN5 Bus-in-a-Box system with adaptors for the Clever Devices Intelligent Transportation A CLEVER DEVICES ULC CANADA Planning System integrated solution installed in a new Nova bus for Transit Customer Systems & Planning. $ 28,685.13 TORONTO ON 26 45089597 Transit Customer Systems & Annual Membership in Imperial College London GOAL Benchmarking Group of North American Light Rail PE A RAILWAY AND TRANSPORT STRATEGY CENT Planning Systems. $ 3 2,863.05 LONDON Section 22(1)(h) - Professional Services < $50,000 27 45089627 Transit Customer Systems & Professional services to integrate the real time train data feed from RTG into Customer Information Systems, PE A CLEVER DEVICES ULC CANADA Planning which will enable the delivery of real-time arrival information on O-Train Line 1. $ 1 08,758.04 TORONTO ON 28 45089660 Transit Customer Systems & Supply and deliver 20 benches as part of the Integrated Street Furniture Program for Transportation Services. A MAGLIN SITE FURNITURE INC Planning $ 2 9,134.91 WOODSTOCK ON Section 22(1)(d) - Absence of competition for technical or other reason 29 45089710 Transit Customer Systems & Supply and deliver 74 networked digital video recorders (CCTV) to be installed in OC Transpo bus fleet. 360 ADVANCED SECURITY CORP Planning $ 4 99,782.03 OTTAWA ON 30 45089875 Transit Customer Systems & Annual software maintentance services for Oracle Internet Application Software in use by the Technology & ORACLE CANADA ULC Planning Control Systems Branch. $ 2 6,820.52 MISSISSAUGA ON Section 22(1)(a) - Proprietary Rights 31 45090023 Transit Customer Systems & Professional Engineering services to review Bus Alternative Energy Sources PE DILLON CONSULTING LIMITED Planning $ 1 43,106.11 LONDON ON 32 45090060 Transit Customer Systems & Supply and deliver one data storage array shelve, 1440 data storage software licenses, one hardware support F DECISIVE TECHNOLOGIES Planning plan and 24 data storage hard drives to expand OC Transpo’s current Data Storage Solution $ 66,171.47 OTTAWA ON 33 45090202 Transit Customer Systems & Supply and delivery of 370 IP Network Cameras to be installed in new build transit buses. ACCARA INC. Planning $ 1 69,070.24 KINGSTON ON 34 45079127 Transit Operations Trainset Maintenance, Inspections and Repairs for the six (6) LINT DMU Trainsets for Transit Operations. A BOMBARDIER TRANSPORTATION CANADA IN $ 4 9,622.22 ST.BRUNO QC 35 45082916 Transit Operations Transit Fleet vehicle towing services on an as and when requested basis. E GERVAIS MOTORS LIMITED $ 2 69,280.00 GLOUCESTER ON 36 45083274 Transit Operations Standing offer to supply and deliver electrical materials to Transit Services. E NEDCO $ 74,820.00 OTTAWA ON 37 45084477 Transit Operations Supply and deliver Ultra Low Sulphur Diesel Fuel (ULSD#1) for on-site, Direct to Locomotive refueling services A SUNCOR/PETRO CANADA for the O-Train, Trillium Line. $ 3 40,023.19 MISSISSAUGA ON 38 45087311 Transit Operations Standing Offer to supply and deliver plumbing materials to Transit Operations Service. NOBLE CORPORATION $ 7 4,820.00 CONCORD ON 39 45087386 Transit Operations Supply and deliver Clever Device Equipment for 19 double decker heavy-duty transit buses for Transit ALEXANDER DENNIS (CANADA) INC Operations. $ 3 19,926.27 VAUGHAN ON 40 45087720 Transit Operations Rental and repair of garage garments for Transit Operations. E32(2) UNIFIRST CANADA LTD $ 2 97,783.60
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • 2. Faqs__Transit Service During Confed Line
    Transit Service During Confederation Line Construction – Updates for 2016 REPORT TRANSIT SERVICES DEPARTMENT REPORT FAQs REPORT Transit Service During Confederation Line Construction – Updates for 2016 TITLE DIVISION: Customer Systems and Planning BRANCH Service Planning REPORT Pat Scrimgeour, Assistant General Manager, Customer Date: January 26, 2016 AUTHOR Systems and Planning SCHEDULED DATES FOR REPORT GM’s REVIEW OF REPORT TRANSIT COMMISSION COUNCIL January 19, 2016 February 17, 2016 N/A Q1. How long will the Confederation Line construction service adjustments last for? What are the next phases for service adjustments? A1. The O-Train Confederation Line is scheduled to open in 2018. Service adjustments will take place in sequential phases as sections of the Transitway undergo construction work. Each section of Transitway that closes for conversion to light rail will never reopen for bus operations. The remaining Transitway closures are: • April 2016 – Laurier Station to Lees Station; and • June 2016 – Tunney's Pasture Station to Merton Street. Timelines will be updated as information becomes available. Service adjustment plans will be implemented as these closures take effect. Stations will remain open during the construction period, with the exceptions of Cyrville Station, which was closed in June 2015, and Campus Station, which will close in April 2016. Q2. What are the main highlights of upcoming transit service adjustments during Confederation Line Construction? A2. The following are the main highlights of upcoming transit service adjustments during O- Train Confederation Line Construction: • On April 24, 2016, the Transitway will close between Laurier Station and Lees Station. Most transit service along this section of the Transitway will be relocated to Nicholas Street and Highway 417, using the bus-only lanes that have been built for this purpose.
