<<

April 2018 Vol. 5 No. 4 National Aeronautics and Space Administration

KENNEDY SPACE CENTER’S

magazine

Newest NOAA Weather Satellite Launches to Orbit ’S SPACEPORT MAGAZINE National Aeronautics and Space Administration

CONTENTS For the latest on upcoming launches, check out NASA’s Launches and Landings 4 ���������������������� NOAA’s GOES-S will provide more accurate forecasts, warnings Schedule at

www..gov/launchschedule. 9 ���������������������� surveys launch pad for crew flights to station

11 ������������������� Dragon to deliver supplies to International Space Station Want to see a launch? The Kennedy Space Center 12 ������������������� InSight prepared for testing Visitor Complex offers the closest public viewing of launches from Kennedy DEBII CALDWELL 15 ������������������� NASA wants ideas from teams for future human space missions Space Center and Cape NASA Voice Systems Lead Canaveral Air Force Station. NASA-Kennedy IT Launch Transportation 16 ������������������� Last of the big swing arm umbilicals installed on mobile launcher Tickets are available for some, but not all, of these As the NASA voice systems lead, I work with customers launches. Call 321-449- from all programs at Kennedy to help them get the ground 18 ������������������� Crew Access Arm installed on mobile launcher 4444 for information on communications they need, such as operational intercomm purchasing tickets. (OIS), paging and radio. 21 ������������������� Solar panels opened on NASA’s TESS satellite I started working at Kennedy in June 1987 in Shuttle Flight Controls. I moved to Payload Ground Communications in 1994. When will the International After working in shuttle processing for a few years, I wanted to Space Station fly over you? expand my knowledge and experience to other activities at the space center. I worked in ground instrumentation for a couple of Find out and sign up for alerts at years, then moved to Payload Comm. I’ve been in Comm ever spotthestation.nasa.gov since.

The biggest challenge is having the desire to please all of our customers, but having so much work that it’s hard to get it all Cover: A United Launch Alliance V rocket lifted off from done. Fortunately, we’ve hired a few new people recently, and I Space Launch Complex 41 at Cape Canaveral Air Force Station think they will help a lot. on March 1, 2018, carrying NOAA’s Geostationary Operational Environmental Satellite (GOES-S). Liftoff was at 5:02 p.m. EST. I’ve had so many awesome memories since I came to work with GOES-S is the second satellite in a series of next-generation weather satellites. Photo credit: NASA/Bill White NASA. I had only been here for three days when a couple of co-workers took me into the shuttle aft compartment, and over time I had work that took me into the crew compartment, the payload bay, inside the booster forward and aft skirts, and even To get the latest Kennedy Space Center updates, follow us on our Blog, Flickr, Facebook and Twitter. the shuttle wing. There are so many amazing things that we get to take part in KSC improving every day! BLOG

THE SPACEPORT MAGAZINE TEAM

Editorial Writers Group Creative Group

Editor...... Linda Herridge Stefano Coledan Bob Granath Greg Lee Amy Lombardo

Asst. Editor...... Anna Heiney Anna Heiney Linda Herridge Richard Murrey Matthew Young SKY WATCHING NOAA’s GOES-S will provide more accurate forecasts, weather warnings

BY BOB GRANATH NASA launched the Geostationary Operational Environmental Satellite-S into orbit for NOAA -- the National Oceanic and Atmospheric Administration on March 1, 2018. Liftoff occurred at 5:02 p.m. EST atop a United Launch Alliance (ULA) Atlas V rocket from Space Launch Complex (SLC) 41 at Cape Canaveral Air Force Station in Florida.

4 SPACEPORT Magazine SPACEPORT Magazine 5 A United Launch Alliance Atlas V rocket lifts off from Space Launch Complex 41 at Cape Canaveral Air Force Station The spacecraft, known as GOES-S, will give meteorologists transported to the Cape where it was mounted on top of the rocket. carrying NOAA’s Geostationary an additional tool to significantly improve the detection and NOAA manages the GOES-R Series Program through an Operational Environmental Satellite (GOES-S) Liftoff was at observation of environmental phenomena that directly affect public integrated NOAA/NASA office and oversees the acquisition of 5:02 p.m. EST on March 1, 2018. safety and protection of property. the program ground system. NASA oversees the acquisition of the Photo credit: NASA/Kim Shiflett spacecraft, instruments and launch vehicles. Lockheed Martin Space of Littleton, Colorado, built the spacecraft and is responsible for spacecraft development, integration and testing.

