The POMA Minimetro® in Cairo Press Release - the POMA Minimetro® in Cairo 2|3

Total Page:16

File Type:pdf, Size:1020Kb

The POMA Minimetro® in Cairo Press Release - the POMA Minimetro® in Cairo 2|3 Press release The POMa MiniMeTrO® in CairO Press release - The POMa MiniMeTrO® in CairO 2|3 hubert Jean Magnon-Pujo souchal hassan Chief executive POMa Chairman rashed Officer for egis rail of the Board Chairman of ehCaan Working on the first MiniMetro® in the Middle East and Egypt, the cradle of civilisation, with its exceptionally Cairo International Airport is one of the most dynamic Africa has been as much a source of pride, as it has rich history and architecture, is a mix of modernity airports in Africa, enjoying a privileged geographic been an honour for Egis Rail, the urban and railway and tradition. This country is open to the world and location at the crossroads of Europe, Africa, and the engineering branch of Egis. Through this engineering has always been an important transit hub for trade. Middle East. contract, Egis Rail had the privilege of working closely We at POMA, as well as our partners, are proud to Aware of this competitive advantage, Cairo Airport with the client, from the start of the project. We have have built this MiniMetro® and to have participated Company (CAC) and Egyptian Holding Company for had the opportunity to accompany and advise the client in the development of Cairo International Airport Airports and Air Navigation (EHCAAN) have spent the throughout the project process. with such innovative and durable equipment — the last few years implementing a development strategy First, Egis Rail undertook the feasibility studies, first of its kind in the Middle East and Africa. Our which aims to significantly enhance the travelling conceptual design, and the preliminary design followed teams of engineers and technicians imagined and experience for passengers using Cairo International by the tendering phase for the Design Build and Operate designed an installation that is dedicated to public Airport, providing them with high quality facilities contract that was awarded to POMA. transportation, providing one-of-a-kind comfort throughout their journey. Egis Rail was then asked to supervise the “turnkey” and silence, thanks particularly to Air Levitation The MiniMetro® project built by POMA is the cornerstone part of the MiniMetro® project. Egis Rail relies on the technology, with the carriers gliding on a cushion of in CAC’s strategy — propelling Cairo International Airport Egyptian engineering company NECB for civil works air. From building to commissioning the Cairo Airport into the very exclusive circle of the most advanced construction. All aspects of the construction were MiniMetro®, POMA Group teams illustrated with brio airports in the world. By connecting the different airport monitored, from supervising the construction of the their professional ethics, availability and reliability facilities, the MiniMetro® provides users with integrated foundations to the close follow-up and monitoring of in all circumstances in order to bring this project to services for parking, travel, transit, shopping, and the transit system tests. Throughout this second phase, fruition. And our mission at Cairo International Airport accommodation — making the airport a regional hub. human and social interactions between the client (Cairo continues since POMA is now ensuring the operation The MiniMetro® solution was chosen for its Air Levitation Airport Company), the engineer (Egis Rail) and the and maintenance of the MiniMetro® with qualified, technology since it provides Cairo International Airport Contractor (POMA) were the key to the success of this local teams whose trustworthiness and motivation I with the quality, availability, reliability, and high-tech MiniMetro® project. wish to commend. Together with the French company image required by the upscale position of the airport. Egis Rail, representing our Egyptian client, we were able Completing this MiniMetro® project in an effervescent egis — a subsidiary 75% owned by the Caisse des Dépôts and 25% by to combine our individual skills and expertise to make context of political transition was a challenge that the iosis Partenaires (“partner” executive and employee shareholding) French engineering a strong example of success. On CAC, POMA and their partners met brilliantly. — is an engineering and consulting group working in the fields behalf of everyone at the POMA Group, I wish to thank of