110 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

110 Bus Time Schedule & Line Route 110 bus time schedule & line map 110 Northbound View In Website Mode The 110 bus line (Northbound) has 2 routes. For regular weekdays, their operation hours are: (1) Northbound: 12:12 AM - 11:48 PM (2) Southbound: 12:14 AM - 11:50 PM Use the Moovit App to ƒnd the closest 110 bus station near you and ƒnd out when is the next 110 bus arriving. Direction: Northbound 110 bus Time Schedule 10 stops Northbound Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 4:38 AM - 11:48 PM Clarkson Go Station Platform 9 Tuesday 12:12 AM - 11:48 PM Southdown Rd at Hartland Dr 2020 Hartland Drive, Peel Wednesday 12:12 AM - 11:48 PM Southdown Rd at Truscott Dr Thursday 12:12 AM - 11:48 PM 1405 Southdown Road, Mississauga Friday 12:12 AM - 11:48 PM Erin Mills Pky at Fowler Dr Saturday 12:12 AM - 12:57 AM 2165 Erin Mills Pky, Mississauga Dundas St W East Of Erin Mills Pky 2683 Hammond Rd, Peel 110 bus Info University Of Toronto At Mississauga Campus Direction: Northbound Stops: 10 South Common Mall Bus Terminal Platform A,B,C Trip Duration: 35 min 2227 South Millway, Peel Line Summary: Clarkson Go Station Platform 9, Southdown Rd at Hartland Dr, Southdown Rd at Erin Mills Pky at Folkway Dr Truscott Dr, Erin Mills Pky at Fowler Dr, Dundas St W Erin Mills Parkway, Peel East Of Erin Mills Pky, University Of Toronto At Mississauga Campus, South Common Mall Bus Erin Mills Station West Platform 4 Terminal Platform A,B,C, Erin Mills Pky at Folkway Dr, Mississauga Transitway, Peel Erin Mills Station West Platform 4, City Centre Transit Terminal Platform O City Centre Transit Terminal Platform O 189 Rathburn Road West, Mississauga Direction: Southbound 110 bus Time Schedule 10 stops Southbound Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 4:39 AM - 11:50 PM City Centre Transit Terminal Platform O 189 Rathburn Road West, Mississauga Tuesday 12:14 AM - 11:50 PM Erin Mills Station East Platform 6 Wednesday 12:14 AM - 11:50 PM Mississauga Transitway, Peel Thursday 12:14 AM - 11:50 PM Erin Mills Pky at Folkway Dr Friday 12:14 AM - 11:50 PM 4140 Erin Mills Parkway, Peel Saturday 12:14 AM - 1:21 AM South Common Centre Bus Terminal Platform H,I,J 2227 South Millway, Peel University Of Toronto At Mississauga Campus 110 bus Info Direction: Southbound Erin Mills Pky South Of Dundas St W Stops: 10 2627 Comet Crt, Peel Trip Duration: 42 min Line Summary: City Centre Transit Terminal Platform Erin Mills Pky at Leanne Blvd O, Erin Mills Station East Platform 6, Erin Mills Pky at 2185 Leanne Boulevard, Mississauga Folkway Dr, South Common Centre Bus Terminal Platform H,I,J, University Of Toronto At Mississauga Southdown Rd at Truscott Dr Campus, Erin Mills Pky South Of Dundas St W, Erin 1430 Ludbrook Crt, Peel Mills Pky at Leanne Blvd, Southdown Rd at Truscott Dr, Southdown Rd at Bromsgrove Rd, Clarkson Go Southdown Rd at Bromsgrove Rd Station Platform 9 2089 Bromsgrove Road, Peel Clarkson Go Station Platform 9 110 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or subway schedule, and step-by-step directions for all public transit in Toronto. Check Live Arrival Times About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • Peel Sustainable Transportation Strategy
    Background Documents Sustainable Transportation Strategy February 2018 Region of Peel Sustainable Transportation Strategy Online Consultation Survey Summary Shaping the Vision for Sustainable Transportation in the Region of Peel Prepared for Region of Peel by IBI Group May 19, 2017 IBI GROUP REGION OF PEEL SUSTAINABLE TRANSPORTATION STRATEGY ONLINE CONSULTATION SURVEY SUMMARY Prepared for Region of Peel Table of Contents List of Exhibits .............................................................................................................................. 1 1 Survey Objective and Design ............................................................................................ 2 1.1 Objectives ................................................................................................................ 2 1.2 Design ...................................................................................................................... 2 1.3 Promotion ................................................................................................................. 3 2 Survey Responses .............................................................................................................. 3 3 Respondent Demographics ............................................................................................... 4 3.1 Priority Ranking ........................................................................................................ 8 4 Strategy Rating ..................................................................................................................
