48 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

48 Bus Time Schedule & Line Route 48 bus time schedule & line map 48 Northbound View In Website Mode The 48 bus line (Northbound) has 2 routes. For regular weekdays, their operation hours are: (1) Northbound: 12:00 AM - 11:25 PM (2) Southbound: 12:03 AM - 11:28 PM Use the Moovit App to ƒnd the closest 48 bus station near you and ƒnd out when is the next 48 bus arriving. Direction: Northbound 48 bus Time Schedule 24 stops Northbound Route Timetable: VIEW LINE SCHEDULE Sunday 12:10 AM - 10:21 PM Monday 5:15 AM - 11:25 PM South Common Centre Bus Terminal Platform E,F 2150 Burnhamthorpe Rd W, Peel Tuesday 12:00 AM - 11:25 PM Erin Mills Pky at Folkway Dr Wednesday 12:00 AM - 11:25 PM Erin Mills Parkway, Peel Thursday 12:00 AM - 11:25 PM Erin Mills Station West Platform 3 Friday 12:00 AM - 11:25 PM 4380 Erin Mills Pky, Peel Saturday 12:00 AM - 11:28 PM Erin Mills Pky North Of Credit Valley Rd Erin Mills Parkway, Mississauga Credit Valley Hospital 2200 Eglinton Ave W, Mississauga 48 bus Info Direction: Northbound Eglinton Ave at Erin Mills Pky Stops: 24 2455 Eglinton Avenue West, Mississauga Trip Duration: 31 min Line Summary: South Common Centre Bus Terminal Erin Mills Town Centre Bus Terminal Platform B Platform E,F, Erin Mills Pky at Folkway Dr, Erin Mills Station West Platform 3, Erin Mills Pky North Of Erin Centre Blvd East Of Mall Access Credit Valley Rd, Credit Valley Hospital, Eglinton Ave at Erin Mills Pky, Erin Mills Town Centre Bus Terminal Erin Mills Pky At Erin Centre Blvd Platform B, Erin Centre Blvd East Of Mall Access, Erin Mills Pky At Erin Centre Blvd, Erin Mills Pky At Erin Mills Pky At Mcfarren Blvd Mcfarren Blvd, Erin Mills Pky at Thomas St, Erin Mills 5289 McFarren Boulevard, Mississauga Pky At Vista Blvd, Erin Mills Pky at Britannia Rd, Erin Mills Pky at Windwood Dr, Battleford Rd West Of Erin Erin Mills Pky at Thomas St Mills Pky, Battleford Rd at Montevideo Rd, 2492 Thomas St, Mississauga Montevideo Rd North Of Battleford Rd, Montevideo Rd at Eastridge Rd, Montevideo Rd at Valencia Rd, Erin Mills Pky At Vista Blvd Montevideo Rd at Barrisdale Dr, Aquitaine Ave West 5634 Turney Dr, Mississauga Of Montevideo Rd, Aquitaine Ave at 2701 Aquitaine Ave, Aquitaine Ave At Glen Erin Dr, Meadowvale Town Erin Mills Pky at Britannia Rd Centre Bus Terminal Platform E,F 2398 Britannia Rd W, Peel Erin Mills Pky at Windwood Dr 6099 Erin Mills Pky, Peel Battleford Rd West Of Erin Mills Pky 2536 Brasilia Cir, Peel Battleford Rd at Montevideo Rd 6315 Montevideo Rd, Peel Montevideo Rd North Of Battleford Rd Montevideo Rd at Eastridge Rd 6449 Eastridge Rd, Peel Montevideo Rd at Valencia Rd 2554 Valencia Rd, Peel Montevideo Rd at Barrisdale Dr 6942 Barrisdale Dr, Peel Aquitaine Ave West Of Montevideo Rd 2651 Aquitaine Ave, Peel Aquitaine Ave at 2701 Aquitaine Ave 2701 Aquitaine Ave, Peel Aquitaine Ave At Glen Erin Dr 2701 Aquitaine Avenue, Peel Meadowvale Town Centre Bus Terminal Platform E,F Direction: Southbound 48 bus Time Schedule 26 stops Southbound Route Timetable: VIEW LINE SCHEDULE Sunday 12:09 AM - 10:20 PM Monday 5:06 AM - 11:28 PM Meadowvale Town Centre Bus Terminal Platform E,F Tuesday 12:03 AM - 11:28 PM Aquitaine Ave First Stop East Of Glen Erin Dr Wednesday 12:03 AM - 11:28 PM 2770 Aquitaine Avenue, Peel Thursday 12:03 AM - 11:28 PM Aquitaine Ave at 2700 Aquitaine Ave Friday 12:03 AM - 11:28 PM 2701 Aquitaine Ave, Peel Saturday 12:03 AM - 11:29 PM Aquitaine Ave At Montevideo Rd 2660 Aquitaine Avenue, Peel Montevideo Rd at Barrisdale Dr 6610 Montevideo Road, Peel 48 bus Info Direction: Southbound Montevideo Rd at Valencia Rd Stops: 26 6500 Montevideo Road, Peel Trip Duration: 32 min Line Summary: Meadowvale Town Centre Bus Montevideo Rd at Treviso Crt Terminal