PRC: Central Sichuan Roads Development Project

Total Page:16

File Type:pdf, Size:1020Kb

PRC: Central Sichuan Roads Development Project Resettlement Monitoring Report Project Number: 34174 October 2008 PRC: Central Sichuan Roads Development Project Prepared by The Research Institute of Foreign Capital Introduction And Utilization, Southwest Jiaotong University For Sichuan Yaxi Expressway Company Ltd. ADB Loan No.: 2181-PRC Central Sichuan Roads Development Project Evaluation Report on External Monitoring of Resettlement (Phase II) Research Institute of Foreign Capital Introduction and Utilization Southwest Jiaotong University October, 2008 Evaluation Report on External Monitoring of Resettlement for Central Sichuan Roads Development Project Table of Contents PREFACE .................................................................................................................................................... 1 SUMMARY ON EXTERNAL MONITORING OF RESETTLEMENT ............................................... 2 1. OVERVIEW .................................................................................................................................... 6 1.1 BASIC SITUATIONS OF THE PROJECT ........................................................................................... 6 1.2 CONSTRUCTION PROGRESS ........................................................................................................ 6 1.3 RESETTLEMENT PROGRESS ........................................................................................................ 6 1.4 MONITORING AND EVALUATION ................................................................................................. 7 2 MONITORING OF THE PROJECT’S IMPACT ............................................................................ 7 2.1 OVERALL MONITORING OF THE PROJECT’S IMPACT .................................................................... 7 2.2 MONITORING OF THE LAND REQUISITION TARGET ..................................................................... 8 2.3 DEMOLISHMENT TARGET ........................................................................................................... 8 2.4 MONITORING OF INFRASTRUCTURE ........................................................................................... 9 2.5 MONITORING OF TEMPORARILY OCCUPIED LAND ...................................................................... 9 2.6 MONITORING OF FRAGMENTARY TREE AND GRAVE .................................................................... 9 2.7 MONITORING OF ENTERPRISES AND INSTITUTIONS .................................................................. 10 3 COMPENSATION STANDARD AND COMPENSATION MONITORING .............................. 10 3.1 COMPENSATION POLICY MONITORING .................................................................................... 10 3.1.1 Policy Foundation ................................................................................................................... 10 3.2 COMPENSATION STANDARD MONITORING ................................................................................ 11 3.2.1 Monitoring of compensation standard in Ya’an City ............................................................... 11 3.2.2 Monitoring of compensation standard in Liangshan Yi Autonomous Prefecture. ................... 14 3.2.3 Conclusion of Compensation Standard Monitoring ................................................................ 16 3.3 THE GENERAL SITUATION AND CHANNELS OF FUND APPROPRIATION ....................................... 16 4 MONITORING FOR RESETTLEMENT RESULT OF THE AFFECTED PEOPLE ............... 18 4.1 MONITORING FOR RESETTLEMENT RESULT OF THE LAND REQUISITION AND DEMOLISHMENTDEMOLISHMENT............................................................................................................. 18 4.1.1 The general evaluation of the resettlement result of the land requisition and Demolishment . 18 4.1.2 Sample survey of the affected counties, towns, townships, villages and groups of villagers... 21 4.1.3 Sample survey of affected households ..................................................................................... 43 4.2 MONITORING OF INFRASTRUCTURE RESTORATION .................................................................. 44 4.3 MONITORING OF THE RESTORATION OF TEMPORARY LAND REQUISITION ............................... 44 5. MONITORING OF RESETTLEMENT AGENCY ................................................................... 45 5.1 GENERAL MONITORING OF THE RESETTLEMENT AGENCY ........................................................ 45 5.2 MONITORING OF THE OWNER’S RESETTLEMENT AGENCY ....................................................... 45 5.3 MONITORING OF RESETTLEMENT AGENCY OF THE LOCAL GOVERNMENT ................................ 46 5.4 MEASURES TO STRENGTHEN THE CAPACITY OF THE DEPARTMENT ........................................... 46 6. MONITORING OF THE IMPLEMENTATION OF THE RESETTLEMENT PLAN .......... 47 6.1 MONITORING OF IMPLEMENTATION PROCEDURE ..................................................................... 47 6.2 MONITORING OF PROCESSING PLANNING ................................................................................. 49 6.3 MONITORING OF FUND APPROPRIATION ................................................................................... 49 6.3.1 Monitoring of allocation rules ................................................................................................ 49 6.3.2 The department responsible for the financial resettlement...................................................... 50 6.3.3 Monitoring of financial circulation ......................................................................................... 50 7. PUBLIC PARTICIPATION AND CHANNEL TO COMPLAIN .............................................. 