Sample Procurement Plan

Public Disclosure Authorized I. General

1. Bank’s approval Date of the procurement Plan [Original: October 2016]: Revision 1 of Updated Procurement Plan, January 2017] 2. Date of General Procurement Notice: 15 July 2017 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2018

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as

Public Disclosure Authorized stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 780,000 All 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 476,000 First contract 5. Consultation of the suppliers (Works) Above US$ 20,000 First contract 6. (Non-Consultant Services) Above US$ 10,000 First contract 6. Individual consultants Above US$ 19,200 All [Add other methods if necessary] Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines:

4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project under preparation.

5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under Project preparation advance.

Public Disclosure Authorized 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness

PADAP August 22, 2017 1 2 3 4 5 6 7

Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of the ICB 0.00 0 No Prior (Works) Summary of the ICB 0.50 1 No Prior (Goods) Summary of the NCB 3.656 5 No Prior (Works) Summary of the NCB 0.78 1 No Prior (Goods) Summary of the ICB 0.00 0 No Prior (Non-Consultant Services)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) All 2. Single Source (Firms) All 3. Individual All

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements:

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Assignment Estimated Packages Review Comments Cost by Bank US$ million (Prior / Post) Summary of number of contracts 0.00 0 Prior that will be let under QCBS Summary of number of contracts 0.00 0 Prior that will be let under other methods

PADAP August 22, 2017 PROCUREMENT : Sustainable Landscape Management Project PLAN General Information

Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2017-11-23 Revised Plan Date(s): (comma delineated, leave blank if none)2020-05-06 Project ID: P154698 GPN Date: Project Name: Sustainable Landscape Management Project Loan / Credit No: IDA / V0430, IDA / 59790, COFN / C1540 Executing Agency(ies):PADAP PROJECT UNIT MANAGEMENT

WORKS Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

T 05-18/CN / Travaux de rénovation des locaux de l'UGP (Unité de Gestion du Component 3: Project Single Stage - One Projet) du PADAP à la IDA / 59790 Management Coordination A posteriori Appel d'offres Open - National 50,000.00 69,010.77 Signé 2018-11-13 2018-10-13 2018-11-18 2018-12-18 2018-11-14 2018-12-28 2018-12-20 2019-02-01 2019-02-11 2019-07-01 Envelope direction du Génie rural - and M&E MINAE à Nanisana Antananarivo.

T 01-19/SAV / Travaux de réhabilitation de deux (02) bâtiments de la DRAEP : Component 3: Project Single Stage - One Lot 01 : sis à Sambava, COFN / C1540 Management Coordination A posteriori Appel d'offres Open - National 65,000.00 55,651.97 Signé 2019-03-15 2019-04-11 2019-03-26 2019-04-25 2019-05-13 2019-05-05 2019-06-17 2019-06-09 2019-06-28 2019-08-18 Envelope Commune Sambava, District and M&E Sambava Lot 02 : à Sahamazava Andapa, Commune Andapa, District Andapa

T 03-19/SOF / Travaux de réhabilitations des bureaux Component 3: Project Single Stage - One En cours de la DRAEP Sofia : COFN / C1540 Management Coordination A posteriori Appel d'offres Open - National 100,000.00 0.00 2019-05-24 2019-08-14 2019-05-29 2019-06-28 2019-09-16 2019-07-08 2019-08-12 2020-01-09 Envelope d'exécution Lot 01 : and M&E Lot 02 :

T 01-19/ANJ / Travaux de réhabilitation des ouvrages Component 2: Investments Single Stage - One sur canaux d'irrigation dans COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 427,520.00 239,627.26 Achevé 2019-02-21 2019-02-14 2019-02-21 2019-03-23 2019-03-18 2019-04-07 2019-04-03 2019-05-02 2019-04-19 2019-08-30 2019-04-29 Envelope le périmètre de the selected landscapes Sahavaviana-Iazafo.

T 02-19/ANJ / Travaux de réhabilitation des barrages Component 2: Investments Single Stage - One de dérivation dans le COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 427,520.00 328,571.95 Signé 2019-02-21 2019-02-14 2019-02-21 2019-03-23 2019-03-18 2019-04-07 2019-04-03 2019-05-02 2019-04-19 2019-08-30 Envelope périmètre de Sahanofia- the selected landscapes Iazafo.

T 03-19/ANJ / Travaux de remise en état des ouvrages existant et curage des drains dans le PI d'Iazaf: Lot 1:zone Mahanoro- Mahatsara Component 2: Investments Single Stage - One En cours Lot 2:zone Ambalabe II- COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 2,550,000.00 0.00 2019-04-26 2019-05-06 2019-05-11 2019-06-10 2019-06-11 2019-06-30 2019-07-31 2019-12-28 Envelope d'exécution Antsiratenina the selected landscapes Lot 3:zone B1-B6 Lot 4:zone Maromitety Lot 5:zone Sahafana- Ambatomirahalahy Lot 6:Mahatsara-Andapat

T 04-19/ANJ / Travaux de réhabilitation des canaux d'irrigation et des ouvrages de franchissement dans le district de Soanierana Ivongo : Component 2: Investments Lot 01 : périmètre de Single Stage - One En cours COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 2,720,000.00 0.00 2019-07-11 2019-12-21 2019-07-21 2019-08-20 2020-01-21 2019-09-09 2020-02-26 2019-10-04 2020-03-02 Marovinanto Envelope d'exécution the selected landscapes Lot 02 : périmètre de Sahafary Lot 03 : périmètre de Vohijiny Lot 04 : périmètre d'Ampasimbola

T 02-19/SOF / Travaux d'aménagement du périmètre de Bealanana I Lot 01 : La partie amont Component 2: Investments Single Stage - One En cours du PM 580 sur le canal COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 756,250.00 0.00 2019-03-11 2019-03-05 2019-03-21 2019-04-20 2019-04-04 2019-05-05 2019-06-05 2019-11-02 Envelope d'exécution principal de la rive droite. the selected landscapes Lot 02 : La partie aval du PM 580 sur le canal principal de la rive droite.

T 01-19/BOE / Travaux de Component 2: Investments curage du drain de ceinture Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 431,250.00 0.00 2020-05-14 2020-05-28 2020-06-27 2020-07-17 2020-08-21 2022-01-03 et du drain naturel Envelope d'exécution the selected landscapes Manompo

T 03-19/BOE / Travaux de Component 2: Investments Single Stage - One En attente stabilisation des grands COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 95,000.00 0.00 2020-07-02 2020-07-17 2020-08-16 2020-08-31 2020-09-18 2021-01-26 Envelope d'exécution lavaka the selected landscapes

T 07-19/SAV / Traitement et stabilisation des quatres (04) lavaka dans les Component 2: Investments anciennes zones Single Stage - One En attente IDA / 59790 and capacity building in A posteriori Appel d'offres Open - National 61,820.00 0.00 2020-04-15 2020-04-30 2020-05-30 2020-06-19 2020-07-24 2020-10-12 d'exploitation minières à Envelope d'exécution the selected landscapes Andasinimaro, Commune Rurale Bealampona, District Andapa, Région SAVA

Page 1 T 01-19/SOF / Construction des ouvrages hydraulique et piste d'entretien dans le PI Mangindrano: Lot 1:BARRAGE Component 2: Investments ANTAFIANAMALONA Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 2,188,071.87 0.00 2019-03-11 2019-03-21 2019-04-20 2019-05-05 2019-06-05 2019-11-02 Lot 2:CANAL CPRD DU Envelope d'exécution the selected landscapes PM 2153 - BOUT DU RESEAU Lot 3:CANAL CPRG 1er TRONÇON DE 2921 ML Lot 4:CANAL CPRG 2ème TRONÇON DE 3261 ML Lot 5:PISTE-PONT

T 01-20/ANJ / Travaux de réhabilitation d'un bâtiment à usage de Banque de Component 2: Investments semence communautaire: Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 110,500.00 0.00 2020-07-23 2020-07-28 2020-08-27 2020-09-10 2020-10-15 2021-01-13 -Lot 01: Banque de Envelope d'exécution the selected landscapes semence à Iazafo - Lot 02: Banque desemence à Soanierana Ivongo

T 01-20/BOE / Travaux de réhabilitation des réseaux Component 2: Investments Single Stage - One En attente de drainage des secteurs COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 800,000.00 0.00 2020-04-17 2020-04-27 2020-05-27 2020-06-12 2020-07-11 2020-11-08 Envelope d'exécution 04, 05 et 06 répartis en the selected landscapes trois (3) lots.

T 01-20/SOF / Travaux d'aménagement du Component 2: Investments Single Stage - One En attente périmètre irrigué de COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 1,600,000.00 0.00 2020-07-01 2020-07-11 2020-08-10 2020-08-30 2020-09-30 2021-06-07 Envelope d'exécution dans le the selected landscapes Paysage de Bealanana.

T 02-20/SOF / Travaux Component 2: Investments d'aménagement du Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 160,000.00 0.00 2020-04-30 2020-05-10 2020-06-09 2020-06-29 2020-08-03 2020-12-31 périmètre de Doany dans le Envelope d'exécution the selected landscapes paysage de Bealanana.

T 03-20/SOF / Travaux d'aménagement du Component 2: Investments Single Stage - One En attente périmètre d'Anjohibe- COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 375,000.00 0.00 2020-04-30 2020-05-10 2020-06-09 2020-06-29 2020-08-04 2021-01-01 Envelope d'exécution dans le Paysage the selected landscapes de Bealanana.

T 04-20/SOF / Travaux de stabilisation des lavaka Component 2: Investments Single Stage - One En attente dans le sous-paysage COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 220,000.00 0.00 2020-05-01 2020-05-16 2020-06-15 2020-07-05 2020-08-10 2021-01-07 Envelope d'exécution Est, Bealanana the selected landscapes et Ambatosia.

T 02-20/ANJ / Travaux de réhabilitation des Component 2: Investments infrastructures Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 340,000.00 0.00 2020-02-28 2020-03-14 2020-04-13 2020-05-03 2020-06-03 2021-02-08 hydroagricoles dans le Envelope d'exécution the selected landscapes périmètre d'Iazafo- Mahatsara - Andapatsara

T 05-19/ANJ / Travaux de réhabilitation des Component 2: Investments infrastructures Single Stage - One COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 340,000.00 0.00 Annulé 2019-09-30 2019-10-10 2019-10-15 2019-11-14 2019-11-19 2019-12-04 2020-01-23 2020-01-04 2020-06-02 hydroagricoles dans le Envelope the selected landscapes périmètre d'Iazafo- Mahatsara - Andapatsara

T 04-19/SOF / Travaux de réhabilitation route non revêtue (RIP 117M) reliant Bealanana à Ambatoriha District Bealanana, Région Sofia repartis en trois (03): Component 2: Investments Single Stage - One En attente Lot1:du PK 0+000-PK COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 4,600,000.00 0.00 2020-05-29 2020-06-08 2020-07-08 2020-07-28 2020-09-01 2021-03-30 Envelope d'exécution 18+000. the selected landscapes Lot2:du PK 18+000-PK 22+000. Lot3:du PK 22+000-PK 30+825 (barrière Ambatoriha).

T 05-19/SAV / Travaux d'amélioration du réseau hydroagricole du périmètre Component 2: Investments Single Stage - One En attente Ambalafary de 252 ha, IDA / 59790 and capacity building in A posteriori Appel d'offres Open - National 324,800.00 0.00 2020-03-20 2020-04-02 2020-05-02 2020-05-22 2020-06-26 2020-12-23 Envelope d'exécution Commune Rurale the selected landscapes Ambodidivaina, District Andapa, Région SAVA

T 03-19/SAV / Travaux de reconstruction du réseau hydroagricole de la grappe Component 2: Investments des périmètres Andalamena Single Stage - One En attente IDA / 59790 and capacity building in A posteriori Appel d'offres Open - National 313,500.00 0.00 2020-03-16 2020-03-28 2020-04-27 2020-05-17 2020-06-21 2020-12-18 et Amboadiala de 191 ha , Envelope d'exécution the selected landscapes Commune Rurale Andasibe Kobahina, District Andapa, Région SAVA.

