Preparing the Second Ring Road (Completing the Circle) Project (Financed by the Japan Special Fund)

Total Page:16

File Type:pdf, Size:1020Kb

Preparing the Second Ring Road (Completing the Circle) Project (Financed by the Japan Special Fund) Technical Assistance Report Project Number: 40254 December 2007 Socialist Republic of Viet Nam: Preparing the Second Ring Road (Completing the Circle) Project (Financed by the Japan Special Fund) The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature. CURRENCY EQUIVALENTS (as of 5 November 2007) Currency Unit – dong (D) D1.00 = $0.0001 $1.00 = D16,074 ABBREVIATIONS ADB – Asian Development Bank DTPW – Department of Transport and Urban Public Works EIA – environmental impact assessment EMDP – ethnic minority development plan HCMC – Ho Chi Minh City O&M – operation and maintenance PC-HCMC – People’s Committee of Ho Chi Minh City PPP – public-private partnership PPTA – project preparatory technical assistance TA – technical assistance TECHNICAL ASSISTANCE CLASSIFICATION Targeting Classification – General intervention Sector – Transport and communications Subsector – Roads and highways Theme – Sustainable economic growth Subtheme – Fostering physical infrastructure development NOTE In this report, “$” refers to US dollars. Vice President C. Lawrence Greenwood, Jr., Operations 2 Director General A. Thapan, Southeast Asia Department (SERD) Director J. Cooney, Infrastructure Division, SERD Team leader P. Vallely, Senior Transport Specialist, SERD Team members Y. Feng, Principal Environment Specialist, SERD S. Kawazu, Counsel, Office of the General Counsel M. Sultana, Social Development/Poverty Reduction Specialist, SERD Y. Tsujiki, Financial Analysis Specialist, SERD L. D. Thang, Programs/Projects Implementation Officer, SERD 105 o 00'E 110 o 00'E PEOPLE'S REPUBLIC OF CHINA HA NOI V I E T N A M Hai Phong o 20 00'N Gulf of 20 o 00'N SECOND RING ROAD (COMPLETING THE CIRCLE) PROJECT Tonkin Vinh LAO PEOPLE'S Extension from DEMOCRATIC QL 1A to QL 13 REPUBLIC Da Nang QL 13 PR 16 QL 1A QL 1A Quy Nhon Go Dua Intersection CAMBODIA ue en QL 1K Av PROJECT AREA oi Nha Trang an Da Lat H Gulf of Go Dua Thailand Ho Chi Minh City 10o 00'N 10 o 00'N Vung Tau Thu Duc District Binh Thai South China Sea Intersection 105 o 00'E 110 o 00'E ighway Loi H t-Binh on Nha Tan S Tan Son Nhat Airport Ho Chi Minh- Long Thanh Dau Giay Expressway Rach Chiec District 9 National Capital Bridge City/Town Ho Chi Minh City PR 25 Ring Road No. 2 (missing sections) r Ring Road No. 2 (existing) e v District 2 Phu My Bridge and Approach Roads i R (Under construction) n o East-West Highway Project ig QL 10 a (Under construction) S Ho Chi Minh City - Long Thanh - r Phu My Bridge e Dau Giay Expressway (Future project) Hung Vuong iv R Huynh Tan Phat i An Phu - Second Ring Road Extension a N (Future project) g n Primary Road o D Flyover (to be constructed) District 7 PR 15 Flyover (existing) Binh Tan h n N Li N QL 50 National Highway District n g a u V PR 34 y PR 34 Provincial Road n e ye n 0 u 0 River V 1 2 3 4 5 7 g a - N 3 n 0 International Boundary 3 L Kilometers 4 QL 50 i n Boundaries are not necessarily authoritative. QL 1A R District 8 h M I. INTRODUCTION 1. During the Country Programming Confirmation Mission for the Asian Development Bank’s (ADB’s) 2007 program for Viet Nam, the Government of Viet Nam requested ADB for technical assistance (TA) for the preparation of the Second Ring Road (Completing the Circle) Project. In the memorandum of understanding for the mission it was agreed that a project preparation technical assistance (PPTA) for the Project would be included in the ADB nonlending program for 2007. A mission visited Viet Nam on 8–17 August 2007 and held initial discussions with the Government on the proposed TA. Agreements were reached on the impact, outcome, outputs, implementation arrangements, cost, financing arrangements, and terms of reference.1 A design and monitoring framework for the TA is in Appendix 1. II. ISSUES 2. The economy of Viet Nam—one of the world’s fastest-growing economies—grew by about 8.0% in 2006. This performance came on top of average annual growth of 7.5% over 2001–2005. Industry and services contributed more than 90% of the growth in gross domestic product in 2006. Industry’s robust 10.4% growth in 2006 was only slightly below the rate a year earlier. This sustained rapid growth has led to an equally rapid increase in the use of motorized vehicles, and to mounting congestion on the highway network. For industry and services to continue to drive economic growth, Viet Nam must keep developing its highway transport system so that goods and people can be moved efficiently. 