Final Report and Decision of the Board of Inquiry Into the Transmission Gully Proposal
Total Page:16
File Type:pdf, Size:1020Kb
Final Report and Decision of the Board of Inquiry into the Transmission Gully Proposal Produced under Section 149R of the Resource Management Act 1991 Volume 2: Conditions Published by the Board of Inquiry into the Transmission Gully Proposal Publication No: EPA 0175 ISBN: 978-0-478-34877-4 (print) 978-0-478-34878-1 (electronic) 978-0-478-34879-8 (CD) June 2012 Contents Index of Confirmed Notices of Requirement and Resource Consents ......................................... 5 NZ Transport Agency – Conditions on Confirmed Notices of Requirement ................................. 9 NZ Transport Agency - Resource Consent Conditions ............................................................... 34 RC 1 Land Use Consent – Earthworks ............................................................................. 56 RC 2 Discharge Permit ..................................................................................................... 56 RC 3 Discharge Permit ..................................................................................................... 56 RC4 Land use consents and water permits for Wainui Stream ........................................ 62 RC5 Land use consents and water permits for Te Puka Stream ...................................... 62 RC6 Land use consents and water permits for Horokiri Stream ....................................... 62 RC7 Land use consents and water permits for Ration Stream ......................................... 62 RC8 Land use consents and water permits for Collins Stream ........................................ 62 RC9 Land use consents and water permits for Pauatahanui Stream ............................... 62 RC10 Land use consents and water permits for Duck Creek ........................................... 62 RC11 Land use consents and water permits for Kenepuru Stream ................................. 62 RC12 Land use consents and water permits for Porirua Stream ..................................... 62 RC13 Land Use Consent – To undertake works in, on, over or under the beds of Duck Creek for the purpose of removing existing perched culverts in eight locations, and replacing them with culverts that allow fish passage ................................. 64 RC14 Land Use Consent for use, placement and erection of structures (refer to Schedule C:Temporary Culverts) ...................................................................................... 64 RC 15 Discharge Permit for Concrete Batching Plant: Discharge contaminants to air after bag filtration resulting from the mixing of cement powder with other materials to manufacture concrete or concrete products; and .......................................... 66 RC16 Discharge Permit for Concrete Batching Plant: Discharge contaminants to stormwater from an industrial or trade process................................................................. 66 Porirua City Council – Conditions on Confirmed Notices of Requirement .................................. 70 Porirua City Council - Resource Consent Conditions ................................................................. 83 RC17 Land Use Consent – Earthworks ............................................................................ 84 RC18 Discharge Permit .................................................................................................... 84 RC19 Discharge Permit .................................................................................................... 84 RC20 Land use consent for works in Duck Creek ............................................................ 97 Transpower New Zealand Ltd – Resource Consent Conditions ................................................. 98 RC 21 Resource Consent granted in the jurisdiction of the Kapiti Coast District Council .............................................................................................................................. 98 RC22 Resource Consent Granted in the jurisdiction of the Porirua City Council ............. 98 Schedule of documents appended to conditions ................................................................ 105 Schedule A: Permanent Culverts........................................................................................... 106 Schedule B: Bridges ............................................................................................................... 109 Schedule C: Temporary Culverts........................................................................................... 112 Schedule D: Proposed Mitigation Sites and Treatments .................................................... 114 Schedule E: Changes to Transmission Line Support Structures ...................................... 