T 06-19/SAV / Travaux de rénovation du réseau hydroagricole du périmètre Component 2: Investments Single Stage - One En attente Tanandava sur 400 ha, IDA / 59790 and capacity building in A posteriori Appel d'offres Open - National 598,500.00 0.00 2020-03-20 2020-04-02 2020-05-02 2020-05-22 2020-06-26 2020-12-23 Envelope d'exécution Commune Rurale the selected landscapes Tanandava, District Andapa, Région SAVA.

T 04-19/SAV / Travaux de remise en état du réseau hydroagricole de la grappe de Périmètre Component 2: Investments Single Stage - One En attente Antanimbaribe, COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 412,500.00 0.00 2020-03-16 2020-03-28 2020-04-27 2020-05-17 2020-06-21 2020-12-18 Envelope d'exécution Ambatoharanana et the selected landscapes Andasimenalamba de 244 ha, CR Ambalamanasy II, District Andapa, Région SAVA.

T 02-19/SAV / Travaux de renforcement du réseau hydroagricole du Périmètre Component 2: Investments Single Stage - One En attente Ambodivitagnona de 370ha, IDA / 59790 and capacity building in A posteriori Appel d'offres Open - National 465,000.00 0.00 2020-03-20 2020-04-01 2020-05-01 2020-05-21 2020-06-25 2020-12-22 Envelope d'exécution Commune Rurale the selected landscapes Tanandava, District Andapa, Région SAVA.

Page 2 GOODS Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Passation de F 18-17/CN / Acquisition Component 3: Project marchés auprès des 10 Voitures et des 20 IDA / V0430 Management Coordination A posteriori Direct 500,000.00 341,428.00 Signé 2017-11-27 2017-11-23 2017-12-27 2018-03-22 2018-01-29 2018-06-20 des agences de Motos and M&E l'ONU

F 01-17/CN / Fournitures des matériels informatiques: - Lot 01:08 ordinateurs de bureau (desktop) avec 01 onduleur de chaque et 10 Component 3: Project Demande de Single Stage - One ordinateurs portable IDA / V0430 Management Coordination A posteriori Limited 70,000.00 0.00 Annulé 2017-11-30 2017-09-05 2017-12-05 2017-09-19 2017-12-21 2017-10-19 2017-12-23 2017-10-10 2017-12-27 2018-01-16 propositions Envelope (Laptop). and M&E - Lot 02: fournitures des accessoires informatiques 09 imprimantes, 09 scanners, - lot 03: 06 phootcopieu

MG-UGP PADAP-38789-GO- RFP / L'acquisition des Component 3: Project fournitures de bureau, Demande de Single Stage - One IDA / V0430 Management Coordination A posteriori Limited 20,000.00 0.00 Annulé 2017-11-30 2017-12-05 2017-12-21 2017-12-26 2018-01-03 2018-01-23 consommables informatiques propositions Envelope and M&E et produits d'entretien du PADAP.

F 04-18/CN / Fournitures des matériels informatiques pour Quatre cellules Component 3: Project Single Stage - One régionales d'exécution : 08 IDA / V0430 Management Coordination A posteriori Demande de prix Limited 12,000.00 10,848.04 Achevé 2018-03-26 2018-02-05 2018-05-20 2018-03-16 2018-06-19 2018-03-30 Envelope ordinateurs de bureau and M&E (desktop) avec 01 onduleur de chaque.

F 5-18/CN / Acquisition des matériels informatiques pour Quatre cellules Component 3: Project Single Stage - One régionales d'exécution : 40 IDA / V0430 Management Coordination A posteriori Demande de prix Limited 80,000.00 74,307.22 Achevé 2018-03-24 2018-01-24 2018-05-20 2018-03-08 2018-06-19 2018-03-28 Envelope ordinateurs portables and M&E (laptop) avec une disque dure externe de chaque.

MG-UGP PADAP-55622-GO- DIR / Migration en version Component 3: Project Passation de web et Formation de IDA / V0430 Management Coordination A posteriori marché de gré à Direct 30,000.00 28,504.82 Signé 2018-03-23 2018-03-27 2018-04-02 2018-03-06 2018-05-06 2018-03-23 2018-06-25 logiciel TOM²PRO licence and M&E gré PN-BVPI pour PADAP.

F 15-18/CN / L'acquisition des Consommables Component 3: Project Single Stage - One informatiques pour l'Unité IDA / 59790 Management Coordination A posteriori Demande de prix Limited 9,400.00 3,282.13 Signé 2018-07-25 2018-07-20 2018-09-05 2018-08-14 2018-10-05 Envelope de Gestion de Projet and M&E PADAP

F 06-18/CN / Acquisition de : lot 01 03 photocopieuses pour l'unité de gestion Component 3: Project Single Stage - One projet PADAP. IDA / 59790 Management Coordination A posteriori Demande de prix Limited 48,000.00 29,323.39 Achevé 2018-07-25 2018-08-08 2018-09-05 2018-09-07 2018-10-05 2018-09-14 Envelope lot 02 08 photocopieuses and M&E monochromes pour les quatre cellules d'exécution régionales du PADAP.

MG-UGP PADAP-38789-GO- RFQ / L'acquisition des Component 3: Project fournitures de bureau, Single Stage - One IDA / V0430 Management Coordination A posteriori Demande de prix Limited 20,000.00 7,545.86 Achevé 2017-12-05 2017-07-05 2018-02-04 2017-07-14 2018-03-06 2017-08-25 consommables informatiques Envelope and M&E et produits d'entretien du PADAP.

F 01B-17/CN / Fournitures des matériels informatiques:- Lot 01:08 ordinateurs de bureau (desktop) avec 01 onduleur de chaque et 10 Component 3: Project Single Stage - One ordinateurs portable IDA / V0430 Management Coordination A posteriori Demande de prix Limited 70,000.00 46,297.28 Achevé 2017-09-19 2017-09-06 2017-11-27 2017-10-27 2017-12-17 2017-11-06 Envelope (Laptop).- Lot 02: and M&E fournitures des accessoires informatiques 09 imprimantes, 09 scanners,- lot 03: 06 phootcopie

F 12-18/CN / Acquisition de : - Lot 01 : Fournitures Component 3: Project de bureau pour l'Unité de Single Stage - One IDA / 59790 Management Coordination A posteriori Demande de prix Open - National 12,500.00 9,848.58 Signé 2018-11-18 2019-01-13 2018-12-26 2019-02-12 2018-12-28 Gestion de Projet PADAP. Envelope and M&E - Lot 02 : Produits d'entretien pour l'Unité de Gestion de Projet PADAP.

MG-UGP PADAP-87379-GO- DIR / Acquisition du logiciel ArcGIS auprès de la Passation de Component 1: Information société MAKY Engineering IDA / 59790 A posteriori marché de gré à Direct 35,000.00 22,299.71 Achevé 2018-11-16 2018-12-24 2018-11-26 2018-12-30 2019-01-11 2019-01-29 2019-01-25 and planning et formation sur son gré utilisation (Stockage et gestion des données).

F 01-18/BOE / Dotation de Component 2: Investments tarares pour le Centre Single Stage - One IDA / 59790 and capacity building in A posteriori Demande de prix Open - National 12,000.00 6,360.81 Résilié 2018-11-30 2019-01-31 2019-03-22 2019-03-02 Multiplicateur de Semence Envelope the selected landscapes de Tsararano (Marovoay)

F 01-18/SAV / Dotations de 02 moto pompes suivi d'une formation sur Component 2: Investments Single Stage - One l'utilisation et l'entretien IDA / 59790 and capacity building in A posteriori Demande de prix Open - National 8,000.00 4,034.55 Achevé 2018-11-30 2019-01-31 2019-02-28 2019-03-02 2019-03-27 Envelope aux deux Fédérations : the selected landscapes MEVA Ambodidivaina et SOA Ankiakabe Nord

Page 3 F 9-18/CN / Acquisition des mobiliers de bureau pour les quatre Cellule d'Exécution Régionale du Component 3: Project Single Stage - One PADAP repartis en 04 lots IDA / 59790 Management Coordination A posteriori Demande de prix Open - National 40,000.00 64,583.70 Achevé 2018-11-28 2019-01-14 2019-04-16 2019-02-13 2019-05-14 Envelope : Lot 01 région SOFIA, lot and M&E 02 région Boeny, lot 03 région SAVA et lot 04 région Analanjirofo.

F 02-19/BOE / Acquisition Component 2: Investments des semences pour la Single Stage - One COFN / C1540 and capacity building in A posteriori Demande de prix Limited 4,400.00 4,361.57 Achevé 2019-05-27 2019-04-04 2019-07-08 2019-04-23 2019-07-28 2019-04-24 diffusion des paquets Envelope the selected landscapes technique rizicole.

MG-UGP PADAP-113663- Component 3: Project GO-RFQ / Acquisition de 09 Single Stage - One COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 31,000.00 21,856.23 Signé 2019-06-04 2019-08-10 2019-08-29 2019-11-08 canopy pour les matériels Envelope and M&E roulant du projet

F 1-18/ANJ / Acquisition : lot 01 des fournitures de Component 3: Project Single Stage - One bureau et lot 02 des IDA / 59790 Management Coordination A posteriori Demande de prix Open - National 4,500.00 0.00 Annulé 2018-12-05 2019-01-30 2019-03-01 Envelope consommables informatiques and M&E pour le CER Analanjirofo.

F 05-19/SAV / Acquisition Component 2: Investments Single Stage - One d'intrants au profit des COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 7,000.00 5,300.62 Achevé 2019-06-10 2019-08-16 2019-07-05 2019-08-26 2019-07-12 Envelope paysans formateurs (PF). the selected landscapes

F 06-19/SAV / Acquisition de matériels pour le Component 2: Investments Single Stage - One sarclage et la récolte au COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 10,620.00 7,662.18 Signé 2019-06-10 2019-08-16 2019-07-05 2019-11-29 2019-10-17 Envelope profit des paysans the selected landscapes formateurs (PF).

F 04-19/SOF / Achat des Component 2: Investments Single Stage - One En cours équipement agricole pour COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 36,600.00 0.00 2019-06-23 2019-09-02 2019-10-02 Envelope d'exécution paysans leaders/adoptants. the selected landscapes

MG-UGP PADAP-87384-GO- RFQ / Acquisition des matériels informatiques (02 Desktop) et accessoires (02 Component 1: Information Single Stage - One IDA / 59790 A posteriori Demande de prix Open - National 35,000.00 0.00 Annulé 2018-11-21 2019-01-20 2019-02-19 imprimantes) pour le and planning Envelope logiciel ArcGIS ( Stockage et gestion des données) plus 10 GPS.

MG-UGP PADAP-113652- GO-RFQ / Acquisition des matériels et accessoires informatiques : Lot 1:11 Desktop Lot 2:11 onduleurs online Component 1: Information Single Stage - One Lot 3:09 Laptop avec 01 COFN / C1540 A posteriori Demande de prix Open - National 33,000.00 134,817.17 Signé 2019-06-30 2019-08-29 2019-12-27 2019-09-28 and planning Envelope disque dur externe de chaque Lot 4: imprimante : 01 A1, 06 A3 et 01 jet d'encre A4 Lot 5: 09 vidéoprojecteurs avec écran

MG-UGP PADAP-116266- GO-RFQ / Acquisition des : Component 3: Project Lot 01 : 10 GPS (Global Single Stage - One COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 12,000.00 46,888.43 Signé 2019-07-03 2019-09-01 2019-10-18 2019-10-01 Positioning System). Envelope and M&E Lot 02 : 10 appareils photos numériques.

