ELECTRICAL (GENERAL) DEPT.

ORGANIZATIONAL SET UP:

Sr. DEE/G/SBP S.K.SAHA

DEE/G/SBP P.V.P.RAO

SE/EL / KBJ Sr. S.E / EL / SBP S.E (C.T.A.) S.S.E / EL / TIG (S. Nayak) (R. K. Meher) (J. K. Jojo) (R.K. Meherara )

Tr.J.E-II/ TIG J.E-II /KBJ J.E-II/ MSMD S.N.Haque P.K.Singh B.Sethi

S S

S.E- (TL & AC) S.E (PL) V. Shankar (J. K. Beck)

J.E-I (TL &AC) U.K.Panda

TELEPHONE NOS. OF OFFICIALS AND SUPERVISORS: SL Name Railway phone BSNL phone Mob No Off. Res. Off. Res. 1 Sri S. K. Saha, Sr.DEE(G) 62440 62441 06632522696 06632522704 9437069603 2 Sri P. V. Prasada Rao, DEE(G) 62440 62441 3 Sri J. K.Jojo, CTA 62352 4 Sri R. K. Meher, SSE/EL/SBP 62236 62495 5 Sri J. K. Beck, SE/Elect/SBP 62649 62594 6 Sri V. Shanker, SE/TL&AC/SBP 62445 62574 7 Sri U. K. Panda, J.E-I/TL&AC/SBP 62445 8 Sri B. Sethy, J.E-II/MSMD 9 Sri S. N. Haque, JE-II/Elect/TIG 68345 10 Sri P. K. Singh, J.E-II/KBJ 67245 11 Sri R. K. Meherara, SSE/EL/TIG 68345 68346 06655222983 12 Sri S. K. Nayak, SE/EL/KBJ 67245 67246 06657221948 13 Sri K. Narasingham, Ch. O.S 62352 14 Sri K. M. Majhi, O.S-I 62352 15 Sri B. B. B. Singh, O.S-II 62352 16 Sri P. Munda, Hd.Clerk 62352 17 Sri A. K. Sahu, Hd.Clerk/TIG 68345 18 Sri B. B. Sahu, Hd. Clerk/SBP 62236 19 Sri D.U.M. Rao, Hd.Clerk 62352 20 Sri R. M. Churia, Sr.Clerk 62244 21 Sri R. N. Senapati, Sr.Clerk/KBJ 67245 22 Sri S. N. Prasad, Jr.Clerk 62352 23 Sri K. Naik, Jr.Clerk 62352 24 Sri N. Oram, MVD 62352 EMERGENCY SERVICE 1 Electrical Breakdown, Sambalpur 62349 2 TL&AC at Sambalpur 62357 3 TL&AC at Sambalpur Washing line 62445 JURISDICTION WISE BREAK UP OF SUPERVISORS:-

Sl.No Non – Gazetted Jurisdiction

1 Sr.S.E (EL)/Sambalpur BXQ to SFK and SBP to KPJG

2 Sr.S.E (EL)/Titilagarh TIG to THV

3 S.E.(EL)/ RNBT to MNDH

STAFF STRENGTH:

SL NO. CATEGORY GRADE SANC. ON ROLL VAC. 1 Sr.DEE(G) 10500-15200 ------2 DEE(G) ------3 Sr. Section Engineer 7400-11000 3 3 0 4 Section Engineer 6500-10500 5 3 2 5 Jr. Engineer-I 5500-9000 4 1 3 6 Jr. Engineer-II 5000-8000 4 4 0 7 Section Engineer (Drg) 6500-10500 1 0 1 8 Jr. Engineer (Drg) 5000-8000 1 0 1 9 Ch. OS 7400-11000 1 1 0 10 Office Supdt.-I 6500-10500 1 0 1 11 Office Supdt-II 5500-9000 2 2 0 12 Hd. CLERK 5000-8000 3 4 -1 13 SR. CLERK 4500-7000 3 2 1 14 JR. CLERK 3050-4590 2 3 -1 15 Typist 3050-4590 1 0 1 16 Tech-I (M.V.Driver) 4500-7000 1 1 0 17 Supervisor (Elect) 4500-7000 0 2 0 18 Sr.Tech(Power) 5500-9000 6 2 4 19 Tech - I(Power) 4500-7000 31 32 -1 20 Tech - II(Power) 4000-6000 20 12 8 21 Tech - III(Power) 3050-4590 19 17 2 22 Sr. TLI 5500-9000 1 0 1 23 Sr. Tech(TL) 5000-8000 2 0 2 24 Tech - I (TL) 4500-7000 9 8 1 25 Tech - II(TL) 4000-6000 5 4 1 26 Tech - III(TL) 3050-4590 5 8 -3 27 Sr.Tech (A.C) 5000-8000 0 0 0 28 Tech - I(A.C) 4500-7000 1 1 0 29 Tech - II(A.C) 4000-6000 0 1 0 30 Tech - III(A.C) 3050-4590 0 0 0 31 HELPER-I(Power) 2600-4000 45 31 14 32 HELPER-II(Power) 2550-3200 7 13 -6 33 Sr. PEON 2610-3640 1 1 0 34 B. PEON 2500-3200 1 0 1 35 HELPER-I(TL) 2600-4000 16 12 4 36 HELPER-II(TL) 2550-3200 5 7 -2

FILE AND RECORDS MAINTAINED:

Sl.No Description 1 ESTABLISHMENT RECORDS 2 STORES RECORDS 3 ENERGY CONSUMPTION AND BILL RECORDS 4 TENDER AND WORKS RECORDS 5 TECHNICAL RECORDS 6 MAINTEANCE ACTIVITIES AND OTHER RECORDS 7 POLICY, GUDELINES & SMIs RECORDS

ELECTRIFICATION OF STATIONS.

Total Stations Stations Electrified Proposal pending with State electricity Board. 61 61 NIL

ELECTRIFICATION OF STAFF QUARTERS.

Total Qtrs. in Division. Total Qtrs. electrified 3044 3044

CONSUMPTION OF ELECTRICAL ENERGY IN 2006-07. Sl .No Month Consumption Amount Rebate (In M.U) Paid Availed 1 Apr-06 0.76 2969466 42,117 2 May-06 0.78 3011237 44778

3 Jun-06 0.91 3250594 49832

4 Jul-06 0.87 3246074 49832

5 Aug-06 0.89 3350501 57737

6 Sep-06 0.89 3295782 53839 7 Oct-06 0.86 3259431 51742

8 Nov-06 0.77 2860232 48268

9 Dec-06 0.79 2983316 48079

10 Jan-07 0.74 2794569 49831

11 Feb-07 0.78 2943100 42613

12 Mar-07 0.85 3252115 49546

The department presently looking after the following works: 1) General Power Supply Maintenance. 2) Train Lighting and Air-conditioning Coach maintenances.

JURISDICTION WISE BREAK UP OF SUPERVISORS:-

Non - Gazetted Jurisdiction

Sr.S.E (EL)/Sambalpur BXQ to SFK and SBP to KPJG Sr.S.E (EL)/Titilagarh TIG to THV S.E.(EL)/Kantabanji RNBT to MNDH

TRAIN LIGHTING COACH MAINTENANCE:

Prim. Prim. Sec. Sec. TL Prim. Maint. Prim. Maint. Maint. Maint Maint Maint Depot (Coach) ACCN (Coach) ACCZ (Rake) (Coach) (Rake) (Coach) 01 04 44 05 59 00 05

DETAILS OF TRAINS PRIMARILY MAINTAINED BY THE DIVISION

Sl Train Train Mail/ Primary No. of Composition of rakes No Number Name Exp/ Depot rakes Pass GS GS SLR SLR WCB ACCZ ACCZ ACCN ACCN GSCZ GSCZ GSCN GSCN ACCW/ FCACCW 8301/ SBP- EXP SBP 1 3 1 2 1 8302 RGDA 1 (Intercit y) Exp. 2 2871/ SBP- SF SBP 2 1 2 9 1 2872 HWH (Ispat) 3 8303/ SBP-PUI EXP SBP 1 4 1 2 4 8304 (Intercit y)