transport, urban development, construction, industry, water, environment, and energy. in the road and airport sectors, the group our Egyptian friends for entrusting us with this project is also involved in project financing, turnkey-contract projects, and assure them of our commitment to this partnership and facility operations. With 12,000 employees, including 7,400 in for the years to come. engineering alone, and a turnover of €858 million in 2011, the group is present in over 100 countries and has around 50 offices all over France. Press release - The POMa MiniMeTrO® in CairO 4|5 POMa – CairO – eGYPT On May 15, 2012, a first in the Middle East: the MiniMetro® March 2009 with the Egyptian Civil Aviation Ministry for at Cairo International Airport in Egypt, built by POMA, a total of 75 million Euros. The contract also includes opened to travellers. Cairo International Airport, five years of maintenance and operation services. In second largest African airport behind Johannesburg May 2012, after two years of work, POMA delivered an (South Africa), has a capacity of 22 million passengers innovative MiniMetro® that is at the heart of the Egyptian A single track that doubles in the crossing zone. (estimation for 2013 ) and is now equipped with an airport’s extensive development strategy. This strategy Automatic People Mover (APM1) comprised of two includes renovating and extending the second airport innovative, 170-passenger trains, which connect two terminal (TB2), adapting installations for the Airbus terminals, the carpark and shopping centre, and transport A380 and increasing the capacity of the cargo hub. Cairo Cutting-edge technology: 8.5 million passengers per year. International Airport is strategically located between This POMA innovation is indeed remarkable given that it Asia and Africa — on the road between the Mediterranean air cushioned carriers uses Air Levitation technology. This process brings genuine Basin, India and China. Reinforcing the airport’s capacity innovation to the world of ropeway transportation. Speed, means opening the way to greater economic development. (air levitation) silence, comfort and availability combined with methods The MiniMetro® illustrates ground-breaking expertise in The MiniMetro® by POMA revolutionises the world of transportation that respect the environment, all meet the specifications smooth mobility, created by POMA. thanks to air cushioned carrier technology (Air Levitation). This of this MiniMetro® innovative system has proven to be one of the best solutions in The MiniMetro® construction contract was signed in 1 APM: The APM is an entirely automated, driverless shuttle. The Cairo APM shuttles are hauled by ropes. sustainable mobility. Little noise, few vibrations, and no bearing noise ensure optimal comfort for passengers. This technology enables the carrier to glide along the track with almost no friction — reducing energy Technical data consumption during the trip. • 1.8 km between terminals T1 and T2/T3, with stops A single track that doubles in the shopping centre and carparks. in the crossing zone • One-way travel time: less than 5 minutes environment • Transport capacity: 2,000 passengers per hour The MiniMetro® by POMA is firmly established in the era of sustainable development. and per direction. This is a ropeway transport system, where each carrier is equipped with a drive unit installed • Carrier frequency: every 5 minutes. on the ground. The absence of on-board motors considerably reduces the weight of carriers to • Two 170-passenger shuttles hauled by ropes be hauled. This system, together with the absence of friction of carriers gliding on air cushions, • Air cushioned carriers (Air Levitation) globally reduces energy requirements during operation. • Compartmentalised carriers to separate passengers All other sources of pollution (dust due to wear, smoke and any other nuisance) are also in transit from those who aren’t. eliminated. • Speed: 13.5 m/s, 50 km/h Press release - The POMa MiniMeTrO® in CairO 6|7 Operation and maintenance Cairo International Airport has contracted POMA to operate and maintain the MiniMetro® for 5 years. Operation and maintenance service is organised to ensure operation 18 hours a day, every day of the year. A Franco-Egyptian POMA team of 20 people is permanently appointed to the installation. Two French POMA employees live in Cairo and supervise the team. air cushion technology an efficient, innovative, and safe procedure. Each train produces a thin cushion of air