MG-UGP PADAP-120173- Component 3: Project Single Stage - One GO-RFQ / Materiel et COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 75,000.00 36,864.87 Achevé 2019-07-11 2019-09-23 2019-12-27 2019-11-22 2020-02-03 Envelope mobiler de bureau de and M&E l'UGP.

MG-UGP PADAP-120176- Component 3: Project GO-RFQ / Équipement de Single Stage - One COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 3,000.00 5,206.72 Signé 2019-08-04 2019-10-17 2019-12-27 2019-11-16 protection individuel (EPI) Envelope and M&E du Projet.

MG-UGP PADAP-76372-GO- RFQ / Acquisition d’images satellitaires à haute résolution avec modèle Component 1: Information Open - Single Stage - One En attente COFN / C1540 A posteriori Demande de prix 50,000.00 0.00 2020-04-08 2020-06-18 2020-08-17 numérique de terrain pour and planning International Envelope d'exécution le paysage de Bealanana, d’une superficie de 2776 km2 environ.

F 01-19/BOE / Acquisition de matériels pour les Component 2: Investments Single Stage - One AUEs/Fédérations (Mini COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 82,000.00 0.00 Annulé 2019-06-06 2019-08-20 2019-10-19 Envelope pelle, mini compacteur the selected landscapes motorisé et motopompe)

F 02-19/SAV / Acquisition Component 3: Project des fournitures de bureau Single Stage - One En attente COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 21,880.00 0.00 2020-02-22 2020-05-04 2020-06-03 en 03 années pour la CER Envelope d'exécution and M&E SAVA.

F 03-19/SAV / Acquisition Component 3: Project des produits d'entretien en Single Stage - One En attente COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 3,130.00 0.00 2020-02-17 2020-04-13 2020-05-13 03 années pour la CER Envelope d'exécution and M&E SAVA

F 04-19/SAV / Acquisition Component 3: Project des consommables Single Stage - One En attente IDA / 59790 Management Coordination A posteriori Demande de prix Open - National 21,880.00 0.00 2020-02-17 2020-04-13 2020-05-13 informatiques en 03 années Envelope d'exécution and M&E pour la CER SAVA

F 03-19/ANJ / Achat d'intrants agricoles pour:les payasns formateurs, semenciers, adoptants et Component 2: Investments banques de semences: Lot Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 89,500.00 0.00 2020-04-14 2020-06-24 2020-08-08 01: Engrais minéral et Envelope d'exécution the selected landscapes organique Lot 02: Semences rizicoles Lot 03: Matériels végétaux pour l'agroécologie et production fourragère

Page 4 F 05-19/ANJ / Acquisition Component 3: Project des produits d'entretien en Single Stage - One En attente COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 43,530.00 0.00 2020-04-25 2020-06-20 2020-07-20 03 années pour la CER Envelope d'exécution and M&E Analanjirofo

F 04-19/ANJ / Acquisition Component 3: Project des consommables Single Stage - One En attente COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 27,000.00 0.00 2020-05-02 2020-06-27 2020-07-27 informatiques en 03 années Envelope d'exécution and M&E pour la CER Analanjirofo.

F 01-19/SOF / Achats des Component 2: Investments Single Stage - One En cours intrants agricole pour COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 11,800.00 0.00 2019-06-22 2019-09-01 2019-10-01 Envelope d'exécution paysans leaders/adoptants the selected landscapes

F 01-20/BOE / Acquisition Component 2: Investments de semence pour la Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 2,200.00 0.00 2020-03-16 2020-06-18 2020-12-15 diffusion des paquets Envelope d'exécution the selected landscapes techniques agricoles

F 01-20/ANJ / Achat de fournitures et équipements Component 2: Investments des deux (02) banques de Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 95,600.00 0.00 2020-09-30 2020-12-10 2021-01-09 semences dans les paysages Envelope d'exécution the selected landscapes d'Iazafo et de Soanierana Ivongo

F 03-20/SAV / Acquisition de 31 panneaux d'indication Component 2: Investments Single Stage - One En attente pour les sites de COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 1,300.00 0.00 2020-03-12 2020-05-25 2020-06-24 Envelope d'exécution reboisemnt dans le paysage the selected landscapes d'Andapa, Région SAVA.

F 02-20 /SAV / Acquisition d'intrants (semences et engrais) au profit des 111 Component 2: Investments Single Stage - One En attente anciens paysans formateurs COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 8,110.00 0.00 2020-05-11 2020-07-09 2020-07-23 Envelope d'exécution et de 50 nouveaux paysans the selected landscapes formateurs dans le paysage d'Andapa, Région SAVA

Component 2: Investments F 01-20/SOF / Achat de Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 15,000.00 0.00 2020-08-10 2020-10-23 2020-11-22 matériels agricoles. Envelope d'exécution the selected landscapes

F 01-19/SAV / Acquisition Component 3: Project de deux groupes Single Stage - One COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 5,000.00 0.00 Annulé 2019-08-19 2019-10-29 2019-11-28 électrogènes de la CER Envelope and M&E SAVA.

F 01-20/CN / Acquisition de 4 véhicules (Motos) pour Component 2: Investments les agents communaux Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 16,000.00 0.00 2020-03-04 2020-05-17 2020-07-16 chargés de l'appui aux Envelope d'exécution the selected landscapes Communautés Locales à l'approche LIFE

F 02-20/CN / Conception et fourniture de supports Component 2: Investments Single Stage - One En attente de communication pour le COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 9,500.00 0.00 2020-03-04 2020-05-17 2020-06-16 Envelope d'exécution PADAP (Flyers, the selected landscapes banderôles, T-shirt, Polo, …)

F 04-20/CN / Acquisition Component 3: Project Single Stage - One En attente de 7 coffres forts du COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 2,250.00 0.00 2020-04-03 2020-06-02 2020-07-02 Envelope d'exécution PADAP. and M&E

Passation de F 05-20/CN / Acquisition Component 3: Project marchés auprès En attente d'un véhicule 4x4 pick-up IDA / V0430 Management Coordination A posteriori Direct 83,500.00 0.00 2020-02-28 2020-03-09 2020-04-23 2020-10-20 des agences de d'exécution du PADAP and M&E l'ONU

F 03-20/BOE / Acquisition Component 2: Investments de tarare pour le centre Single Stage - One En attente COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 21,875.00 0.00 2020-06-04 2020-08-30 2020-11-28 multiplicateur de semence à Envelope d'exécution the selected landscapes Tsararano (RELANCE)

F 03-19/SOF / Acquisition Component 1: Information Single Stage - One En attente d'un kit solaire pour la COFN / C1540 A posteriori Demande de prix Open - National 8,000.00 0.00 2020-05-10 2020-07-20 2020-08-19 and planning Envelope d'exécution CER Sofia.

F 06-20/CN / Acquisition Component 3: Project Single Stage - One En attente des matériels de lavage à COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 1,500.00 0.00 2020-04-03 2020-06-02 2020-07-02 Envelope d'exécution haute pression du PADAP. and M&E

F 02-19/SOF / Dotation en Component 2: Investments Single Stage - One matériels et équipements de COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 15,310.00 0.00 Annulé 2019-04-03 2019-06-13 2019-07-13 Envelope surveillance des COBA the selected landscapes

F 02-19/ANJ / Acquisition de matériesl agricoles pour Component 2: Investments Single Stage - One le reboisement dans les COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 15,710.00 0.00 Annulé 2019-10-05 2019-12-15 2020-01-04 Envelope paysages de Soanierana the selected landscapes Ivongo et Iazafo.

F 06-19/ANJ / Acquisition des jeunes plants pour les Component 2: Investments Single Stage - One activités de reboisement COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 23,270.00 0.00 Annulé 2019-09-14 2019-11-24 2020-01-08 Envelope dans les paysages d'Iazafo the selected landscapes et de Soanierana Ivongo.

F 04-19/BOE / Achat Component 3: Project Single Stage - One En attente pneus pou 2 années pour COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 4,000.00 0.00 2020-06-19 2020-08-30 2020-09-29 Envelope d'exécution la CER Boeny and M&E

F 03-20/ANJ / Acquisition de jeunes plants de culture Component 2: Investments Single Stage - One En attente de rente pour COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 22,150.00 0.00 2020-03-04 2020-05-14 2020-07-13 Envelope d'exécution l'agroforesterie à Iazafo et the selected landscapes Soanierana Ivongo

F 01-19/ANJ / Fourniture Component 2: Investments Single Stage - One En attente de bureau en 02 années COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 40,000.00 0.00 2020-04-15 2020-06-23 2022-06-13 Envelope d'exécution pour la CER Analanjirofo. the selected landscapes

Page 5 F 04-20/SAV / Acquisition des balances automatiques Component 2: Investments Single Stage - One En attente force de 25kg pour les COFN / C1540 and capacity building in A posteriori Demande de prix Open - National 1,250.00 0.00 2020-04-20 2020-06-23 2020-07-23 Envelope d'exécution semenciers dans le paysage the selected landscapes d'Andapa, Région SAVA.

F 02-18/BOE / Acquisition de divers articles pour le Component 3: Project Single Stage - One fonctionnement du bureau IDA / 59790 Management Coordination A posteriori Demande de prix Limited 1,700.00 0.00 Annulé 2018-11-30 2019-01-30 2019-03-01 Envelope du Projet (Marovoay et and M&E Mahajanga)

Component 3: Project F 03-19/BOE / Acquisition Single Stage - One En attente COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 3,400.00 0.00 2020-05-22 2020-08-02 2020-09-01 des fournitures de bureau Envelope d'exécution and M&E

F 02-20/ BOE / Component 3: Project Single Stage - One En attente Acquisition de COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 2,000.00 0.00 2020-05-23 2020-08-27 2021-02-23 Envelope d'exécution consommables informatiques and M&E pour 2 années

F 07-20/CN / Acquisition Component 3: Project Single Stage - One En attente de matériels informatiques COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 3,000.00 0.00 2020-05-22 2020-07-31 2020-09-29 Envelope d'exécution du PADAP: 9 stabilisateurs and M&E

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. Estimated Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Actual Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP PADAP-70332-NC- RFQ / Service de transit pour dédouanement de Component 3: Project matériels roulants (10 Single Stage - One IDA / 59790 Management Coordination A posteriori Demande de prix Open - National 57,000.00 34,129.26 Signé 2018-07-24 2018-09-04 2018-07-30 2018-10-04 voitures et 20 motos), et Envelope and M&E service de mise en circulation des véhicules et moto du PADAP.

C 03-20/CN / Service de Component 3: Project transit et douane pour le Single Stage - One En attente COFN / C1540 Management Coordination A posteriori Demande de prix Open - National 5,500.00 0.00 2020-03-08 2020-04-17 2020-05-17 dédouanement des matériels Envelope d'exécution and M&E roulants du PADAP

CONSULTING FIRMS Activity Reference No. Actual Short List and Draft Combined Evaluation Loan / Credit Market Contract Type Estimated Process Expression of Request for Opening of Technical Evaluation of / Description Component Review Type Method Amount Terms of Reference Request for Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Status Interest Notice Proposals as Issued Proposals / Minutes Technical Proposal (US$) Proposals Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

C 6-18/CN / Etude d'aménagement (APS-APD- EIES-PAR-DAO-MGE) et Component 2: Investments Sélection fondée surveillance des travaux IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 62,500.00 51,882.50 Signé 2018-01-22 2018-04-19 2018-02-06 2018-02-28 2018-05-11 2018-03-30 2018-06-12 2018-04-14 2018-07-02 2018-05-04 2018-07-24 2018-05-28 2018-08-29 2018-10-25 dans le périmètre the selected landscapes le coût d'Andranomafana Mangindrano, région Sofia.