Platform E,F, Aquitaine Ave First Stop East 2678 Treviso Crt, Peel Of Glen Erin Dr, Aquitaine Ave at 2700 Aquitaine Ave, Aquitaine Ave At Montevideo Rd, Montevideo Rd at Battleford Rd at Montevideo Rd Barrisdale Dr, Montevideo Rd at Valencia Rd, 8 Moonstream Crt, Peel Montevideo Rd at Treviso Crt, Battleford Rd at Montevideo Rd, Battleford Rd at Erin Mills Pky, Erin Battleford Rd at Erin Mills Pky Mills Pky At Windwood Dr, Erin Mills Pky At Britannia 2514 Battleford Road, Peel Rd, Erin Mills Pky At Wickham Rd, Erin Mills Pky at Thomas St, Erin Mills Pky At Banƒeld Rd, Erin Mills Erin Mills Pky At Windwood Dr Pky at Erin Centre Blvd, Erin Centre Blvd West Of Erin 2511 Windwood Dr, Peel Mills Pky, Erin Mills Town Centre Bus Terminal Platform C, Eglinton Ave W at Erin Mills Pky, Credit Erin Mills Pky At Britannia Rd Valley Hospital, Erin Mills Pky At Credit Valley Rd, Erin 6015 Featherhead Cres, Peel Mills Station East Platform 5, Erin Mills Pky at Folkway Dr, Erin Mills Pky at Burnhamthorpe Rd, The Erin Mills Pky At Wickham Rd Collegeway at South Common Centre Access Rd, 2535 Scarth Crt, Mississauga South Millway North Of the Collegeway, South Common Centre Bus Terminal Platform E,F Erin Mills Pky at Thomas St 2550 Thomas St, Mississauga Erin Mills Pky At Banƒeld Rd 2516 Banƒeld Rd, Mississauga Erin Mills Pky at Erin Centre Blvd 5220 Erin Mills Parkway, Mississauga Erin Centre Blvd West Of Erin Mills Pky 2545 Erin Centre Blvd, Mississauga Erin Mills Town Centre Bus Terminal Platform C Eglinton Ave W at Erin Mills Pky 2300 Eglinton Avenue West, Mississauga Credit Valley Hospital 2200 Eglinton Ave W, Mississauga Erin Mills Pky At Credit Valley Rd 4530 Erin Mills Parkway, Mississauga Erin Mills Station East Platform 5 Mississauga Transitway, Peel Erin Mills Pky at Folkway Dr 4140 Erin Mills Parkway, Peel Erin Mills Pky at Burnhamthorpe Rd 4046 Erin Mills Parkway, Peel The Collegeway at South Common Centre Access Rd 2205 South Millway, Peel South Millway North Of the Collegeway South Common Centre Bus Terminal Platform E,F 2150 Burnhamthorpe Rd W, Peel 48 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or subway schedule, and step-by-step directions for all public transit in Toronto. Check Live Arrival Times About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • General Government Committee Agenda
    Final General Government Committee Agenda Date: November 7, 2016 Time: 9:30 AM Place: Council Chambers, 2nd Floor Municipal Administrative Centre 40 Temperance Street Bowmanville, Ontario Inquiries & Accommodations: For inquiries about this agenda, or to make arrangements for accessibility accommodations for persons attending, please contact: Michelle Chambers, Committee Coordinator, at 905-623-3379, ext. 2106 or by email at [email protected]. Alternate Format: If this information is required in an alternate format, please contact the Accessibility Coordinator, at 905-623-3379 ext. 2131. Audio Record: The Municipality of Clarington makes an audio record of General Government Committee meetings. If you make a delegation or presentation at a General Government Committee meeting, the Municipality will be audio recording you and will make the recording public by publishing the recording on the Municipality’s website. Noon Recess: Please be advised that, as per the Municipality of Clarington’s Procedural By-law, this meeting will recess at 12:00 noon, for a one hour lunch break, unless otherwise determined by the Committee. Cell Phones: Please ensure all cell phones, mobile and other electronic devices are turned off or placed on non-audible mode during the meeting. Copies of Reports are available at www.clarington.net General Government Committee Agenda Date: November 7, 2016 Time: 9:30 AM Place: Council Chambers 1 Call to Order 2 New Business – Introduction 3 Adopt the Agenda 4 Declaration of Interest 5 Announcements 6 Adoption of