on which it glides. function, each train is equipped with three fans when The air is produced by fans installed in each carrier frame. only two are required for operation. If one of the air Thus, the carrier hovers over the flying surface — a smooth cushions should fail to function, the airflow would be surface, usually made of concrete. The absence of contact automatically regulated and operation would be ensured when hovering offers exceptional comfort with no vibrations until maintenance became possible. If emergency braking is and greatly increases the lifespan of the gliding surfaces. triggered, the air cushion function is bypassed and the train Easy to access, carrier and equipment maintenance is settles onto lateral
Recommended publications
  • Urban Aerial Cable Cars As Mass Transit Systems Case Studies, Technical Specifications, and Business Models
    Urban Aerial Public Disclosure Authorized Cable Cars as Mass Transit Systems Case studies, technical specifications, and business models Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Copyright © 2020 by the International Bank for Reconstruction and Development / The World Bank, Latin America and Caribbean region 1818H Street, N.W. Washington DC 20433, U.S.A. www.worldbank.org All rights reserved This report is a product of consultant reports commissioned by the World Bank. The findings presented in this document are This work is available under the Creative based on official sources of information, interviews, data, and Commons Attribution 4.0 IGO license previous studies provided by the client and on the expertise of (CC BY 4.0 IGO). the consultant. The information contained here has been compiled from historical records, and any projections based Under the Creative Commons thereon may change as a function of inherent market risks and Attribution license, you are free to copy, uncertainties. The estimates presented in this document may distribute, transmit, and adapt this therefore diverge from actual outcomes as a consequence of work, including for commercial future events that cannot be foreseen or controlled, including, purposes, under the following but not limited to, adverse environmental, economic, political, or conditions: Attribution—Please cite the market impacts. work as follows: World Bank Group. Urban Aerial Cable Cars as Mass Transit The World Bank does not guarantee the accuracy of the data Systems. Case studies, technical included in this report and accepts no responsibility whatsoever specifications, and business models. for any consequence of their use or interpretation.
    [Show full text]
  • Ropeway People Movers for Ski Resorts
    Ropeway People Movers for Ski Resorts by Andrew S. Jakes* Abstract Las Vegas, Reno, Sun City, Foxwoods, Tunica, Broad Beach, and several other international mega-resorts, have discovered that People Movers (Automated Guideway Transit) improve their image and subsequently attract new customers. In addition to presenting the rope-propelled People Mover technologies, this paper reviews how specific installations have solved visitor circulation needs in many hotel resort complexes in Las Vegas and elsewhere. This approach can be duplicated to many ski resorts worldwide since the level of ridership in Las Vegas frequently exceeds levels typically found on ski resort shuttle bus systems worldwide. We particularly focus on existing, proven technologies and specific installations, including ropeway Horizontal Elevators (Mandalay Bay, Mirage, Primadonna, and Circus-Circus Automated People Mover installations). People Mover systems represent major changes and advances in equipment, facilities, operations, and services in comparison with conventional rail, bus, taxi, and other street modes. System performance and capacities can be tailored to match expected loads and a broad range of performance and operational requirements. Suppliers usually claim, with justification, that they can adapt their product to buyer's specific needs. Vehicle size can be expanded or reduced. Seats can be added or removed from vehicles. Various grades and curves can be accommodated by altering guideway design and speeds. Riding the circulation People Mover system can be as convenient, safe and comfortable as riding a modern elevator. Stations can be sufficiently numerous to provide development-wide access. Passengers experience little or no waiting for vehicles. The operation can be environmentally friendly with no emissions, very little noise and minimum visual impacts.