C 4-18/CN / Etude de rehabilitation des infrasrtuctures Component 2: Investments Sélection fondée hydroagricoles (APS-APD- IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 500,000.00 287,114.06 Signé 2018-01-22 2018-03-27 2018-02-06 2018-02-28 2018-05-10 2018-03-30 2018-06-12 2018-04-14 2018-07-02 2018-05-04 2018-07-27 2018-05-28 2018-09-03 2018-11-24 EIES-PAR-DAO-MGE) et the selected landscapes le coût surveillance des travaux dans le périmètre de Iazafo, Région Analanjirofo

C 5-18/CN / Etude de reconstruction du barrage et réfection des réseaux hydroagricoles (APD-EIES- Component 2: Investments Sélection fondée PAR-DAO-MGE) et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 87,500.00 23,197.46 Signé 2018-01-22 2018-04-19 2018-02-06 2018-02-28 2018-05-10 2018-03-30 2018-06-12 2018-04-14 2018-07-13 2018-05-04 2018-07-24 2018-05-28 2018-08-31 2018-10-25 surveillance des travaux the selected landscapes le coût dans le périmètre d'Anjohibe Ambatosia, Région Sofia.

C 7-18/CN / Etude de réhabilitation de périmètre irrigué (APD-EIES-PAR- Component 2: Investments Sélection fondée DAO-MGE) et surveillance IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 125,000.00 29,974.84 Signé 2018-01-22 2018-04-19 2018-02-06 2018-02-28 2018-05-10 2018-03-30 2018-06-12 2018-04-14 2018-07-13 2018-05-04 2018-07-24 2018-05-28 2018-09-10 2018-11-24 des travaux dans le the selected landscapes le coût périmètre de Bealanana I, région Sofia.

C 8-18/CN / Etude d'aménagement (APS-APD- Component 2: Investments Sélection fondée EIES-PAR-DAO-MGE) pour IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 54,000.00 0.00 Annulé 2018-01-22 2018-02-06 2018-02-28 2018-03-30 2018-04-14 2018-05-04 2018-05-28 2018-11-24 la stabilisation des terrasse the selected landscapes le coût à Bealanana et surveillance des travaux.

C 03-18/CN / Un cabinet Component 3: Project Sélection au d'audit financier du IDA / 59790 Management Coordination A posteriori Open - National 30,000.00 8,305.01 Signé 2018-01-15 2018-01-23 2018-01-31 2018-02-17 2018-04-17 2018-03-19 2018-05-17 2018-03-29 2018-05-18 2018-04-09 2018-05-25 2018-04-29 2018-05-28 2018-07-28 moindre coût PADAP. and M&E

C 04-17/CN / Études préparatoires du Projet Agriculture Durable par une Approche Paysage Sélection fondée (PADAP) Périmètre d'Iazafo Component 1: Information IDA / V0430 A posteriori sur la qualité et Open - National 200,000.00 224,827.15 Signé 2018-01-24 2017-06-28 2018-02-14 2018-03-30 2017-09-28 2018-04-27 2017-10-30 2018-05-07 2017-11-08 2018-05-21 2018-02-02 2018-06-14 2018-02-05 2018-09-12 dans le district de and planning le coût Vavatenina et dans le district de Soanierana Ivongo, région ANALANJIROFO.

C 02-17/CN / Études préparatoires du Projet Sélection fondée Agriculture Durable par Component 1: Information IDA / V0430 A posteriori sur la qualité et Open - National 150,000.00 156,130.05 Signé 2018-01-24 2017-06-28 2018-02-14 2018-03-30 2017-09-28 2018-04-27 2017-10-30 2018-05-07 2017-11-08 2018-05-21 2017-12-07 2018-06-14 2018-02-09 2018-09-12 une Approche Paysage and planning le coût (PADAP) dans le district de Marovoay, région BOENY

Page 6 C 01-17/CN / Études préparatoires du Projet Sélection fondée Agriculture Durable par Component 1: Information IDA / V0430 A posteriori sur la qualité et Open - National 150,000.00 234,393.50 Signé 2018-01-24 2017-06-28 2018-02-14 2018-03-30 2017-09-28 2018-04-27 2017-10-30 2018-05-07 2017-11-08 2018-05-21 2018-02-06 2018-06-14 2018-03-05 2018-09-12 une Approche Paysage and planning le coût (PADAP) dans le district d'Andapa, région SAVA

C 01-18/CN / Développement d'un guide Component 1: Information Sélection fondée Open - pour l'élaboration des IDA / 59790 A posteriori 100,000.00 0.00 Annulé 2018-04-30 2018-05-03 2018-05-10 2018-05-15 2018-07-13 2018-08-12 2018-08-22 2018-09-06 2018-09-30 2018-12-29 and planning sur la qualité International PAGDP (Firme international)

C 18-18/CN / Service de consultant pour Component 2: Investments Sélection fondée En cours l'encadrement, formation et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 50,000.00 0.00 2018-05-09 2018-09-18 2018-05-30 2018-06-19 2019-12-02 2018-07-19 2020-01-03 2018-07-29 2020-01-20 2018-09-02 2020-02-04 2018-09-26 2019-04-24 d'exécution suivi des agents the selected landscapes le coût communaux pour l'approche LIFE

C 24-18/CN / Etude de traitement des points critiques de la RN31 route Component 2: Investments Sélection fondée En cours non revêtue reliant IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 400,000.00 124,815.95 2018-05-14 2018-11-06 2018-06-04 2018-06-28 2018-12-27 2018-07-28 2019-01-28 2018-08-17 2019-02-15 2018-09-21 2019-02-25 2018-10-26 2019-03-01 2019-08-22 d'exécution Bealanana-Ambatoriha d'une the selected landscapes le coût longueur de 32 km - Contrôle et surveillance

C 12-18/CN / Etude et Component 3: Project Sélection fondée contrôle-surveillance sur Les IDA / 59790 Management Coordination A posteriori sur la qualité et Open - National 21,000.00 24,935.50 Signé 2018-05-14 2018-09-24 2018-06-04 2018-06-28 2018-10-30 2018-07-28 2018-12-03 2018-08-07 2019-02-12 2018-09-11 2019-02-15 2018-10-16 2019-02-25 2019-02-13 travaux d'extension et de and M&E le coût Réhabilitation locaux Sofia

C 15-18/CN / Etude et Component 3: Project Sélection fondée contrôle-surveillance sur Les IDA / 59790 Management Coordination A posteriori sur la qualité et Open - National 10,500.00 3,669.43 Signé 2018-05-14 2018-05-14 2018-06-04 2018-06-28 2018-06-15 2018-07-28 2018-07-16 2018-08-07 2018-08-31 2018-09-11 2018-10-04 2018-10-16 2018-11-14 2019-02-13 travaux d'extension et de and M&E le coût Réhabilitation locaux Sava

C 37-18/CN / Inventaire : surfaces pâturables, espèces fourragères naturelles, points d'abreuvement, Sélection fondée infrastructures d'élevage Component 1: Information En cours IDA / 59790 A posteriori sur la qualité et Open - National 125,000.00 0.00 2018-07-12 2018-09-05 2018-08-02 2018-08-16 2018-11-26 2018-09-15 2018-09-25 2018-10-30 2018-12-04 2019-04-03 existantes dans la zone. and planning d'exécution le coût Lot 01 : de Bealanana. Lot 02 : d'Andapa. Lot 03 : de Marovoay Lot 04 : d'Iazafo

C 01BIS-18/CN / Sélection fondée Développement d'un guide Component 1: Information sur les Open - pour l'élaboration des IDA / 59790 A posteriori 100,000.00 0.00 Annulé 2018-05-03 2018-05-24 2018-07-07 2018-08-06 2018-08-30 2018-11-28 and planning qualifications des International PAGDP (Firme consultants international)

C 41-18/CN / Inventaire des périmètres Sélection fondée hydroagricoles repartis en Component 1: Information En cours IDA / 59790 A posteriori sur la qualité et Open - National 230,000.00 0.00 2018-08-30 2018-09-04 2018-10-14 2018-11-17 2018-11-21 2018-12-17 2018-12-27 2019-01-20 2019-02-24 2019-06-24 quatre (04) lots pour les and planning d'exécution le coût régions : Sava, Boeny, Sofia et Analanjirofo.

C 01-18/BOE / Recrutement d'une ONG chargée du renforcement de capacités et de l'appui des Component 2: Investments Sélection fondée paysans pilotes sur les IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 23,500.00 0.00 Annulé 2018-11-20 2018-11-14 2018-12-11 2019-01-24 2018-12-03 2019-02-23 2019-03-05 2019-04-09 2019-05-14 2019-08-12 paquets techniques de la the selected landscapes le coût production fourragère, agroécologie, agroforesterie et arboriculture

C 02-18/BOE / Recrutement d'une ONG ou Association chargée du Component 2: Investments Sélection fondée diagnostic et redynamisation IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 5,200.00 5,702.82 Signé 2018-11-20 2018-12-05 2018-12-11 2019-01-24 2019-02-06 2019-02-23 2019-03-07 2019-03-05 2019-03-20 2019-04-09 2019-04-12 2019-05-14 2019-05-07 2019-08-12 des 03 Coopératives de the selected landscapes le coût producteurs de semences à Tsararano

C 05-18/BOE / Etude spécifique de protection des Component 2: Investments Sélection fondée En cours lavaka au niveau des SBV IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 47,000.00 0.00 2018-11-20 2019-07-08 2018-12-05 2018-12-27 2020-01-28 2019-01-26 2020-02-12 2019-02-10 2019-03-02 2019-03-26 2019-04-25 d'exécution Ambarindahy, Androtra, the selected landscapes le coût Belafrika

C 1-18/SAV / Amélioration de la disponibilité de Component 2: Investments Sélection fondée semences améliorées et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 7,910.00 15,635.97 Signé 2018-11-30 2019-01-07 2018-12-21 2019-02-03 2019-03-26 2019-03-05 2019-04-25 2019-03-15 2019-05-30 2019-04-19 2019-06-14 2019-05-24 2019-06-21 2019-07-08 certifiées dans le paysage the selected landscapes le coût d'Andapa

C 5-18/ANJ / Etude de rehabilitation des infrasrtuctures hydroagricoles (APS-APD- Component 2: Investments Sélection fondée EIES-PAR-DAO-MGE) et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 79,200.00 46,026.84 Signé 2018-11-30 2019-01-10 2018-12-15 2019-01-06 2019-01-24 2019-02-05 2019-02-25 2019-02-20 2019-03-01 2019-03-12 2019-03-13 2019-04-05 2019-03-27 2020-08-17 surveillance des travaux des the selected landscapes le coût périmètres Marovinanto et Sahafary dans le paysage Soanierana Ivongo.