    [Show full text]
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • IBI Group Ottawa LRT Release 10-07-19 FINAL
    Media Contact: Julia Harper, IBI Group [email protected] 416-596-1930 ext. 61187 or 647-330-4706 - For immediate release - IBI Group-Designed Confederation Line LRT Downtown Tunnel Opens to Public – Global design and technology firm designs underground segment of Ottawa’s largest infrastructure project – TORONTO, ON (October 7, 2019) – Global design and technology firm, IBI Group (TSX:IBG), completed the station design of the downtown tunnel portion of Ottawa’s Confederation Line – a 13-station, 12.5km light rail transit line with a 2.5km underground segment beneath the city center – which is now open to the public. As part of the Rideau Transit Group consortium, IBI Group led the design of the three underground stations – Lyon, Parliament and Rideau – creating iconic facilities that offer spacious and elegant designs with convenient passenger flow systems. This $2.1B, world-class transit system represents the largest infrastructure project in Ottawa’s history and is set to transform how people travel throughout the nation’s capital. “One of the challenges of designing underground transit stations is establishing a design that doesn’t feel like it’s underground. We wanted to create a lot of transparency within the station, focusing on a neutral palette to help bring more light into the space,” said IBI Group Transit Architecture Director, Charlie Hoang. “You also won’t see a lot of obstructions throughout our stations. When going down to platform level you will see a nice wide path to the concourse, then the stairwells, escalators and elevators. Our main goal is always to try to open that up if possible.” The IBI design team selected a neutral material palette, consisting of white, cream and light grey tones accented with stainless steel and glass to help bring more light into the space.
    [Show full text]
  • The Canadian Broadcasting Corporation's Annual Report For
    ANNUAL REPORT 2001-2002 Valuable Canadian Innovative Complete Creative Invigorating Trusted Complete Distinctive Relevant News People Trust Arts Sports Innovative Efficient Canadian Complete Excellence People Creative Inv Sports Efficient Culture Complete Efficien Efficient Creative Relevant Canadian Arts Renewed Excellence Relevant Peopl Canadian Culture Complete Valuable Complete Trusted Arts Excellence Culture CBC/RADIO-CANADA ANNUAL REPORT 2001-2002 2001-2002 at a Glance CONNECTING CANADIANS DISTINCTIVELY CANADIAN CBC/Radio-Canada reflects Canada to CBC/Radio-Canada informs, enlightens Canadians by bringing diverse regional and entertains Canadians with unique, and cultural perspectives into their daily high-impact programming BY, FOR and lives, in English and French, on Television, ABOUT Canadians. Radio and the Internet. • Almost 90 per cent of prime time This past year, • CBC English Television has been programming on our English and French transformed to enhance distinctiveness Television networks was Canadian. Our CBC/Radio-Canada continued and reinforce regional presence and CBC Newsworld and RDI schedules were reflection. Our audience successes over 95 per cent Canadian. to set the standard for show we have re-connected with • The monumental Canada: A People’s Canadians – almost two-thirds watched broadcasting excellence History / Le Canada : Une histoire CBC English Television each week, populaire enthralled 15 million Canadian delivering 9.4 per cent of prime time in Canada, while innovating viewers, nearly half Canada’s population. and 7.6 per cent share of all-day viewing. and taking risks to deliver • The Last Chapter / Le Dernier chapitre • Through programming renewal, we have reached close to 5 million viewers for its even greater value to reinforced CBC French Television’s role first episode.