At Astrotech Space Operations in Titusville, Florida, NOAA’s Geostationary Operational Environmental Satellite-S (GOES-S), is rotated to a vertical position Dec. 5, 2017, after it was uncrated from its shipping container. The facility is located near NASA’s Kennedy Space Center. Photo credit: NASA/Kim Shiflett

GOES-S is the second in the GOES-R Series of next-generation weather satellites that includes GOES-R (now GOES-16), -S, -T and -U. GOES-S will be renamed GOES-17 when it reaches The payload fairing containing NOAA’s Geostationary Operational Environmental Satellite-S (GOES-S) is lifted up by crane Feb. 16, 2018, at the United Launch Alliance geostationary orbit. It will reside in a geostationary position over Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force the Pacific Ocean to provide imagery and data to improve weather Station. Photo credit: NASA/Glenn Benson forecasts for the western continental U.S., Alaska, Hawaii, and Pacific Ocean to New Zealand. Geosynchronous satellites orbit Mission operations are performed by NOAA at their Satellite about 22,000 miles above the Earth allowing them to keep constant Operations Facility in Suitland, Maryland. Harris Corp. of watch over the same location. These spacecraft play a crucial role in Melbourne, Florida, provided the main instrument payload, the U.S. weather monitoring and forecasting. Advanced Baseline Imager and the ground system, which The GOES-S satellite was delivered to Kennedy’s Shuttle includes the antenna system for data receipt. United Launch Landing Facility by a U.S. Air Force C-5 Galaxy cargo jet on Dec. Alliance of Centennial, Colorado, is the provider of the Atlas V 4, 2017. GOES-S was then transported to the Astrotech payload launch service. NASA’s (LSP), based processing facility in Titusville where it was checked out and tested. at Kennedy Space Center in Florida, manages the agency’s efforts to Meanwhile on Jan. 22 the ULA Atlas V booster and Centaur commercially provide rockets for specific missions. LSP also directs upper stage arrived aboard a Mariner transport ship at Port the overall launch effort including overseeing development and Canaveral’s Army Wharf. The rocket stages then were transported integration of the rocket with the spacecraft. to the Atlas Spaceflight Operations Center (ASOC) near SLC 41 at the Cape for inspections and checkouts. On Jan. 24, the Centaur upper stage was transported from the ASOC to the Delta Operations Center for further processing. A For more information about the week later, the Atlas V booster was moved from the ASOC to the Vertical Integration Facility at SLC 41 where it was positioned on GOES-R Series Program, visit: its launcher. Soon after, the Centaur was stacked on the booster. Once checkouts and processing were completed at the Astrotech http://www.goes-r.gov. facility, GOES-S was encapsulated in its payload fairing and

6 SPACEPORT Magazine SPACEPORT Magazine 7 Astronaut surveys launch pad for crew flights to station

NASA astronaut Eric Boe, one of four working with the agency’s , had the to check out the Crew Access Tower at Space Launch Complex 41 on Feb. 28 with a United Launch Alliance (ULA) Atlas V on the pad. Boe, along with launch operations engineers from NASA, Boeing and ULA, climbed the launch pad tower to evaluate lighting and spotlights after dark. The survey helped ensure crew members will have acceptable visibility as they prepare to launch aboard Boeing’s Starliner spacecraft on the Crew Flight Test to the International Space Station, targeted for later this year.

8 SPACEPORT Magazine SPACEPORT Magazine 9 Dragon to deliver supplies to International Space Station

Commercial Resupply Services Mission: SpaceX CRS-14 Launch Time and Date: 4:30 p.m., Monday, April 2, 2018 Launch Off: Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida Launch Vehicle: SpaceX Falcon 9, 230 feet tall Spacecraft: Dragon, 20 feet high, 12 feet in diameter Payload: Dragon delivering more than 5,800 pounds of cargo and material to support science investigations aboard the International Space Station. Return to Earth: After about one month attached to the space station, Dragon will return with results of earlier experiments, splashing down in the Pacific Ocean off the coast of Baja California.