C 02-18/SAV / Amélioration de la Component 2: Investments Sélection fondée disponibilité de semences IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 7,910.00 0.00 Annulé 2018-11-20 2018-12-11 2019-01-24 2019-02-23 2019-03-10 2019-04-14 2019-05-19 2019-07-03 améliorées et certifiées dans the selected landscapes le coût le paysage d'Andapa

C 01-19/SAV / Études de réhabilitation du barrage souple avec avant canal rive droite et réfection des réseaux hydroagricoles, Component 2: Investments Sélection fondée digue de protection et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 45,500.00 67,478.28 Signé 2019-01-30 2018-12-11 2019-02-14 2019-03-02 2019-01-31 2019-04-01 2019-03-04 2019-04-15 2019-03-09 2019-04-27 2019-04-17 2019-05-17 2019-05-17 2020-12-12 pistes (APS-APD-EIES- the selected landscapes le coût PAR-DAO-MGE) et contrôle - surveillance du périmètre Ambalafary sur 203 ha et Analambe Est

Page 7 C 02-19/SAV / Études de réhabilitation du barrage en dur avec avant canal rive droite et renovation des réseaux hydroagricoles Component 2: Investments Sélection fondée et pistes (APS-APD-EIES- IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 72,220.00 37,620.86 Signé 2019-01-30 2019-01-18 2019-02-14 2019-03-02 2019-01-31 2019-04-01 2019-03-04 2019-04-15 2019-03-09 2019-04-27 2019-05-02 2019-05-17 2019-05-17 2020-12-12 PAR-DAO-MGE) et contrôle the selected landscapes le coût - surveillance du périmètre Ambodivitagnona sur 310ha, CR Ambalamanasy II, district d'Andap

C 04-19/SAV / Études de réhabilitation d'un barrage avec avant canal rive gauche et de réfection des réseaux hydroagricoles et Component 2: Investments Sélection fondée les ouvrages connexes du IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 63,500.00 64,941.59 Signé 2019-01-30 2019-01-25 2019-02-14 2019-03-02 2019-01-31 2019-04-01 2019-03-04 2019-04-15 2019-03-09 2019-04-27 2019-05-03 2019-05-17 2019-05-17 2020-12-12 grappe (APS-APD-EIES-PAR- the selected landscapes le coût DAO-MGE) et contrôle - surveillance du Périmètre Antanimbaribe et périmètre d'Ambatoharanan

C 05-19/SAV / Études de réhabilitation du barrage en dur avec avant canal rive droite et réfection des Component 2: Investments Sélection fondée réseaux hydroagricoles IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 94,470.00 45,623.17 Signé 2019-01-30 2019-01-25 2019-02-14 2019-03-02 2019-01-31 2019-04-01 2019-03-04 2019-04-15 2019-03-09 2019-04-27 2019-05-03 2019-05-17 2019-05-17 2020-12-12 (APS-APD-EIES-PAR-DAO- the selected landscapes le coût MGE) et contrôle - surveillance du périmètre Tanandava sur 399ha CR Tanandava, district d'Andapa

C 08-19/SAV / Etude technique et maitrise d'œuvre de traitements et stabilisation des « lavaka » Component 2: Investments Sélection fondée En cours dans les anciennes zones IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 16,510.00 0.00 2019-02-11 2019-11-04 2019-03-13 2019-04-06 2019-12-12 2019-05-06 2020-01-13 2019-05-26 2020-03-05 2019-06-19 2019-07-09 2020-02-04 d'exécution d'exploitation minières à the selected landscapes le coût Ankarierabe, Commune Rurale Bealampona, District d'Andapa

C 06-19/SAV / Création et mise en place des huit (08) Component 2: Investments Sélection fondée nouveaux AUE sur les IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 40,500.00 13,786.27 Signé 2019-02-12 2019-09-13 2019-03-14 2019-04-07 2019-05-29 2019-05-07 2019-06-28 2019-05-27 2019-07-17 2019-06-20 2019-09-16 2019-07-10 2019-10-02 2020-07-04 périmètres nouvellement à the selected landscapes le coût réhabiliter

C 03-19/ANJ / Etude de rehabilitation des infrasrtuctures hydroagricoles (APS-APD- Component 2: Investments Sélection fondée EIES-PAR-DAO-MGE) et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 207,200.00 52,228.62 Achevé 2019-02-20 2019-02-08 2019-03-22 2019-04-13 2019-02-14 2019-05-13 2019-03-18 2019-05-28 2019-03-22 2019-06-17 2019-03-28 2019-07-11 2019-04-23 2021-02-20 2019-04-24 Contrôle-surveillance des the selected landscapes le coût travaux dans les périmètres de Vohijiny et Ampasimbola- District de Soanierana Ivongo

C 04-19/ANJ / Recrutement de firme pour la capitalisation des acquis sur les paquets techniques Component 2: Investments Sélection fondée agroécologique, IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 55,500.00 65,328.45 Signé 2019-02-20 2019-02-08 2019-03-22 2019-04-13 2019-06-06 2019-05-13 2019-07-08 2019-05-28 2019-08-13 2019-06-17 2019-08-23 2019-07-11 2019-09-18 2022-10-23 agroforesterie, arbiriculture the selected landscapes le coût et culture fourragère dans les paysages d'Iazafo et Soanierana Ivongo

C 01-19/BOE / Recrutement d'une ONG Component 2: Investments Sélection fondée En cours chargée des études de COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 16,090.00 11,039.03 2019-02-24 2019-02-18 2019-03-26 2019-04-19 2019-04-26 2019-05-19 2019-05-28 2019-06-03 2019-06-12 2019-07-02 2019-06-18 2019-07-27 2019-10-10 d'exécution diagnostic des AUE dans the selected landscapes le coût les secteurs 04, 05 et 06

C 02-19/BOE / Recrutement d'une ONG chargée de l'étude de Component 2: Investments Sélection fondée stabilisation des zones COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 10,000.00 7,934.21 Signé 2019-02-24 2019-02-18 2019-03-26 2019-04-17 2019-04-15 2019-05-17 2019-05-14 2019-06-01 2019-05-29 2019-06-21 2019-06-06 2019-07-15 2019-06-21 2019-10-23 d'érosion et protection des the selected landscapes le coût réseaux hydroagricoles le long du CPRD et CSPC Ambolomoty (ONG)

C 03-19/BOE / Etudes, contrôle et surveillance des Component 2: Investments Sélection fondée travaux de curage du drain COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 26,000.00 20,616.05 Signé 2019-02-24 2018-12-18 2019-03-26 2019-04-17 2019-02-19 2019-05-17 2019-03-19 2019-06-01 2019-04-12 2019-06-21 2019-04-24 2019-07-15 2019-05-08 2021-01-25 de ceinture et reprofilage the selected landscapes le coût du drain naturel Manompo

C 04-19/BOE / Etudes des Component 2: Investments Sélection fondée travaux de reprofilage des COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 52,500.00 69,283.53 Signé 2019-02-24 2019-03-03 2019-03-26 2019-04-17 2019-02-28 2019-05-17 2019-04-01 2019-06-01 2019-04-09 2019-06-21 2019-04-30 2019-07-15 2019-06-06 2021-01-25 réseaux de drainage des the selected landscapes le coût secteurs 04, 05 et 06

C 16-18/CN / Analyse des Sélection fondée problématiques d'entretien Component 1: Information sur les des ouvrages hydroagricoles, IDA / 59790 A posteriori Open - National 30,000.00 0.00 Annulé 2018-06-28 2018-10-08 2018-08-07 2018-09-10 2018-11-30 2018-10-20 2018-11-13 2019-02-21 and planning qualifications des proposition d'instruments et consultants stratégies

C 01-19/CN / Élaboration du Plans d'Aménagement et de Gestion Durable des Paysages (PAGDP) du PADAP pour le : Lot 01 : Paysage d'Andapa Sélection fondée Component 1: Information Open - Lot 02 : Paysage de COFN / C1540 A posteriori sur la qualité et 967,463.00 1,014,833.73 Signé 2019-03-29 2019-05-01 2019-05-13 2019-06-02 2019-05-25 2019-07-17 2019-07-08 2019-08-01 2019-07-19 2019-08-31 2019-08-16 2019-10-01 2019-09-25 2020-02-28 and planning International Bealalana le coût

Lot 03 : Paysage de Marovoay Lot 04 : Paysage d'Iazafo Lot 05 : Paysage de Soanierana Ivongo

C 29-18/CN / Développement d'une Sélection fondée Component 1: Information méthodologie d'inventaire IDA / 59790 A posteriori sur la qualité et Open - National 25,000.00 0.00 Annulé 2018-08-30 2018-09-26 2018-10-14 2018-11-17 2018-12-17 2018-12-27 2019-01-20 2019-02-24 2019-06-24 and planning des ressources en eau et le coût estimation des besoins

Page 8 C 04 BIS-18/BOE / Etudes et contrôle-surveillance des travaux de regabaritage des Component 2: Investments Sélection fondée cours d'eau exutoire du COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 145,000.00 90,071.60 Signé 2018-11-21 2019-03-03 2018-12-21 2019-02-03 2018-12-07 2019-03-05 2019-01-07 2019-04-04 2019-02-20 2019-05-09 2019-02-25 2019-06-13 2019-03-22 2020-06-12 drainage de périmètre the selected landscapes le coût irrigué des secteurs 4, 5 et 6 de la plaine de Marovoay.

C 04-18/BOE / Etudes de Réhabilitation des cours Component 2: Investments Sélection fondée d'eau exutoire du drainage IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 62,500.00 0.00 Annulé 2018-11-20 2018-11-21 2018-12-11 2019-01-04 2019-02-03 2019-02-13 2019-03-20 2019-04-24 2019-12-10 (Rivière Marovoay Aval, the selected landscapes le coût Rivière Karambo Aval)

C 05/19/SOF / Etudes et Component 2: Investments Sélection fondée contrôle et surveillance de En cours COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 58,590.00 0.00 2019-05-30 2019-07-08 2019-06-29 2019-07-21 2019-10-21 2019-08-20 2020-01-22 2019-09-04 2020-02-21 2019-09-24 2019-10-18 2019-12-17 travaux de stabilisation de d'exécution the selected landscapes le coût lavaka à Bealanana

MG-UGP PADAP-117841- CS-QCBS / Agence de Component 3: Project Sélection fondée communication pour la COFN / C1540 Management Coordination A posteriori sur la qualité et Open - National 28,500.00 20,587.41 Signé 2019-06-17 2019-04-10 2019-07-08 2019-08-21 2019-05-23 2019-09-20 2019-10-02 2019-10-10 2019-11-06 2019-11-03 2019-12-03 2019-11-27 2019-12-27 2020-01-26 création, animation et and M&E le coût l'hébergement du site web du PADAP.

MG-UGP PADAP-118799- CS-LCS / Recrutement d'un Component 3: Project cabinet pour l'audit externe Sélection au COFN / C1540 Management Coordination A posteriori Open - National 75,000.00 17,544.75 Signé 2019-06-20 2019-06-27 2019-06-20 2019-06-22 2019-08-29 2019-07-22 2019-09-30 2019-08-06 2019-10-04 2019-08-21 2019-10-21 2019-10-04 2019-12-27 2020-01-02 des trois (03) exercices du moindre coût and M&E PADAP : 2019, 2020 et 2021.

C 01 BIS-18/BOE / Recrutement d'une ONG chargée du renforcement de capacités et de l'appui des Component 2: Investments Sélection fondée paysans pilotes sur les COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 70,500.00 49,883.77 Signé 2018-11-14 2018-10-08 2018-12-05 2019-01-18 2018-12-03 2019-02-15 2019-01-03 2019-03-17 2019-01-24 2019-04-21 2019-01-31 2019-05-26 2019-02-11 2020-05-25 paquets techniques de la the selected landscapes le coût production fourragère, agroécologie, agroforesterie et arboriculture

C 03-19/SAV / Etudes APS- APD-EIES-PAR-MGE-DAO- assistance passation de marché et contrôle- surveillance des travaux Component 2: Investments Sélection fondée reconstruction des deux IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 47,000.00 46,114.62 Signé 2019-01-30 2019-01-25 2019-02-14 2019-03-02 2019-01-31 2019-04-01 2019-03-04 2019-04-15 2019-03-09 2019-04-27 2019-04-19 2019-05-17 2019-05-17 2020-12-12 barrages avec avant-canaux the selected landscapes le coût rive gauche & droite et des réseaux hydroagricoles d'Antsahameloka pour les PI Ambodiala et Andalamena.

