17th Meeting of Transport Sector Coordinating Committee (TSCC)

18-20 April, 2018 National Highway Authority www.nha.gov.pk CENTRAL ASIA REGIONAL ECONOMIC COOPERATION (CAREC) Kyrgyzstan Kashghar REGIONAL CONNECTIVITY Dushanbe TajikistanKaramyk Ka Lasu China CAREC Corridor = 5a 5b 5c Mary Murghab Kashkurgan CAREC Corridor = 5a Termez Turkmenistan Location Km Total Kunduz Khunjrab -Ratodero Click560 560 Ratodero-DG Khan Here383 943 Mazari Sharif 5b DG Khan-Pindi Bhatian 386 1329 Jalalabad Pindi Bhatain-Isalambad 239 1568 -Kabul 449 2017 5a INDIAN Kabul-Dushanbe 577 2594 Kabul OCCIPIED Herat Dushanbe-Karamyk 340 2934 Afghanistan Peshwar KASHMIR Islamabad Karamyk-Kashghar 975 3909 5c CAREC Corridor = 5b Location Km Total CAREC Pindi Bhattian Link Road Karachi-Ratodero 560 560 Ratodero-DG Khan 383 943 Iran Kandahar DG Khan-Pindi Bhatian 386 1329 Pindi Bhatain-Isalambad 239 1568 DGKhan Islamabad-Mansehra 118 1686 Mansehra-Kashghar 1,026 2712 Pakistan CAREC Corridor = 5c Ratodero Location Km Total India -Quetta 858 858 Quetta-Kandahar 239 1097 Kandahar-Kabul 494 1591 Kabul-Kunduz 341 1932 Gwadar Kunduz - Dushanbe 242 2174 Karachi Dushanbe-Kashghar 1,231 3405 Tashkent Kyrgyzstan Kashghar REGIONAL CONNECTIVITY Dushanbe TajikistanKaramyk Ashgabat Uzbekistan Ka Lasu Mary Karshi China CAREC Corridor = 6c 6c China Kashkurgan CAREC Corridor = 6c Turkmenistan Termez Location Km Total Kunduz Khunjrab Karachi – Ratodero 560 560 Mazari Sharif Ratodero – DG Khan 383 943 5b DG Khan – Pindi Bhatian 386 1329 Jalalabad Pindi Bhatain-Isalambad 239 1568 Islamabad – Kabul 461 2029 5a Mansehra Kabul – Kunduz 336 2365 Herat Kabul Afghanistan Peshwar Kunduz – Dushanbe 242 2607 Islamabad Dushanbe – Tashkent 427 3034 5c

CAREC Pindi Bhattian Link Road Lahore Quetta IranIran Kandahar DGKhan

Pakistan

Ratodero India India

Gwadar Karachi In a historic moment, Gwadar Port starts commercial shipping service 7 Mar, 2018 PAKISTAN Khunjrab National Highway Authority N35 S1 Raikot N45 N95 N15 Road Network

Havelian S S3 M1 2 125 N75 Burhan N80 Islamabad N55 M2

Pindi Yarik Bhatian DI Khan Zhob M4 Lahore Gojra N50 Shorkot Abdul Hakeem N65 Khanewal Quetta M4

N40 N65 Surab Shahdad WanguhillsKot Rato Shikarpur Dero Basima 105 N30 M8 655 155 N85 225

N25 Category Motorway Expressway Highway Total 305 Hoshab M8 Current 689 93 10,392 11,174 N10 M10 120 M9 Hyderabad Gwadar Karachi Planned 2015-18 1,673 - 281 1,954 110 Total 2,362 93 10,673 13,128 Khunjrab PAKISTAN N35 Gilgit National Highway Authority Chitral Raikot N45 N95 Skardu Road Pictures Thakot N90 N15

Havelian N75 Peshawar M1 Burhan Islamabad N80

N55 Sialkot M2 Pindi Yarik Bhatian DI Khan Zhob Lahore GojraM4 Shorkot N50 Abdul Hakeem N5 Quetta N70 Multan Khanewal