DETAILS OF TRAINS SECONDARY MAINTAINED BY THE DIVISION

Composition of rakes Mail/ Secon Sl Train No. of Exp/ dary No Number rakes GS GS SLR SLR

Pass Depot VPU WCB WCB ACCZ ACCZ ACCN ACCN GSCZ GSCZ GSCN GSCN ACCW/ ACCW/ FCACCW

8005/ EXP SBP 2 2 10 2 1 3 1 1 8006 333/ Pass KBJ 2 8 2 2. 334 2893/ Exp SBP 1 8 1 2 3. 2894

INVENTRY OF PUMPS IN SBP DIVISION. Sl. No Stn Capacity/Location QTY 1 SAMBALPUR 3 HP S/P at Goods shed and stn. Fountain. 2 10 HP H.S pump at Goods shed 1 7.5 HP Submersible pump at Goods shed 1 1 HP Jet pump at DRM Bunglow and DRM office. 2

0.5 HP H.S and S/P pumps at DRM office & Bunglow fountains. 2 2 HP S/P at SBP station Fountain. 1 60 HP H.S pump at SBP/F.H 1 30 HP H.S pump at SBP/F.H. 1 30 HP H.S pump at SBP/F.H 1 10 HP Mono block pump at SBP/F.H 1 25 H.P H.S . at SBP/F.H 2 1 HP H.S pump at SBP/F.H 6 5HP compressor pump at SBP/sector-C/Rly colony 1 7.5 HP H.S pump at Distilled water plant. 1 2 SAMBALPUR ROAD 3 HP Submersible pump 1 3 SASON 2 HP submersible pump 1 4 RENGALI 3 HP Submersible pump 1 5 SAMBALPUR CITY 3 HP Submersible pump 2 6 MANESWAR 2 HP Submersible pump 1 7 HATIBARI 3 HP Submersible pump 1 8 JUJAMURA 3 HP Submersible pump 1 9 CHARMAL 1.5 HP Submersible pump 1 3 HP Submersible pump 2 10 RAIRAKHOL 2 HP Submersible pump 1 11 BAMUR 3 HP Submersible pump 1 12 SARGIPALI 3 HP Submersible pump 1 13 HANDAPA 3 HP Submersible pump 1 14 BOINDA 3 HP Submersible pump 1 15 JHARPADA 3 HP Submersible pump 1 16 KEREJUNG 1.5 HP Submersible pump 1 17 HIRAKUD 90 H.P V.S pump at HKG/P.H 2 35 HP S/P at HKG/P.H 2 04 HP S/P pump at HKG/F.H 1 18 GODBHAGA 1.5 HP S/P pump at colony 1 19 ATTABIRA 1.5 HP S/P at ATS stn.. 1 BARGARH ROAD 5 HP S/P at BRGA/stn 1 20 3 H.P S/P at BRGA/Stn. 1 21 BARPALI 3 HP HP S/P pump at BRPL/Colony 1 22 DUNGRIPALI 10 HP mono block at DJX stn. 1 23 KHALIAPALI 3 HP mono block at KHPL stn. 1 24 LOISINGA 3 HP mono block at LSX stn.. 1 25 35 HP S/P pump at Suktel river. 1 40 HP V.S pump at Suktel river. 1 40 HP V.S pump at Suktel river. 1 3 HP S/P at BLGR/R.R 1 7.5 HP S/P at BLGR/F.H 1 10 HP H.S pump at BLGR/F.H 1 30 HP H.S pump at BLGR/F.H 1 26 DEOGAON RD. 3 HP S/P pump at colony 1 27 10 HP mono blocks pump SFC stn. 1 28 BADMAL 5 HP Jet pump at BUDM /stn. 1