    [Show full text]
  • Mayor Crombie's State of the City Address 2015 Mayor's Annual
    Mayor Crombie’s State of the City Address 2015 Mayor’s Annual Address Luncheon Mississauga Board of Trade Delivered September 22, 2015 CHECK AGAINST DELIVERY Good afternoon, everyone. Thank you, Jim, for the kind introduction [Jim Molyneux MNP]. And thank you to the Mississauga Board of Trade for organizing this opportunity to deliver my inaugural State of the City Address. MBOT holds an important place in our community, representing nearly 1,500 businesses from Port Credit to Churchill Meadows; from Cooksville to Streetsville; from Meadowvale to Malton; and all neighbourhoods in between. The leadership of MBOT are respected partners called upon by Council to develop solutions for Mississauga. Together, we work to achieve our common goals to attract foreign-direct investment and help aspiring entrepreneurs, along with established businesses, to achieve unrivaled success right here in Mississauga! I would like to acknowledge Sheldon Leiba, for his many years of leadership. And I wish to reiterate my congratulations to David Wojcik as he takes the helm of MBOT. It is never easy filling big shoes. Trust me, David! All of Council looks forward to working closely with you, Chair Jeffrey Percival, and your entire team. Today, we gather on the traditional territory of the Mississaugas of the New Credit, a Mississauga Objibwa First Nation with a history dating back centuries ago. It is only fitting that our City’s motto reads: “ Pride in our past, Faith in our future.” And it is the genuine appreciation, understanding, and pride that we have in our past; which gives us the confidence to have faith in our future; and to overcome challenges before us.
    [Show full text]
  • FOR LEASE ROAD EAST OAKVILLE, on 24,849SF TOTAL for More Information, Please Contact
    OFFICE SPACE 277 AVAILABLE LAKESHORE FOR LEASE ROAD EAST OAKVILLE, ON 24,849SF TOTAL For more information, please contact: Avison Young Kurt Love, SIOR Hayden Jaworski Commercial Real Estate (Ontario) Inc., Brokerage Vice President, Sales Representative Sales Representative 77 City Centre Drive, Suite 301 905.283.2341 905.283.2395 Mississauga, Ontario, Canada L5B 1M5 [email protected] [email protected] 905.712.2100 905.712.2937 www.avisonyoung.ca FOR LEASE PROPERTY DETAILS PRICING $16.50 $11.99 Net psf Additional psf (2019 est.) DETAILS HIGHLIGHTS TOTAL AVAILABLE AREA: 24,849 square feet • Built out units available • Downtown Oakville location ZONING: Office • Unparalleled access to amenities on Lakeshore PARKING: Underground • Connected to Oakville Go Station via Oakville Transit AVAILABILITY: Immediately AVAILABILITY Suite 204: 1,218 square feet Suite 207: 1,210 square feet Suite 302: 11,048 square feet (Divisible) Suite 309: 2,626 square feet 277 Suite 400: 4,950 square feet (September 1, 2019) LAKESHORE Suite 408: 3,797 square feet ROAD EAST OAKVILLE, ON 2 FOR LEASE LOCATION 403 407 QEW 277 LAKESHORE ROAD EAST OAKVILLE, ON AERIAL RANDALL ST LAKESHORE RD E THOMAS ST TRAFALGAR RD REYNOLDS ST 277 ALLAN ST LAKESHORE ROAD EAST FIRST ST LAKESHORE RD E TRAFALGAR RD 3 FOR LEASE FLOOR PLAN AREA SUMMARY UNIT: 204 UNIT: 207 RENTABLE AREA: RENTABLE AREA: 1,218 sf 1,210 sf UNIT: 302 RENTABLE AREA: 11,048 sf 4 FOR LEASE FLOOR PLAN AREA SUMMARY UNIT: 309 UNIT: 408 RENTABLE AREA: 2,626 sf RENTABLE AREA: 3,797 sf AMENITIES &
    [Show full text]