N40 N65 Surab Shahdad Kot Rato Shikarpur Khuzdar Dero Basima M8 Sukkur

N85 N25

Hoshab 305 M8

N10 Hyderabad Gwadar Karachi M9

110 Khunjrab Pakistan CAREC Route Projects February Realignment of at Hunza due to Attabad Status and Investment as of February 2018 Gilgit Lake Overflow, N-35 Chitral S1 N35 Raikot N45 N95 Skardu Thakot E-35 (Section 1 Havelian – Peshawar–Torkham, N-5 N15 Mansehra) 4-Lane Expressway Havelian S S3 Peshawar M1 E35 2 N-70 Muzaffargarh – DG Khan N75 Burhan 125 Islamabad E-35 (Section 1 Hasanabdal – Section (Upgrading of Existing N80 Road to 4-Lane Dual Havelian) 4-Lane Expressway Carriageway) Sialkot M2 Pindi M-4 (Section 1 – Gojra Yarik Bhatian BCP Expansion and Upgrading at DI Khan 4-Lane Motorway) Torkham, Wagah and Zhob Lahore GojraM4 Shorkot M3 N50 Abdul Hakeem M-4 (Section 2 Gojra–Shorkot Surab – Kalat (N85 and N25) [4-Lane Motorway]) Quetta N65 Multan Khanewal Karachi – Hub – Dureji – Sehwan M-7 (250 km), M-4 (Section 3-Shorkot-Khanewal New Alignment, 6-Lane Motorway [4-Lane MW ind. bridges over N40 N65 M5 Ravi & Sidhnai Rivers]) Surab Shahdad Kot Rato Shikarpur Khuzdar Dero Hoshab – Surab (N85 and N25) Basima M-4 (Section 4 Khanewal– N30 M8 105 Sukkur Multan) 4-Lane Motorway 155 N85 Gwadar – Hoshab (M8) N25 M6 Ratodero–Dera Ghazi (DG) Khan, Hoshab 305 N-55 (Expressway, 200 km) M8

N10 Hyderabad 120 Gwadar Karachi M9 Sehwan–Ratodero, N-55 (Expressway) 110 Key Completed Ongoing Planned • In last four years, Pakistan has initiated an ambitious program of US$ 13.63 Billion • Complete North – South Motorway Link • Strengthen East – West Connectivity i.e. Baluchistan • Revival of Sick Mega Projects • Largest BoT Regime under PPP Mode US$ 3.4 Billion • Off budget financing and cost saving of US$ 4.43 Billion • Contribution to GDP Growth i.e. 1.0% to 1.5% Thank You National Highway Authority

National Highway Authority www.nha.gov.pk Trade & Transport Sector Vision • Improve trade competitiveness • Establish efficient / well integrated transport system • Reduce transport costs • Enhance road density from 0.32 to 0.64 Km / Km2 • Develop Pakistan as hub of sub regional connectivity 100 95 90 90 Freight Traffic 80 Passenger Traffic 70 Reliance on Road Network 60 95% 90% % 50 100 90 40 80 70 30 60 % 50

20 40 Freight Traffic Freight 30 Traffic Passenger 8 8% 2 10 20 0.5 5% 0 0% 2% 10 0 0

ROAD RAIL

ROAD RAIL AIR Road Density Comparison

3.2 3.5 3 2.12 2.5 1.73 1.72 2 1.32 1.25 1.5 1.04 1 0.67 0.4 0.32 0.5 0.23 0.20 0.17 0.08

0

UK

USA

Italy

India

Spain

China

Japan

Brazile

France

Pakistan

Hungary

Malaysia

Indonesia Road Length/Sq. km of Area of km Length/Sq. Road Countries Argentina ExistingRoad Length National of HighwaysNational HighwaysNetwork ProvinceProvince- wiseWise Length Breakup