29 SIKIR 3 HP S/P at SFK/stn. 1

TITLAGARH 12.5 HP S/P - TIG/P.H 2 12.5 H.P Mono block - TIG/P.H 1 30 10 HP mono block at TIG/P.H 1 35 HP S/P at TIG/P.H 2 31 40HP V.S.Pump at KSNG/P.H 1 KESINGA 45HP V.S.Pump (Stand by) 1 32 RUPRA ROAD 5HP Ejecto Pump in open well. 1 33 NARLA ROAD 3HP S/P in open well 1 34 AMBADOLA 5HP S/P in bore-well 1 35 DOIKALU 1.5HP S/P in bore-well 1 36 10.5HP Mono Block Pump in open-well 1 MUNIGUDA 12.5HP Mono Block Pump(Stand by) 1 37 THERUVALI 7.5HP S/P in bore-well 1

MANDIRHASAUD 4 HP S/P in bore well. 1 38 2 HP Ejecto pump in open well 1

39 LAKHOLI 3 HP S/P in open well. 1

40 ARANG MAHANADI 3 HP S/P in open well 1 41 BELSONDA 3 HP S/P in open well 1 42 MAHASAMUND 12.5HP S/P in open well 1 14.5HP H.S.C.F.Pump in open well (Stand by) 1

43 ARAND 3 HP jet pump in open well 1

3HP S/P in open well (Stand by) 1 44 BHIMKHOJ 3 HP S/P in open well. 1 45 BAGBEHERA 3 HP Jet pump in open well. 1

46 KOMAKHAN 5 HP mono block pump in open well 1

KHARIAR ROAD 6 HP S/P in bore well. 1 47 20 HP H.S pump (DSM-2) in open well 1 48 KANTABANJI 12.5 HP S/P at KBJ/GPH (2 nos.) and Hospital unit. 3 7.5 HP S/P in bore well. 2 5 HP S/P at KBJ store. 2 3 HP S/P in bore well. 1 2 HP jet pump at KBJ store 1 49 MURIBAHAL 3HP S/P in P.H 1 TOTAL 104

LIST OF D.G.SETS AT SBP DIVISION: SL. STN LOCATION CAPACITY QNTY LOADS. NO 1 SBP SBP (Construction Office complex) 160KVA 1No. DRM Complex & Stn. Building 2 SBP SBP (RailNagar Sub Station) 100KVA 1No. 3 SBP ARME/SBP 2.5KVA 2Nos. 4 SBP SBP (SSE/Office) for breakdown for other Stations 2.5KVA 2Nos.

5 HKG HKG (PH) 160KVA 1No. 6 BLGR BLGR (1No.defective, 1No.BLGR Station & 1No. for other 2.5KVA 3Nos. Stations.) 7 TIG TIG (1No. TIG Station, 1No. Defective & 2Nos. For other 2.5KVA 4Nos. Station break down)

8 TIG TIG (Pump House) 34KVA 1No. Pump House 9 KSNG KSNG (Pump House) 66.5KVA 1No. Pump House 10 KBJ ART/KBJ 7.5KVA 2Nos. 11 KBJ ART/KBJ 2.5KVA 6Nos. 12 KBJ ART/KBJ 2.5KVA 2Nos. 13 KBJ ART/KBJ 2KVA 2Nos. 14 KBJ GPH/KBJ 35KVA 1No. 15 KBJ GPH/KBJ 187KVA 1No.

LIST OF TRANSFORMERS UTILISED FOR POWER DISTRIBUTION IN THE DIVISION:

Sl. Qty & Capacity MVA/KVA Date of Status Make No -– KV/--KV Commissioning 1 1 no. & 250 KVA 15.06.2001 Working Power master Electricals 2 1 no. & 250 KVA 05.01.2002 Working 3 2 nos. & 250 KVA 10.04.2003 Working 4 2 nos. & 100 KVA 10.04.2003 Working 5 1 no. & 63 KVA 01.04.2003 Working 6 1 no. & 160 KVA 15.04.1997 Working 7 1 no. & 100 KVA 27.02.1998 Working 8 1 no. & 50 KVA 03.11.2005 Working Automatic Electro gear 9 1 no. & 100 KVA 17.01.2004 Defective 10 2 nos. & 250 KVA 04.05.2002 Working 11 2 nos. & 250 KVA 10.04.1998 Working Alfa Transformers 12 2 nos. & 160 KVA 22.07.1999 Working 13 2 nos. & 160 KVA 01.04.2003 Working 14 2 nos. & 400 KVA 12.07.200… Working 15 2 nos. & 250 KVA 10.04.1998 Working United Machinery (MECAVO brand) 16 2 nos. & 250 KVA 13.07.2002 Working 17 1 no. & 100 KVA 02.06.1963 Working 18 1 no. & 500 KVA 15.03.2005 Working Alstom Limited 19 1 no. & 250 KVA 05.03.2005 Working 20 1 no. & 100 KVA 01.04.1964 Working HBE Ltd. 21 1 no. & 75 KVA 05.02.1967 Working T&SG Ltd.

TENDER FOR THE FOLLOWING WORKS OPENED AND UNDER FINALISATION Sl. No Name of work Tender value Remarks

1 Development of goods terminal facilities at Hirakud Railway 9,02,788/- Tender opened on 09.03.2007 station of Sambalpur Division. and T.C.is under process. 2 Improvement of street light and power supply arrangement 9,21,920/- --- Do --- to different railway colonies of Sambapur division 3 Electrification of 4units Type-IV staff quarters at 2,26,026/- --- Do --- Sambalpur. TENDER FOR THE FOLLOWING WORKS TO BE OPENED :

Sl.No Name of work Tender value Remarks

1 Electrification of 2 Units Type-III and 5 Units Ty-II 3,03,330/- Tender will be opened on quarters at Rairakhol of Sambalpur Division. (L.B 06-07 08.05.2007 item no.363) 2 Electrification of rest house for track machine staff at 1,55,472/- --- Do --- MANE, RAIR, BONA, & KPJG. (L.B 06-07 item no.534) 3 Electrification of 10 Units Type-I staff quarters for 2,34,153/- --- Do --- Gateman at Engineering L Cs in Sambalpur - Angul section of Sambalpur Division.(L.B 06-07 item no.365) 4 (i)SBP: Electrifiation of Supervisor Rest House. (L.B 06- 1,32,347/- --- Do --- 07item no.532)of Sambalpur Division. (ii) Electrification for Provision of FOB at BUDM Station (L.B.Item no.95 of 2006-07)of Sambalpur Division. (iii) Electrification for Provision of FOB at MNDH Station.(L.B.Item no. 94 of 2006-07).of Sambalpur Division.

TENDER FOR THE FOLLOWING WORKS FLOATED

Sl. Name of work Tender value Remarks No 1 Electrification of 8 Units Type-I staff quarters in BLGR of 1,41,296/- Tender floate d on 01.05.07 and Sambalpur Division (D/S). (L.B 06-07 item no. 366). will be opened 14.06.2007 2 Electrification of Standard out post/office Building for 6,96,480/- ---DO --- RPF post at KBJ, MNGD, MSMD station and 30 beaded RPF barrack at SBP of Sambalpur Division

