Electrical (General) Dept
Total Page:16
File Type:pdf, Size:1020Kb
ELECTRICAL (GENERAL) DEPT. ORGANIZATIONAL SET UP: Sr. DEE/G/SBP S.K.SAHA DEE/G/SBP P.V.P.RAO SE/EL / KBJ Sr. S.E / EL / SBP S.E (C.T.A.) S.S.E / EL / TIG (S. Nayak) (R. K. Meher) (J. K. Jojo) (R.K. Meherara ) Tr.J.E-II/ TIG J.E-II /KBJ J.E-II/ MSMD S.N.Haque P.K.Singh B.Sethi S S S.E- (TL & AC) S.E (PL) V. Shankar (J. K. Beck) J.E-I (TL &AC) U.K.Panda TELEPHONE NOS. OF OFFICIALS AND SUPERVISORS: SL Name Railway phone BSNL phone Mob No Off. Res. Off. Res. 1 Sri S. K. Saha, Sr.DEE(G) 62440 62441 06632522696 06632522704 9437069603 2 Sri P. V. Prasada Rao, DEE(G) 62440 62441 3 Sri J. K.Jojo, CTA 62352 4 Sri R. K. Meher, SSE/EL/SBP 62236 62495 5 Sri J. K. Beck, SE/Elect/SBP 62649 62594 6 Sri V. Shanker, SE/TL&AC/SBP 62445 62574 7 Sri U. K. Panda, J.E-I/TL&AC/SBP 62445 8 Sri B. Sethy, J.E-II/MSMD 9 Sri S. N. Haque, JE-II/Elect/TIG 68345 10 Sri P. K. Singh, J.E-II/KBJ 67245 11 Sri R. K. Meherara, SSE/EL/TIG 68345 68346 06655222983 12 Sri S. K. Nayak, SE/EL/KBJ 67245 67246 06657221948 13 Sri K. Narasingham, Ch. O.S 62352 14 Sri K. M. Majhi, O.S-I 62352 15 Sri B. B. B. Singh, O.S-II 62352 16 Sri P. Munda, Hd.Clerk 62352 17 Sri A. K. Sahu, Hd.Clerk/TIG 68345 18 Sri B. B. Sahu, Hd. Clerk/SBP 62236 19 Sri D.U.M. Rao, Hd.Clerk 62352 20 Sri R. M. Churia, Sr.Clerk 62244 21 Sri R. N. Senapati, Sr.Clerk/KBJ 67245 22 Sri S. N. Prasad, Jr.Clerk 62352 23 Sri K. Naik, Jr.Clerk 62352 24 Sri N. Oram, MVD 62352 EMERGENCY SERVICE 1 Electrical Breakdown, Sambalpur 62349 2 TL&AC at Sambalpur 62357 3 TL&AC at Sambalpur Washing line 62445 JURISDICTION WISE BREAK UP OF SUPERVISORS:- Sl.No Non – Gazetted Jurisdiction 1 Sr.S.E (EL)/Sambalpur BXQ to SFK and SBP to KPJG 2 Sr.S.E (EL)/Titilagarh TIG to THV 3 S.E.(EL)/Kantabanji RNBT to MNDH STAFF STRENGTH: SL NO. CATEGORY GRADE SANC. ON ROLL VAC. 1 Sr.DEE(G) 10500-15200 --- --- --- 2 DEE(G) --- --- --- 3 Sr. Section Engineer 7400-11000 3 3 0 4 Section Engineer 6500-10500 5 3 2 5 Jr. Engineer-I 5500-9000 4 1 3 6 Jr. Engineer-II 5000-8000 4 4 0 7 Section Engineer (Drg) 6500-10500 1 0 1 8 Jr. Engineer (Drg) 5000-8000 1 0 1 9 Ch. OS 7400-11000 1 1 0 10 Office Supdt.