50 7.1 PUBLIC PARTICIPATION ............................................................................................................. 50 RIFCIU- SWJTU i ABD Loan Project (2181-PRC) Evaluation Report on External Monitoring of Resettlement for Central Sichuan Roads Development Project 7.2 CHANNEL TO COMPLAIN .......................................................................................................... 52 8. CONCLUSION, PROBLEMS AND PROPOSAL ..................................................................... 53 8.1 CONCLUSION OF THE MONITORING AND EVALUATION ............................................................. 53 8.2 PROBLEMS AND PROPOSAL ...................................................................................................... 55 8.3 ARRANGEMENT FOR THE NEXT PHASE ..................................................................................... 55 9. ATTACHMENTS .......................................................................................................................... 57 ATTCHMENT1: LIST OF THE MAIN INTERVIEW PERSONNEL OF MONITORING GROUP (FARMERS NOT INCLUDED) 57 ATTCHMENT2 BASIC SITUATION OF THE SAMPLE INVESTIGATION HOUSEHOLD ........................... 61 ATTCHMENT3 BASIC SITUATION OF SAMPLE IN THE AFFECTED VILLAGES ................................... 68 ATTCHMENT4 NEW COMPENSATION STANDARD FOR DEMOLISHMENT IN SHIMIAN COUNTY ....... 71 RIFCIU- SWJTU ii ABD Loan Project (2181-PRC) Evaluation Report on External Monitoring of Resettlement for Central Sichuan Roads Development Project Preface Sichuan Yaxi Expressway Co. Ltd (hereinafter referred to as Yaxi Company), as the Owner of Central Sichuan Roads Development Project which has been evaluated by Asian Development Bank, has officially authorized Research Institute of Foreign Capital Introduction and Utilization of Southwest Jiaotong University to take charge of the external independent monitoring and evaluation. From July, 2008 to September, 2008, more than ten people from Research Institute of Foreign Capital Introduction and Utilization of Southwest Jiaotong University have gone to the site repeatedly to carry out the outdoor research. This Phase II Report on External Monitoring of Resettlement is finished based on the latest statistic data of Yaxi Company which has been analyzed and arranged. Based on the full line field investigation; overall understanding of the construction and progress of land requisition and resettlement of the Project, the compensation standards for demolishment and fund appropriation, the implementation of resettlement program; listening to the opinions and suggestions of the affected people; seriously verifying the Resettlement Arrangement Plan (RAP) and comparing the changes of the affected people’s production and living level before and after the resettlement, the Monitoring Group has already made an objective and impartial evaluation for the current resettlement effect of the Project. During the process of monitoring and evaluation preparation, field investigation and report preparation, Yaxi Company and resettlement agencies at different levels from Ya’an in Sichuan Province and Liangshan Yi Autonomous Prefecture have actively cooperate and given great support to the evaluation work of the external Monitoring Group. We hereby would like to sincerely thank them all. Research Institute of Foreign Capital Introduction and Utilization Southwest Jiaotong University October, 2008 RIFCIU- SWJTU 1 ABD Loan Project (2181-PRC) Evaluation Report on External Monitoring of Resettlement for Central Sichuan Roads Development Project Summary on External Monitoring of Resettlement 1 Resettlement External Monitoring Status Yaxi Company, as the Owner of Central Sichuan Roads Development Project which has been evaluated by Asian Development Bank as the construction of an
Recommended publications
  • Prevalence of and Risk Factors for Depression Among Older Persons 6 Months After the Lushan Earthquake in China: a Cross-Sectional Survey
    ORIGINAL RESEARCH published: 25 September 2020 doi: 10.3389/fpsyt.2020.00853 Prevalence of and Risk Factors for Depression Among Older Persons 6 Months After the Lushan Earthquake in China: A Cross-Sectional Survey Lan Li 1,2,3,7, Jan D. Reinhardt 3,4,5, Andrew Pennycott 6, Ying Li 7,8 and Qian Chen 7,8* 1 West China School of Nursing/West China Hospital, Sichuan University, Chengdu, China, 2 School of Nursing, Southwest Medical University, Luzhou, China, 3 The Hong Kong Polytechnic University Institute for Disaster Management and Reconstruction, Sichuan University, Chengdu, China, 4 Swiss Paraplegic Research, Nottwil, Switzerland, 5 Department of Health Sciences and Health Policy, University of Lucerne, Lucerne, Switzerland, 6 Sensory-Motor Systems Lab, Department of Health Science and Technology ETH Zürich, Zürich, Switzerland, 7 The Center of Gerontology and Geriatrics, West China Hospital, Sichuan University, Chengdu, China, 8 National Clinical Research Center of Geriatrics, West China Hospital, Sichuan University, Chengdu, China Edited by: Background: Older persons are particularly vulnerable to the impact of earthquakes and Francesca Assogna, Santa Lucia Foundation (IRCCS), Italy are more likely to suffer from depression. Reviewed by: Objectives: We aimed to estimate the prevalence of depression, to compare the Valentina Ciullo, prevalence between disaster-affected and non-disaster affected areas, and to explore Santa Lucia Foundation (IRCCS), Italy Clelia Pellicano, additional risk factors for depression 6 months after the Lushan earthquake. Santa Lucia Foundation (IRCCS), Italy Design: Delfina Janiri, A cross-sectional study was conducted. Sapienza University of Rome, Italy Setting: A magnitude 7.0 earthquake occurred in Lushan County, Ya’an Prefecture, *Correspondence: Sichuan Province, on April 20, 2013.