    [Show full text]
  • Peel Sustainable Transportation Strategy
    Background Documents Sustainable Transportation Strategy February 2018 Region of Peel Sustainable Transportation Strategy Online Consultation Survey Summary Shaping the Vision for Sustainable Transportation in the Region of Peel Prepared for Region of Peel by IBI Group May 19, 2017 IBI GROUP REGION OF PEEL SUSTAINABLE TRANSPORTATION STRATEGY ONLINE CONSULTATION SURVEY SUMMARY Prepared for Region of Peel Table of Contents List of Exhibits .............................................................................................................................. 1 1 Survey Objective and Design ............................................................................................ 2 1.1 Objectives ................................................................................................................ 2 1.2 Design ...................................................................................................................... 2 1.3 Promotion ................................................................................................................. 3 2 Survey Responses .............................................................................................................. 3 3 Respondent Demographics ............................................................................................... 4 3.1 Priority Ranking ........................................................................................................ 8 4 Strategy Rating ..................................................................................................................
    [Show full text]
  • City of Mississauga
    Complete Streets in Southern Ontario: Project Overview In summer 2012, the Toronto Centre for Active Transportation (TCAT), a project of Clean Air Partnership, conducted survey-based research in Grey and Bruce Counties, Niagara Region and the City of Mississauga. TCAT’s objective was to investigate the status of Complete Streets in these jurisdictions and to gain a better understanding of the barriers to implementing Complete Streets policy and projects. TCAT collected online surveys from a diverse set of respondents from each jurisdiction including planners, engineers and public health staff, active transportation and accessibility advocates and elected officials. Survey responses from the City of Mississauga were analysed and incorporated into a case study available below. Survey respondents’ names are kept confidential. City of Mississauga Population 713,443 Land Area (km²) 292.40 Population density (people/km²) 2439.9 Jurisdiction type Lower-tier Munic. “It is important to work collaboratively with the various City departments, from urban design to land use planning, when designing a complete street” – Survey Respondent Geography and Government Mississauga is located west of Toronto, in the Regional Municipality of Peel. The City of Mississauga is a lower -tier municipality governed by 11 councillors and a mayor. All plans and policies in Mississauga must conform to the Growth Plan for the Greater Golden Horseshoe (2006) and the Provincial Policy Statement (2005). Mississauga's new Official Plan directs population and employment growth to its Downtown, Mixed-Use Nodes, Corporate Centres, Major Transit Station Areas and Intensification Corridors to support existing and planned infrastructure, particularly transit and cycling facilities. Compact, mixed use development in these areas will reduce the need for extensive travel to fulfill the needs of daily living and will provide more opportunities to live and work in the city.