3. The transport system in Viet Nam is inefficient and expensive. ADB’s strategy, as set out in its country strategy and program for the country,2 is to support the Government in improving transport infrastructure and reducing transport costs. Investments will be made in urban transport and priority expressway and railway facilities to allow the safe and efficient movement of goods and people around, through, and between major centers of economic activity nationwide. 4. Greater Ho Chi Minh City (HCMC) is the largest city in Viet Nam and the country’s economic hub, with a population forecast to grow by 2.1% yearly from the current 7.9 million3 to 10.3 million by 2020. The volume of trade through HCMC’s port grew by more than 15% in value in 2006. With economic growth expected to continue in the medium term, and households earning higher incomes, many more families will be able to buy cars, and the number of journeys undertaken will significantly increase. Already, the roads within and around HCMC are becoming heavily congested, travel speeds are dropping, and transport costs are rising. There is an urgent need to provide relief to the city roads connecting the center of HCMC and the port area with the suburbs to the north and northeast of the city, and, farther out, to the roads leading north from the city to central and northern Viet Nam. As part of development planning for HCMC, several master plans have been prepared to deal with the needs of specific sectors. The city’s needs are huge. For transport alone, $26 billion is required to fund priority investment projects until 2020 to enable the city’s transport systems to cope with the demands of growth. To implement the required improvements in transport infrastructure, HCMC must (i) begin priority projects as soon as possible, and (ii) maximize its funding leverage in raising money from all sources. 1 The TA first appeared in ADB Business Opportunities on 21 September 2007. 2 ADB. 2006. Country Strategy and Program (2007–2010): Socialist Republic of Viet Nam. Manila. 3 Including both the permanent and the transient population. 2 5. A transport master plan was prepared in 2004, with assistance from the Japan International Cooperation Agency.4 This plan was later consolidated with a second master plan prepared by the People’s Committee of Ho Chi Minh City (PC-HCMC) and work done by the Ministry of Transport’s Technical, Engineering, and Design Institute. This consolidated transport master plan, approved by the Government in January 2007, sets out a $26 billion investment program up to 2020. The highest priority is to be given to subway and urban rail projects, as well as to the completion by 2010 of the city’s Second Ring Road. 6. The Second Ring Road is one of four concentric ring roads planned for HCMC. Encircling HCMC at a radius of about 5–10 km from the city center, it will decongest the city center and relieve it of large volumes of heavy truck traffic heading to and from the port area south of the city center. Much of the Second Ring Road has already been built and is in use, but a large part of the eastern section and a segment of the western section still have to be completed. Along the southern section, the Phu My Bridge across the Saigon River is being constructed. The construction of the bridge and the approach roads is being undertaken by a private sector consortium under a build-operate-transfer concession. 7. The Department of Transport and Urban Public Works (DTPW) is responsible for planning, constructing, operating, and maintaining the transport system in HCMC. Maintaining the city’s road network, in its view, requires about $3.6 million a year. Until recently the DTPW received only about 50% of the required funds, but the PC-HCMC has committed itself to providing about 75% from the third quarter of 2007. A funding gap remains, however. To bridge this gap the DTPW is trying to reduce operation and maintenance (O&M) costs and has begun contracting out maintenance works to the private sector. Contracting has so far been single-source, although a pilot project using competitive bidding started in September 2007. The DTPW realizes that further cuts in maintenance costs will require more innovative approaches, such as public-private partnership (PPP) arrangements and long-term O&M concessions. 8. The PC-HCMC has established traffic controls in parts of the city with the help of various donors, principally the Government of France and the World Bank. These controls cover only some areas and are not interconnected. Future transport development plans for HCMC will provide for traffic control systems that can monitor and control the movement of traffic throughout the city. Thus far, however, developments have been piecemeal.