Payloads on Board: Visit https://go.nasa.gov/2Isu6rt

The two-stage Falcon 9 launch vehicle lifts off from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida, carrying the Dragon resupply spacecraft to the International Space Station. Photo credit: NASA/Tony Gray, Tim Powers and Tim Terry

10 SPACEPORT Magazine SPACEPORT Magazine 11 InSight spacecraft prepared for testing

Inside the Astrotech processing facility at Vandenberg Air Force Base in California, NASA’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, or InSight, spacecraft has been mounted on to a rotation fixture for testing. InSight is scheduled to launch May 5, 2018, atop a United Launch Alliance Atlas V rocket for its trip to Mars. InSight was developed and built by Lockheed- Martin Space Systems in Denver, Colorado, and arrived at Vandenberg on Feb. 28 aboard a U.S. Air Force C-17 aircraft. The spacecraft then was transported to the Astrotech facility at the West Coast launch site. This missionwill be the first to look deep beneath the Martian surface, studying the planet’s interior by measuring its heat output and listening for marsquakes. It will use the seismic waves generated by marsquakes to develop a map of the Red Planet’s deep interior. The resulting into Mars’ formation will provide a better understanding of how other rocky planets, including Earth, were created. Photo credit: USAF 30th Space Wing/Alex Valdez

12 SPACEPORT Magazine SPACEPORT Magazine 13 NASA wants ideas from university teams for future human space missions

Teams at U.S. colleges and universities have an opportunity to potentially help NASA with innovative design ideas to meet the challenges of . The 2019 eXploration Systems and Habitation (X-Hab) Academic Innovation Challenge supports NASA’s efforts to develop technologies and capabilities that will enable future human missions throughout our .

NASA, in collaboration with the National Space Grant Foundation, will offer competitively selected awards of $15,000 to $50,000 for innovative studies and to enhance the human exploration of space.

This year’s X-Hab Challenge addresses eight topic areas, some of which relate to NASA’s new Lunar Orbital Platform-Gateway. Entries are due April 27, 2018.

The X-Hab Challenge provides real-world, hands-on design, research and development opportunities for students interested in aerospace careers, while strengthening NASA’s efforts to optimize technology investments, foster innovation and facilitate technology infusion. The products and technologies developed for the 2018 X-Hab Challenge will be further refined for next-generation exploration systems, and could eventually provide the basis for future demonstrations and missions. Find out more at https://go.nasa.gov/2oiL8j7.

14 SPACEPORT Magazine SPACEPORT Magazine 15 Last of the big swing arm One of the last of several large connection lines, called umbilicals, was installed on the mobile launcher at NASA’s Kennedy Space Center. The umbilical was lifted by crane and umbilicals attached high on the tower of the mobile launcher at about the 240-foot level, bringing the steel structure one step closer to installed supporting processing and launch of NASA’s Orion spacecraft and Space Launch System (SLS) rocket. The launcher is designed to support the assembly, testing, check out and servicing of the rocket, on mobile as well as transfer it to the pad and provide the platform from which it will launch. launcher “The installation of this umbilical marks another big milestone for the mobile launcher team, the Exploration Ground Systems BY LINDA HERRIDGE Program, and moves us one step closer to rolling to Launch Pad 39B and the Vehicle Assembly Building for testing,” said Sam

Talluto, mobile launcher deputy project manager.” Construction workers with JP Donovan install the Interim Cryogenic Propulsion Stage This particular umbilical will supply propellants, environmental Umbilical (ICPSU) to the tower of the mobile launcher at about the 240-foot-level on control systems, pneumatics and electrical connections to the March 16, 2018. The last of the large umbilicals to be installed on the tower, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System interim cryogenic propulsion stage (ICPS) of the SLS rocket rocket’s interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration and will swing away before launch. The umbilical also will provide Mission-1. Photo credit: NASA/Ben Smegelsky hazardous gas leak detection while the rocket is on the pad. The ICPS is located between the core stage of the rocket and the Orion capsule, and will provide propulsion for Orion while in space and give the spacecraft the big push needed to fly beyond the Moon.