    [Show full text]
  • Mississauga Transitway Ambitious Design
    2 DRIVING TECHNOLOGY Durham innovates REVAMPED TARGETS 3 Amendments proposed WEDNESDAY, GREATER TORONTO JANUARY 23, 2019 Vol. 22 & HAMILTON AREA No. 4 URBAN DESIGN & PLACEMAKING REVITALIZING HAMILTON Rachael Williams s the City of Hamilton “I see a very strong will come,” said Torne. efective economic development prepares for signifcant connection between getting With the success of Art tool,” said placemaking, public A redevelopment along the the public realm right and Crawl, the community saw art and projects manager Ken waterfront, LRT corridor and promoting development and an opportunity to organize a Coit. in the downtown, the planning city-building, especially in a lot four-day music festival along Inspired by the success of and economic development of our older commercial areas James Street, where artists, James Street North, Coit told department is pulling together where we want to drive a lot of chefs, photographers and other NRU the new staf team will a staf team that will put a activity of pedestrians and foot vendors could showcase their attempt to follow a similar much-needed emphasis on trafc,” said Torne. creations. Te festival, known formula, looking at how to placemaking and public realm. Te synergy between art, as Super Crawl, attracts 200,000 repopulate under-utilized areas Led by Hamilton’s planning placemaking and economic visitors annually and results throughout the city through and economic development development has been playing in an economic impact of the use of public art and urban general manager Jason Torne, out in Hamilton over the past $16.9-million. design. the city is creating a new two decades, particularly along “It was a community driven One area that the city section within the tourism and James Street North.
    [Show full text]
  • Authority to Waive the City's Right to a Hearing of Necessity in Connection
    12.12 Date: July 16, 2020 Originator’s files: To: Chair and Members of Council From: Geoff Wright, P.Eng, MBA, Commissioner of Meeting date: Transportation and Works July 22, 2020 Subject Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5) Recommendations 1. That the Corporate Report titled “Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5)” dated July 16, 2020 from the Commissioner of Transportation and Works, be received. 2. That the Legal Services Section of the City Manager’s Office be given authority to waive the City’s right to a Hearing of Necessity as provided pursuant to Section 6 (2) of the Expropriations Act, RSO. Background Under cover of letters dated April 21, 2020, the City of Mississauga received four (4) Notices of Application for Approval to Expropriate (the “Notices”) from Metrolinx for the following interests in property required in connection with Metrolinx’s Eglinton Crosstown West Extension Project: 1. City’s easement interest in PIN132970628 2. City’s easement interest in PIN132970627 3. Fee simple interest in the City-owned lands identified as PIN74240245 4. Fee simple interest in the City-owned lands identified as PIN132970624. The location of these properties is illustrated in Appendix 1. 12.12 Council
    [Show full text]
  • CREDIT VALLEY HOSPITAL CELEBRATES COMPLETION of 20 YEAR EXPANSION PLAN Over 150,000 Square Feet of Renovated Space Improves Care and Experience for Patients
    For Immediate Release CREDIT VALLEY HOSPITAL CELEBRATES COMPLETION OF 20 YEAR EXPANSION PLAN Over 150,000 square feet of renovated space improves care and experience for patients November 23, 2018 (Mississauga, ON) – Today, Trillium Health Partners (THP) celebrated the completion of the third phase of its 20 year Credit Valley Hospital (CVH) expansion plan that has added more space to care for more patients. The Honourable Doug Ford, Premier of Ontario, the Honourable Christine Elliott, Deputy Premier and Minister of Health and Long-Term Care, the Honourable Monte McNaughton, Minister of Infrastructure, local Members of Provincial Parliament and community leaders joined front-line staff to mark the momentous occasion with an official ribbon cutting. The CVH Phase 3 Redevelopment Project has improved patient experience, medical technology and created more space to care for the community which includes: Added space that will support care for over 107,000 emergency department visits and 17,000 surgeries annually 187,000 square feet of renovated space and 20,000 square feet of new space for patient care, as well as 12 new or renovated operating rooms; Fully renovated emergency department features additional space to care for patients, as well as dedicated paediatric and mental health treatment areas; New high accuracy computed tomography (CT) scanners that are faster and more accurate; Art installations above each bed in the Intensive Care Unit (ICU) and Critical Care Unit (CCU) to support the healing and wellbeing of patients and their families; and Introduction of robotics assisted surgery. The completion of the CVH Phase 3 Redevelopment Project is the most recent step in THP’s plan to meet the community’s growing need for health care services.