    [Show full text]
  • Recommended Plan.Pdf
    Blair Station 9-34 Maintenance and Storage Facility Track redundancy within the facility will be provided to ensure The proposed Maintenance and Storage Facility is an integral the ability to move LRVs under vehicle or system failure part of the project, as it will: conditions. • House and service all of the trains needed to operate the The preferred site for the Maintenance and Storage Facility has line been determined based on the following criteria: • Service vehicles to be used on future LRT lines • Site Characteristics (topography, grade, land use compatibility, expansion capability and environmental • House the operations control centre (signalling, considerations) communications) for the line • Facility Operations (turnaround loops, track redundancy, • Be the primary heavy maintenance facility for the LRT layout efficiency and municipal services) network Maintenance of the LRVs is crucial to maintain vehicle • System Operations (connectivity to the line, efficiency and manufacturer's warranties, minimize long term operating costs access to freight rail), and and provide for system safety and reliability. The Maintenance • Relative Costs (capital, operating, maintenance and and Storage Facility will accommodate the following elements property ownership and acquisition) on-site: The proposed Maintenance and Storage Facility for the DOTT 9-35 • Main facility building housing offices, roster areas, meeting project will be located on lands to the west of the existing OC rooms and control equipment Transpo headquarters and bus maintenance facility located on • Storage yard for regular cleaning and minor maintenance the north side of Belfast Road, west of St. Laurent Boulevard and south of the VIA rail corridor. In order to access this • Repair areas for heavy and light maintenance areas for location, a connecting track is required between the DOTT vehicles alignment and the Maintenance and Storage Facility.
    [Show full text]
  • 1 Report to Rapport Au
    1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur.
    [Show full text]
  • Operational Readiness
    Operational Readiness Transit Commission March 20, 2019 OCTRANSPO.COM/READY4RAIL0 We’re Ready For Rail You can view the video from the presentation at the link below. https://youtu.be/oDMadi_Nbw0 1 1 OCTRANSPO.COM/READY4RAIL The Customer Journey • The opening of O-Train Line 1 will mark a historic positive transformation in the way transit service is delivered in Ottawa; • The shift towards creating an integrated multimodal transit operation begins with ensuring that the customer is taken care of every step of the way; • In support of this goal, OC Transpo completed the Multimodal Customer Journey project to help put the interests of customers at the heart of all decision-making; • The results of the customer journey mapping project highlighted what customers need to know so that they are informed, educated, prepared and excited for their new journey on the system; and, • Using the results and themes drawn from the multimodal Customer Journey project, ten priority topics were identified. 2 2 OCTRANSPO.COM/READY4RAIL Top 10 Things Customers Want To Know Bus, bike, ride Transfers / Bus routes & walk Fare-paid and stations connections zones Frequency of Ready for Rail Ticket Fare gates service travel planner machines Safety and Train capacity Accessibility security and doors features features 3 3 OCTRANSPO.COM/READY4RAIL Best Practices Best practices and review of other multimodal operations have been used in our planning: • Montréal; • Toronto; • Calgary; • Edmonton; • Vancouver; • Seattle • Boston; • Philadelphia; • Dallas; • Chicago; and, • Hudson Bergen (Jersey City). 4 4 OCTRANSPO.COM/READY4RAIL A Multimodal Commute • Line 1 will connect 13 stations from Tunney’s Pasture in the west to Blair in the east; and, • Customers can connect with Line 1 by: - Bus at 10 of 13 Line 1 stations; - O-Train Line 2 at Bayview Station; and, - Walking, mobility device, and bike, via local streets and many multi-use pathways.