AJK Punjab Gilgit - Baltistan 0.78% 22.51% 5.42%

2731 kms

2204 kms 4565 kms 18.17%

Balochistan 1878 kms 37.63%

KP Total Length - 12,131 Km 15.48% Existing National Highways Network

Sr. Length in Kilometers Route No. Road Description No. Motoway Expressway Highway 1 N-5 Karachi-Lahore-Peshwar-Torkham - - 1819 2 N-10 -coastal; liari-Ormara-Gwadar-Jiwani - - 653 3 N-15 Mansehra-Naran-Jalkhad - - 240 4 N-25 Karachi-Kalat-Quetta-Chaman - - 813 5 N-30 Basima – Khuzdar - - 110 6 N-35 Hassanabdal-Thakot-Khunjrab - - 806 7 N-40 Lakpass-Dalbandin-Taftan - - 610 8 N-45 Nowsehra-Dir-Chitral - - 309 9 N-50 Kuchlack-Zhob-D.I.Khan - - 531 10 N-55 Kotri--D.G.Khan-D.I.Khan-Peshawar - - 1264 11 N-65 Sukkur-Sibi-Quetta - - 385 12 N-70 Multan-D.G.Khan-Loralai-Qali Saifullah - - 447 13 N-75 Islamabad-Satra Mile-Lower Topa-Kohala - 54 14 N-80 Tarnol-Fateh Jang-Jand-Khushal Garh- - - 146 15 N-85 Hoshab-Panjgur-Nag-Baseema-Sorab - - 487 16 N-90 Khwazakhela – - - 64 17 N-95 Chakdara – Kalam - - 135 18 N-105 Larkana - Naudero – Lakhi - - 61 19 N-110 Gharo - Keti Bunder - - 90 Continue…. Existing National Highways Network

Sr. Length in Kilometers Route No. Road Description No. Motorway Expressway Highway 20 N-120 Hyderabad - Mirpukhas - Khokhrapar - - 220 21 N-125 - Khanpur – Hairpur - - 44 22 N-155 Larkana - Moenjo Daro Road - - 28 23 N-255 Larkana - Nasirabad via RasheedWagan - - 34 24 N-305 Sakrand - Shaheed Benazirabad - - 35 25 N-455 Larkana - Kamber – - - 50 26 N-655 Ratodero - Naudero Road - - 18 27 S-1 KKH-Skardu Road (Strategic Road) - - 167 28 S-2 Kohala- - - 40 29 S-3 Muzaffarabad – Chakothi - - 55 30 M-1 Islamabad-Peshawar Motorway 155 - - 31 M-2 Lahore-Islamabad Motorway incl. 32 Km 367 - - 32 M-3 Pindi Bhattian-Faisalabad Motorway 53 - - 33 M-4 Faisalabad - Khanewal - Multan 241 115 - - 34 N-5A Khanewal – Lodhran - - 102 35 M-8 Gwadar-Hoshab-Khuzdar-Ratodero - - 436 36 M-9 Karachi-Hyderabad Motorway - - 136 37 M-10 Karachi Northern Bypass - - 57 38 - Layari Expressway - 39 - Total (Current National Highways) 690 93 10392 Planned 2016-18

Sr. Length in Kilometers Route No. Road Description No. Motoway Expressway Highway 1 KLM Hyderabad – Sukkur 296 - - 2 KLM Sukkur - Multan 387 - - 3 KLM Abdul Hakeem – Lahore 230 - - 4 E-35 Burhan - Havalian 60 - - 5 CPEC Havalian - Thakot 39 - 81 6 M-4 Gojra - Khanewal 124 - - 7 SLM Lahore - Sialkot - 91 - 8 - Yakmach - Kharan - - 200 9 CPEC Islamabad – DIKhan - 210 - 10 M-9 Karachi - Hyderabad 136 - - 11 MMM Muzaffarabad – Mangla - Mirpur - 174 Total (Planned 2016-18) 1,272 475 281 LINK SLIDES CENTRAL ASIA REGIONAL ECONOMIC COOPERATION (CAREC)

New N-35 (KKH) Khunjrab – Hassanabdal (806 km) N-35 (KKH) Khunjrab – Hassanabdal (806 km) N-35 (KKH) Atta Abad Barrier Lake M-1 Peshawar – Islamabad Motorway (155 Km) M-2 Lahore – Islamabad Motorway (357 Km) M-4 Pindi Bhattian - Faisalabad Motorways (53 Kms) M-4 Faisalabad – Gojra Motorway (59 Kms) N-5 (Grand Trunk Road) Karachi – Peshawar 1,819 km N-75 (Islamabad – Dual Carriage Way) 54 km N-10 (Makran Costal) 653 km M-8 (Gwadar – – Hoshab) 193 Km M-9 (Hyderabad – Karachi) 136 Km N-25 (Karachi – Kalat – Quetta – Chaman) 813 Km N-40 Quetta – Taftan (Iran Border) N-70 (DG Khan – Loralai) N-85 (Sura – Basima – Hoshab) N-45 (Nowsehra – Dir – Chitral) 309 km N-90 (Khwazakhela – Besham) 64 km N-95 (Chakdara – Kalam) 135 km N-15 N-15 Link Slides KKH Improvement / Up-gradation Project (Raikot – Khunjerab Section) 335 Km