TENDER FOR THE FOLLOWING WORKS AWARDED TO DIFFERENT AGENCIES: Sl. Name of work Agmt. Physical Financial TDC No Value progress progress M/S B.K.SHARMA/SAMBALPUR. 1 Improvement of Illumination, Fannage and water 14,83,835/- 80% 47% 30.04.2007. coolers at platforms, Station buildings, waiting hall and booking offices a t BLGR TIG,KSNG& KBJ Stations of Sambalpur Division.(TO BE READ ALONG WITH EXPLANATORY NOTES) 2 Improvement of illumination, Fannage and 1,55,623/- 50% NIL 31.03.2007 Signage facilities at Sambalpur Station of Sambalpur Division.(To be read along with explanatory notes annexed with schedules). 3 Provision of one deep tube well and pump house 7,12,199/- 90% 65% 31.03. 2007 at Bargarh, Brundamal, Bagbahara, Belsonda, Muniguda & Bissam Cuttack. 4 Provision of LED string type sign boards in Station 17,13,685/- NIL NIL 31.03.2007 Buildings at Bolangir , Kesinga, Kantabanji(4-stns) in Tri-languages of Sambalpur Division 5 Electrification of one bay of P.F. Shelter of size 3,11,456/- 50% 66% 31.03. 2007. 6.25mx6.25m using multi walled polycarbonate sheet at KMK, BMKJ, DFR, LAE, DJX and at PF-1 & 2 of LJR,BMCK & MNDH Stations. 6 Electrification for Manning of four Nos. Un 4,93,213/- 50% NIL 31.10. 2005 manned level crossing Gates at KMs 518/12, 537/11, 592/3 in JSG-TIG section and 175 / 7-8 in R-THV section. 7 a) Electrification of one Unit Type-III & 4 Units 4,87,095/- NIL 07.03. 2004 Type-I Quarters at RGL in SBP Divn. b) Electrical works in connection with Through Sleeper Renewal (Primary) at Km 4.66-28 between R-LAE (c) Electrical works in co nnection with End Cropping And Welding of Existing 52Kg Rails for 26.75 Kms at Km 95/0-105/0(SL) Km 288.75- 292.50(UP) & Km 290/0-305/0 (DN) between Raipur- Theruvali Section. (d) Improvement of Illumination of Yard at KMK & KRAR i connection with CTR (P) at Km 95-105.(e) Improvement of Illumination of Yard at NRLR & LJR in connection with CTR (P) at Km 239-249. 8 Electrification of a) 6Units Type-II 1 unit Type-III 3,32,346/- 45% 45% 31.05. 2004 Qrs. for T.T Machine staff (SBP-Type-III= 1No, BLGR-Type-II=1No,MSMD-Type-II=1No,KRAR- Type-II=02Nos & MNGD-Type-II= 02Nos) b) Health Inspectors office cum Store at SBP c) New ASTE office at TIG. d) S.E (elect) office at TIG. e) Manning of 02Nos Unmanned Level crossing at KM36/2-3 and 41/1-40/15 between ANMD-BLSN station of Sambalpur Division. WORKS AWARDED TO M/S.S.P.ASSOCIATES, BHUBANESWAR 