Recommended publications
  • Roundabout Planning, Design, and Operations Manual
    Roundabout Planning, Design, and Operations Manual December 2015 Alabama Department of Transportation ROUNDABOUT PLANNING, DESIGN, AND OPERATIONS MANUAL December 2015 Prepared by: The University Transportation Center for of Alabama Steven L. Jones, Ph.D. Abdulai Abdul Majeed Steering Committee Tim Barnett, P.E., ALDOT Office of Safety Operations Stuart Manson, P.E., ALDOT Office of Safety Operations Sonya Baker, ALDOT Office of Safety Operations Stacey Glass, P.E., ALDOT Maintenance Stan Biddick, ALDOT Design Bryan Fair, ALDOT Planning Steve Walker, P.E., ALDOT R.O.W. Vince Calametti, P.E., ALDOT 9th Division James Brown, P.E., ALDOT 2nd Division James Foster, P.E., Mobile County Clint Andrews, Federal Highway Administration Blair Perry, P.E., Gresham Smith & Partners Howard McCulloch, P.E., NE Roundabouts DISCLAIMER This manual provides guidelines and recommended practices for planning and designing roundabouts in the State of Alabama. This manual cannot address or anticipate all possible field conditions that will affect a roundabout design. It remains the ultimate responsibility of the design engineer to ensure that a design is appropriate for prevailing traffic and field conditions. TABLE OF CONTENTS 1. Introduction 1.1. Purpose ...................................................................................................... 1-5 1.2. Scope and Organization ............................................................................... 1-7 1.3. Limitations ...................................................................................................
    [Show full text]
  • American Title a Sociation ~ ~
    OFFICIAL PUBLICATION AMERICAN TITLE A SOCIATION ~ ~ VOUJME XXXVI JUNE, 1957 NUMBER 6 TITLE NEWS Official Publication of THE AMERICAN TITLE ASSOCIATION 3608 Guardian Building-Detroit 26, Michigan Volume XXXVI June, 1957 Number 6 Table of Contents Introduction-The Federal Highway Program ......... ... ................ .. .................... 2 J. E. Sheridan Highway Laws Relating to Controlled Access Roads ..... .. ....... ........... 6 Norman A. Erbe Title Companies and the Expanded Right of Way Problems ...... ............. .. 39 , Daniel W. Rosencrans Arthur A. Anderson Samuel J. Some William A . Thuma INTRODUCTION The Federal Highway Program J. E. SHERIDAN We are extremely grateful to Nor­ veloped its planning sufficiently to man A. Erbe, Attorney General of the show to the satisfaction of the dis­ State of Iowa, for permission to re­ trict engineer the effect of the pro­ print his splendid brief embracing posed construction upon adjace.nt the highway laws of various states property, the treatment of access con­ relating to the control in access roads. trol in the area of Federal acquisi­ Mr. Erbe originally presented this m tion, and that appropriate arrange­ narrative form before the convention ments have been made for mainte­ of the Iowa Title Association in May nance and supervision over the land of this year. As is readily ascertain­ to be acquired and held in the name able, this is the result of a compre­ of the United States pending transfer hensive study of various laws touch· of title and jurisdiction to the State ing on the incidents of highway regu­ or the proper subdivision thereof." lations. Additionally, we are privi­ It is suggested that our members leged to carry the panel discussion bring this quoted portion to the at­ of the American Right of Way Asso­ tention of officers of the Highway ciation Convention held in Chicago, Department and the office of its legal May 16 and 17, dealing with "Title division, plus the Office of the Attor­ Companies and the Expanded Right ney General within the members' ju­ of Way Problems".