    [Show full text]
  • Transportation
    transportation OPPORTUNITIES IN THE GREATER TORONTO AREA BUILDING ON TORONTO TRANSIT CITY AND MOVE ONTARIO 2020 The Residential and Civil Construction Alliance of Ontario (RCCAO) is an alliance composed of management and labour groups that represent all facets of the construction industry. Its stakeholders stem from residential and civil sectors of the construction industry, creating a unified voice. The RCCAO's goal is to work in cooperation with governments and related stakeholders to offer realistic solutions to a variety of challenges facing the construction industry. RCCAO members and contributors are: • Metro Toronto Apartment Builders Association • Toronto Residential Construction Labour Bureau • Heavy Construction Association of Toronto • Greater Toronto Sewer and Waterman Contractors Association • Residential Low-rise Forming Contractors Association of Metro Toronto & Vicinity • LIUNA Local 183 • Residential Carpentry Contractors Association • Carpenters' Union • Ontario Concrete & Drain Contractors Association • Toronto and Area Road Builders Association RCCAO is also a founding member of the Infrastructure Investment Coalition (IIC). For more information please visit: www.rccao.com www.infracoalition.ca BUILDING ON TORONTO TRANSIT CITY AND MOVEONTARIO 2020 AN INDEPENDENT STUDY FUNDED BY THE RESIDENTIAL AND CIVIL CONSTRUCTION ALLIANCE OF ONTARIO RICHARD M. SOBERMAN TRIMAP COMMUNICATIONS INC. JANUARY 2008 abstract 2007 was a banner year for transportation announcements including mobilization of a new regional transportation authority (Metrolinx), a federal/provincial agreement to fund a number of transit initiatives in Peel, York, Toronto, and Durham, seven new LRT routes as part of Toronto Transit City, and two thirds of the funding for 52 transit projects under MoveOntario 2020. With respect to Toronto Transit City, the study emphasizes that implementing true LRT service on existing streets requires a fundamental policy decision on the part of municipal officials to either reduce road capacity for automotive traffic and parking or to widen roads.