124 Schedule F: Tables L5 and L6 as updated from the Draft ESCMP ..................................... 127 4 | Conditions | June 2012 Index of Confirmed Notices of Requirement and Resource Consents General Specific Appended NZTA Notices of Requirement Conditions Conditions Documents Schedule D: Proposed Notice of Requirement relating to Kapiti Coast District Council NOR 1 NZTA 1-83 Mitigation Sites and (Main Alignment) Treatments (NZTA53) Schedule D: Proposed Notice of Requirement relating to Upper Hutt City Council NOR 2 NZTA 1-83 Mitigation Sites and (Main Alignment) Treatments (NZTA53) Schedule D: Proposed Notice of Requirement relating to Porirua City Council (Main NOR 3 NZTA 1-83 Mitigation Sites and Alignment) Treatments (NZTA53) Schedule D: Proposed Notice of Requirement relating to Wellington City Council NOR 4 NZTA 1-83 Mitigation Sites and (Main Alignment) Treatments (NZTA53) Schedule D: Proposed Notice of Requirement relating to Porirua City Council NOR 5 NZTA 1-83 Mitigation Sites and (Kenepuru Link Road component) Treatments (NZTA53) Schedule D: Proposed Notice of Requirement relating to Wellington City Council NOR 6 NZTA 1-83 Mitigation Sites and (Kenepuru Link Road component) Treatments (NZTA53) NZTA Resource Consents (Main Alignment/Kenepuru Link Road components) Land use consent - Earthworks Schedule D: Proposed For approximately 6 million cubic metres of earthworks for the Mitigation Sites and purpose of road construction over an area of approximately Treatments (G.31); 170 hectares between Linden and MacKays Crossing RC 1 G 1-57 E 1-28 Schedule F: Tables L5 including five fill sites, construction laydown areas and site and L6 updated from compounds, and erosion and sediment control devices; and the draft ESCMP the associated removal of vegetation including plantation (G.39) forestry. Discharge permit Schedule F: Tables L5 To authorise the discharge of sediment laden stormwater and and L6 updated from RC 2 G 1-57 E 1-28 chemically treated (which would include flocculant and similar the draft ESCMP products) sediment laden water to land that may enter water (G.39) Discharge permit Schedule F: Tables L5 To authorise the discharge of sediment laden stormwater and and L6 updated from RC 3 G 1-57 E 1-28 chemically treated (which would include flocculant and similar the draft ESCMP products) sediment laden water to water (G.39) Land use consent and water permit for Wainui Stream -Land Use Consent and Water Permit – to permanently realign (divert and reclaim) the beds of steams, being pipe culverts, bridges and associated erosion protection control Schedule A: structures and stormwater outlet structures; Permanent Culverts; -Land use consent to undertake permanent works in the beds Schedule B: Bridges; RC 4 streams and associated tributaries, including the G 1-57 WS 1-9 Schedule F: Tables L5 construction, use and maintenance of culverts and fords; the and L6 updated from construction and maintenance of gabion baskets and rock rip- the draft ESCMP rap erosion protection structures; and associated channel (G.39) realignment and disturbance of the beds of those streams; -Water permit to divert water as part of the reclamation of the bed of a stream and associated tributaries Land use consent and water permit for Te Puka Stream -Land Use Consent and Water Permit – to permanently Schedule A: realign (divert and reclaim) the beds of steams, being pipe Permanent Culverts; culverts, bridges and associated erosion protection control Schedule B: Bridges; RC 5 structures and stormwater outlet structures; G 1-57 WS 1-9 Schedule F: Tables L5 -Land use consent to undertake permanent works in the beds and L6 updated from streams and associated tributaries, including the the draft ESCMP construction, use and maintenance of culverts and fords; the (G.39) construction and maintenance of gabion baskets and rock rip- 5 | Conditions | June 2012 rap erosion protection structures; and associated channel realignment and disturbance of the beds of those streams; -Water permit to divert water as part of the reclamation of the bed of a stream and associated tributaries Land use consent and water permit for Horokiri Stream -Land Use Consent and Water Permit – to permanently realign (divert and reclaim) the beds of steams, being pipe culverts, bridges and associated erosion protection control Schedule A: structures and stormwater outlet structures; Permanent Culverts; -Land use consent to undertake permanent works in the beds Schedule B: Bridges; RC 6 streams and associated tributaries, including the G 1-57 WS 1-9 Schedule F: Tables L5 construction, use and maintenance of culverts and fords; the and L6 updated from construction and maintenance of gabion baskets and rock rip- the draft ESCMP rap erosion protection structures; and associated channel (G.39) realignment and disturbance of the beds