    [Show full text]
  • Press Kit 2017 English Version
    poma.net Press Kit 2017 English Version Press contact: Alexandre Bérard - Tel.: +33 (0)4 76 12 01 33 - Mobile: +33 (0)6 08 61 36 97 - [email protected] Contents The POMA Group ............................................................................................................ 3 A word from the President ...................................................................... 4 International presence ...................................................................................... 5 Business sectors and expertise ................................................... 6 R&D/Innovation ................................................................................................................. 9 Current projects .............................................................................................................11 Some of our installations .........................................................................16 Press Kit Press Press contact: Alexandre Bérard - Tel.: +33 (0)4 76 12 01 33 Mobile: +33 (0)6 08 61 36 97 - [email protected] 2 The POMA Group POMA — based in Voreppe, near the city of Grenoble, in France — has become a major player in cable transportation. Present all over the globe for over 80 years, we have innovated and demonstrated our expertise in the snow, tourism, science, industrial and urban transportation sectors. The POMA Group boasts several production subsidiaries located in the Rhône-Alpes region of France, as well as several commercial subsidiaries in China, the USA, Switzerland,
    [Show full text]
  • Notified Body : Nr 1267 STRMTG Service Technique Des Remontées
    Notified body : Nr 1267 Certificates STRMTG EU design examination certificate (module H1 §3.6) Date : 20/04/2021 Service Technique des Remontées Mécaniques et des Transports Guidés EU-type examination certificate (module B) 1461 rue de la piscine Certificate of conformity (module G) 38400 St Martin d'Hères Certificate of EU type conformity (module F) Original language : EN FRANCE Tél : 33 (0)4 76 63 78 78 e-mail : [email protected] Regulation (EU) 2016/424 of the European Parliament Page 1/25 Web site : http://www.strmtg.developpement-durable.gouv.fr/ and the Council of 9 March 2016 on cableway installations - NB CSG Certificate Deadline refused, suspended and Revision Module Type of product Designation of the [product] Manufacturer Issue date withdrawal Technical annex Index Issue date number date otherwise restricted Certificate at the 1501 0 H1 § 3.6 Subsystem Subsystem 1 « Cables and cable connections » REDAELLI 03/07/2018 S.O end of validity on SS1 5 03/07/2018 21/04/2020 H1 § 3.6 Certificate at the 1 26/10/2018 1502 0 Subsystem Cable and cable connection ARCELOR 26/10/2018 S.O end of validity on M13-IN0032-FR H1 § 3.6 21/04/2020 2 20/06/2019 Certificate at the 1503 0 H1 § 3.6 Safety component MOTORGAMES GAMESYSTEM 21/06/2018 S.O end of validity on MOTORGAMES A 21/06/2018 21/04/2020 Certificate at the DIAMOND ambulance cabin - C12D210 1504 0 H1 § 3.6 Safety component SIGMA 22/06/2018 S.O end of validity on D10210014 00 22/06/2018 Emerging posts - (Floor/ceiling height: 2100mm) 21/04/2020 JACQUARD 0 H1 § 3.6 Safety
    [Show full text]
  • SUMMIT COUNTY BOARD of COUNTY COMMISSIONERS 1ST AMENDED REGULAR MEETING AGENDA Tuesday, March 12, 2019, 1:30 P.M
    SUMMIT COUNTY BOARD OF COUNTY COMMISSIONERS 1ST AMENDED REGULAR MEETING AGENDA Tuesday, March 12, 2019, 1:30 p.m. County Commissioners’ Meeting Room; Summit County Courthouse 208 Lincoln Avenue, Breckenridge, Colorado For assistance or questions regarding special accommodations, accessibility, or available audio/visual equipment, please contact 970-453-3429 as soon as possible. I. CALL TO ORDER II. ROLL CALL III. APPROVAL OF AGENDA IV. CITIZEN COMMENT V. PROCLAMATIONS & ANNOUNCEMENTS A. Resolution Proclaiming The Period From 8:30 P.m. To 9:30 P.m. On Saturday, March 30, 2019 As Earth Hour Documents: PROCA - EARTH HR 2019-XX RESO.PDF B. Resolution In Honor And Recognition Of Dan Gibbs's Service And Contribution To Summit County, Colorado Documents: PROCB - DRAFT RECOGNITION RESOLUTION - DAN GIBBS.PDF VI. CONSENT AGENDA A. Approval Of Minutes From The 2-26-19 Meeting Documents: CONSENT A - 022619 REG MIN.PDF B. Warrant Lists Of 2-16-19 To 2-28-19 (Finance) Documents: