Greenvale Central Psp Transport Assessment Report
Total Page:16
File Type:pdf, Size:1020Kb
Traffix Group Traffic Engineers and Transport Planners GREENVALE CENTRAL PSP TRANSPORT ASSESSMENT REPORT PREPARED FOR GAA JULY 2012 Our Reference: 12643R7262 Traffix Group Pty Ltd ABN 32 100 481 570 Directors: Henry H Turnbull, Charmaine C Dunstan, William D de Waard, Donald J Robertson, Jason Walsh Associates: Nathan B Woolcock, Anthony J Coyle Suite 8, 431 Burke Road, Glen Iris VIC 3146 Telephone: 03 9822 2888 Facsimile: 03 9822 7444 Email: [email protected] GREENVALE CENTRAL PRECINCT STRUCTURE PLAN TRANSPORT ASSESSMENT REPORT PREPARED BY PREPARED FOR 9 JULY 2012 OUR REFERENCE: 12643R7262 Transport Assessment Report – July 2012 GREENVALE CENTRAL PRECINCT STRUCTURE PLAN TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................... 2 2. EXISTING CONDITIONS ......................................................................................................... 2 2.1. The PSP Area ................................................................................................................................... 2 2.2. Land Use ........................................................................................................................................ 4 2.3. Existing Road Network ..................................................................................................................... 6 2.4. Existing Public Acquisition Overlays (PAO) ......................................................................................... 10 2.5. Existing Public Transport Network.................................................................................................... 11 2.6. Principle Bicycle Network ............................................................................................................... 12 3. ULTIMATE ARTERIAL ROAD NETWORK ................................................................................ 13 3.1. New Arterial Roads ........................................................................................................................ 13 3.2. Upgrades to Existing Roads ............................................................................................................. 15 3.3. Ultimate Traffic Volumes on Arterials ............................................................................................... 16 4. ADJACENT GREENVALE WEST PSP ....................................................................................... 17 5. DEVELOPMENT PLAN – YIELD ............................................................................................. 18 6. TRAFFIC ASSESSMENTS ...................................................................................................... 19 6.1. Traffic Generation.......................................................................................................................... 19 6.2. Traffic Distribution ......................................................................................................................... 20 7. CONSIDERATION OF PSP GUIDELINES .................................................................................. 22 7.1. Outputs ........................................................................................................................................ 22 7.2. Design Response ........................................................................................................................... 34 7.3. Relevant Standards ........................................................................................................................ 36 7.4. Considerations for Planning Permit Applications ................................................................................ 40 8. HUME CORRIDOR TRAFFIC MODELLING .............................................................................. 41 9. SUMMARY & RECOMMENDATIONS .................................................................................... 43 LIST OF TABLES Table 1: Ultimate Traffic Volumes ........................................................................................................................ 16 Table 2: Traffic Generation – Greenvale Central ................................................................................................... 19 Table 3: Assumed Traffic Distribution................................................................................................................... 20 Table 4: Transport Table ...................................................................................................................................... 27 Table 5: Design Response – PSP Draft Guidelines ................................................................................................. 34 Table 6: PSP Guidelines – Standards..................................................................................................................... 36 Page i 12643R7262 - June 2012 Transport Assessment Report – July 2012 GREENVALE CENTRAL PRECINCT STRUCTURE PLAN 1. INTRODUCTION Traffix Group has been engaged by the Growth Areas Authority (GAA) to undertake a transport assessment report for the Greenvale Central Precinct Structure Plan. The transport assessment report not only considers the transport infrastructure requirements for the Greenvale Central precinct, but also considers the transport requirements in the context of the broader surrounding area, including the recently completed Greenvale West (R3), Greenvale North (R1) and Craigieburn (R2) PSPs and the adjacent existing developed areas. The report also takes into consideration the possibility of a shift of the Urban Growth Boundary (UGB) to the west. The transport assessment report takes into account relevant background information and existing conditions, and responds to the criteria set out in Element 6 (Transport and Movement) of the Precinct Structure Planning Guidelines – Part 2 (2009), prepared by the GAA. The purpose of the report is to provide input for the documentation required in preparing a Precinct Structure Plan (PSP) and Development Contributions Plan (DCP) for the Greenvale Central Precinct. 2. EXISTING CONDITIONS 2.1. The PSP Area The study area of Greenvale Central has a total area of approximately 237 hectares and is comprised of two areas. The southern area (Part A) is bordered by Somerton Road to the north, Mickleham Road to the east, and the UGB to the south and west; the northern area (Part B) is bordered by Aitken College to the north, Greenvale Reservoir to the east, Somerton Road to the south and Mickleham Road to the west. Figure 1 shows the study area and a locality plan and also shows the existing road hierarchy on the surrounding road network. Page 2 12643R7262 Transport Assessment Report – July 2012 GREENVALE CENTRAL PRECINCT STRUCTURE PLAN Reproduced with permission from Melway Publishing Pty Ltd. Figure 1: Greenvale Central PSP Study Area Page 3 12643R7262 Transport Assessment Report – July 2012 GREENVALE CENTRAL PRECINCT STRUCTURE PLAN 2.2. Land Use The southern area (Part A) of the Greenvale Central PSP area is located within the Urban Growth Zone (UGZ), whilst the northern area (Part B) is located within the Rural Living Zone (RLZ) as indicated in Figure 2 below. Figure 2: Land Use Zoning Map – Hume Planning Scheme Page 4 12643R7262 Transport Assessment Report – July 2012 GREENVALE CENTRAL PRECINCT STRUCTURE PLAN The urban growth boundary runs along the southern, western and part of the northern boundary of the Greenvale Central (south) area. The urban growth boundary then extends along the western and northern boundaries of the Greenvale West (R3) area before extending up along Mickleham Road. Key land uses surrounding the study area include the following: Woodlands Historic Park is located immediately west and south of Greenvale Central (south), Melbourne Airport is located approximately 2.5km south-west of the study area, existing residential development at conventional density (Residential 1 Zone) is located to the east of Mickleham Road south of Somerton Road, existing residential development at low density (Low Density Residential Zone) is located east of Mickleham Road south of Greenvale Drive, Greenvale Shopping Centre is located on the east side of Mickleham Road north of Greenvale Road and contains a supermarket, medical centre and a number of specialty shops, Aitken College is located immediately north of Greenvale Central (north), a Residential 1 Zone is located north of Aitken College (known Providence Estate) and is currently under construction, Greenvale Reservoir is located further to the east of Greenvale Central (north), a Green Wedge Zone is located to the west and north of Greenvale West (R3) with Moonee Ponds Creek located further to the west, and Oakland Junction Quarry is located approximately 2.8km northwest of the Somerton Road/Mickleham Road intersection. Page 5 12643R7262 Transport Assessment Report – July 2012 GREENVALE CENTRAL PRECINCT STRUCTURE PLAN 2.3. Existing Road Network Mickleham Road Mickleham Road is an arterial road (Road Zone Category 1) which extends approximately 19km between Tullamarine in the south and Mickleham in the north. South of Somerton Road adjacent to Greenvale Central (south), Mickleham Road has recently been duplicated and is constructed with dual 7 metre carriageways carrying two lanes each way separated by a 13 metre central median, within a 56 metre wide road reservation. A 3 metre wide shared path is located on the east side. Figure