    [Show full text]
  • In Mississauga
    Livingin Mississauga The Real Estate Market Watch Winter 2014 Winter 2014 Winter 2014 Phase One of Mississauga Transitway Now Open for Business Phase One of Mississauga Transitway Now Open for Business MISSISSAUGA – Western GTA residents can now enjoy partial access to one of the region’s most ambitious transit projects to date, with four stations of the MississaugaMISSISSAUGA Transitway – Western – Central GTA residents Parkway, can Cawthra, now enjoy Tomken, partial and access Dixie to – one now of officially the region’s open most for business.ambitious transit projects to date, with four stations of the Mississauga Transitway – Central Parkway, Cawthra, Tomken, and Dixie – now officially open for business. The Transitway is a grade-separated, Right-of-Way (ROW) route – ensuring that buses will be able to move quickly and smoothly alongside the 403 without the The Transitway is a grade-separated, Right-of-Way (ROW) route – ensuring that buses will be able to move quickly and smoothly alongside the 403 without the interference of regular vehicle traffic. When the line is finished (completion is expected in 2017), it will span 12 stations stretching from Winston Churchill in the west interference of regular vehicle traffic. When the line is finished (completion is expected in 2017), it will span 12 stations stretching from Winston Churchill in the west side of the city, to Renforth Gateway in the east. side of the city, to Renforth Gateway in the east. Made possible through a partnership Made possible through a partnership between the City of Mississauga and between the City of Mississauga and Metrolinx, the finished Transitway will provideMetrolinx, a safe the andfinished efficient Transitway corridor will provide a safe and efficient corridor usable by both MiWay and GO buses.
    [Show full text]
  • Medical Oncologist Oncology Program TRILLIUM HEALTH PARTNERS
    Medical Oncologist Oncology Program TRILLIUM HEALTH PARTNERS Trillium Health Partners (THP) is the largest community based academic health network in Ontario serving over one million residents in the communities of Mississauga, Peel Region and West Toronto. The hospital encompasses three main sites – Credit Valley Hospital (CVH), Mississauga Hospital (MH), and Queensway Health Centre (QHC) – offering a full range of acute care hospital services, as well as a variety of community-based specialized programs including the Peel Regional Cancer Centre. The Division of Medical Oncology is comprised of a dedicated group of medical oncologists. The Division also has affiliated clinics at Halton Healthcare (Oakville site). The successful applicant will be expected to potentially participate in sub-specialty off site clinics. The Division provides a full spectrum of Oncology consultation and related services. We currently have a clinical position available for a Medical Oncologist to join our team. This position is a fully funded Cancer Care Ontario AFP. Services provided by the Division Medical Oncology include providing MRP coverage for patients admitted to Medical Oncology; providing consultant coverage as required; and participating in shared sub-specialty call and related procedures. The successful candidate will be responsible for cancer treatment and care of patients with a variety of cancers. The successful candidate will promote and exemplify excellence in professional practice and conduct; be licensed or eligible for a license to practice in Ontario; and certified in Medical Oncology by the Royal College of Physicians and Surgeons of Canada. He/she will have evidence of an academic interest and expertise and be eligible for an academic appointment at the University of Toronto (UT), Faculty of Medicine, Department of Medicine.
    [Show full text]
  • Daniel Erin Mills
    danielserinmills.com BUILDING YOUR NEW HOME WITH INTEGRITY, CREATIVITY & VISION OUR ROOTS ARE GROUNDED IN ERIN MILLS In the late 1970’s, The Daniels Corporation’s Founder and CEO, John Daniels, was a moving force behind the ‘New Town’ of Erin Mills. His vision for what was to come in the City of Mississauga was, and still is, extraordinary, and we are proud that The Daniels Corporation continues to play a major role in bringing that vision to life. Daniels has built numerous successful neighbourhoods here, from our award-winning condominium collection in Mississauga’s City Centre to our sell-out successes at our Daniels FirstHome™ Communities. Known as a city builder across the GTA, we have used innovation and creativity to introduce residential landmarks such as NY Towers at Bayview and Sheppard in North York, Festival Tower, which rises atop TIFF Bell Lightbox in the heart of Toronto’s Entertainment District, and our continuing work in the world-renowned and award-winning Regent Park revitalization within Toronto’s downtown east. Daniels always looks for new ways to help people “Love Where They Live” by inspiring neighbourly interaction through pedestrian-friendly walkways, green space and retail. Now, we are bringing all of our city building ingenuity to Daniels Erin Mills - the BIGGEST and BEST new homeownership opportunity in the GTA. THE DAWN OF A NEW LANDMARK Located in the heart of Erin Mills at Eglinton Avenue and Erin Mills Parkway, Daniels Erin Mills will rise 25-storeys and offer incredible views, smart suite layouts, the ultimate in contemporary finishes, healthy and user-friendly amenities and a home that encourages community and connectivity.
