Roading Projects - New Zealand Transport Agency (Lead Agency) Progressing As Planned Key Milestone Achieved in This Quarter ☺
Total Page:16
File Type:pdf, Size:1020Kb
Attachment 4 to Report 09.216 Page 1 of 3 Roading Projects - New Zealand Transport Agency (Lead Agency) Progressing as planned Key milestone achieved in this Quarter ☺ Project Status (for projects with start dates before 2016) Moderate delay Significant delay (more than two years) Project Overall Partner Progress Indicative Start (Year) Corridor Project Name Project Description Comments Delay No. Progress Agencies Issues Investigation Design Construction Western 20 MacKays Overbridge Completion of the bridge over the North Island Main Trunk Rail Line on SH1 100% - Complete Complete Complete Practical completion achieved & south of Paraparaumu. surfacing issues resolved. Reshaping & surfacing enhancing (OGPA) work now complete. Western 21 Travel Demand Allowance for implementation of advanced traffic management measures & 94% PCC Complete Complete Nearing VMS installed at various locations Management Western high occupancy vehicle lanes on the Western Corridor strategic roading KCDC completion across Wellington region. CCTV Corridor network. Details have yet to be determined. installed on Centennial Highway is 100% (Advanced Traffic Regional Variable Message Signs (VMS) installation on SH 1 & 2 to advise operational. Testing & commissioning of Management System motorists of congestion, incidents, detour options, etc. CCTV complete. and High Occupancy See TDM Plan action no. 1.1 for detail on other corridors. Vehicle Lane) Western 22 Centennial Highway Continuation of the existing trial wire rope barrier to cover the whole length of 100% - Complete Complete Complete Barrier completed. Median Barrier (CMB) the coastal section of SH1 between Paekakariki and Pukerua Bay. Western 26 Pukerua Bay Safety Allowance for safety improvements, largely directed at addressing pedestrian 5% PCC Nearing Indicative start in Indicative start in Following a 29 July 2008 meeting re Improvements conflicts, in the urban section of Pukerua Bay. completion 2006/07 2006/07 "Neighbourhood Accessibility Plan" (now complete) - NZTA Board will consider the plan shortly Western 27 Paekakariki (Hill Road Allowance for safety improvements at the intersection of SH1/Paekakariki, but 33% - Complete Complete Underway Seagull Island option approved by NZTA Intersection) Traffic at a scale consistent with the long term down grading of the highway level of Board. Community Board has decided to Signals service through this section once the new Transmission Gully Motorway is have only speed threshold signs. open. Western 28.1 Transmission Gully Preparation of a scheme assessment report including geotechnical 5% - Complete N/A N/A Completion 2008. Motorway Preparation investigations and identification of a preferred alignment. Allowance for (Investigation Phase 1)preparatory works to enable construction of Transmission Gully Motorway to commence in five years. Western 28.2 Transmission Gully Preparation of information for designations and resource consents. 1% - Funding Approved Underway Completion 2009/10 (ready to lodge Motorway Preparation Alteration to Designation & Resource (Investigation Phase 2) Consents). Info gathering at present in readiness for regulatory applications. Western 29 Transmission Gully Construction of a new inland highway between MacKays and Tawa. 0% - Full development N/A N/A Indicative start in Construction starts 2014/15. Completion Motorway Construction contingent on 2011/12 by 2019/20. (RAP Undertaken hence approval of a xtra 12mths) funding plan. Western 31 SH58 Upgrade Allowance to upgrade SH58 between TGM & SH2. Links to project 15 (SH58, 0% PCC Not included in 10- To be confirmed To be confirmed Beyond 2015/16 Investigation included as part of TGM Between Transmission SH2 – summit 4 laning). HCC year State Highway investigation. Gully Motorway and UHCC Forecast. SH2 Western 32 Otaihanga Interchange Grade separated interchange on SH1 at the intersection to Otaihanga 0% KCDC Indicative start in Indicative start in Indicative start in Will be considered as part of SH1 Kapiti (2-lane) township. 2012/13 2013/14 2014/15 Study (underway). Western 33 Waikanae Upgrade Allowance to commence upgrading of SH1 through the Waikanae urban area 1% KCDC Indicative start in Indicative start in Indicative start in Will be considered as part of SH1 Kapiti to address capacity & safety issues. The timing of this project has been 2011/12 2013/14 2015/16 Study (underway). delayed assuming some relief will be provided by the Western Link Road project (projects 23-25). Hutt 10 Dowse - Petone Grade Aimed at reducing delays & improving safety along this section of SH2. 