    [Show full text]
  • A Case Study of the Sichuan-Tibet Scenic Byway
    CONVERTER MAGAZINE Volume 2021, No. 5 Study on the Influence of Road Network on the Spatial Distribution of Tourism Resources – A Case Study of the Sichuan-Tibet Scenic Byway Bo Zhang1,2, Boming Tang1, Liangyu Zhou3, Ke Huang4 1 School of Civil Engineering, Chongqing Jiaotong University, Chongqing, China 2 School of Art Design, Chongqing Jiaotong University, Chongqing, China 3 School of Traffic & Transportation, Chongqing Jiaotong University, Chongqing, China 4 College of Architecture and Urban Planning, Chongqing Jiaotong University, Chongqing, China Abstract Objectives: The Sichuan-Tibet Scenic Byway is one of the most well-known scenic byway in China. Researching on the mechanism of action between the routes and tourism resources nodes of the Sichuan-Tibet Scenic Byway network, will benefit the Sichuan-Tibet Scenic Byway’s development by changing the development patterns of the Scenic Byway from “point-line” to network, and will be helpful to promote the integration of tourism resources along the route, furthermore to construct the Sichuan-Tibet Scenic Byway as a destination of all-for-one tourism. Methods: Based on the spatial design network analysis (sDNA model), GIS spatial analysis and other methods, the current study analyzed regional tourism resources and the spatial characteristics of road network morphology along the Sichuan-Tibet Scenic Byway, and explored the influence of road network forms on the spatial distribution of tourism resources and its spatial spillover effect by combining with spatial econometric model. Results: The distribution pattern of tourism resources along the Sichuan-Tibet Scenic Road is “dense at both ends and sparse in the middle”, and the “Matthew Effect” is significant.
    [Show full text]
  • Post-Wenchuan Earthquake Rural Reconstruction and Recovery in Sichuan China
    POST-WENCHUAN EARTHQUAKE RURAL RECONSTRUCTION AND RECOVERY IN SICHUAN CHINA: MEMORY, CIVIC PARTICIPATION AND GOVERNMENT INTERVENTION by Haorui Wu B.Eng., Sichuan University, 2006 M.Eng., Sichuan University, 2009 A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY in THE FACULTY OF GRADUATE AND POSTDOCTORAL STUDIES (Interdisciplinary Studies) THE UNIVERSITY OF BRITISH COLUMBIA (Vancouver) September 2014 ©Haorui Wu, 2014 Abstract On May 12, 2008, an earthquake of a magnitude of 7.9 struck Wenchuan County, Sichuan Province, China, which affected 45.5 million people, causing over 15 million people to be evacuated from their homes and leaving more than five million homeless. From an interdisciplinary lens, interrogating the many interrelated elements of recovery, this dissertation examines the post-Wenchuan earthquake reconstruction and recovery. It explores questions about sense of home, civic participation and reconstruction primarily based on the phenomenon of the survivors of the Wenchuan Earthquake losing their sense of home after their post-disaster relocation and reconstruction. The following three aspects of the reconstruction are examined: 1) the influence of local residents’ previous memories of their original hometown on their relocation and the reconstruction of their social worlds and lives, 2) the civic participation that took place throughout the post-disaster reconstruction, 3) the government interventions overseeing and facilitating the entire post-disaster reconstruction. Based on fieldwork, archival and document research, memory workshops and walk-along interviews, a qualitative study was conducted with the aim of examining the earthquake survivors’ general memories of daily life and specific memories of utilizing space in their original hometown.