    [Show full text]
  • Mayor Crombie's State of the City Address 2015 Mayor's Annual
    Mayor Crombie’s State of the City Address 2015 Mayor’s Annual Address Luncheon Mississauga Board of Trade Delivered September 22, 2015 CHECK AGAINST DELIVERY Good afternoon, everyone. Thank you, Jim, for the kind introduction [Jim Molyneux MNP]. And thank you to the Mississauga Board of Trade for organizing this opportunity to deliver my inaugural State of the City Address. MBOT holds an important place in our community, representing nearly 1,500 businesses from Port Credit to Churchill Meadows; from Cooksville to Streetsville; from Meadowvale to Malton; and all neighbourhoods in between. The leadership of MBOT are respected partners called upon by Council to develop solutions for Mississauga. Together, we work to achieve our common goals to attract foreign-direct investment and help aspiring entrepreneurs, along with established businesses, to achieve unrivaled success right here in Mississauga! I would like to acknowledge Sheldon Leiba, for his many years of leadership. And I wish to reiterate my congratulations to David Wojcik as he takes the helm of MBOT. It is never easy filling big shoes. Trust me, David! All of Council looks forward to working closely with you, Chair Jeffrey Percival, and your entire team. Today, we gather on the traditional territory of the Mississaugas of the New Credit, a Mississauga Objibwa First Nation with a history dating back centuries ago. It is only fitting that our City’s motto reads: “ Pride in our past, Faith in our future.” And it is the genuine appreciation, understanding, and pride that we have in our past; which gives us the confidence to have faith in our future; and to overcome challenges before us.
    [Show full text]
  • Hoodq Detailed Report™ | 145 Cheverie St, Oakville, on L6J 6C3
    Michela Mantle 145 Cheverie St 905.330.4077 Oakville, ON michelamantle.com HOODQ DETAILED REPORT™ ELEMENTARY TRANSIT SAFETY SCHOOLS HIGH PARKS CONVENIENCE SCHOOLS PUBLIC SCHOOLS (ASSIGNED) Your neighbourhood is part of a community of Public Schools offering Elementary, Middle, and High School programming. See the closest Public Schools near you below: Maple Grove PS about a 17 minute walk - 1.25 KM away Pre-Kindergarten, Kindergarten, Elementary and Middle 288 Maple Grove Dr, Oakville, ON L6J 4V5, Canada http://mag.hdsb.ca... Address 288 Maple Grove Dr, Oakville, ON L6J 4V5, Canada Language English Grade Level Pre-Kindergarten, Kindergarten, Elementary and Middle School Type Public Phone Number 905-844-9322 School Board Halton DSB School Number 334693 Grades Offered PK to 8 School Board Number B66133 Oakville Trafalgar HS 1.55 KM away High 1460 Devon Rd, Oakville, ON L6J 3L6, Canada Oakville Trafalgar High School, or 'OT' as it is commonly known in the community, started as Oakville High School in 1908 on Reynolds Street. Renamed Oakville Trafalgar High School in the 1940s, the school moved to the present location on Devon Road in 1992. http://oth.hdsb.ca... Address 1460 Devon Rd, Oakville, ON L6J 3L6, Canada Language English Grade Level High School Type Public Phone Number 905-845-2875 School Board Halton DSB School Number 932060 Grades Offered 9 to 12 School Board Number B66133 École EJ James PS 2.03 KM away Elementary and Middle 338 Cairncroft Rd, Oakville, ON L6J 4M6, Canada EJJ is a single track French Immersion school with over 500 students in grades 1 through 8 located in southeast Oakville.
    [Show full text]