Moscow Central Diameters
Total Page:16
File Type:pdf, Size:1020Kb
About the Company Strategic report Performance overview Moscow Central Diameters For us, Moscow Central Diameters and Moscow Central Circle are flagship projects making our cities and towns more comfortable. “ Looking at Moscow’s example, we see that railways can be a central part of transportation systems serving large metropolitan areas – the one offering comfort and speed to passengers.” Oleg Belozerov CEO, Chairman of the Management Board Integrated Free transfers New Operating hours: ticket offering between MCC infrastructure: from 5:30 AM for city and the Moscow continuous to 1:00 AM and suburban Metro during welded rails without breaks routes a 90-minute ride for a smooth ride Travel intervals Troika New New railway platforms: 5–6 minutes card comfortable • barrier-free environment during payments Ivolga 2.0 • lifts and escalators 1 peak hours trains • vending machines • free Wi-Fi • charging ports for mobile devices • information boards • panic buttons • heated pedestrian crossings and ticket office areas Improved transport availability2 for 9.6 70 17 m people districts towns of Moscow in the Moscow Region For more details see the Passenger Transportation section 1. For mixed operations. 2. After the launch of all five MCDs. 14 Russian Railways Sustainable development Corporate governance Appendices To Kimry To Yaroslavl To Tver Lobnya D3 D1 D5 Pushkino Zelenograd Skhodnya Khimki Mytishchi To Rzhev To Vladimir and Nizhny Novgorod D2 Rizhsky Krasnogorsk Savelovsky Zheleznodorozhny Nakhabino Yaroslavsky/ Belorussky Leningradsky/Kazansky D4 Kursky Odintsovo Reutov Kievsky Paveletsky Lyubertsy D1 To Smolensk Zhukovsky D3 Ramenskoye Solnechnaya transport interchange hub To Ryazan Aprelevka D4 Metro Podolsk Circle Line To Kiev D2 Big Circle Line D5 Moscow Central Circle Domodedovo Moscow To Serpukhov Ring Road To Kashira Railway stations Launched D1 Belorussko- D2 Kursko- Yaroslavsko- in 2019: Savelovsky Rizhsky D5 Paveletsky3 3. In 2020, the Company is planning To be launched Leningradsko- Kievsko- to develop basic design solutions D3 D4 for MCD 5 and subsequently review by 2025: Kazansky Gorkovsky the expediency of enabling commuter trains to run the radial routes to Moscow’s key railway stations. Annual report 2019 15.