C 16 BIS-18/CN / Analyse des problématiques Component 2: Investments Sélection fondée d’entretien des ouvrages COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 30,000.00 0.00 Annulé 2018-10-08 2018-11-07 2018-12-21 2019-01-20 2019-02-19 2019-03-26 2019-04-30 2019-08-08 hydroagricoles à the selected landscapes le coût Madagascar, proposition d’instrument et stratégies

C 07-19/SAV / Mise en place des douze (12) pépinières communautaires Component 2: Investments Sélection fondée au niveau des villages et IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 37,490.00 0.00 Annulé 2019-02-20 2019-04-12 2019-03-22 2019-04-15 2019-05-15 2019-06-04 2019-06-28 2019-07-18 2020-03-14 des COBAS autour des the selected landscapes le coût aires protegées de la cuvette d'Andapa

C 01-20/ANJ / Elaboration (PCD/SAC) au niveau des Component 2: Investments Sélection fondée En attente communes dans les COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 33,140.00 0.00 2020-02-28 2020-03-29 2020-05-08 2020-06-17 2020-07-07 2020-08-12 2020-09-16 2020-12-15 d'exécution paysages d'intervention du the selected landscapes le coût PADAP CER Analanjirofo

C 04-20/ANJ / Recrutement de firme pour l'instauration et la Component 2: Investments Sélection fondée formalisation de neuf (09) En attente COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 12,000.00 0.00 2020-04-17 2020-05-17 2020-06-20 2020-07-20 2020-08-09 2020-09-13 2020-10-18 2021-01-16 comités de gestion des d'exécution the selected landscapes le coût matériels agricole dans le paysage d'Iazafo et Soanierana Ivongo

C 05-20/ANJ / Recrutement d'un Bureau d'Etude pour études, Component 2: Investments Sélection fondée contrôle et surveillance des En attente IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 15,200.00 0.00 2020-03-18 2020-04-17 2020-05-12 2020-06-11 2020-07-01 2020-08-01 2020-09-05 2021-02-17 travaux de construction de d'exécution the selected landscapes le coût bâtiment à usage de banque de semence à Iazafo et Soanierana Ivongo.

C 05-19/BOE / Recrutement d'une ONG Component 2: Investments Sélection fondée En attente chargée de la structuration COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 70,000.00 0.00 2020-04-15 2020-05-01 2020-06-05 2020-07-05 2020-07-25 2020-08-24 2020-09-22 2021-07-22 d'exécution et redynamisation des AUE the selected landscapes le coût sur la gestion des réseaux

C 05-20/SOF / Etudes, mise en place et accompagnement d’une Component 2: Investments Sélection fondée En attente Structure de gestion COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 245,000.00 0.00 2020-02-28 2020-03-14 2020-04-28 2020-05-28 2020-06-27 2020-07-17 2020-08-11 2020-12-09 d'exécution adaptée pour l’axe routier the selected landscapes le coût Bealanana – Ambatoriha (RIP 117) dans le district de Bealanana, région Sofia

C 06-20/SOF / Etude, Contrôle et surveillance des travaux de réhabilitation Component 2: Investments Sélection fondée En attente (APD-EIES-PAR-DAO-MGE) COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 187,500.00 0.00 2020-02-28 2020-03-29 2020-05-03 2020-06-02 2020-06-22 2020-07-17 2020-08-22 2020-12-20 d'exécution du Périmètre de the selected landscapes le coût Beandrarezona dans le paysage de Bealanana

C 07-20/SOF / Contrôle et Surveillance des Travaux de Component 2: Investments Sélection fondée En attente réhabilitation du Périmètre COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 24,000.00 0.00 2020-02-28 2020-03-09 2020-04-02 2020-05-02 2020-06-01 2020-06-26 2020-07-21 2020-08-05 d'exécution d'Anjohibe Ambatosia dans the selected landscapes le coût le Paysage de Bealanana

Page 9 C 02-20/SAV / Etude de faisabilité, mise en place et opérationnalisation des Component 2: Investments Sélection fondée En attente comités de gestion des COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 10,500.00 0.00 2020-02-28 2020-03-13 2020-04-26 2020-05-26 2020-06-15 2020-07-19 2020-08-23 2020-10-22 d'exécution matériels agricoles dans le the selected landscapes le coût paysage d'Andapa, Région SAVA.

C 01-20/SAV / Elaboration contrat plan pluriannuel et Component 2: Investments Sélection fondée Accompagnement En attente COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 29,690.00 0.00 2020-02-28 2020-02-28 2020-03-09 2020-04-09 2020-04-19 2020-05-24 2020-06-28 2021-12-20 (Encadrement et Suivi) des d'exécution the selected landscapes le coût AUEs sur la mise en œuvre des Contrat Plan

C 04-19/SOF / Études, contrôle et surveillance de Component 2: Investments Sélection fondée En attente travaux d'aménagement du COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 41,000.00 0.00 2020-02-20 2020-03-01 2020-04-05 2020-05-05 2020-05-25 2020-06-24 2020-07-24 2020-12-21 d'exécution périmètre de Doany,Paysage the selected landscapes le coût de Bealanana

C 01-20/CN / Service de consultant pour l'évaluation Component 3: Project Sélection fondée En attente à mi-parcours du Projet COFN / C1540 Management Coordination A posteriori sur la qualité et Open - National 18,750.00 0.00 2020-02-28 2020-03-29 2020-04-20 2020-05-20 2020-06-04 2020-06-24 2020-07-18 2020-10-16 d'exécution Agriculture Durable par and M&E le coût une Approche Paysage

C 04-20/CN / Service de Consultant pour la caractérisation des Component 2: Investments Sélection fondée ressources en eau et En attente COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 351,300.00 0.00 2020-02-10 2020-03-11 2020-04-14 2020-05-14 2020-06-03 2020-07-08 2020-08-12 2020-11-10 estimation des besoins dans d'exécution the selected landscapes le coût les 5 paysages d'intervention du PADAP (5 lots)

C 02-20/CN / Service de consultant pour le Component 3: Project Sélection fondée développement d'un logiciel En attente COFN / C1540 Management Coordination A posteriori sur la qualité et Open - National 25,000.00 0.00 2020-02-28 2020-03-20 2020-05-03 2020-06-02 2020-06-22 2020-07-16 2020-08-09 2021-08-04 pour le suivi-évaluation du d'exécution and M&E le coût Projet Agriculture Durable par une Approche Paysage

C 03-19/SOF / Etudes et contrôle et surveillance de Component 2: Investments Sélection fondée En attente travaux de construction du COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 27,810.00 0.00 2021-02-25 2021-03-27 2021-04-18 2021-05-18 2021-06-02 2021-06-22 2021-07-16 2022-11-18 d'exécution centre de multiplication de the selected landscapes le coût semences à Betainkankana

T 1-18/SOF / Travaux de stabilisation biologique des Sélection fondée Component 1: Information lavaka avec mise en place IDA / 59790 A posteriori sur la qualité et Open - National 9,800.00 0.00 Annulé 2018-11-30 2018-12-15 2019-01-06 2019-02-05 2019-02-20 2019-03-12 2019-04-05 2019-05-05 and planning de fascines dans le sous le coût paysage d'Ambatoriha

C 01-19/SOF / ONG ou Component 2: Investments Sélection fondée Association pour le En attente COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 32,120.00 0.00 2020-04-30 2020-05-30 2020-06-29 2020-07-29 2020-08-18 2020-09-21 2020-10-20 2021-01-28 renouvellement des contrats d'exécution the selected landscapes le coût de transfert gestion.

C 02-19/SOF / Élaboration Component 2: Investments Sélection fondée En attente d'un cadre incitatif (Contrat COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 56,250.00 0.00 2020-04-30 2020-05-30 2020-06-23 2020-07-23 2020-08-07 2020-09-05 2020-09-30 2021-01-08 d'exécution Plan Pluriannuel) par AUE the selected landscapes le coût

MG-UGP PADAP-118793- CS-QCBS / Inventaire forestier et écologique : - Lot 01: dans le paysage d'Andapa Sélection fondée Component 1: Information - Lot 02 : dans le paysage COFN / C1540 A posteriori sur la qualité et Open - National 365,000.00 0.00 Annulé 2019-06-12 2019-07-12 2019-08-11 2019-09-10 2019-09-25 2019-10-15 2019-11-20 2020-03-19 and planning de Bealalana le coût - Lot 03 : dans le paysage de Marovoay - Lot 04 : dans le paysage Sonierana Ivongo et Iazafo

MG-UGP PADAP-117852- CS-QCBS / Un cabinet Component 3: Project Sélection fondée spécialisé en communication COFN / C1540 Management Coordination A posteriori sur la qualité et Open - National 22,900.00 0.00 Annulé 2019-06-03 2019-06-24 2019-07-18 2019-08-17 2019-09-06 2019-09-30 2019-10-24 2019-12-23 en vue de la réalisation du and M&E le coût film documentaire sur le PADAP et le PAGDP.

C 09-18/ANJ / Recrutement d'agence d'encadrement pour la communauté locale faisant Component 2: Investments Sélection fondée la création pépinière et la COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 85,000.00 0.00 Annulé 2019-10-16 2019-11-15 2019-12-07 2020-01-06 2020-01-21 2020-04-01 2020-05-08 2022-05-08 Plantation d'espèces the selected landscapes le coût pérennes par les agro forêts et les espèces forestières à Iazafo et Soanierana Ivongo.

C 06-19/ANJ / Mise en place/Actualisation de base Component 2: Investments Sélection fondée des données sur les IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 37,500.00 0.00 Annulé 2019-04-30 2019-05-30 2019-06-21 2019-07-21 2019-08-05 2019-08-25 2019-09-18 2019-12-27 référentiels technico the selected landscapes le coût financiers des filières porteuses régionales

C 02-19/ANJ / Formation de tous les membres des Component 2: Investments Sélection fondée AUEs sur la gestion des IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 56,100.00 0.00 Annulé 2019-05-31 2019-09-02 2019-06-30 2019-07-24 2019-08-23 2019-09-07 2019-10-06 2019-10-31 2020-01-29 réseaux transférables the selected landscapes le coût (Entretien/Maintenance)

C 01-19/ANJ / Élaboration Component 2: Investments Sélection fondée d'un cadre incitatif (contrat En attente IDA / 59790 and capacity building in A posteriori sur la qualité et Open - National 82,820.00 0.00 2020-03-25 2020-04-24 2020-05-18 2020-06-17 2020-07-02 2020-07-31 2020-08-25 2020-11-23 plan pluriannuel) par AUE d'exécution the selected landscapes le coût Iazafo et Soanierana Ivongo.