    [Show full text]
  • Petition For/Request to Initiate Vacation of Public Highway, Street, Alley Or Easement Requirements and Process Overview
    Petition for/request to initiate vacation of public highway, street, alley or easement Requirements and process overview The City of St. Louis Park will vacate public highways, streets, alleys or easements if it is found that the city has no current or future need for these lands. Proceedings to vacate such land may be commenced by petition of a majority of the owners of property fronting upon the portion of the public highway, street, alley or easement to be vacated, by action of the St. Louis Park City Council or by recommendation of the St. Louis Park Planning Commission. In order to constitute a petition for vacation, a majority of abutting property owners of the portion of public highway or street to be vacated must appear on the petition form. If the request is for vacation of a public alley or easement, it must be signed by the majority of owners of property adjacent to the alley or easement in the block where the alley or easement is situated, whether or not the petition requests vacation of the entire alley or easement. The petition shall be filed with the city clerk. If the application represents a request to the planning commission to recommend and to the city council to initiate vacation, that must be specifically stated. The applicant is encouraged to discuss the proposal with community development staff prior to completion of final plans and filing of a petition/request. Submittal checklist ☐ Petition/request ☐ Filing fee (see application for fee schedule) ☐ A complete and accurate legal property description must be submitted if the property to be vacated is an easement.
    [Show full text]
  • Mr. Gupta Detailed the Current Status of India's Road Network and Its
    Mr. Gupta detailed the current status of India’s road network and its maintenance: “The total length of the road network in India is 4.69 million km. It is the second largest road network in the world, just after the United States. ….. The national highways constitute 82,000 kilometers, 1.7 percent of the total length, and carry 40 percent of the total traffic.” “65 percent of total traffic and 90 percent of passenger traffic are being serviced by roads. The corresponding figures in the 1950s were 12 percent and 31.6 percent. The compounded annual growth rate of traffic on roads during the last two decades has been 9 percent. Road maintenance, however, is not commensurate with the traffic growth rate.” “The Indian Constitution assigns responsibility for the national highway network to the central government while State governments are responsible for developing and maintaining the state highways, major district roads, other district roads, and village roads. ….. The Ministry of Road Transport & Highways is the apex organization in the road sector in the country responsible for the planning, development, and maintenance of the national highways. It extends technical and financial support to state governments for the development of state roads, the connectivity of roads of interest and economic importance; it evolves the standards and specifications for roads and bridges in the country.” “Several road development programs are being implemented in the country. The first, the National Highway Development Program, is one of the world's largest road development programs. It comprises seven phases of development of more than 55,000 km of national highways; of which 21,000 km of road length has already been completed.” “Another is the Rural Road Development Program fully funded by the central government to supplement the efforts of the state governments in the construction and maintenance of the rural road network.
    [Show full text]
  • Adopted Text
    THIS PAGE INTENTIONALLY LEFT BLANK Amendment No. 2017-28 Adopted November 17, 2020 AMENDMENT TO THE COMPREHENSIVE PLAN (2017 EDITION) The following changes to the Comprehensive Plan have adopted by the Board of Supervisors. To identify changes from the previously adopted Plan, new text is shown with underline and deleted text shown with strikethrough. MODIFY: Fairfax County Comprehensive Plan, 2017 Edition, Area III, Fairfax Center Area, as amended through 7-31-2018, Fairfax Center Area-Wide Recommendations, page 8, to delete strikethrough text: “The core area near the first Metrorail station is planned for a mix of uses at a variety of intensities, some of which are tied to the funding of the Metrorail extension, or in the interim, funding of a Bus Rapid Transit System. Any development or redevelopment occurring prior to the funding of the Metrorail extension should not preclude higher-intensity transit-oriented development that is envisioned in the future. …” MODIFY: Fairfax County Comprehensive Plan, 2017 Edition, Area III, Fairfax Center Area, Amended through 7-31-2018, Land Use Plan Recommendations – Suburban Center Core Area, Land Unit A, Land Use Recommendations, page 37: “Sub-unit A1 Baseline: Mixed use up to .15 FAR Overlay: Mixed use up to .65 FAR; 1.0 FAR Sub-unit A1 consists of approximately 133 acres, including a 109.5-acre portion that and contains the Fair Oaks regional mall Regional Mall at its center (“Mall Property” or “Mall”), as shown on Figure 11. and several Several office buildings, and hotels, and other commercial uses around its the perimeter of the Mall Property occupy the approximately 24-acre remainder of the sub-unit.