Contractor China Road and Khunjrab Bridge Corporation (CRBC) Mode of Contract Engineer, Procure, Construct-Contract (EPC/ Turnkey) Total Project Cost US$ 510.42 Million Date of Comm. August 01, 2008 Date of Completion Nov 30th, 2013 (64 Calendar Months) Tunnel (Mined) 02-697 meter Tunnel (Open 16 No’s cut/Shed) Bridges (New) 35 No’s Culverts (New) 1,040 Nos. Gilgit

Completed CAREC: 5b Raikot Open Cut Tunnels FEATURES OF KKH Slope Protection Open Slab Tunnels 2 way Tunnels Breast Wall Sign Boards

Drain Anchor Rope Ribbed Panel Wall Wide Bridges Retaining Wall

Sign Boards Guard Rail Chevrons

Ruling Gradient 4% Shoulder 0.6m wide Shoulder 0.6m wide

Asphalt Concrete Cement Stabilized Base Graded Grit Subbase Geogrid/Geotextile Crushed Rock Subgrade (for Frozen Soils) Atta Abad Barrier Lake

Name of Project Re-alignment of KKH at Atta Abad Barrier Lake Name of Contractor China Road and Bridge Corporation

Scope of Work 24 Km, 5 Tunnels, 2 Bridges and 78 Culverts

Date of th Commencement July 26 , 2012 Date of Completion September 25th, 2015

Length of Project 24 Km

Progress 100% Atta Abad Barrier Lake (KKH) Atta Abad Barrier Lake (KKH) Khunjrab MOTORWAY NETWORK Havelian – Thakot Havelian – Thakot Section (CPEC) 118 km Gilgit Partial Completion:Ongoing Oct-18 (39 km) CPEC

Raikot S1 Hazara Motorway (E-35) Thakot N35 Length 118 km CAREC:57 km 5b Thakot Tunnel N45 N95 Completion:May-18 615 m Thakot 136.659 B N15 PC-I Cost Hakla-DI Khan 290 km EPC Cost 133.98 B Peshawar Havelian S2 S3 M1 Completion: May-19 N75 Scope 125 Islamabad Construction of 39 km 06 Lane Access Burhan Lahore - Islamabad (M-2) controlled MW, 79 km Class-II N80 357 km Highway N55 Completed Pindigheb Contractor Sialkot Lahore – Sialkot M/s China Communications Battal TunnelM2 Mianwali2,906 m 91 km Construction company Ltd Pindi Bhatian Completion: Dec-18 E35 Yarik Commencement September, 2016 DI Khan Lahore Zhob M4 Lahore – Multan (M-3) Gojra 230 km Completion March, 2020 (42 Months) Completion: Aug-18 Shorkot M3 Karmong Tunnel Havelian-Mansehra section (39 km) N50 442 m by October 2018 Abdul Hakeem Faisalabad-Gojra (M-4) N70N65 Multan 58 km Quetta Khanewal Completed Progress 45% Mansehra Tunnel 2528 m Gojra – Shorkot (M-4) 62 km Completion: Jul-18 N65 N40 Mansehra M5 Interchange Surab Shorkot – Khanewal (M-4) InterchangeWanguhills Mansehra Tunnel Shahdad Rato Shikarpur 65 km Khuzdar Dero Completion: Aug-18 Basima Kot M8 105 N30 655 Sukkur KWL – MLN (M-4 Ext.) 155 225 56 km N85 Qalandarabad Completed Interchange N25 M6 N35 Sukkur-Multan (M-5) Hoshab 305 392 km M8 Tunnel -2 Partial Completion: Apr-18 (254 km) CPEC Hyderabad 390 m N10 Gwadar 120 Hyderabad – Sukkur (M-6) KarachiMuslim Abad 299 km InterchangeM9 Abbottabad Tunnel -1 1720 m Karachi – Hyderabad (M-9) Completion in 110 136 km 2017 2018 2019 Completion: Feb-18 Or Earlier Or After Havelian Salient Features

Length 118 Km Contractor M/s China Communications construction company Ltd Type of Road Expressway/ Access Controlled Highway (Class-II) PC-I cost (Works) PKR 136.65 Billion

PC-I cost (Land) Original 7.267 Billion Under Revision 13.178 Billion Contract Cost PKR 133.98 Billion Start Point Havelian End Point Thakot a. Havelian – Abbottabad 60 M b. Abbottabad – Mansehra 60 M ROW c. Mansehra – 40 M d. Battagram –Thakot Section 40 M TECHINCAL FEATURES OF THE PROJECT