C 04-20/BOE / Recrutement d'une firme Component 2: Investments Sélection fondée En attente pour l'appui, encadrement COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 125,000.00 0.00 2020-04-29 2020-05-14 2020-06-19 2020-07-20 2020-08-09 2020-09-11 2020-10-06 2021-10-06 d'exécution et réalisation des actions de the selected landscapes le coût reboisement

Page 10 C 09-20/SOF / Recrutement d'une ONG ou Association pour l'Instauration et Formalisation des Comités Component 2: Investments Sélection fondée En attente de Gestion des matériels COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 9,500.00 0.00 2020-05-29 2020-06-28 2020-08-07 2020-09-06 2020-09-21 2020-10-16 2020-11-10 2021-03-10 d'exécution agricoles : the selected landscapes le coût Lot 01 : dans le périmètre de Mangindrano Lot 02 : dans le périmètre de Bealanana

C 02-20/ANJ / Etudes et CS des travaux de réhabilitation des périmètres dans le district de Soanierana Ivongo - Lot 01: Périmètre Component 2: Investments Sélection fondée En attente hydroagricoles de Manjato COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 141,100.00 0.00 2020-02-28 2020-03-29 2020-05-02 2020-06-11 2020-07-01 2020-08-05 2020-09-09 2021-09-09 d'exécution et Ambodibonara the selected landscapes le coût - Lot 02: Périmètre hydroagricoles de Anamborano,Ambodimanga- Ambodihongo et Diavolamasoandro

C 01-20/BOE / Recrutement d'ONG/Association pour Component 2: Investments Sélection fondée En attente l'instauration et la COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 2,000.00 0.00 2020-04-15 2020-05-05 2020-06-11 2020-07-11 2020-07-31 2020-09-01 2020-10-03 2021-01-02 d'exécution formalisation de comités de the selected landscapes le coût gestion de matériels agricoles

C 03-20/BOE / Diagnostic des banques de semences communautaires à Component 2: Investments Sélection fondée Madagascar et En attente COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 20,000.00 0.00 2020-05-26 2020-06-10 2020-08-01 2020-08-31 2020-09-20 2020-10-20 2020-11-23 2021-08-23 redynamisation de la d'exécution the selected landscapes le coût banque de semence communautaire à Tsararano, district de Marovoay, Région Boeny

C 03-20/SOF / Recrutement d'une ONG en Component 2: Investments Sélection fondée En attente vue de l’Élaboration des COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 70,000.00 0.00 2020-05-29 2020-06-19 2020-08-02 2020-08-30 2020-09-29 2020-11-03 2020-12-08 2021-12-08 d'exécution schémas d'aménagement the selected landscapes le coût communaux (SAC)

C 06-19/BOE / Recrutement d'une firme Component 2: Investments Sélection fondée pour assurer la "Mise en En attente COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 5,800.00 0.00 2020-05-12 2020-06-01 2020-07-06 2020-08-05 2020-08-25 2020-09-24 2020-10-19 2021-05-27 œuvre des plans d'action de d'exécution the selected landscapes le coût lutte contre les feux de brousses"

C 08-20/SOF / étude de faisabilité de la réouverture du centre de sélection Component 2: Investments Sélection fondée En attente variétale et de COFN / C1540 and capacity building in A posteriori sur la qualité et Open - National 52,000.00 0.00 2020-02-28 2020-03-29 2020-05-08 2020-06-07 2020-06-22 2020-07-12 2020-08-06 2020-11-04 d'exécution multiplication de semences the selected landscapes le coût Betaikankana dans le Paysage de Bealanana

INDIVIDUAL CONSULTANTS Activity Reference No. Actual Invitation to Loan / Credit Market Contract Type Estimated Process Draft Negotiated / Description Component Review Type Method Amount Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Status Contract (US$) Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP PADAP-38775-CS- INDV / Responsable de Component 3: Project Passation des marchés pour IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 11,178.36 Signé 2017-11-30 2017-08-17 2017-12-30 2018-02-06 2018-01-09 2018-03-08 2018-02-02 2018-03-26 2019-02-02 l'unité de Coordination and M&E Régionale d'Andapa.

MG-UGP PADAP-38776-CS- INDV / Responsable de Component 3: Project Passation des Marchés IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 13,209.42 Signé 2017-11-30 2017-08-17 2018-01-19 2018-01-29 2018-01-23 2018-02-22 2018-01-31 2019-02-22 (RPM) pour l'Unité de and M&E Coordination Régionale de Sofia.

C 61-17/CN / Responsable Administratif et Finacier Component 3: Project (RAF) pour l'Unité de IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 14,267.74 Signé 2017-11-30 2017-09-05 2017-12-30 2017-11-02 2018-01-09 2018-02-09 2018-02-02 2018-02-27 2019-02-02 Coordination Régionale and M&E d'Analanjirofo.

C 62-17/CN / Responsable de Passation des Marchés Component 3: Project (RPM) pour l'Unité de IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 12,272.69 Signé 2017-11-27 2017-08-17 2018-01-16 2018-04-24 2018-01-26 2018-04-27 2018-02-19 2018-05-02 2019-02-19 Coordination Régionale and M&E d'Analanjirofo.

MG-UGP PADAP-38779-CS- INDV / Responsable Component 3: Project Administratif et Finacier IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 14,308.06 Signé 2017-11-30 2017-09-05 2017-12-30 2017-11-02 2018-01-09 2018-02-16 2018-02-02 2018-02-27 2019-02-02 (RAF) pour l'Unité de and M&E Coordination Régionale de Sava.

MG-UGP PADAP-38780-CS- INDV / Responsable Component 3: Project Administratif et Finacier IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 11,889.78 Signé 2017-11-30 2017-09-05 2017-12-30 2017-11-02 2018-01-09 2018-02-09 2018-02-02 2018-02-27 2019-02-02 (RAF) pour l'Unité de and M&E Coordination Régionale de Sofia.

C 63-14/CN / Comptable Component 3: Project pour l'Unité de IDA / 59790 Management Coordination A posteriori Individuel Open 12,000.00 8,181.79 Signé 2017-11-30 2017-09-05 2017-12-30 2018-02-08 2018-01-09 2018-02-09 2018-02-02 2018-02-27 2019-02-02 Coordination Régionale and M&E d'Analanjirofo.

C 57-17/CN / Responsable Component 3: Project eau/irrigation national du IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 12,980.94 Signé 2017-12-01 2017-12-22 2017-12-31 2018-01-10 2018-01-03 2018-02-03 2018-01-18 2019-02-03 Projet. and M&E

Component 3: Project C 49-17/CN / Comptable IDA / 59790 Management Coordination A posteriori Individuel Open 24,000.00 11,923.38 Signé 2017-11-30 2017-09-14 2017-12-30 2017-11-02 2018-01-09 2018-02-01 2018-02-02 2018-02-26 2019-02-02 national du PADAP. and M&E

Page 11 MG-UGP PADAP-38784-CS- Component 3: Project INDV / Comptable pour IDA / 59790 Management Coordination A posteriori Individuel Open 12,000.00 8,176.03 Signé 2017-11-30 2017-09-05 2017-12-30 2017-11-02 2018-01-09 2018-02-28 2018-02-02 2018-03-01 2019-02-02 l'Unité de Coordination and M&E Régionale de Sofia.

MG-UGP PADAP-38778-CS- INDV / Responsable Component 3: Project Administratif et Finacier IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 13,588.32 Signé 2017-11-30 2017-09-05 2017-12-30 2017-11-02 2018-01-09 2018-02-09 2018-02-02 2018-02-27 2019-02-02 (RAF) pour l'Unité de and M&E Coordination Régionale de Boeny.

MG-UGP PADAP-38781-CS- Component 3: Project INDV / Comptable pour IDA / 59790 Management Coordination A posteriori Individuel Open 12,000.00 8,181.79 Signé 2017-11-30 2017-09-05 2017-12-30 2018-02-08 2018-01-09 2018-02-09 2018-02-02 2018-02-27 2019-02-02 l'Unité de Coordination and M&E Régionale de Boeny.

MG-UGP PADAP-38783-CS- Component 3: Project INDV / Comptable pour IDA / 59790 Management Coordination A posteriori Individuel Open 12,000.00 8,176.03 Signé 2017-11-30 2017-09-05 2017-12-30 2018-03-01 2018-01-09 2018-03-05 2018-02-02 2018-03-07 2019-02-02 l'Unité de Coordination and M&E Régionale de Sava.

MG-UGP PADAP-38445-CS- INDV / Responsable de Component 3: Project Passation des Marchés IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 13,166.16 Signé 2017-11-27 2017-08-17 2017-12-27 2018-01-06 2018-01-23 2018-01-30 2018-02-15 2019-01-30 (RPM) pour l'Unité de and M&E Coordination Régionale de Boeny.

C 65-17/CN / 04 Responsables en Agriculture pour les 04 Unités de Gestion régionale du Component 3: Project PADAP : Iazafo-Soanierana IDA / 59790 Management Coordination A posteriori Individuel Open 192,000.00 23,032.99 Signé 2018-01-08 2018-01-25 2018-02-17 2018-04-17 2018-03-10 2018-04-24 2018-04-14 2018-05-02 2019-04-14 2018-05-02 Ivongo (Région and M&E Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA)

C 69-17/CN / 04 Responsables Socio-orga et développement local pour les 04 Unités de Gestion Component 3: Project régionale du PADAP : IDA / 59790 Management Coordination A posteriori Individuel Open 192,000.00 40,130.70 Signé 2018-01-08 2017-12-28 2018-02-16 2018-04-17 2018-03-09 2018-04-25 2018-04-13 2018-04-26 2019-04-13 Iazafo-Soanierana Ivongo and M&E (Région Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA).

C 67-17/CN / 04 Responsables en environnement et Foresterie pour les 04 Unités de Component 3: Project Gestion régionale du IDA / 59790 Management Coordination A posteriori Individuel Open 192,000.00 43,958.48 Signé 2018-01-08 2018-02-07 2018-02-17 2018-04-19 2018-03-10 2018-05-02 2018-04-14 2018-05-14 2019-04-14 PADAP : Iazafo-Soanierana and M&E Ivongo (Région Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA).

C 55-17/CN / Responsable Component 3: Project Sauvegarde IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 15,286.86 Signé 2018-01-08 2018-02-23 2018-02-17 2018-03-30 2018-03-10 2018-04-27 2018-04-14 2018-05-02 2019-04-14 Environnementale et Sociale and M&E au niveau national (UGP)

MG-UGP PADAP-44922-CS- INDV / 04 Responsables Eau et Irrigation pour les 04 Unités de Gestion Component 3: Project régionale du PADAP : IDA / 59790 Management Coordination A posteriori Individuel Open 192,000.00 43,958.48 Signé 2018-01-22 2018-02-08 2018-03-12 2018-04-17 2018-04-02 2018-04-27 2018-05-07 2018-05-02 2019-05-07 Iazafo-Soanierana Ivongo and M&E (Région Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA).

C 60-17/CN / 04 Assistants techniques des Opérations pour chaque Unité de Gestion Régionale Component 3: Project du PADAP : Iazafo- IDA / 59790 Management Coordination A posteriori Individuel Open 384,000.00 58,083.89 Signé 2017-12-01 2017-10-23 2017-12-31 2018-01-22 2018-01-10 2018-02-23 2018-02-03 2018-05-02 2019-02-03 Soanierana Ivongo (Région and M&E Analanjirofo), Marovoay (Région Boeny), Bealalana (Région SOFIA) et Andapa (Région SAVA).

Component 3: Project MG-UGP PADAP-44950-CS- IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 17,197.72 Signé 2018-01-22 2018-03-21 2018-02-26 2018-05-18 2018-03-13 2018-06-27 2018-03-28 2018-06-29 2019-03-28 INDV / Auditeur interne and M&E

MG-UGP PADAP-59456-CS- CDS / Recrutement d'un consultant international en Component 2: Investments Sélection de vue de la finalisation du IDA / V0430 and capacity building in A posteriori consultants par Direct 30,250.00 40,425.00 Signé 2018-04-16 2018-04-30 2018-05-06 2018-04-30 2018-06-29 2018-05-15 2018-07-29 plan d'actions sur la the selected landscapes entente directe gestion des bois précieux (Diospyros spp, Dalbergia spp)

MG-UGP PADAP-59459-CS- INDV / Recrutement d'un consultant national francophone pour Component 2: Investments l'assistance au consultant IDA / V0430 and capacity building in A posteriori Individuel Limited 10,000.00 2,437.96 Signé 2018-04-16 2018-05-14 2018-05-16 2018-04-19 2018-05-26 2018-05-21 2018-06-15 2018-05-21 2018-07-15 international en vue de la the selected landscapes finalisation du plan d'actions sur la gestion des bois précieux.