  • 48 Bus Time Schedule & Line Route
    48 bus time schedule & line map 48 Northbound View In Website Mode The 48 bus line (Northbound) has 2 routes. For regular weekdays, their operation hours are: (1) Northbound: 12:00 AM - 11:25 PM (2) Southbound: 12:03 AM - 11:28 PM Use the Moovit App to ƒnd the closest 48 bus station near you and ƒnd out when is the next 48 bus arriving. Direction: Northbound 48 bus Time Schedule 24 stops Northbound Route Timetable: VIEW LINE SCHEDULE Sunday 12:10 AM - 10:21 PM Monday 5:15 AM - 11:25 PM South Common Centre Bus Terminal Platform E,F 2150 Burnhamthorpe Rd W, Peel Tuesday 12:00 AM - 11:25 PM Erin Mills Pky at Folkway Dr Wednesday 12:00 AM - 11:25 PM Erin Mills Parkway, Peel Thursday 12:00 AM - 11:25 PM Erin Mills Station West Platform 3 Friday 12:00 AM - 11:25 PM 4380 Erin Mills Pky, Peel Saturday 12:00 AM - 11:28 PM Erin Mills Pky North Of Credit Valley Rd Erin Mills Parkway, Mississauga Credit Valley Hospital 2200 Eglinton Ave W, Mississauga 48 bus Info Direction: Northbound Eglinton Ave at Erin Mills Pky Stops: 24 2455 Eglinton Avenue West, Mississauga Trip Duration: 31 min Line Summary: South Common Centre Bus Terminal Erin Mills Town Centre Bus Terminal Platform B Platform E,F, Erin Mills Pky at Folkway Dr, Erin Mills Station West Platform 3, Erin Mills Pky North Of Erin Centre Blvd East Of Mall Access Credit Valley Rd, Credit Valley Hospital, Eglinton Ave at Erin Mills Pky, Erin Mills Town Centre Bus Terminal Erin Mills Pky At Erin Centre Blvd Platform B, Erin Centre Blvd East Of Mall Access, Erin Mills Pky At Erin Centre Blvd, Erin
    [Show full text]
  • Public Information Centre April 2008 Welcome
    Mississauga Bus Rapid Transit Preliminary Design Project PUBLIC INFORMATION CENTRE APRIL 2008 WELCOME The Mississauga Bus Rapid Transit (BRT) Project Thank you for attending this Public Information Centre. We welcome your input on preliminary design issues for this project. Please sign in at our registration table and pick up a comment booklet. The purpose of today’s session is to: Provide Mississauga Bus Rapid Transit (BRT) project background and context Describe the current project and explain where we are in the preliminary design process Present preliminary design concepts of the busway stations Obtain your comments and suggestions on preliminary design issues Outline the next steps and how you can be involved WHAT IS BUS RAPID TRANSIT? Bus Rapid Transit (BRT) is an integrated system for moving people by bus using dedicated road rights-of-way, called busways, for the operation of bus services. To maximize flexibility and reduce the need for transfers, stations are placed at key points along the busway where passengers can connect to other modes of travel (e.g. cycling, local bus, etc). MISSISSAUGA’S BRT The BRT system will improve the quality of life for those living and working in Mississauga. The Mississauga BRT system was originally planned in the early 1990’s to respond to forecast travel demand within and through the City of Mississauga. The Mississauga BRT system is part of a Greater Toronto Area- wide GO Transit initiative to create a high-efficiency east-west busway which will span from Oakville to Pickering. Mississauga’s portion of this BRT system will cover approximately 18 kilometres The City Centre Transit Terminal and the Highway 403 Bus Bypass Shoulders were built in the 1990’s as part of the BRT program.