CONSENT B - WARRANT LISTS OF FEBRUARY 16 - 28.PDF C. Liquor License Renewal For Powdr-Copper Mountain LLC Dba COPPER MOUNTAIN RESORT; Resort Complex; Jay Edwards; Located At 209 Ten Mile Circle, Copper Mountain, CO 80443 (Clerk) Documents: CONSENT C - COPPER MOUNTAIN RESORT RENEWAL MATERIALS_REDACTED.PDF D. Seeding Of The Joint Upper Blue TDR Bank With 2.00 Units Of Density From Open Space Tracts A, B, C, Golden Edge Subdivision And Jumbo Mill Site MS# 4252 Located In T6-R77W-S20; A Total Of 40.134 Acres Zoned Backcountry (PLN19-011/Summit County) Upper Blue Basin (Planning) Documents: CONSENT D1 - PLN19-011_STAFF REPORT.PDF CONSENT D2 - PLN19-011_ATTACHMENT A_TDR DENSITY TRANS AND CCRS.PDF CONSENT D3 - PLN19-011_ATTACHMENT B_VICNITY MAP.PDF VII.
    [Show full text]
  • New Additions in Colorado Ski Country Winter 2019-20 Investment, Enhancement and Transformation Continue
    New Additions in Colorado Ski Country Winter 2019-20 Investment, Enhancement and Transformation Continue Colorado Ski Country USA member ski areas are in the midst of a transformative period of investment over the last two years. Since 2018, Colorado ski areas small, medium and large have added 11 new chairlifts to whisk skiers and riders up the mountain more quickly and efficiently, four new lodging offerings, 10 new dining options and other facility and program upgrades. New Lifts and New Terrain • Cooper will have a new lift on the east-facing slopes and new terrain. The Way Back lift will serve 70 acres of new, mostly double black diamond gladed or tree skiing including 5 new runs. • Copper Mountain will welcome 273 acres of expert terrain on Tucker Mountain with the new Three Bears chairlift, which tops out at 12,421 ft. This three-person fixed grip lift will access terrain that was previously accessible via snowcat or hiking only. The lift will come complete with a ski patrol warming hut at the summit and bathrooms at the base. • Winter Park Resort’s new 6-person Sunnyside chair will replace the original 3-person fixed grip chair. The $6 million upgrade will reduce the ride time from eight minutes to under four. This will greatly reduce lift lines at this popular resort location. • Steamboat Resort is replacing the gondola after over 30 years. This will increase capacity by nearly 40 percent, reducing ride time from 12 minutes to 10 and increasing guest ease with gondola cabins flush to the ground allowing riders to walk straight on as opposed to stepping up into the cabin.
    [Show full text]
  • Copper Mountain Resort Ambassador
    COPPER MOUNTAIN RESORT AMBASSADOR A-Z REFERENCE HANDBOOK WINTER 2016-2017 11/18/2016 ~ 4/16/2017 1 COPPER MOUNTAIN RESORT AMBASSADOR A-Z REFERENCE HANDBOOK ADAPTIVE SKI PROGRAM – Copper has a number of mountain guests who enjoy snowsports with special adaptive equipment and guides. Every effort is made to include their needs on the lifts and trails. Guides are available through the Breckenridge Outdoor Education Center (BOEC). Contact them at www.boec.org. ADAPTIVE ACTION SPORTS – Located on the north side of Copper One, Adaptive Action Sports was founded by Daniel Gale and Amy Purdy Gale. It is the first adaptive snowboard and skateboard specific nonprofit organization. Adaptive Action Sports creates skateboard, snowboard and other action sport camps, events and programs for youth, young adults and wounded veterans living with permanent physical disabilities, traumatic brain injuries and post-traumatic stress disorder. More information is available at www.adacs.org. AEDs – Automatic External Defibrillators are located by Jack’s at top of escalators, West Village, Copper - Station, EDGE, Solitude, Athletic Club, PHQ, Timberline Patrol, Motel Six, the Copper Fire Department and the Copper security vehicle. ALL ACCESS PASS – A new season pass this year that unlimited access to Copper Mountain and Woodward. ALLIROO ALLEY - A fun area for kids of all ages in the trees with pictures of animal critters. Located beneath the American Flyer lift near the top. ALPINE LIFT – Copper’s easternmost front side lift that opened in 1979. Originally lifts were lettered and trails were numbered. Alpine was originally “A” lift. ALPINE LOT – Free parking lot near the Copper Mountain entrance on route 91 that has free bus service to Ten Mile Circle, East Village and West Village.