1 Electrification of 12 Units Type-I staff quarters 2,19,747/- 50% NIL 15.07.2006. (6Units for Gang No.50A & 6Units for Gang No.41) in R-THV section(THV-6Units & LJR 6units) 2 Electrification of 13 Units of Type-I staff Quarters 3,70212/- NIL NIL 01.09.2006. at 8 manned Level crossings in R-TIG section (Gate Nos.4/10, 41/0-1, 103/9-10,161/1-2, 163/11-12, 83/5-6, 171/1-2 & 186 / 11-12). WORKS AWARDED TO M/S.ORISSA SPARES, SAMBALPUR. 1 Electrification of 28 Nos. Type-I and 12Nos Type- 6,79,973/- 50% NIL 31.03. 2007 II Quarters in Sambalpur - Angul section (SBPY- Ty-I=04 Nos, MANE-Ty-I =08 & Ty-II=02 Nos,CHAR -Ty-I=04 & Ty-II 02Nos,RAIR -Ty-I= 12 & Ty-II =08Nos) and Electrification for Provision of 5 Units Type-I Quarters for Gang man at HKG of JSG-BRGA section. WORKS AWARDED TO M/S.JAIENTERPRISES, RAIPUR. 1 Power supply augmentation at Kesinga, Kendal 27,89,711/- 75% 41% 24.03. 2007. Road, Rupra Road and Norla Road stations of Samba lpur Division. DETAILED SCHEDULE (TO BE READ ALONG WITH THE EXPLANATORY NOTES) 2 Electrification for provision of rail level island 4,66,631/- 50% 44% 21.03. 2007. Platform and FOB at Baragarh Road Station. LIST OF WORK AWARDED TO M/S.PRAKASH CONSTRUCTION, CHAKRADHARPUR. 1 Illumination of 5 Nos. manned level crossing 4,17,006/- 30% NIL 09.08. 2006 gates over Sambalpur division (L.C. Gates at K.M 4/10,5/14,9/11,218/7 and 237/11 in R-THV section). WORKS AWARDED TO M/S PRADIP ELECRICALS, SAMBALPUR 1 Electrification of Extended Platform at 2,10,990/- NIL NIL 15.02. 2007 KANTABANJI Railway Stations,(PF-I=148M ) 2 Provision of second Platform, F.O.B landing with 4,76,226/- NIL NIL 15.02. 2007 PF.Shelter at Kantabanji station. LIST OF WORK AWARDED TO M/S.WEATHER MAKERS,JAMSHEDPUR 1 Annual Train lighting maintenance contract of TL 4,98,638/- 50% 25% 15.09.2007 & AC coaches of train No.8301/8302 (Sambalpur - Rayagada Express), 8303/8304 (Sambalpur - Bhubaneswar Intercity Express) for a period of one year. 2 Repair and maintenance contract for Window/ 7,24,992/- 75% 75% 16.07.2007 Split A.Cs, Water Coolers & Refrigerators of different makes at SBP Division for a period of Two years. WORKS AWARDED TO M/S NATIONAL TRADERS, JAMSHEDPUR 1 Annual maintenance contract for repair & 4,41,396/- 50% 41% 05.09.2007 overhauling of 70 Nos. of DG sets ranging from 1.4 KVA to 250 KVA installed at different locations over SBP Division for a period of one year

