About Birmingham/Redditch (BHX1)

About Birmingham/Redditch (BHX1)

Data Center Brief About Birmingham/Redditch PROFILE BUILD OUT Data Center Types: Cage, locking cabinets (BHX1) Overall: 60,000 sq. ft. Standard Rack: 42U x 600 mm x 1000 mm Raised Floor: 24,800 sq. ft. Raised Floor Load: 250 lbs. / sq. ft. Our portfolio includes 31 Data Centers across 4 continents, 11 countries Meeting rooms: available upon request Sub Floor Load: 250 lbs. / sq. ft. Cross Connect: Copper, fiber, coaxial Site Area: Light industrial and 25 markets. Our centers are designed to deliver high standards of Remote Hands: 24x7 Seismic Zone: Low risk Loading Dock: Yes reliability including redundant power, cooling and dual rail connectivity Built: 2000 and have historically met or exceeded 99.999 percent availability. With Retrofitted: N/A FIRE PROTECTION over 18 years of data center operational experience and our commitment Amenities to excellence you can be confident in selecting Evoque Data Center Customer Lounge: Yes Fire Alarm: All halls have VESDA smoke Solutions™ as your colocation partner. Conference Room: Yes detection with floor and ceiling mounted cross zoned detection Telco Information NPA / NXX: N/A Fire Suppression CLLI Code: RDCHENAAA00 Data Center Areas: FM200 fire POP: RDCHENAXDC0 suppression. Operation of the gas fire Carriers: AT&T, BT, Century Link (Level 3), suppression is via “double knock” operation of fire detection with system in manual operation LOCATION SSE (Neos),Virgin Media * Cloud Connectivity: Megaport initiation Ravensbank Drive, Redditch Worcestershire B98 9AY UK COOLING POWER From Airport: 13 Location: Located in Parking: On site HVAC Distribution: N+1 miles* from Birmingham the Heart of England in parking HVAC System: N+1 Electrical Capacity Airport (BHX) the suburbs of the UK’s Chillers: Phase 1: 70W per sq. ft. second city. 1 hour 25 *approximate Hall 1- 15 x 64kW Chilled Water (C/W) = Phase 2: 98W per sq. ft. Cabinet (1.8, 2.5 Kw) minutes from London. mileage 768kW @ N+3. UPS Configuration: N+1 Hall 2 - 4 x C/W and 3 x D/X = 370kW @ N+1. # Utility Feeders: 2 (Supply and standby with auto change over on utility failure) Hall 3 - 4 x C/W and 3 x D/X = 370kW @ N=1. Standby Power Config: Hall 4 - 4 x D/X = 159kW @N+1 Standby Power: 3 x diesel generators; Generator Hall 5 - 5 x C/W = 252kW @ N+1. A & B – 3 x 1200 kVA units (2400kVA @ N+1); Hall 6 - 10 x C/W = 520kW @ N+2. Generator C – 2 x 1200 kVA units (1200kVA @ Hall 7 - 3 x C/W = 130kW @ N+1. N+1); Generator D/E – 3 x 2000 kVA units (4000kVA @ N+1); Diesel Capacity: Fuel Farm – For A,B+C NETWORK 160,000 Ltrs; Fuel Farm – For D/E 44,000 Ltrs above ground storage tanks Internet: Two 10 Gig STM4 High speed uplinks to the ATT IP Network Redundancy: Redundant & path-diverse SLA entrances and exits Services historically meet or exceed 99.999% availability PHYSICAL SECURITY Physical: Mantrap AUDIT / CERT. Staffing: 24x7 STANDARDS Electronic: Closed circuit monitors, secure key-card access, biometrics scanner, and • ISAE 3402 • ISO 27001 alarmed doors.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us