    [Show full text]
  • Rice County, Minnesota Highway
    A B C D E F G H I J R 22 WR22 W21 R W21 R WR20 W R20 WR19 Road Name Location Road Name Location Eaton Ave................G4-5, G8, G9, G9-10G9,G8, EatonAve................G4-5, 13000 12000 11000 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 E..............H7-J7 200th St EavesAve...............G3 200th St W.............A7 200th St EbelAve..................G5 201st Ct W.............B7 201stCt EbelWa y.................G3 202ndW............A7 St EbertCt....................G3 Rice County, 204th St E..............G7 204th St EchaCt..................G3 rt 205th St W.............C7 205th St D8-9 D6-7, EchoAve.................D4-5, 1 W.............C7 206th St EchoCt....................D8 1 Edg e brookDr...........G3 3000 E..............F8 208th St 209th St W.............C8 209th St Edward sWa y...........G5 3000 S co tt County Scott I8-J8 E..............I8, 210th St G9 EilerAve...................G6-8, 210th St W.............A8-D8 210th St ElginCt.....................D6 Minnesota ElginTrl....................D8 Porter 02 E..............H8-I8 215th St 04 C8B8, W.............A8, 215th St ElktonTrl..................D8 Creek 218th St W.............A8 218th St ElmCt.......................G6 06 05 04 03 02 06 01 Bridg e waterTowns hip County Wheatland County Porter03 Creek W e bsterTowns hip I8 E..............F8-H8, 220th St D9-10D8,D6, D5-6, D4-5, ElmoreAve...............D2-3, 4000 01 T112NR21W T111NR20W Ditch 14 Ditch 31 W.............B8-C8 220th St ElmorePath..............D6 4000 Delano 1. Ave De 1. cke Ct r 222ndW............D8-E8 St ElmoreTrl.................D6 05 ElmoreWa y..............D6 Highway Map Rice County, W 41stSt 2.
    [Show full text]
  • Phase II Highway Corridor Strategy Descriptions Technical
    ENTRAL ORK OUNTY ONNECTIONS TUDY CENTRAL YORK COUNTY CONNECTIONS STUDY PHASE II HIGHWAY CORRIDOR STRATEGY DESCRIPTIONS PHASE II TECHNICAL MEMORANDUM SEPTEMBER 2011 Prepared for: Maine Department Maine Turnpike Authority of Transportation Prepared by: In association with: Morris Communications • Kevin Hooper Associates T.Y. Lin • Planning Decisions • Facet Decision Systems Dr. Charles Colgan, University of Southern Maine • Evan Richert Normandeau Associates • Preservation Company This document is formatted for two-sided printing. Document II-4 ENTRAL ORK OUNTY ONNECTIONS TUDY CENTRAL YORK COUNTY CONNECTIONS STUDY 1 INTRODUCTION This document summarizes the potential highway corridor improvements – called strategies – that are being tested and evaluated for Phase II of the Central York County Connections Study (CYCCS). Phase II Highway Strategies are a starting point in the development and consideration of candidate improvements for the study; they are not recommendations, nor are they the only strategies that will be studied. Phase II strategies are conceptual in nature, and not yet detailed, specific proposals. Strategies considered later in the study during Phase III, as well as those ultimately recommended by the study, may differ considerably from the initial strategies currently under evaluation in Phase II. Specific aspects of these initially proposed strategies may be dropped, carried forward or combined in different ways, depending on the results of the analyses conducted during Phase II. The study is guided by a Purpose and Need Statement, which articulates that the study is to identify transportation and related land use strategies that enhance economic development opportunities and preserve and improve the regional transportation system. Additional information on the study, including the full Purpose and Need Statement, is available at the project website: www.connectingyorkcounty.org.