    [Show full text]
  • Poma, the Partner of Choice
    PRESS KIT 2019/2020 POMA, THE PARTNER OF CHOICE the mountains of tomorrow Winter is approaching, and it is time for poma to take stock of its lifts in the final stages of finalisation. In france, as in the rest of the world, technological biases are the reflection of trends in this sector for more efficient mountain services to meet the needs of skiers, but no longer just skiers. Following on from last season, poma is developing innovative solutions for all those who live in, visit and respect the mountains. The systems are designed to make the very most of the INNOVATING TO BENEFIT space available at stations. Ergonomics and capacity are USERS watchwords, and a calm environment is highly valued, especially when it comes to loading and unloading novice skiers and people with reduced mobility. The numbers of POMA innovates to support the development model of visitors to these redeveloped areas speak for themselves. tomorrow’s resorts, characterised by a combination of economic, urban, tourist and environmental requirements. Serving passengers from an ever-increasing variety of INNOVATING TO BENEFIT backgrounds: families, complete beginners, skiers looking for new and increasingly connected experiences – safety, OPERATORS performance and comfort are also a priority when it comes to transport expectations. Ease of operation is improving too, due to innovations that Plenty of space, sleek design, climate-controlled seats, facilitate operation, making it practically intuitive, so that silence... resorts are upgrading to the most comfortable staff can focus their attention on welcoming customers. equipment quite simply to offer their customers the best. The ease with which technicians are able to operate and Among the latest POMA carriers, the Symphony gondola maintain a ropeway, and with which operations managers is positioned on a very high-end segment, for an unrivalled are able to fully manage all their equipment is no longer a experience.
    [Show full text]
  • Metrocable in Medellin, Colombia
    The Medellin Project in Colombia Philippe Adrien Export Director Pomagalski SA Page – 13.1 Abstract: The Medellin Project in Colombia Philippe Adrien1) The municipal council of Medellin has chosen the gondola lift solution to connect the hillside district of Santo Domingo to the city's overground metro network. The MetroCable project, as it is called, is jointly funded by the city and the mass transit company, Metro Medellin. The system is an ARIANA 8-10 gondola lift from the SATELLIT range, equipped with aluminum DIAMOND gondolas made by SIGMA. The line is scheduled to run 18 hours/day, all year round. It is 2 km long, with a vertical rise of 400 meters, three sections and four terminals, including two intermediate stations, the first of which includes a 15° turn. Ground on which the lift is built calls for extremely deep anchoring for the single-shaft towers, each of which rests on four piles, with a diameter of 2 m, driven down to a depth of 8 meters. 1 Export Director, Pomagalski SA, 109 rue Aristide Beregs, BP 47, Voreppe Cedex, F-38341, 33 4 7628 7146, Fax 33 6 7399 5702, [email protected] Page – 13.2 A New Application of the Aerial Ropeway Transportation Technology METROCABLE in MEDELLIN - COLOMBIA Philippe ADRIEN1 A. PRESENTATION: 1. MEDELLIN: a. Located at an altitude of 1,200 m, Medellin is COLOMBIA second largest city and a major economic center of this country of 50 million people. b. MEDELLIN is famous for its coffee its clothes manufacturing along with an important role played in the fashion business.