    [Show full text]
  • CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in Effect As Of: 28 July 2006
    PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS A. General description of project activity B. Application of a baseline and monitoring methodology C. Duration of the project activity / crediting period D. Environmental impacts E. Stakeholders‟ comments Annexes Annex 1: Contact information on participants in the project activity Annex 2: Information regarding public funding Annex 3: Baseline information Annex 4: Monitoring plan PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 2 SECTION A. General description of project activity A.1. Title of the project activity: Project title: Sichuan Dechang Xinma 120 MW Hydropower project PDD Version: 1.0 Completion date PDD: 11/08/2009 A.2. Description of the project activity: The Sichuan Dechang Xinma 120 MW Hydropower project (hereafter referred to „ the project „ or „project‟) involves the construction of a run-of-river hydropower station at the main stream of the Anning River at Meizi Village, Dechang county of Sichuan Province, China, which is constructed and operated by Dechang Xinma Hydropower development Co., Ltd. The dam locates 40 km from Dechang County, The total installed capacity of the project will be 120MW and the total surface area of the reservoir at full capacity is 374,000m2 and the power density of the project is 320 W/m2. The expected annual effective operating hour is 4,086 hours and annual power generation is about 573,960MWh. The expected annual power supply is 544,000 MWh.
    [Show full text]
  • Report on Domestic Animal Genetic Resources in China
    Country Report for the Preparation of the First Report on the State of the World’s Animal Genetic Resources Report on Domestic Animal Genetic Resources in China June 2003 Beijing CONTENTS Executive Summary Biological diversity is the basis for the existence and development of human society and has aroused the increasing great attention of international society. In June 1992, more than 150 countries including China had jointly signed the "Pact of Biological Diversity". Domestic animal genetic resources are an important component of biological diversity, precious resources formed through long-term evolution, and also the closest and most direct part of relation with human beings. Therefore, in order to realize a sustainable, stable and high-efficient animal production, it is of great significance to meet even higher demand for animal and poultry product varieties and quality by human society, strengthen conservation, and effective, rational and sustainable utilization of animal and poultry genetic resources. The "Report on Domestic Animal Genetic Resources in China" (hereinafter referred to as the "Report") was compiled in accordance with the requirements of the "World Status of Animal Genetic Resource " compiled by the FAO. The Ministry of Agriculture" (MOA) has attached great importance to the compilation of the Report, organized nearly 20 experts from administrative, technical extension, research institutes and universities to participate in the compilation team. In 1999, the first meeting of the compilation staff members had been held in the National Animal Husbandry and Veterinary Service, discussed on the compilation outline and division of labor in the Report compilation, and smoothly fulfilled the tasks to each of the compilers.
    [Show full text]
  • Central Sichuan Roads Development Project
    Completion Report Project Number: 34174 Loan Number: 2181 June 2014 People’s Republic of China: Central Sichuan Roads Development Project This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS Currency Unit – yuan (CNY) At Appraisal At Project Completion (31 August 2005) (6 February 2013) CNY1.00 = $0.1208 $0.1605 $1.00 = CNY8.2770 CNY6.2287 ABBREVIATIONS ADB – Asian Development Bank EIA – environmental impact assessment EIRR – economic internal rate of return FIRR – financial internal rate of return GDP – gross domestic product O&M – operation and maintenance PRC – People’s Republic of China SPTD – Sichuan Provincial Transport Department SYECL – Sichuan Yaxi Expressway Company Limited WACC – weighted average cost of capital WEIGHTS AND MEASURES km – kilometer m2 – square meter mu – Chinese unit of measurement (1 mu = 666.67 m2) NOTE In this report, ―$‖ refers to US dollars, unless otherwise stated. Vice-President S. Groff, Operations 2 Director General A. Konishi, East Asia Department (EARD) Director H. Sharif, Resident Mission in the People’s Republic of China, EARD Team leader W. Zhang, Senior Project Officer, EARD Team members Z. Niu, Senior Project Officer (Environment), EARD F. Wang, Senior Project Officer (Financial Management), EARD H. Xia, Project Analyst, EARD W. Zhu, Senior Project Officer (Resettlement), EARD In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Research on the Influencing Factors of the Construction of Tourism and Leisure Characteristic Towns in Sichuan Province Under Th