    [Show full text]
  • Line 1 Preparations Continue
    Transpo Express FALL 2017_Layout 1 2017-Oct-20 10:42 AM Page 1 TRANSPO express WINTERFall 2017 2019 Line 1 preparations continue 2. Derek Stevens 3. Tony Spinello GARAGE ATTENDANT 1. Tim Wielinga PARA TRANSPO 1. 7150 Brian Ferguson 2. 7313 Hussein Suleiman reparations have been underway for some requirements that come with the transition to that have been created and how they will con- time for the highly anticipated launch a multi-modal transit system, made up of bus, tribute to the success of our new light rail line. PCONVENTIONALof O-Train Line 1. Many positions have diesel rail and light rail. Continue reading on been created and filled to meet the changing page 4 for an in-depth look at some of the roles 1. 2883 Manjit Nagra 2. 5833 Kulwinder Sidhu he 2017 Roadeo competition and weather competition this year. Manjit will compete in the In this issue was HOT! Competitors, spectators, staff and 2018 International Roadeo in Tampa, Florida. He 3. 2643 Terry Claesson Tvolunteers came out on a beautiful will be joined by William Castillo, Derek Stevens September Sunday for this year’s annual Roadeo. and Tony Spinello, who will compete in the Mechanical competition. Another successful OperatorPriority Manjit Seating Nagra, who Cards was runner-up in6 past years, won first place in the Conventional Transit Food Drive! 2 2017 ROADEO cont’d P. 4-5 Transecure stories 7 InThe charter this experience issue 2 Accessible entrances NewTraining Nova - onebuses track at at andNew parking Employee at OC Passes Transpo 7 4 OC Celebrates Ottawa cominga
    [Show full text]
  • The Confederation Line Ottawa LRT Project
    The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development – Canada Dragados Canada PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook Project Stakeholders Sponsors Equity Developers Project Co Design Build Joint Venture Maintenance Team Engineering Joint Venture PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 1 City of Ottawa • Canada’s Capital City with population of 950,000 • Problem: saturated with buses (BRT) • Solution: replace BRT with Light Rail Transit (LRT) Yukon Northwest Territories Nunavut Newfoundland / Labrador British Columbia Alberta Manitoba Quebec Saskatchewan Ontario Prince Edward Island New Brunswick Nova Scotia PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 2 Confederation Line • 12.5 km LRT line with 13 stations • 10 km at grade in existing BRT Right-of-Way • 2.5 km tunnel between Ottawa University (uOttawa) and Pimisi • 3 underground stations: Lyon, Parliament and Rideau PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 3 Initial Design Approach • Running tunnel: TBM tunnel (mono tube or twin-tube) • Underground stations: cut- and-cover PARIS – 15 November 2017 The Confederation Line - Ottawa LRT Project | Tom Middlebrook 4 Design Options Option Pros Cons Design Single • Lower cost • Higher risk of settlement minimized by Scheme Tunnel • Flexibility in operation rock quality • Multiple faces • Higher cost and longer
    [Show full text]
  • June 2018: Public Presentation of the Preliminary Project and Request for Financial Commitments
    Gatineau at a glance • 284,557 inhabitants (4th largest city in Quebec) • Growing population: + 23% since the 2002 merger (53,200 more people) • Part of the Gatineau-Ottawa metropolitan area (1.2 million inhabitants – 5th largest in Canada) • Close to 60,000 vehicles during peak periods between the two cities • Growing need in terms of moving people • Growing need for public transit (constantly growing ridership since 2014) • Saturation of the road network and few opportunities to increase road capacity • 45,000 Gatineau residents (37.8%) working in Ottawa 2 Bird’s-eye view of Gatineau 3 Bird’s-eye view of Gatineau’s west end, the project focus 4 A rail project for a modern network • 26 km rail system project linking Gatineau’s west end with downtown Gatineau and Ottawa • Links on two bridges for optimal connection to the light train and downtown Ottawa • A high frequency, reliable and comfortable system • 100% electric and environmentally friendly 5 Purpose of the project • Meet the demand for mobility for residents in Gatineau’s west end • Provide a reliable, efficient and ecological link between Gatineau’s west end and the major employment and entertainment poles in downtown Gatineau and Ottawa • Structure urban development and densification in Gatineau’s west end around a high frequency public rail transportation system • Support Gatineau’s economic development by promoting sustainable mobility for employees in current and future businesses and for the tourism sector • Contribute to the government’s greenhouse gas and sustainable mobility
    [Show full text]
  • 10.0 Environmental Effects, Significance and Mitigation
    10.0 ENVIRONMENTAL EFFECTS, SIGNIFICANCE AND MITIGATION To a large degree, environmental effects were avoided or minimized to the extent possible due to the nature of the project (i.e., conversion from BRT to LRT); and during the evaluation of the alternatives and the selection of the preferred alternative. Moreover, many mitigation measures have been directly incorporated into the recommended plan. This section describes the environmental benefits and potential environmental effects of the proposed project and mitigation measures for the effects that cannot be avoided. Sections Include: 10.1 Assessment Approach 10.2 Project Benefits 10.3 Impact Assessment Results, Mitigation, Significance and Residual Effects 10.4 Cumulative Effects 10.5 Accidents and Malfunctions 10.6 Municipal, Provincial, Federal or Other Approvals or Permits 10.7 Future Commitments 10-1 • the magnitude, spatial extent, and duration of the effects; irregularities, but would have no measurable effect on the 10.1 Assessment Approach • the proportion of a species population or the number of population, entity or group as a whole. An assessment was undertaken to describe the potential people affected; environmental effects, both positive and negative of the • direct or indirect effects; Positive (P): An effect that exhibits a beneficial outcome. planning, construction and operational activities associated with • the degree to which the effect responds to mitigation; and the proposed DOTT project. The definitions of significance were adopted for use in this • the level of uncertainty about the possible effect. assessment because many of the impacts cannot be quantified in The assessment of effects involves applying the following steps: absolute terms, although changes and trends can be predicted.
    [Show full text]