To install the umbilical, construction workers with JP Donovan prepared the rigging lines and attached the umbilical to a large crane. The ICPS umbilical was slowly lifted up and bolted to the mobile launcher. The entire process took about four hours. With the umbilical in place, workers will install additional equipment on the tower, as well as electrical wiring, environmental control system tubing, hydraulics and other commodities will be routed to the umbilical arm before testing. Tests of the swing arm also will be performed as part of the verification and validation process. Exploration Ground Systems is overseeing installation of the launch umbilicals and launch accessories on the mobile A heavy-lift crane and rigging lines are used to lift the Interim Cryogenic Propulsion launcher to prepare for the first integrated test flight of Orion atop Stage Umbilical high up for installation on the tower of the mobile launcher on March the SLS on Exploration Mission-1. A pair of tail service mast 16, 2018, at NASA’s Kennedy Space Center. Photo credit: NASA/Ben Smegelsky umbilicals are slated for installation later this year and will be the last of the twenty umbilicals and launch accessories to be installed on the mobile launcher. With this test flight, NASA is preparing for missions to send astronauts to deep space destinations, including the Moon, Mars and beyond.

The Interim Cryogenic Propulsion Stage Umbilical (ICPSU) is lifted high up for installation on the mobile launcher (ML) on March 16, 2018, at NASA’s Kennedy Space Center. Photo credit: NASA/Ben Smegelsky

16 SPACEPORT Magazine SPACEPORT Magazine 17 ASTRONAUTS LAST STOP Orion Crew Access Arm installed on mobile launcher

BY BOB GRANATH

As astronauts prepare for trips to destinations beyond low-Earth orbit, their last steps before boarding an Orion spacecraft will be across a crew access arm on the mobile launcher at NASA’s Kennedy Space Center in Florida.

The agency reached an important milestone Feb. 26, 2018, on the path to Exploration Mission-1 with the installation of the crew access arm at about the 274-foot level on the mobile launcher tower. TheExploration Ground Systems team at Kennedy has been overseeing installation of umbilicals and other launch accessories on the 380-foot-tall mobile launcher in preparation for stacking the first launch of the Space Launch System rocket, called the SLS, with an Orion spacecraft. The SLS will be the largest launch vehicle in the world, designed for missions beyond low-Earth orbit carrying crew and cargo to the Moon or beyond. The initial configuration for what Viewed from the 274-foot level of the mobile launcher, a technician begins installation of the Orion crew access arm (CAA) to the tower. The CAA will support the Space launch System SLS can carry past low-Earth orbit and on to the Moon is more than rocket at NASA’s Kennedy Space Center. Photo credit: NASA/Bill White 26 metric tons, with a final configuration of at least 45 metric tons. The crew access arm installation marks the completion of 17 of the 20 major launch accessories and umbilicals that provide access, power, many other ground support equipment installations, the crawler- communication, coolant, fuel and other services to the launch vehicle transporter will move the mobile launcher out to Launch Pad 39B and spacecraft. A pair of Tail Service Mast Umbilicals are slated for for a fit-check and then inside the VAB for validation and verification installation in the spring/summer timeframe. tests. The crew access arm is made up of two major components — the The mobile launcher’s massive steel tower is engineered to truss assembly and the environmental enclosure, known as “white withstand the loads of the umbilicals that will connect to the room.” It is given that name not only because is painted white, but SLS rocket, as well as to endure the natural forces such as wind, also because it is kept clean to avoid contaminants entering the temperature and vibration. Similar to skyscrapers and other large spacecraft prior to flight. The crew access arm is designed to rotate structures, engineers designed the mobile launcher to withstand from its retracted position and line up with Orion’s crew hatch. the movements associated with predicted loads and compensate The arm will provide entry and emergency egress for astronauts and for anticipated forces. As each piece of hardware is installed, teams technicians into and out of the Orion spacecraft. precisely measure the structure to ensure the required alignment of Although there will be no crew on the first flight, the crew access the swing arms and umbilicals with the vehicle interface are within arm provides a bridge to Orion for personnel and equipment entering the design tolerances. the spacecraft and allows the ground crew access for processing and A crane lifts the Orion crew access arm so it can be attached to the mobile launcher at prelaunch integrated testing while in the Vehicle Assembly Building NASA’s Kennedy Space Center. The crew access arm is designed to rotate from its retracted (VAB) and at Launch Pad 39B. position and line up with Orion’s crew hatch. The arm will provide entry and emergency egress for astronauts and technicians into and out of the Orion spacecraft. After technicians check out the crew access arm and complete the A crane positions the Orion crew access arm so it can be attached to the mobile launcher Photo credit: NASA/Bill White (ML). The arm will be installed at about the 274-foot level on the 380-foot-tall ML tower. Photo credit: NASA/Bill White