Sr. Item Unit Technical Standards and Sections No. Expressway (Havelian Expressway (Abbottabad – Class II Highway 1 Highway classification - – Abbottabad) Mansehra) (Mansehra – Battagram) (27.601 KM) (11.910 KM) (79.170 KM)

2 No of Lanes Nos. 06 06 02

3 Design speed KM/h 100 80 60

Minimum radius of 4 m 437 252 125 horizontal curve Maximum longitudinal 5 % 4~6 4~6 6 slope

6 Pavement structure - Flexible pavement Flexible pavement Flexible pavement Detail of Structures

Sr. Structure Description Total Numbers No. 06 No’s (02x in Section-I&II having length of 2,110 meters 1. Tunnels and 04x in Section-III with length of 6,491 meters)

2. Interchanges 03 No’s 3. Bridges 101 No’s (Total Length= 12.769 KM) 4. Culverts 440 No’s 5. Underpasses/Cattle creeps 29 No’s 6. Toll Plazas 07 No’s 7. Weigh Stations 07 No’s 8. Service Areas 02 No’s Tunnels Progress

Total Entrance Excavation % completed Exit Excavation Length completed Total length S# TUNNEL NAME Description Length length (Meters) length (Meters) (Meters) (Meters) (Meters) K73+260-K75+025 450.7 645.3 1096 1765 62.10% Abbotabad 1 # 1 Tunnel ZK73+316-ZK75+040 305.1 655.1 960.2 1724 55.70%

K78+260-K78+660 24.6 375.4 400 400 100.00% Abbotabad 2 # 2 Tunnel ZK78+253-ZK78+625 29 343 372 372 100.00%

3 Mansehra Tunnel K100+922-K103+450 413 580 993 2528 39.28%

4 Karmang Tunnel K13+227-K136+669 0 0 0 442 0.00%

5 Battal Tunnel K144+874-K147+780 750 704 1454 2906 50.03%

6 Thakot Tunnel K176+125-K176+640 565.5 0 565.5 615 91.95%

Khunjrab MOTORWAY NETWORK Havelian – Thakot ADB Funded Burhan to Havelian (Hazara Motorway) 6 Lanes118 km

Gilgit Partial Completion: Oct-18 (39 km) CPEC

Raikot S1 Hazara Motorway (E-35) Package-1 Package-2 N35 Package-3 57 km N45 N95 Completion:May-18 Thakot Burhan – Jarikas Jarikas – Sarai Saleh N15 Sarai Saleh – Havelian Hakla-DI Khan M/s CGGC - GRC (JV) M/s CGGC - AM Asso. (JV) M/s Limak-ZKB (JV) 290 km Peshawar Havelian S2 S3 M1 Completion: May-19 20.3 km / Rs. 10.2 B 19.2 km / Rs. 9.311 B N75Islamabad17.1 km / Rs. 13.10 B Burhan 125 Lahore - Islamabad (M-2) N80 357 Haveliankm N55 Completed Pindigheb Sialkot Lahore – Sialkot M2 91 km Pindi Bhatian Completion: Dec-18 Yarik DI Khan Lahore Zhob M4 Lahore – Multan (M-3) Gojra 230 km Completion: Aug-18 Shorkot M3 N50 Abdul Hakeem S. MaqsoodFaisalabad-Gojra (M-4) N70N65 Multan Interchange 58 km Quetta Khanewal 42+496 Completed Hattar Completed Interchange Sarai Gojra – Shorkot (M-4) Jarikas 62 km 24+160 Completion:CAREC: Jul-18 5b Interchange N65 Saleh 17+860N40 M5 Surab Wanguhills Shorkot – Khanewal (M-4) Rato Shikarpur Chechian 65 km Shahdad Dero Khuzdar Kot Interchange Completion: Aug-18 Burhan Basima Length / Cost 57 Km / Rs. 30.27 Billion Interchange M8 105 29+200 N30 655 Sukkur Scope ConstructionKWL – ofMLN 06 Lane (M-4 Access Ext.) 0+00 Jarikas 155 225 56 km N85 Controlled MotorwayCompleted Commencement March, 2015 N25 M6 Sukkur-Multan (M-5) Hoshab 305 Completion Packages I and II:392 Completed km