    [Show full text]
  • Draft Alternatives Development and Screening Report
    APPENDIX E Draft Aerial Transit Initial Feasibility Study Draft Aerial Transit Concepts Initial Feasibility Study Little Cottonwood Canyon Environmental Impact Statement S.R. 210 - Wasatch Boulevard to Alta Lead agency: Utah Department of Transportation April 3, 2020 This page is intentionally blank. Contents 1.0 Introduction ....................................................................................................................................................... 1 1.1 Aerial Transit Systems ............................................................................................................................ 1 1.2 Description of the Study Area ................................................................................................................. 1 1.3 Previous Analysis .................................................................................................................................... 2 2.0 Types of Aerial Transit Systems ....................................................................................................................... 4 2.1 Aerial Tramways ..................................................................................................................................... 4 2.2 Funifors ................................................................................................................................................... 5 2.3 Funitels ..................................................................................................................................................
    [Show full text]
  • NSAA Ski Lift Safety Fact Sheet
    CONTACT: Adrienne Saia Isaac Director of Marketing & Communications [email protected] (720) 963-4217 office UPDATED: December 2018 NSAA Ski Lift Safety Fact Sheet In the 2017/18 season, ski lifts and aerial tramways transported a total of 53.3 million skiers a total of 200 million miles. The last guest fatality resulting from a mechanical malfunction of a ski lift occurred in the 2016/17 season. Since 2004, there have been three fatalities resulting from falls from chairlifts unrelated to mechanical malfunctions. A passenger is five times more likely to suffer a fatality riding an elevator than a ski lift, and more than eight times more likely to suffer a fatality riding in a car than on a ski lift. Lift maintenance, safety and operation is governed by ANSI B77 and regulated in many states by a state agency. Overview Aerial ropeways (including lifts, trams, and gondolas) remain one of the safest methods of transportation. Ski areas across the United States are committed to lift safety and have an excellent safety record for uphill transportation as a result of this commitment. There is no other transportation system that is as safely operated, with so few injuries and fatalities, as the uphill transportation provided by chairlifts at ski resorts in the United States. Methodology & Terms NSAA compiles lift incident information and updates this Ski Lift Safety Fact Sheet annually to provide ski areas and the public with the most current information on the ski industry’s commitment to overall lift safety, financial investment in lifts and lift maintenance, industry education and training on lifts, and frequently asked questions about chairlifts.
    [Show full text]
  • Previewof"ANSIB77.2-2014".Clickheretopurchasethefullversionfromansistore
    This is a preview of "ANSI B77.2-2014". Click here to purchase the full version from the ANSI store. ANSI B77.2-2014 for Funiculars – Safety Requirements ANSI B77.2-2014 American National StandardAmerican National This is a preview of "ANSI B77.2-2014". Click here to purchase the full version from the ANSI store. This is a preview of "ANSI B77.2-2014". Click here to purchase the full version from the ANSI store. ANSI® B77.2-2014 Revision of ANSI B77.2-2004 American National Standard for Funiculars – Safety Requirements Secretariat National Ski Areas Association Approved September 19, 2014 American National Standards Institute, Inc. This is a preview of "ANSI B77.2-2014". Click here to purchase the full version from the ANSI store. Approval of an American National Standard requires review by ANSI that the American requirements for due process, consensus, and other criteria for approval have National been met by the standards developer. Standard Consensus is established when, in the judgement of the ANSI Board of Standards Review, substantial agreement has been reached by directly and materially affected interests. Substantial agreement means much more than a simple majority, but not necessarily unanimity. Consensus requires that all views and objections be considered, and that a concerted effort be made towards their resolution. The use of American National Standards is completely voluntary; their existence does not in any respect preclude anyone, whether he has approved the standards or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not conforming to the standards. The American National Standards Institute does not develop standards and will in no circumstances give an interpretation of any American National Standard.
    [Show full text]