64% HCC Complete Complete Underway Construction underway. Target Separation Proposed improvements include: building an overbridge at the Korokoro completion 1st Qtr 2010. Intersection (connecting the Western Hills with Hutt Road); an interchange at the Dowse Drive intersection (connecting Dowse Drive & Hutt Road via a roundabout raised over the highway); & safety improvements between the existing Korokoro & Petone intersections. All appeals have been resolved, design work is complete & all required properties have been acquired. Dowse interchange provides access to SH2 for the proposed Grenada – Gracefield Stage 2, Cross Valley Link. WGN_DOCS-#652096 Attachment 4 to Report 09.216 Page 2 of 3 Project Overall Partner Progress Indicative Start (Year) Corridor Project Name Project Description Comments Delay No. Progress Agencies Issues Investigation Design Construction Hutt 11 SH2/SH58 Grade To improve safety at the intersection of SH 2 with SH 58, Transit NZ is 11% HCC Consult with HCC Complete Indicative start in Indicative start in Option selection made. SAR presented Separation proposing to build a grade-separated interchange (similar in layout to the UHCC @ design stage. 2008/09 2009/10 to NZTA & approved. Porirua Mungavin interchange). Complements SH58 (SH2 - summit) 4-laning. Hutt 12 Ngauranga Triangle Investigation of a new link road between Petone & Grenada was identified as a 2% WCC Underway Indicative start in Indicative start in Traffic modelling included as part of Strategic Study high priority in the Hutt Corridor Plan adopted in November 2003. If HCC 2008/09 2010/11 TGM investigation. (Grenada - Gracefield) established, it will provide a more efficient link between the Hutt Valley & Interdependent with Ngauranga Triangle Stage1 Porirua & shift traffic from the already congested Ngauranga – Petone & Strategic Study (Grenada-Gracefield) (Grenada to Petone) Ngauranga Gorge routes. The project will also need to include a major upgrad Stage 2 & Petone - Ngauranga to the SH2/Horokiwi intersection. Links to Wellington Regional Strategy and (Including cycle lane) Strategic Study - Western Corridor Study. Also needs to be considered with Petone - Tender awarded. Ngauranga HOT lane & Cross Valley Link proposals. Hutt 15 SH58 4-laning: SH2 - To improve safety along the 5 km length of SH58 from SH2 to Harris Road, 9% HCC Construction not Complete Investigation included as part of TGM summit Transit NZ is proposing to realign the road & upgrade it to 4 lanes with a UHCC included in 10-year investigation median barrier. Links to SH2/SH58 Grade Separation & SH58 upgrade TGM t State Highway SH2. Forecast. Hutt 16 Petone - Ngauranga Establishment of a new fifth lane between Petone & Ngauranga to be manage 2% HCC Underway Indicative start in Indicative start in Completion of cycleway (separate (Including Cycle Lane) as a tidal flow, possibly with a toll for low occupancy vehicles. WCC 2010/11 2010/11 project) expected end of '08 beginning '09 Interdependent with Grenada - Gracefield Stg1 (to Petone) & Grenada - Gracefield Stage 2 (Cross Valley Link). Hutt 18 SH2 Hutt Intersection Allowance to undertake safety upgrades at minor road intersections along SH2 100% HCC Complete Complete Complete SH2 Petone - Haywards safety review. Safety Improvements between Melling & SH58. Work at Wairere Rd & Hebden Crescent complete. Hutt 18.1 Moonshine Hill Road 94% UHCC Complete Complete Nearing Upgrade of Whakatiki St/Moonshine Rd Intersections completion + east of Moonshine Hill Rd now complete. Remainder of intersection Moonshine Hill Rd west suspended due to weather & was resumed November 2008. Wairarapa 35 Rimutaka Corner Project includes straightening several tight bends in SH2 about 500 metres 19% - R funding required. Complete Complete Indicative start in Funding committed on 11 February Easing (Muldoon's) south of Rimutaka Hill summit. Heavy vehicles regularly cross the centre line Resource consents 2007/08 2009. Construction expected to proceed at this site. The Transit NZ Board has approved a scheme to provide a required from by October 2009. 55km/h speed environment along this section of the highway. The project is UHCC. Drainage consistent with the aim to continually improve access to Wairarapa by consents agreed to upgrading the hill road. by GWRC (Opus). Ngauranga 4 Inner City Bypass Completion of a new route between Willis St & Kent Tce. State highway traffic 100% WCC Disposal of Complete Complete Complete Completed 6 June 2007. to Airport (ICB) will be removed from Ghuznee St allowing it to return to a local access road. hereitage buildings Vivian St will flow eastbound & a new route (an extension of Buckle St) will flo in progress westbound. The route is fully connected to the local road network via traffic signal controlled intersections. Footpaths and cycle lanes are being provided. Ngauranga 6 Terrace Tunnel Tidal Allowance for the development of a traffic flow system for the Terrace Tunnel