M8 Partial Completion: Apr-18 (254 km) CPEC December, 2017. Burhan Hyderabad th N10 Package-III: 27 May, 2018 Gwadar 120 Hyderabad – Sukkur (M-6) Interchange Karachi 299 km M9 Package-I Package-II Package-III Hassan Abdal Substantially CompletedKarachi – Hyderabad81% (M-9) Completion in 110 136 km 2017 2018 2019 Completion: Feb-18 Or Earlier Or After Faisalabad – Gojra (M-4)

SALIENT FEATURES Completed Project Cost Rs. 10,305 M CAREC: 5abc, 6c Final Project Cost Rs. 9,630 M (Saving: Rs. 675 M) Funding ADB / GOP Type of Road Four (04) Lane Fenced Motorway Structures (for 6 Lane Motorway Ext.) Design Speed 120 kph Interchanges Three (03) Bridges & Culverts 11 and 246 Nos. Respectively Underpasses 55 Nos Status Completed (March 2015) Khunjrab MOTORWAY NETWORK Havelian – Thakot ADB Funded Gojra – Shorkot Section (62 Km) 118 km

Gilgit Partial Completion: Oct-18 (39 km) CPEC

Raikot S1 Hazara Motorway (E-35) Gojra – Shorkot Section (62 Km) ProjectJhang Details N35 To Faisalabad57 km N45 N95 Completion:May-18 Section/Package Section-2A Gojra-Jamani Section-2B Jamani-Shorkot Thakot N15 Hakla-DI Khan Length 31 km 31 km M4 290 km Peshawar Havelian S2 S3 Completion: May-19 Contract Cost 8.35 Billion 8.83 Billion M1 N75Islamabad Construction of 04 Lane Access Controlled Motorway Burhan 125 Lahore - Islamabad (M-2) Scope N80 357 km With 06 Lane Structures. N55 Completed ST Gojra Contractor M/s Xinjiang Beixin M/s China Railways 1 Group Pindigheb Sialkot Lahore – Sialkot Commencement March, 2016 Mianwali M2 91 km Pindi Bhatian Completion: Dec-18 2018 2018 Yarik Completion DI Khan Lahore Zhob M4 Lahore – Multan (M-3) Progress 62% Gojra Gojra 230 km 50% Completion: Aug-18 Shorkot M3 N50 Interchange Abdul Hakeem Faisalabad-Gojra (M-4) N70N65 Multan 58 km Ongoing Quetta Khanewal Completed T.T. Singh Gojra – Shorkot (M-4) CAREC: 5abc, 6c Interchange 62 km Completion: Jul-18 N65 N40 Jamani M5 Surab Wanguhills Shorkot – KhanewalTo Lahore (M-4) Shahdad Rato Shikarpur 65 km Khuzdar Dero Completion: Aug-18 Qaim Basima Kot M8 105 Bharwana N30 655 Sukkur KWL – MLN (M-4 Ext.) 155 Waryamwala 225 56 km N85 Interchange Completed

N25 M6 Sukkur-Multan (M-5) Hoshab 305 392 km

M8 Partial Completion: Apr-18 (254 km) CPEC Hyderabad N10 M3 Gwadar 120 Hyderabad – Sukkur (M-6) Karachi 299 km ShorkotM9 Rajana Shorkot Interchange Karachi – Hyderabad (M-9) Completion in 110 136 km 2017 2018 2019 Completion: Feb-18 Or Earlier Or After To Khanewal To Abdul Hakim Khunjrab MOTORWAY NETWORK Havelian – Thakot ADB Funded Shorkot – Khanewal (M-4) 65 Km 118 km