    2021 International Conference on Education, Humanity and Language, Art (EHLA 2021) ISBN: 978-1-60595-137-9 Research on the Influencing Factors of the Construction of Tourism and Leisure Characteristic Towns in Sichuan Province under the Background of New Urbanization Yi-ping WANG1,a,* and Xian-li ZHANG2,b 1,2School of Business, Southwest Jiaotong University Hope College, Chengdu, Sichuan, China [email protected], [email protected] *Corresponding author Keywords: Tourism and leisure characteristic towns, Influencing factors, New urbanization. Abstract. Promoting the construction of characteristic towns under the background of new urbanization is an important way for my country to break the bottleneck of economic development and realize economic transformation and upgrading. In recent years, although the construction of characteristic towns in Sichuan Province has achieved remarkable results and a large number, especially tourist and leisure characteristic towns accounted for the largest proportion, they still face urgent problems such as avoiding redundant construction, achieving scientific development, and overall planning. This study takes 20 cultural tourism characteristic towns selected by the first batch of Sichuan Province as the research object, combined with field research and tourist questionnaire surveys, and screened out relevant influencing factors of characteristic towns from different aspects such as transportation, economy, industry, ecology, historical and cultural heritage. Analyze the correlation with the development level of characteristic towns in order to find out the key factors affecting the development of characteristic towns of this type, provide a policy basis for the scientific development and overall planning of reserve characteristic towns in our province, and contribute to the construction of new urbanization And provide advice and suggestions on the development of tourism industry in our province.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Earthquake Phenomenology from the Field the April 20, 2013, Lushan Earthquake Springerbriefs in Earth Sciences
    SPRINGER BRIEFS IN EARTH SCIENCES Zhongliang Wu Changsheng Jiang Xiaojun Li Guangjun Li Zhifeng Ding Earthquake Phenomenology from the Field The April 20, 2013, Lushan Earthquake SpringerBriefs in Earth Sciences For further volumes: http://www.springer.com/series/8897 Zhongliang Wu · Changsheng Jiang · Xiaojun Li Guangjun Li · Zhifeng Ding Earthquake Phenomenology from the Field The April 20, 2013, Lushan Earthquake 1 3 Zhongliang Wu Guangjun Li Changsheng Jiang Earthquake Administration of Sichuan Xiaojun Li Province Zhifeng Ding Chengdu China Earthquake Administration China Institute of Geophysics Beijing China ISSN 2191-5369 ISSN 2191-5377 (electronic) ISBN 978-981-4585-13-2 ISBN 978-981-4585-15-6 (eBook) DOI 10.1007/978-981-4585-15-6 Springer Singapore Heidelberg New York Dordrecht London Library of Congress Control Number: 2014939941 © The Author(s) 2014 This work is subject to copyright. All rights are reserved by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. Exempted from this legal reservation are brief excerpts in connection with reviews or scholarly analysis or material supplied specifically for the purpose of being entered and executed on a computer system, for exclusive use by the purchaser of the work. Duplication of this publication or parts thereof is permitted only under the provisions of the Copyright Law of the Publisher’s location, in its current version, and permission for use must always be obtained from Springer.
    [Show full text]
  • Sichuan Earthquake
    SICHUAN EARTHQUAKE THREE YEAR REPORT MAY 2011 Overview TABLE OF 5 CONTENTS 2008–2011 Key Results 8 Maps 11 Health and Nutrition 13 Water, Sanitation and Hygiene 25 Education 37 Child Protection 57 HIV/AIDS 67 Social Policy 73 Financial Report 76 Conclusion 81 COVER PHOTO: Students at the newly-constructed Yongchang Primary 2 - SICHUAN EARTHQUAKE School in Sichuan Province’s Beichuan County play basketball during recess. Young children in the playground of the newly constructed Anchang Kindergarten in Sichuan Province’s Beichuan County. THREE YEAR REPORT - 3 The first tranche of UNICEF’s emergency relief items contained 86 tonnes of health and nutritional supplies for children and pregnant women. 4 - SICHUAN EARTHQUAKE OVERVIEW Three years ago, on 12 May 2008, the most devastating natural disaster in China in decades struck the country’s southwestern Sichuan Province. The 8.0-magnitude earthquake affected the lives of millions of people, killing 88,000, injuring 400,000 and leaving 5 million homeless. Immediately after the earthquake, the Government of China led a remarkable disaster response and relief programme. Today, life in the Rebirth, reconstruction affected communities has resumed. Rebirth, reconstruction and renewed hope have come to replace the death, destruction and despair of the and renewed hope earthquake. On this third anniversary, UNICEF remembers what was lost have come to replace three years ago, celebrates what has been achieved since, and reaffirms the death, destruction our commitment to children and women in the Sichuan earthquake zone. and despair of the The magnitude of the earthquake triggered, for the first time in recent earthquake.