    [Show full text]
  • What Are the Advantages of Roundabouts?
    What is a roundabout? A roundabout is an intersection where traffic travels around a Circulatory central island in a counter- Truck Apron Roadway clockwise direction. Vehicles entering or exiting the roundabout must yield to vehicles, bicyclists, and pedestrians. Figure 1 presents the elements of a roundabout. Yield Line Splitter Island Figure 1: Elements of a Roundabout What are the advantages of roundabouts? • Less Traffic Conflict: Figure 2 compares the conflict points between a conventional intersection and a modern roundabout. The lower number of conflict points translates to less potential for accidents. • Greater safety(1): Primarily achieved by slower speeds and elimination of left turns. Design elements of the roundabouts cause drivers to reduce their speeds. • Efficient traffic flow: Up to 50% increase in traffic capacity • Reduced Pollution and fuel usage: Less stops, shorter queues and no left turn storage. • Money saved: No signal equipment to install or maintain, plus savings in electricity use. • Community benefits: Traffic calming and enhanced aesthetics by landscaping. (1) Statistics published by the U.S. Dept. of transportation, Federal Highway Administration shows roundabouts to have the following advantages over conventional intersections: • 90% reduction in fatalities • 76% reduction in injuries • 35% reduction in pedestrian accidents. Signalized Intersection Roundabout Figure 2: Conflict Point Comparison How to Use a Roundabout Driving a car • Slow down as you approach the intersection. • Yield to pedestrians and bicyclists crossing the roadway. • Watch for signs and pavement markings. • Enter the roundabout if gap in traffic is sufficient. • Drive in a counter-clockwise direction around the roundabout until you reach your exit. Do not stop or pass other vehicles.
    [Show full text]
  • Movingforward
    FORWARD movingfAll 2010 A quarterly review of news and information about Pennsylvania local roads. When to Use Stop Signs in Alleys A Guide to Understanding the State’s Requirements Related to Traffic-Control Devices at Alley Intersections by Patrick Wright, Pennoni Associates When deciding whether to use stop signs and other An alley is considered a “highway” in the Vehicle traffic-control devices in alleys, municipalities Code because it is a “roadway open to the use of the should be familiar with two major issues. The first public.” Following this logic, the junction of an alley is whether traffic control is even required, and the with another highway (including another alley) is con- second is how to properly place the signs especially sidered an “intersection” under the Vehicle Code, and within the space constraints found in most alleys. thus crosswalks (whether marked or unmarked) exist. Understanding Alleys What Traffic-Control and Intersections Devices Are Required? Alleys are defined separately in both the Now that the definitions of alleys and intersec- Pennsylvania Vehicle Code (Title 75) and the tions have been clarified, the next step is to deter- Manual on Uniform Traffic Control Devices mine what traffic-control devices are required for (MUTCD). According to the Vehicle Code (Title alleys. As at any intersection, the Vehicle Code does 75, Section 102) as well as the MUTCD, an alley not necessarily require stop signs or other traffic-con- is “a street or highway intended to provide access to trol devices. Instead, the code has specific “rules of the rear or side of lots or buildings in urban districts the road” that govern driving behavior and the right- and not intended for the purpose of through of-way at intersections depending on the situation.