-I 6500-10500 1 0 1 11 Office Supdt-II 5500-9000 2 2 0 12 Hd. CLERK 5000-8000 3 4 -1 13 SR. CLERK 4500-7000 3 2 1 14 JR. CLERK 3050-4590 2 3 -1 15 Typist 3050-4590 1 0 1 16 Tech-I (M.V.Driver) 4500-7000 1 1 0 17 Supervisor (Elect) 4500-7000 0 2 0 18 Sr.Tech(Power) 5500-9000 6 2 4 19 Tech - I(Power) 4500-7000 31 32 -1 20 Tech - II(Power) 4000-6000 20 12 8 21 Tech - III(Power) 3050-4590 19 17 2 22 Sr. TLI 5500-9000 1 0 1 23 Sr. Tech(TL) 5000-8000 2 0 2 24 Tech - I (TL) 4500-7000 9 8 1 25 Tech - II(TL) 4000-6000 5 4 1 26 Tech - III(TL) 3050-4590 5 8 -3 27 Sr.Tech (A.C) 5000-8000 0 0 0 28 Tech - I(A.C) 4500-7000 1 1 0 29 Tech - II(A.C) 4000-6000 0 1 0 30 Tech - III(A.C) 3050-4590 0 0 0 31 HELPER-I(Power) 2600-4000 45 31 14 32 HELPER-II(Power) 2550-3200 7 13 -6 33 Sr. PEON 2610-3640 1 1 0 34 B. PEON 2500-3200 1 0 1 35 HELPER-I(TL) 2600-4000 16 12 4 36 HELPER-II(TL) 2550-3200 5 7 -2 FILE AND RECORDS MAINTAINED: Sl.No Description 1 ESTABLISHMENT RECORDS 2 STORES RECORDS 3 ENERGY CONSUMPTION AND BILL RECORDS 4 TENDER AND WORKS RECORDS 5 TECHNICAL RECORDS 6 MAINTEANCE ACTIVITIES AND OTHER RECORDS 7 POLICY, GUDELINES & SMIs RECORDS ELECTRIFICATION OF STATIONS. Total Stations Stations Electrified Proposal pending with State electricity Board. 61 61 NIL ELECTRIFICATION OF STAFF QUARTERS. Total Qtrs. in Division. Total Qtrs. electrified 3044 3044 CONSUMPTION OF ELECTRICAL ENERGY IN 2006-07. Sl .No Month Consumption Amount Rebate (In M.U) Paid Availed 1 Apr-06 0.76 2969466 42,117 2 May-06 0.78 3011237 44778 3 Jun-06 0.91 3250594 49832 4 Jul-06 0.87 3246074 49832 5 Aug-06 0.89 3350501 57737 6 Sep-06 0.89 3295782 53839 7 Oct-06 0.86 3259431 51742 8 Nov-06 0.77 2860232 48268 9 Dec-06 0.79 2983316 48079 10 Jan-07 0.74 2794569 49831 11 Feb-07 0.78 2943100 42613 12 Mar-07 0.85 3252115 49546 The department presently looking after the following works: 1) General Power Supply Maintenance. 2) Train Lighting and Air-conditioning Coach maintenances. JURISDICTION WISE BREAK UP OF SUPERVISORS:- Non - Gazetted Jurisdiction Sr.S.E (EL)/Sambalpur BXQ to SFK and SBP to KPJG Sr.S.E (EL)/Titilagarh TIG to THV S.E.(EL)/Kantabanji RNBT to MNDH TRAIN LIGHTING COACH MAINTENANCE: Prim. Prim. Sec. Sec. TL Prim. Maint. Prim. Maint. Maint. Maint Maint Maint Depot (Coach) ACCN (Coach) ACCZ (Rake) (Coach) (Rake) (Coach) 01 04 44 05 59 00 05 DETAILS OF TRAINS PRIMARILY MAINTAINED BY THE DIVISION Sl Train Train Mail/ Primary No. of Composition of rakes No Number Name Exp/ Depot rakes Pass GS GS SLR SLR WCB ACCZ ACCZ ACCN ACCN GSCZ GSCZ GSCN GSCN ACCW/ FCACCW 8301/ SBP- EXP SBP 1 3 1 2 1 8302 RGDA 1 (Intercit y) Exp. 2 2871/ SBP- SF SBP 2 1 2 9 1 2872 HWH (Ispat) 3 8303/ SBP-PUI EXP SBP 1 4 1 2 4 8304 (Intercit y) DETAILS OF TRAINS SECONDARY MAINTAINED BY THE DIVISION Composition of rakes Mail/ Secon Sl Train No. of Exp/ dary No Number rakes GS GS SLR SLR Pass Depot VPU WCB WCB ACCZ ACCZ ACCN ACCN GSCZ GSCZ GSCN GSCN ACCW/ ACCW/ FCACCW 8005/ EXP SBP 2 2 10 2 1 3 1 1 8006 333/ Pass KBJ 2 8 2 2. 334 2893/ Exp SBP 1 8 1 2 3. 2894 INVENTRY OF PUMPS IN SBP DIVISION. Sl. No Stn Capacity/Location QTY 1 SAMBALPUR 3 HP S/P at Goods shed and stn. Fountain. 2 10 HP H.S pump at Goods shed 1 7.5 HP Submersible pump at Goods shed 1 1 HP Jet pump at DRM Bunglow and DRM office. 2 0.5 HP H.S and S/P pumps at DRM office & Bunglow fountains. 2 2 HP S/P at SBP station Fountain. 1 60 HP H.S pump at SBP/F.H 1 30 HP H.S pump at SBP/F.H. 1 30 HP H.S pump at SBP/F.H 1 10 HP Mono block pump at SBP/F.H 1 25 H.P H.S . at SBP/F.H 2 1 HP H.S pump at SBP/F.H 6 5HP compressor pump at SBP/sector-C/Rly colony 1 7.5 HP H.S pump at Distilled water plant. 1 2 SAMBALPUR ROAD 3 HP Submersible pump 1 3 SASON 2 HP submersible pump 1 4 RENGALI 3 HP Submersible pump 1 5 SAMBALPUR CITY 3 HP Submersible pump 2 6 MANESWAR 2 HP Submersible pump 1 7 HATIBARI 3 HP Submersible pump 1 8 JUJAMURA 3 HP Submersible pump 1 9 CHARMAL 1.5 HP Submersible pump 1 3 HP Submersible pump 2 10 RAIRAKHOL 2 HP Submersible pump 1 11 BAMUR 3 HP Submersible pump 1 12 SARGIPALI 3 HP Submersible pump 1 13 HANDAPA 3 HP Submersible pump 1 14 BOINDA 3 HP Submersible pump 1 15 JHARPADA 3 HP Submersible pump 1 16 KEREJUNG 1.5 HP Submersible pump 1 17 HIRAKUD 90 H.P V.S pump at HKG/P.H 2 35 HP S/P at HKG/P.H 2 04 HP S/P pump at HKG/F.H 1 18 GODBHAGA 1.5 HP S/P pump at colony 1 19 ATTABIRA 1.5 HP S/P at ATS stn.. 1 BARGARH ROAD 5 HP S/P at BRGA/stn 1 20 3 H.P S/P at BRGA/Stn. 1 21 BARPALI 3 HP HP S/P pump at BRPL/Colony 1 22 DUNGRIPALI 10 HP mono block at DJX stn. 1 23 KHALIAPALI 3 HP mono block at KHPL stn. 1 24 LOISINGA 3 HP mono block at LSX stn.. 1 25 BALANGIR 35 HP S/P pump at Suktel river. 1 40 HP V.S pump at Suktel river. 1 40 HP V.S pump at Suktel river. 1 3 HP S/P at BLGR/R.R 1 7.5 HP S/P at BLGR/F.H 1 10 HP H.S pump at BLGR/F.H 1 30 HP H.S pump at BLGR/F.H 1 26 DEOGAON RD. 3 HP S/P pump at colony 1 27 SAINTALA 10 HP mono blocks pump SFC stn.