    [Show full text]
  • Crustal Stress State and Seismic Hazard Along Southwest Segment of the Longmenshan Thrust Belt After Wenchuan Earthquake
    Journal of Earth Science, Vol. 25, No. 4, p. 676–688, August 2014 ISSN 1674-487X Printed in China DOI: 10.1007/s12583-014-0457-z Crustal Stress State and Seismic Hazard along Southwest Segment of the Longmenshan Thrust Belt after Wenchuan Earthquake Xianghui Qin*, Chengxuan Tan, Qunce Chen, Manlu Wu, Chengjun Feng Institute of Geomechanics, Chinese Academy of Geological Sciences, Beijing 100081, China; Key Laboratory of Neotectonic Movement & Geohazard, Ministry of Land and Resources, Beijing 100081, China ABSTRACT: The crustal stress and seismic hazard estimation along the southwest segment of the Longmenshan thrust belt after the Wenchuan Earthquake was conducted by hydraulic fracturing for in-situ stress measurements in four boreholes at the Ridi, Wasigou, Dahegou, and Baoxing sites in 2003, 2008, and 2010. The data reveals relatively high crustal stresses in the Kangding region (Ridi, Wasigou, and Dahegou sites) before and after the Wenchuan Earthquake, while the stresses were relatively low in the short time after the earthquake. The crustal stress in the southwest of the Longmenshan thrust belt, especially in the Kangding region, may not have been totally released during the earthquake, and has since increased. Furthermore, the Coulomb failure criterion and Byerlee’s law are adopted to analyzed in-situ stress data and its implications for fault activity along the southwest segment. The magnitudes of in-situ stresses are still close to or exceed the expected lower bound for fault activity, revealing that the studied region is likely to be active in the future. From the conclusions drawn from our and other methods, the southwest segment of the Longmenshan thrust belt, especially the Baoxing region, may present a future seismic hazard.
    [Show full text]
  • Phytoremediation of Cadmium Using Plant Species of Athyrium Wardii (Hook.)
    Int. J. Environ. Sci. Technol. (2014) 11:757–764 DOI 10.1007/s13762-013-0384-z ORIGINAL PAPER Phytoremediation of cadmium using plant species of Athyrium wardii (Hook.) S. J. Zhang • T. X. Li • H. G. Huang • X. Z. Zhang • H. Y. Yu • Z. C. Zheng • Y. D. Wang • T. J. Zou • X. Q. Hao • Y. Pu Received: 1 October 2011 / Revised: 24 April 2012 / Accepted: 28 February 2013 / Published online: 22 October 2013 Ó Islamic Azad University (IAU) 2013 Abstract Athyrium wardii (Hook.) is a promising her- concentrations. Meanwhile, Cd taken up by the plant baceous plant species for phytostabilization of cadmium existed in different chemical forms. Results showed that (Cd)-contaminated sites with large biomass and fast growth the majority of Cd in plant was in undissolved Cd–phos- rate. However, little information is available on its toler- phate complexes (extracted by 2 % CH3COOH), followed ance mechanisms toward Cd. To further understand the by water-soluble Cd–organic acid complexes, Cd(H2PO4)2, mechanisms involved in Cd migration, accumulation and pectates and protein form (extracted by deionized water detoxification, the present study investigated subcellular and 1 M NaCl), whereas only small amount of Cd in roots distribution and chemical forms of Cd in the mining eco- was in inorganic form (extracted by 80 % ethanol), which types and corresponding non-mining ecotypes of A. wardii suggests low capacity to be transported to aboveground via greenhouse pot experiment. Subcellular fractionation of tissues. It could be suggested that Cd integrated with Cd-containing tissues demonstrated that the majority of the undissolved Cd–phosphate complexes in cell wall or element was mainly located in soluble fraction in cell compartmentalization in vacuole might be responsible for walls.
    [Show full text]