Gilgit Partial Completion: Oct-18 (39 km) CPEC

To Gojra Raikot S1 Hazara MotorwayTo (ELahore-35) Shorkot – Khanewal (M-4) 65 Km Project Details Shorkot N35 57 km N45 N95 Shorkot Completion:May-18 Section-3A Section-3B Thakot Interchange M3 Section / Package N15 Shorkot-Dinpur Dinpur-Khanewal Hakla-DI Khan 290 km 34 km Peshawar Havelian S2 S3 Length 31 km M1 Completion: May-19 Shorkot N75Islamabad Contract Cost 11.22 Billion 10.82 Billion BurhanCantt125 Pir Mahal Lahore - Islamabad (M-2) N80 357 km Construction of 04 Lane Access Controlled M-4 N55 Completed Scope Motorway With 06 Lane Structures. Pindigheb Sialkot Lahore – Sialkot M/s China M2 M/s Xinjiang Beixin Mianwali 91 km Contractor Pindi Bhatian Completion: Dec-18 Gezhouba -GRC JV Yarik December, 2016 DI Khan Lahore Commencement Zhob M4 Lahore – Multan (M-3) Gojra 230 km Completion September, 2018 Completion: Aug-18 Shorkot M3 N50 Progress 39% 32% Abdul Hakeem Faisalabad-Gojra (M-4) N70N65 Multan 58 km Quetta Khanewal Completed Dinpur Interchange Gojra – Shorkot (M-4) Ongoing 62 km Completion: Jul-18 N65 N40 Abdul HakimM5 CAREC: 5abc, 6c Surab Wanguhills Shorkot – Khanewal (M-4) Shahdad Rato Shikarpur 65 km Khuzdar Dero Completion: Sep-18 Basima Kot M8 105 N30 655 Sukkur KWL – MLN (M-4 Ext.) 155 225 56 km N85 Mukhhdumpur Completed Interchange N25 M6 Mian Sukkur-Multan (M-5) Kabirwala 392 km Hoshab Kabirwala305 M8 Channu Partial Completion: Apr-18 (254 km) CPEC Interchange Hyderabad N10 Gwadar 120 Hyderabad – Sukkur (M-6) Karachi 299 km KhanwelM9 Interchange Karachi – Hyderabad (M-9) Completion in 110 M-4 Ext. 136 km 2017 2018 2019 Khanewal Completion: Feb-18 Or Earlier Or After To Multan Khanewal – Multan (M-4 Ext.) 55.6 Kms Completed CAREC: 5abc, 6c Khanewal

Multan M4 Multan – Muzaffargarh – DG Khan (N-70)

Multan

Dera Ghazi Khan N70 Muzaffargarh

Scope of Work • Dualization of Muzaffargarh – DG Khan portion of N-70 • Construction of New 2-Lane Bridge on River Indus at Ghazi Ghat • Maintenance of Multan – Muzaffargarh – DG Khan Section (N-70) Length / Cost 80 Km / 9.35 Billion Concession Period 25 Years Construction Period 24 Months Commencement Sep, 2016 Exp. Completion Sep, 2018 Work in progress Ratodero - (N-55) (Expressway - 200 Km)

Ongoing Dera Ghazi Khan CAREC: 5abc, 6c

N55

M5

Ratodero Sehwan - Ratodero (N-55) (Expressway -199 Km) – (JBIC & GOP) Ratodero Completed CAREC: 5abc, 6c

N55

Sehwan Peshawar - Torkham N-5 (47 km) USAID

Torkham Completed CAREC: 5ac, 6c

Peshawar Gwadar – Hoshab Motorway (M-8) GoP

Completed CAREC: 5c, 6abd M-8 Hoshab Turbat

Gwadar-Turbat Gwadar-Turbat Turbat- Description Sec-I, Pakage-IIA Sec-I, Pakage-IIB Hoshab (Nalient-Dasht) (Dasht-Turbat) Section-IIA Length 53.60 km 63.45km 76.25 Km Contractor M/s FWO Consultant M/s LRA Group Cost 5.43 Billion 6.571 Billion 6.910 Billion Commencement June, 2014 Completion 3rd February, 2016

N-10

Gawdar Surab – Hoshab (N-85) Surab Surab-Hoshab (N-85) Length 449 km Cost Rs 17.969 Billion Commencement September, 2007 Completion December, 2016 Basima Status Completed

Nag

N85 Panjgur Completed CAREC: 5c, 6abd

Wadh

Hoshab Chaman Jungle-PirAlizai -Chaman Khuzdar-Kalat-Quetta– Chaman Section (N-25) existing 2 lane carriageway 56 km

Existing Carriageway Balance work of Kalat – Quetta - Chaman (N-25) 226 km Quetta Length / Cost 116 (Pckg. II & IV) / 90 MUSD Contractor M/s FWO(EPC) Commencement June, 2014 Completion June, 2016 Additional works of 4xbridges, toll plazas, Wiegh bridges and Kuchlack Bypass are underway and shall be completed 2018

N25

Kalat

Surab

Completed Additional Carriageway (Khuzdar – Chaman) CAREC: 5c, 6abd Length 431 km Khuzdar • FS completed/ Detailed Design underway