    [Show full text]
  • 109 Bus Time Schedule & Line Route
    109 bus time schedule & line map 109 Meadowvale Express View In Website Mode The 109 bus line (Meadowvale Express) has 2 routes. For regular weekdays, their operation hours are: (1) Northbound: 5:18 AM - 11:16 PM (2) Southbound: 4:20 AM - 10:17 PM Use the Moovit App to ƒnd the closest 109 bus station near you and ƒnd out when is the next 109 bus arriving. Direction: Northbound 109 bus Time Schedule 20 stops Northbound Route Timetable: VIEW LINE SCHEDULE Sunday 8:18 AM - 10:42 PM Monday 5:18 AM - 11:16 PM Kipling Terminal Platform 14 95 Subway Cres, Toronto Tuesday 5:18 AM - 11:16 PM Dundas St At Billingham Rd Wednesday 5:18 AM - 11:16 PM 5500 Dundas Street West, Toronto Thursday 5:18 AM - 11:16 PM Renforth Station West Platform 1 Friday 5:18 AM - 11:16 PM 5001 Commerce Blvd, Mississauga Saturday 7:43 AM - 10:36 PM Orbitor Station West Platform B 5025 Orbitor Dr, Mississauga Spectrum Station West Platform B 5019 Spectrum Way, Mississauga 109 bus Info Direction: Northbound Etobicoke Creek Station West Platform B Stops: 20 Trip Duration: 53 min Tahoe Station West Platform B Line Summary: Kipling Terminal Platform 14, 4652 Tahoe Blvd, Mississauga Dundas St At Billingham Rd, Renforth Station West Platform 1, Orbitor Station West Platform B, Dixie Transitway Station Wb Spectrum Station West Platform B, Etobicoke Creek Station West Platform B, Tahoe Station West Tomken Station West Platform B Platform B, Dixie Transitway Station Wb, Tomken 4450 Tomken Road, Mississauga Station West Platform B, Cawthra Station West Platform B, Central Parkway
    [Show full text]
  • Transportation
    TRANSPORTATION Last Updated: July 2021 1 City of Mississauga - Transportation Mississauga • Ontario • Canada Transportation This profile contains information on highways, ground, air and water transportation services; customs services, and public transit systems. Road Highways • As the only city in the Greater Toronto Area (GTA) serviced by • Highway 410 provides a link northwards from Highways 403 and seven major highways, Mississauga offers fast, convenient access 401 through the City of Mississauga to the City of Brampton. to major destinations in Canada and the USA. It services a major portion of Mississauga’s industrial area west of Pearson International Airport. • Highway 401 is a multi lane highway running from Windsor on the west to the Quebec border on the east. Often called “Ontario’s Main • Highway 427 is a north/south highway system linking the City of Street”, it is by far the busiest highway in Canada and Toronto with Mississauga and areas to the north. North America. Running through the Greater Toronto corridor, it is • The Queen Elizabeth Way (QEW), is a highway that connects the GTA a complex system of express lanes, collector lanes and ramps. with the international border at Niagara. The QEW provides entry to Highway 401 passes through Mississauga with six interchanges the USA at Lewiston, Niagara Falls and Buffalo and passes through within the City. Mississauga en route to downtown Toronto. • Highway 403 is a multiple lane highway which connects the QEW • For further information, contact: Ministry of Transportation, with Highway 401 and provides an east/west highway link through Tel: 416-235-4686. the centre of Mississauga.