18 SPACEPORT Magazine SPACEPORT Magazine 19 Solar panels opened on NASA’s TESS satellite

Technicians dressed in clean room suits check the solar panels on NASA’s Transiting Exoplanet Survey Satellite (TESS) on Feb. 22, 2018, inside the Payload Hazardous Servicing Facility (PHSF) at the agency’s Kennedy Space Center in Florida. Inside the PHSF, the satellite is being processed and prepared for its flight. TESS is scheduled to launch April 16, 2018, atop a SpaceX Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station. The satellite is the next step in NASA’s search for planets outside our solar system, known as exoplanets. TESS is a NASA Astrophysics Explorer mission led and operated by MIT in Cambridge, Massachusetts, and managed by NASA’s Goddard Space Flight Center in Greenbelt, Maryland. Dr. George Ricker of MIT’s Kavli Institute for Astrophysics and serves as principal investigator for the mission. Additional partners include Orbital ATK, NASA’s , the Harvard-Smithsonian Center for Astrophysics and the Space Telescope Science Institute. More than a dozen universities, research institutes and observatories worldwide are participants in the mission. NASA’s Launch Services Program is responsible for launch management. Photo credit: NASA/Leif Heimbold

20 SPACEPORT Magazine SPACEPORT Magazine 21 Kennedy Space Center workers and guests mingled during the center’s Black History Month event Feb. 28, 2018. The special presentation was hosted by the center’s Black Employee Strategy Team. Photo credit: NASA/Tony Gray

Colonel Kevin L. Williams, commander of the 45th Mission Support Group at Patrick Air Force Base and Cape Canaveral Air Force Station in Florida, was the keynote speaker during the Black History Month event Feb. 28, 2018, at Kennedy Space Center. Photo credit: NASA/Tony Gray

Kennedy Space Center’s Black Employee Strategy Team celebrated Black History Month in February with several events for the center’s Read the full feature at https://go.nasa.gov/2IUHTY9 workforce, including a special presentation Feb. 28, 2018. Aaron Jenkins, an IT specialist, presented a short overview of the event theme, . “African-Americans in Times of War." Photo credit: NASA/Tony Gray

22 SPACEPORT Magazine SPACEPORT Magazine 23 Led by Kennedy Space Center Director Bob Cabana, spaceport employees took part in an annual tradition March 13: the KSC Walk Run. It’s NASA’s version of the community fun run, but the Shuttle Landing Facility is a one-of-a-kind race course. Runners chose a distance – 10K, 5K or two miles – then took off down the runway alongside their colleagues in the of friendly competition. Open only to badged spaceport employees and their guests, the KSC Walk Run was part of the spaceport’s Safety and Health Days, a week-long event dedicated to fostering a culture of safety and wellness both at work and at home. Photo credits: NASA/Ben Smegelsky (large photo) and NASA/Fred Benavidez (inset)

24 SPACEPORT Magazine SPACEPORT Magazine 25 45th Anniversary of First Probe to

Launched 45 years ago, Pioneer 11 became the first spacecraft to explore Saturn. Inside the AO Building at Cape Kennedy (now Cape Canaveral) Air Force Station, the Pioneer 11 spacecraft is seen on March 16, 1973, during installation of its protective payload fairing. The 571-pound was 9.5-feet long and included a 9-foot diameter antenna. The spacecraft lifted off April 6, 1973, atop an Atlas Centaur rocket.

Along with sister ship, , they were the earliest spacecraft to venture through the treacherous beyond Mars. Pioneer 11’s nearly two-year mission took it on a fly-by of on Dec. 3, 1974, then used the giant planet’s gravity to propel it on to Saturn.

Pioneer 11 completed the 1.5 billion mile trip with the closest approach to Saturn on Sept. 1, 1979, passing within 13,000 miles of the ringed planet. While taking the first close-up photographs of Saturn, Pioneer 11’s instruments located two previously undiscovered moons, an additional ring and charted the planet’s magnetic field. Photo credit: NASA

National Aeronautics and Space Administration

John F. Kennedy Space Center Kennedy Space Center, FL 32899 www.nasa.gov SPACEPORT MAGAZINE SP-2018-03-358-KSC