SOME ACHIEVEMENTS OF THE DEPARTMENT:  A new shelter on platform no. 1 of Sambalpur railway station along with covered pathway shed connecting the station building with the platform shelters on P.F-1 has been electrified with provision of nine nos. 150 W M.H fittings, twenty seven nos. recessed mounting white powder coated CRCA sheet steel housing with aluminium mirror reflector CFL fittings (2 x 11W) and six nos. A. C. Ceiling fans in the month of January -06.  Electrification of two L.C gates at K.M nos. 145/11-12 and 161/1-2 have been completed in the month of January –06.  Illumination level of the approach road to Bolangir railway station has been enhanced by providing five nos. 150W HPSV fittings in place of F/L (O/D) type in the month of February -06.  In P.F-2 of Bolangir railway station, 4-spans 4 wires O/H conductor re-tensioned and in P.F-1, 2 span, 4-wire cupper conductor replaced by ACSR conductor in the month of February -06.  Four nos. of manned level crossing gates at K.M No. 640/7 (DJX-KHPL), 529/15 (LPG-RGL), 673/7 (LSX-BLGR) and 678/8 (LSX-BLGR) have been electrified in the month of March -06.  Electrical wiring of Terminal Management System (TMS) Room in Sambalpur City station, second class waiting hall at Bargarh road railway station, Officer Rest House annexe at Sambalpur and newly constructed S&T room at Sambalpur have been completed in the month of March -06.  Electrical Safety Week celebrated in the division from 01.05..06 to 07.05.2006 in the month of April –06 in the month of May -06.  Concealed electrical wiring of newly built patient attendant room (adjacent to Divl. Railway Hospital) has been done in the month of April –06 in the month of May -06.  One 4 H.P submersible pump set has been installed at Bagbahara DTW in the month of May -06.  1 KVA UPS each have been provided at UTS, Sambalpur, PRS, Sonepur, Weighbridge house, Titilagarh, PRS, Bhawanipatna and Nawapara to have uninterrupted power supply in the month of June -06.  Mortuary in Divl. Railway Hospital, Sambalpur have been electrified with power back up through D.G supply in the month of June -06.  The existing Divisional power car of 63.2 KVA capacity has been upgraded to 100 KVA by installing a new 100 KVA D.G set with all accessories and new set of base channels in the month of July -06.  In order to eliminate the use of MASHAL and to facilitate better token lifting in JSG-TIG section, 24 nos. token lifting light and 12 nos. 150W HPSV in off side of station have been provided in the month of July -06.  Goods shed siding at Mahasamund has been electrified by providing four nos. 150W and four nos. 250 W M.H fittings after erecting six nos. second hand rail poles in the month of July -06.  To achieve energy conservation, twenty nine nos. of PLS fittings 2 x 18W have been provided in place of 35 nos. FL tube of 40W fittings in various officers chambers and Operation Theater of Divl. Railway Hospital in the month of July -06.  Nine nos. 150W M.H fittings provided in newly extended portion P.F shelter in P.F-1 of Sambalpur railway station in the month of August -06.  Ten nos. 2 x 11W CFL fittings have been provided in the new pathway shelter in between 2 nd class waiting hall and PF-1 of Sambalpur railway station in the month of August -06.  Staff canteen at Sambalpur has been inaugurated. Illumination & fannage of the Canteen has been made by providing six nos. A.C ceiling fans, 11 nos. 2 x 11W PLS fittings, six nos. decorative fittings and one Jhumer in the month of October -06.  36 nos. 11W CFL fittings have been provided in place of 70W HPSV defective fittings at Kherjung, Jharpada, Handapa, Sargipali, Bamur and Jujumura railway stations in the month of October -06.  Two nos. 16 meter high High Mast lighting system with six nos. 2 x 400W MH fittings have been commissioned in the circulating area of Sambalpur station in the month of November -06.  A board depicting “WISH YOU A HAPPY JOURNEY” with background of Hirakud Dam, Samaleswari temple, Sambalpuri dance of local importance items has been provided at the entrance of the station building in the month of November -06.  Illumination of circulating areas of Rupra road, Bisamcuttack and Norla road railway stations have been improved by providing additional 150W HPSV fittings (4 nos.), 70W M.H fittings (1 no.) in the month of November –06.  16 Meter high Hight Mast Lighting system with six nos. 2 x 400W M.H fittings each have been commissioned at Kesinga, Kantabanji, Mahasamund and Bolangir stations circulating areas in the month of December –06.  To cope up with low voltage problem, 36W CFL lamps have been provided at Norla road railway station in the month of December -06.  Illumination of FOB at Kantabanji railway station has been done by providing 10 nos. FL fittings in the month of December -06.  Boudh PRS have been commissioned with two A.C ceiling fans, four FL fittings, one UPS and one 1.5 Ton air- conditioner in the month of January-07.  Six nos. wall decorative fittings, four nos. wall fan, eight nos. 2 x 11 W PLS fittings have been provided and concealed wiring has been done at Gents & Ladies waiting hall at Sambalpur in the month of January-07.  Electrical Casing capping wiring has been done at non-railhead PRS Deogarh in the month of February-07.  Concealed wiring, 2x18W PLS fittings – 13 Nos, 2x11W PLS fittings – 16 Nos and wall fan 06 Nos. have been provided at 1 st class waiting hall, dormitory, SS room and VIP lounge of Sambalpur Bolangir departmentally during the month in the month of February-07.  For reliable water supply 01 No. 7.5 HP submersible pump has been installed at bore well of Good shed pump house Kantabanji in the month of February-07.  For dedicated water supply, 01 No. 3 HP submersible pump’s automation work has been done at Belsonda Railway station during the month in the month of February-07.  04 Nos. 1.5 ton Split type AC have been installed at VIP room, Sambalpur during the month in the month of March-07.  For reliable water supply, 01 No. 6 HP submersible pump has been provided in place of 5 HP defective Submersible pump at Ambadola Railway station during the month in the month of March-07.  The two pantry cars (828801 WCB and 988805 WCB) have been provided with four nos. inverters, two nos. freezes and two nos. deep freezes along with ancillary electrical wiring during the month.  One 2.4 KVA D.G set has been provided for PRS Nuapada for power back up.