    [Show full text]
  • General Committee Agenda
    City of Mississauga Agenda MISSISSaUGa General Committee Date September 9, 2015 Time 9:00 AM Location Council Chamber, 2nd Floor, Civic Centre, 300 City Centre Drive, Mississauga, ON L5B3Cl Members Mayor Bonnie Crombie Councillor Jim Tovey Ward 1 Councillor Karen Ras Ward 2 Councillor Chris Fonseca Ward 3 (Chair) Councillor John Kovac Ward 4 Councillor Carolyn Parrish Ward 5 Councillor Ron Starr Ward 6 -- ----- - - Councillor Nando lannicca Ward 7 Councillor Matt Mahoney Ward 8 Councillor Pat Saito Ward 9 Councillor Sue McFadden Ward 10 Councillor Georg e Carlson Ward 11 Contact Sacha Smith, Legislative Coordinator, Legislative Services 905-615-3200 ext. 4516 Email [email protected] Find it online http://www.mississauqa.ca/portal/cityhall/qeneralcommittee mi~si~saugavideos Meetings of General Committee streamed Mv on aironhne live and archived at Mississauga.ca/videos General Committee 9/9/2015 2 INDEX - GENERAL COMMITTEE - SEPTEMBER 9. 2015 CALL TO ORDER APPROVAL OF THE AGENDA DECLARATIONS OF CONFLICT OF INTEREST PRESENTATIONS DEPUTATIONS A. Amrita Kumar-Ratta, Project Lead - Diversity and Inclusion Charter of Peel and Varsha Naik, Chair, Regional Diversity Roundtable, Varsha Naik with respect to the City's endorsement of the Diversity & Inclusion Charter of Peel. B. Haris Yaqeen, Chairman, University of Toronto Branch, Monarchist League of Canada with respect to acknowledgement of Her Majesty Queen Elizabeth ll's reign on September 9, 2015 at 12 noon. C. Elliott Silverstein, Manager, Government Relations, CAA South Central Ontario (Information Item A) MATTERS TO BE CONSIDERED - --- -- ------- 1. All-Way Stop - Foxwood Avenue and Lisgar Drive (Ward 10) 2. Speed Limit Review - Hickory Drive (Ward 3) 3.
    [Show full text]
  • Mississauga Transitway Now Complete with Official Opening Of
    A-10 | Friday, December 22, 2017 COMMUNITY www.WeeklyVoice.com Mississauga Transitway Now Complete With Oicial Opening Of Renforth Station MISSISSAUGA: Renforth residents by investing in the tran- Station, part of the Mississauga sit and transportation system that Transitway, was oficially opened they deserve.” on Monday by all three levels of Renforth Station is the east- government. With the inal sta- ern-most stop of the 18-kilometre tion now open, the completed Mississauga Transitway and pro- Transitway will continue to make vides commuters with consistent east-west travel across Missis- travel times, better access to GO sauga faster and more convenient Transit, MiWay, and the Toronto for commuters in the region. Transit Commission (TTC), and Steven Del Duca, Minister of provides a service connection to Transportation; Navdeep Bains, Toronto Pearson International Minister of Innovation, Science Airport. The station includes: and Economic Development • Heated shelters and Member of Parliament for • Public washrooms Mississauga-Malton, on behalf • Bus platforms with ticket of the Amarjeet Sohi, Minister vending machines of Infrastructure and Communi- • Information boards and el- ties; Bonnie Crombie, Mayor of evators. Mississauga and Peter Zuk, Chief The Mississauga Transitway Capital Oficer of Metrolinx, project is funded through a joint were at Renforth Station to of- partnership between all three lev- icially open the new bus stationels of government. The Govern- and mark the completion of the ment of Canada has contributed transitway. up to $83 million to the project Steven Del Duc said: “Renforth through the Canada Strategic In- Station is the inal bus station to frastructure Fund. The Province open along the Mississauga Tran- of Ontario has provided $113 sitway, and marks the comple- million towards the project which tion of the project.