C 26-18/ CN / Diagnostic agroécologique et Component 2: Investments Sélection de Formation des En cours IDA / 59790 and capacity building in A posteriori consultants par Direct 45,000.00 0.00 2018-05-09 2018-10-26 2018-05-26 2018-11-22 2018-07-20 2018-12-17 Organisations paysannes et d'exécution the selected landscapes entente directe des paysans sur les pratiques agroécologiques

C 11-18/CN / Etude sur la Component 3: Project Rénovation locaux de l'UGP IDA / 59790 Management Coordination A posteriori Individuel Open 2,500.00 2,172.74 Signé 2018-05-09 2018-06-06 2018-06-07 2018-06-28 2018-06-14 2018-08-02 2018-06-29 2018-09-01 à Nanisana. and M&E

Page 12 MG-UGP PADAP-64943-CS- INDV / Prestations d'un consultant individuel pour le poste de Component 3: Project Responsable en Suivi- IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 12,229.49 Signé 2018-06-01 2018-07-09 2018-07-16 2018-10-08 2018-07-23 2018-10-11 2018-08-12 2018-10-12 2019-08-12 évaluation pour l'Unité de and M&E Coordination Régionale de PADAP-Région ANALANJIROFO

MG-UGP PADAP-65206-CS- CDS / Prestations pour 03 ans d'un consultant Component 3: Project Sélection de individuel pour le poste de IDA / 59790 Management Coordination A posteriori consultants par Direct 65,000.00 55,369.44 Signé 2018-06-04 2018-04-19 2018-06-14 2018-07-18 2018-04-23 2021-07-17 RESPONSABLE and M&E entente directe ADMINISTRATIF ET FINANCIER du projet PADAP.

MG-UGP PADAP-66144-CS- INDV / Prestations d'un Component 3: Project consultant individuel pour IDA / 59790 Management Coordination A posteriori Individuel Open 10,000.00 7,459.85 Signé 2018-06-11 2018-02-20 2018-07-20 2018-03-21 2018-08-10 2018-03-22 2018-09-03 2018-03-26 2019-09-03 le poste d'Assistant and M&E Informatique pour l'Unité de Gestion du PADAP

MG-UGP PADAP-75687-CS- CDS / Prestations pour 03 ans d'un consultant Component 3: Project Sélection de individuel pour le poste de IDA / 59790 Management Coordination A posteriori consultants par Direct 65,000.00 18,531.97 Signé 2018-08-27 2017-01-16 2018-09-06 2018-10-10 2018-08-01 2021-10-09 RESPONSABLE and M&E entente directe PASSATION DES MARCHES du projet PADAP

C 42-18/CN / La mise en place d'un système Component 1: Information d'information géographique IDA / 59790 A posteriori Individuel Open 10,000.00 7,436.62 Signé 2018-08-30 2018-08-30 2018-11-08 2019-01-15 2018-11-18 2019-02-05 2018-12-23 2019-02-08 2019-04-22 and planning des périmètres hydroagricoles (SIGPHY)

C 17-18/CN / Adaptation de la méthodologie et le Component 1: Information protocole du MEEF des IDA / 59790 A posteriori Individuel Open 25,000.00 15,699.95 Signé 2018-11-09 2018-09-24 2018-12-08 2018-12-18 2019-01-03 2019-01-18 2019-01-11 2019-04-03 and planning inventaires forestiers et écologiques.

MG-UGP PADAP-86980-CS- CDS / Prestations d'un an Component 3: Project Sélection de d'un consultant individuel IDA / 59790 Management Coordination A posteriori consultants par Direct 20,250.00 18,284.62 Signé 2018-11-13 2018-10-02 2018-11-23 2018-12-27 2018-10-18 2019-12-27 pour le poste d'Assistant and M&E entente directe Technique des Opérations du projet PADAP

C 54-17/CN / Responsable Component 3: Project en Agriculture au niveau IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 0.00 Annulé 2018-01-08 2018-02-16 2018-03-09 2018-04-13 2019-04-13 national (UGP) and M&E

C 10-19/ANJ / Component 2: Investments Recrutement d'agent de COFN / C1540 and capacity building in A posteriori Individuel Open 6,560.00 0.00 Annulé 2019-03-12 2019-05-18 2019-05-28 2019-06-17 2019-09-25 suivi et d'accompagnement the selected landscapes des COBA.

MG-UGP PADAP-86978-CS- CDS / Protocole d'accord PAPRIZ pour les Chaînes de valeur riz irrigué Component 2: Investments Sélection de (Introduction des nouvelles IDA / 59790 and capacity building in A posteriori consultants par Direct 31,400.00 0.00 Annulé 2018-11-13 2018-10-16 2018-11-30 2019-01-13 2019-02-12 technologie à travers de the selected landscapes entente directe formation, Facilitation d'accés à des intrants et des materiels Agricoles)

MG-UGP PADAP-87818-CS- CDS / Protocole d'accord avec la DREEF analanjirofo Component 2: Investments Sélection de pour la redynamisation et IDA / 59790 and capacity building in A posteriori consultants par Direct 35,000.00 0.00 Annulé 2018-11-22 2018-12-09 2019-01-12 2019-05-12 renforcement de capacité the selected landscapes entente directe des COBA existants dans le paysage de Soanierana Ivongo

MG-UGP PADAP-87819-CS- CDS / Protocole d'accord avec la DREEF Sofia pour Component 2: Investments Sélection de la redynamisation et IDA / 59790 and capacity building in A posteriori consultants par Direct 25,000.00 0.00 Annulé 2018-11-22 2018-12-09 2019-01-12 2019-05-12 renforcement de capacité the selected landscapes entente directe des COBA existants dans le paysage de Soanierana Ivongo

C 02-18/CN / Protocole avec DPV sur l'atelier de Component 2: Investments Sélection de formation et production des IDA / 59790 and capacity building in A posteriori consultants par Direct 40,000.00 0.00 Annulé 2018-05-09 2018-05-26 2018-07-09 2019-04-05 fiches techniques de gestion the selected landscapes entente directe des pestes et pesticides

MG-UGP PADAP-127049- CS-CDS / Contrôle et surveillance des travaux sur PI d’Iazafo : LOT 3: réseaux d’irrigation Component 2: Investments Sélection de et drainage zone COFN / C1540 and capacity building in A posteriori consultants par Direct 72,900.00 68,676.43 Signé 2019-08-16 2019-08-09 2019-08-23 2019-08-28 2019-09-21 2019-09-24 2020-02-18 d’Antsiratenina-Nosibe the selected landscapes entente directe LOT 4: réseaux d’irrigation et drainage zone d’Ambatomipaka-Maromitety LOT 6: réseaux d’irrigation zone de Mahatsara

MG-UGP PADAP-127177- CS-CDS / Contrôle&surveillance des travaux sur PI Andranomafana Mangindrano-paysage Component 2: Investments Sélection de Bealanana : COFN / C1540 and capacity building in A posteriori consultants par Direct 47,900.00 42,922.67 Signé 2019-08-16 2019-08-09 2019-08-23 2019-08-23 2019-09-21 2019-08-26 2020-02-18 -lot n°2: canal CPRD du the selected landscapes entente directe pm 2153 jusqu’au bout du réseau -lot n°3: canal CPRG 1er tronçon de 2921 m -lot n°4: canal CPRG 2ème tronçon de 3261 m -lot n°5: piste et pont

Page 13 C 22-18/CN / Protocole avec réseau des Sélection de observatoires rureaux sur Component 1: Information IDA / 59790 A posteriori consultants par Direct 20,000.00 0.00 Annulé 2018-04-30 2018-05-17 2018-07-21 2019-02-16 l'observatoire des données and planning entente directe socio-économiques pour le paysage de Bealanana.

C 03-18/BOE / Recrutement d'un consultant individuel chargé du Component 2: Investments diagnostic du En attente IDA / 59790 and capacity building in A posteriori Individuel Open 5,000.00 0.00 2020-01-21 2020-03-08 2020-03-10 2020-03-15 2020-12-22 fonctionnement et d'exécution the selected landscapes opérationnalisation de la Banque de semences au CMS Tsararano.

C 06-20/ANJ / Consultant Component 2: Investments individuel pour formation En attente COFN / C1540 and capacity building in A posteriori Individuel Open 5,140.00 0.00 2020-04-17 2020-06-13 2020-06-21 2020-07-22 2020-10-20 des dirigeants du d'exécution the selected landscapes Tranoben'ny Tantsaha

C 08-20/ANJ / Recrutement d'un consultant individuel pour la formation Component 2: Investments En attente du personnel des Ministères COFN / C1540 and capacity building in A posteriori Individuel Open 2,250.00 0.00 2020-02-28 2020-04-25 2020-05-05 2020-06-05 2020-11-02 d'exécution au niveau Régional à la the selected landscapes construction et mise en œuvre du SIS (Formation)

C 09-19/ANJ / Recrutement d'un consultant individuel pour/ Lot 1: la formation en Component 2: Investments GIRE des personnels de En attente COFN / C1540 and capacity building in A posteriori Individuel Open 4,500.00 0.00 2020-04-13 2020-06-09 2020-06-19 2020-07-20 2020-12-17 DREEH/DRAEP/DREDD d'exécution the selected landscapes Lot 2: Diffuser et expliquer les rôles, responsabilités de l’Autorité Nationale de l’Eau et de l’Assainissement

C 10-20/SOF / Recrutement de Consultants Component 2: Investments individuels pour En attente COFN / C1540 and capacity building in A posteriori Individuel Open 6,000.00 0.00 2020-04-30 2020-07-29 2020-08-19 2020-09-23 2020-12-22 l'encadrement et l'appui d'exécution the selected landscapes conseils de proximité aux Paysans Formateurs et aux Paysans adoptants

C 07-19/ANJ / Appui aux dialogues public-privé Component 2: Investments régionaux pour la promotion IDA / 59790 and capacity building in A posteriori Individuel Open 4,000.00 0.00 Annulé 2019-03-12 2019-05-11 2019-05-21 2019-06-10 2019-09-18 de 3P dans l'agriculture et the selected landscapes l'élevage

C 05-19/ANJ / Consultant individuel pour appuyer la Component 2: Investments En attente redynamisation COFN / C1540 and capacity building in A posteriori Individuel Open 5,630.00 0.00 2020-04-30 2020-07-02 2020-07-13 2020-08-03 2020-12-01 d'exécution duTranoben'ny Tantsaha à the selected landscapes Fenérive Est.

C 05-20/BOE / Recrutement de deux (02) agents communaux pour l'approche LIFE dans le Component 2: Investments district de Marovoay, En attente COFN / C1540 and capacity building in A posteriori Individuel Open 8,100.00 0.00 2020-05-06 2020-06-24 2020-07-09 2020-08-05 2022-08-15 Région Boeny. d'exécution the selected landscapes Lot 1: Commune rurale de Tsararano Lot 2: Commune rurale d' Anosinalainolona

C 02-20/SOF / Recrutement de deux (02) agents communaux sur Component 2: Investments En attente l'approche LIFE : 01 COFN / C1540 and capacity building in A posteriori Individuel Open 8,750.00 0.00 2020-05-28 2020-07-17 2020-08-07 2020-09-11 2022-06-23 d'exécution Commune Rurale the selected landscapes AMBODIAMPANA- 01 Commune Rurale AMBATOSIA

C 04-20/SOF / Assistance technique pour Component 2: Investments l'encadrement et appui- En attente COFN / C1540 and capacity building in A posteriori Individuel Open 6,000.00 0.00 2020-07-07 2020-09-15 2020-10-06 2020-11-06 2021-03-06 conseil de proximité des d'exécution the selected landscapes Paysans Formateurs et des paysans adoptants

C 02-20/BOE / Recrutement de 3 Consultants Individuels pour la validation expérimentale des paquets techniques agroécologie, Component 2: Investments En attente agroforesterie, arboriculture COFN / C1540 and capacity building in A posteriori Individuel Open 5,800.00 0.00 2020-05-22 2020-07-16 2020-07-27 2020-08-26 2022-08-26 d'exécution et cultures fourragères the selected landscapes Lot 1: Commune d'Ambolomoty Lot 2: Commune Tsararano Lot 3: Commune Anosinalainolona

C 05-20/CN / Responsables en Agriculture pour la Component 3: Project En attente cellule d'exécution régionale IDA / 59790 Management Coordination A posteriori Individuel Open 48,000.00 0.00 2020-04-30 2020-06-18 2020-07-09 2020-08-13 2022-08-13 d'exécution du PADAP Région SOFIA and M&E (Basé à Bealalana).