    [Show full text]
  • 2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020
    2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020 CONNECTICUT DEPARTMENT OF Transportation BUREAU OF POLICY AND PLANNING Office of Roadway Information Systems Roadway INVENTORY SECTION INTRODUCTION Each year, the Roadway Inventory Section within the Office of Roadway Information Systems produces this document entitled "Limited Access - State Numbered Highways," which lists all the limited access state highways in Connecticut. Limited access highways are defined as those that the Commissioner, with the advice and consent of the Governor and the Attorney General, designates as limited access highways to allow access only at highway intersections or designated points. This is provided by Section 13b-27 of the Connecticut General Statutes. This document is distributed within the Department of Transportation and the Division Office of the Federal Highway Administration for information and use. The primary purpose to produce this document is to provide a certified copy to the Office of the State Traffic Administration (OSTA). The OSTA utilizes this annual listing to comply with Section 14-298 of the Connecticut General Statutes. This statute, among other directives, requires the OSTA to publish annually a list of limited access highways. In compliance with this statute, each year the OSTA publishes the listing on the Department of Transportation’s website (http://www.ct.gov/dot/osta). The following is a complete listing of all state numbered limited access highways in Connecticut and includes copies of Connecticut General Statute Section 13b-27 (Limited Access Highways) and Section 14-298 (Office of the State Traffic Administration). It should be noted that only those highways having a State Route Number, State Road Number, Interstate Route Number or United States Route Number are listed.
    [Show full text]
  • Outline Business Case
    West of England - Outline Business Case Project Title: A4174/Wraxall Road Roundabout Signal Scheme Project Owner: Richard Gillingham, South Gloucestershire Council Promoter and partners: South Gloucestershire Council Description of Intervention: Wraxall Road Roundabout is located on the A4174 Avon Ring Road in South Gloucestershire south- east of Kingswood and north-west of Cadbury Heath (see below). The northern and southern arms of the roundabout are the dual carriageway A4174. The side-road arms of Wraxall Road Roundabout are Wraxall Road to the west and Tower Lane to the east. A4174/Wraxall Road Roundabout To the north the A4174 continues through the A420 Roundabout that provides access to Kingswood and forms a major arterial route into Bristol. Further north the A4174 continues through the East Fringe to the M32 and the A38 beyond that to the west. The A4174 terminates some 3.6km to the south at Hicks Gate Roundabout at the intersection between the A4174 and the A4 with the latter providing a key strategic route into Brislington and Bristol, to the west, and towards Bath in the east. Wraxall Road Roundabout currently experiences congestion with delays mainly on the side-road arms during the weekday morning peak period of nearly 30 seconds according to journey time data, and delays of over a minute on most approaches during the weekday evening peak period. Delays on the A4174 southbound approach are nearly one and half minutes during this period. There are a number of development sites in the North and East Fringe that are either committed or in the planning process.
    [Show full text]
  • A6120 Outer Ring Road Improvements Roundhay Park Lane
    A6120 Outer Ring Road Improvements Roundhay Park Lane Sub-carriageway ducts to be installed off-peak under single lane closures. Wherever possible, where multiple ducts e.g.. Street lighting and UTMC cross adjacent these will be installed under the same closure , in a combined trench where possible or by separate resources when there is sufficient safe ty zone between them. Main drainage crossings also installed – Not shown for clarity Drawing Title Notes UTMC duct crossing Drawing Number E17015/SK/PH-1B/1 Rev 0 Outline Phasing Plan Enabling Works – Off peak Street lighting duct crossing Issue Date 01/10/2018 NPG Diversion duct crossing Drawn By Rob Evans A6120 Outer Ring Road Improvements Roundhay Park Lane Pedestrian route to be maintained Pedestrian route to be maintained by constructing verge half and half. by constructing verge half and half. Pedestrian route diverted into Pedestrian route diverted into carriageway within TM off-peak carriageway within TM off-peak when works dictate access is when works dictate access is required to full width of verge. required to full width of verge. Pedestrian routes to be maintained on existing footway which is to be re-surfaced only. Pedestrian route to be moved on to carriageway within TM off-peak to facilitate surfacing operations. Drawing Title Key Under Construction TM Limit Drawing Number E17015/SK/PH-1B/2 Rev 0 Outline Phasing Plan Stage 1 – – Peak Time Arrangement Completed Traffic Movement Issue Date 01/10/2018 Temporary Surfacing Pedestrian Route Drawn By Rob Evans A6120 Outer Ring Road Improvements Roundhay Park Lane Pedestrian route to be maintained Pedestrian route to be maintained by constructing verge half and half.
    [Show full text]