<<

Data Center Brief

About /Redditch PROFILE BUILD OUT Data Center Types: Cage, locking cabinets (BHX1) Overall: 60,000 sq. ft. Standard Rack: 42U x 600 mm x 1000 mm Raised Floor: 24,800 sq. ft. Raised Floor Load: 250 lbs. / sq. ft. Our portfolio includes 31 Data Centers across 4 continents, 11 Meeting rooms: available upon request Sub Floor Load: 250 lbs. / sq. ft. Cross Connect: Copper, fiber, coaxial Site Area: Light industrial and 25 markets. Our centers are designed to deliver high standards of Remote Hands: 24x7 Seismic Zone: Low risk Loading Dock: Yes reliability including redundant power, cooling and dual rail connectivity Built: 2000 and have historically met or exceeded 99.999 percent availability. With Retrofitted: N/A FIRE PROTECTION over 18 years of data center operational experience and our commitment Amenities to excellence you can be confident in selecting Evoque Data Center Customer Lounge: Yes Fire Alarm: All halls have VESDA smoke Solutions™ as your colocation partner. Conference Room: Yes detection with floor and ceiling mounted cross zoned detection Telco Information NPA / NXX: N/A Fire Suppression CLLI Code: RDCHENAAA00 Data Center Areas: FM200 fire POP: RDCHENAXDC0 suppression. Operation of the gas fire Carriers: AT&T, BT, Century Link (Level 3), suppression is via “double knock” operation of fire detection with system in manual operation LOCATION SSE (Neos),Virgin Media * Cloud Connectivity: Megaport initiation Ravensbank Drive, Redditch B98 9AY UK COOLING POWER From Airport: 13 Location: Located in Parking: On site HVAC Distribution: N+1 miles* from Birmingham the Heart of in parking HVAC System: N+1 Electrical Capacity Airport (BHX) the suburbs of the UK’s Chillers: Phase 1: 70W per sq. ft. second city. 1 hour 25 *approximate Hall 1- 15 x 64kW Chilled Water (C/W) = Phase 2: 98W per sq. ft. Cabinet (1.8, 2.5 Kw) minutes from London. mileage 768kW @ N+3. UPS Configuration: N+1 Hall 2 - 4 x C/W and 3 x D/X = 370kW @ N+1. # Utility Feeders: 2 (Supply and standby with auto change over on utility failure) Hall 3 - 4 x C/W and 3 x D/X = 370kW @ N=1. Standby Power Config: Hall 4 - 4 x D/X = 159kW @N+1 Standby Power: 3 x diesel generators; Generator Hall 5 - 5 x C/W = 252kW @ N+1. A & B – 3 x 1200 kVA units (2400kVA @ N+1); Hall 6 - 10 x C/W = 520kW @ N+2. Generator C – 2 x 1200 kVA units (1200kVA @ Hall 7 - 3 x C/W = 130kW @ N+1. N+1); Generator D/E – 3 x 2000 kVA units (4000kVA @ N+1); Diesel Capacity: Fuel Farm – For A,B+C NETWORK 160,000 Ltrs; Fuel Farm – For D/E 44,000 Ltrs above ground storage tanks

Internet: Two 10 Gig STM4 High speed uplinks to the ATT IP Network Redundancy: Redundant & path-diverse SLA entrances and exits Services historically meet or exceed 99.999% availability PHYSICAL SECURITY

Physical: Mantrap AUDIT / CERT. Staffing: 24x7 STANDARDS Electronic: Closed circuit monitors, secure key-card access, biometrics scanner, and • ISAE 3402 • ISO 27001 alarmed doors