    [Show full text]
  • Mississauga Mayor Bonnie Crombie
    A Personal Message from Mississauga Mayor Bonnie Crombie The 2016 Budget is a solid financial plan for our thriving community that paves the way for Mississauga’s promising future. We heard from residents about their funding priorities, and together, we put forward a fiscally-responsible plan that invests in local priorities including building infrastructure, expanding public transit and delivering quality services. To achieve our Budget 2016 investment goals, called in and joined us. We heard tremendous feedback, the overall impact is a 2.6% increase to the property and were better able to understand resident priorities. taxpayer; 1.6% represents delivering Mississauga For those who were unable to ask a question or be services; and 1.0% represents the Region of Peel. part of the discussion, our conversation did not We have built continuous improvement processes end there. Residents were encouraged to email their like Lean into our corporate DNA. For 2016, nearly questions or comments to a dedicated email account: $5 million in savings from across different departments [email protected]. were found. These savings are equivalent to reducing We had a Budget Allocator – an online tool which the local tax rate by 1.1%. allows people to more thoroughly identify their budget Mississauga continues to maintain its strong financial priorities. Residents were also encouraged to attend reputation with our Triple-A Credit Rating. This Council and Budget Committee meetings in person. gives job-creators the confidence to grow, expand, and Meetings were broadcasted live. succeed here at home. It further allows us to leverage the work we are undertaking to attract new foreign- I have joined Councillors and held direct investments with the Mississauga International one-on-one Community Office Partnership Program Committee (MIPP).
    [Show full text]
  • Carson, Katie GO Regional Express Rail New Station Analysis
    Carson, Katie m Subject: FW: Metrolinx Update Attachments: Item 8 - Regional Express Rail Progress Update (Infrastructure Update).pdf; Item 8 - Regional Express Rail Progress Update (New Station Analysis).pdf; Item 10 - GTHA Fare Integration Update.pdf; Item 9 - Rapid Transit Capital Projects Update.pdf From: CEO (Metrolinx) [mailto:[email protected]] Sent; October-20-15 11:03 AM To" CEO (Metrolinx) Subject; Metrolinx Update Good morning, I am writing to provide you with an update on some key Metrolinx projects and planned engagement activities. Metrolinx is championing long-term transportation and transit solutions that enhance prosperity, sustainability, and quality of life. Currently there are more than 200 projects underway across the region. More than $16 billion in investment has been made and construction is under way on our First Wave of projects, helping to realize the Big Move vision. More is yet to come. At our recent Board of Directors meeting, updates were provided on the following projects. GO Regional Express Rail Metrolinx is working with the Government of Ontario to bring faster, more reliable service to the GO network, a 10-year program that will provide significant new travel choices across the GTHA. With 63 existing stations and 7 stations currently planned or under construction, the GO Train network is the backbone of our regional transit network. More GO rail service will mean all-day electrified service every 15-minutes or better in both directions through core areas and running four times the number of off- peak trips including evenings and weekends with a mix of all-stop and express service to meet demand and reduce travel times.
    [Show full text]
  • Annual Report 2015/16
    Board Report To: Metrolinx Board of Directors From: Robert Siddall, Chief Financial Officer Judy Pfeifer , Chief Communications and Public Affairs Officer Date: June 28, 2016 Re: Metrolinx Draft Annual Report 2015/16 Recommendations RESOLVED: THAT the Metrolinx Annual Report 2015/16 be approved; and THAT the CEO submit the Annual Report to the Minister of Transportation in accordance with the Metrolinx Act, 2006 .Background The Annual Report for 2015/16 will be printed in black and white and available at Metrolinx’s head office. In addition a colour version will be posted to Metrolinx’s website at http://www.metrolinx.com/en/aboutus/publications/annual_reports.aspx The Annual Report is consistent with the guideline provided by the Province for Annual Reports and is in accordance with the requirements of the Metrolinx Act, 2006. The Annual Report includes a look back at significant milestones from 2015-16, including the progress made on the 10-year Regional Express Rail initiative and the Eglinton Crosstown Light Rail Transit (LRT), as well as the launch of UP Express, the activation of PRESTO on UP and the TTC, and supporting an increase of more than 35,000 additional GO customers every day. In addition there may be changes required as a result of the review of Audit, Finance and Risk Management Committee. This Draft Report will be finalized upon approval of the Board of Directors. Attachments Metrolinx Annual Report 2015/16 Respectfully submitted, Robert Siddall and Judy Pfeifer Metrolinx Annual Report 2015–2016 METROLINX ANNUAL REPORT // 2015-2016 We are experiencing an exciting and unprecedented time of transit growth, with more than $32 billion in projects underway.
    [Show full text]