IEE: India: Sambalpur-Titlagarh Doubling Subproject, Railway

Total Page:16

File Type:pdf, Size:1020Kb

IEE: India: Sambalpur-Titlagarh Doubling Subproject, Railway Initial Environmental Examination March 2011 India: Railway Sector Investment Program Sambalpur-Titlagarh Doubling Subproject Prepared by Ministry of Railway for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 15 March 2011) Currency unit – Indian rupee (Rs) Rs1.00 = $0.22222 Rs 45.00 $1.00 = ABBREVIATIONS ACF Assistant Conservator of Forest ADB Asian Development Bank EIA environmental impact assessment EMoP environment monitoring plan EMP environment management plan ESDU Environment and Social Development Unit GIS geographic information system GOI Government of India GHG greenhouse gases HFL highest flood level IBS Intermittent Block Station ICAR Indian Council of Agricultural Research IEE initial environmental examination IS Indian Standard IUCN International Union for Conservation of Nature Jn. junction (The term used by Indian Railways for the Stations where two or more lines meet) LHS Left Hand Side MoEF Ministry of Environment and Forests MOR Ministry of Railways NAAQS National Ambient Air Quality Standard NE northeast NGO non-governmental organization NH national highway NSDP National Strategic Development Program NOx oxides of nitrogen PF protected forest PHC public health centre PIU project implementation unit PPEs personal protective equipments PMC Project Management Consultant PWD Public Works Department RDSO Research Design and Standards Organization R&R resettlement and rehabilitation RF reserved forest RHS right hand side RoB road over bridge RoW right of way RSPM respirable suspended particulate matter RuB road under bridge RVNL Rail Vikas Nigam Ltd. SDP state domestic product SEIA summary environmental impact assessment SIEE summary initial environmental examination SO2 oxides of sulphur SOI Survey of India SWR South-western Railways SPCB State Pollution Control Board SPM suspended particulate matter SPV special purpose vehicle SSE P.Way Senior Section Engineer (Pathway) SW south west UNDP United Nation Development Program WEIGHTS AND MEASURES cum – cubic meter ha – hectare km – kilometer m – meter mm – millimeter NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Initial Environmental Examination for Doubling of Sambalpur-Titlagarh Rail Section Railway Investment Program India (PPTA-4998-IND) TABLE OF CONTENT Executive summary .................................................................................................... 0-1 1. Introduction ......................................................................................................... 1-8 1.1. Project Background....................................................................................... 1-8 1.2. Stage of Project Preparation ......................................................................... 1-8 1.3. Purpose of the Report ................................................................................... 1-8 1.4. Extent of IEE ................................................................................................. 1-9 1.5. IEE Content .................................................................................................. 1-9 1.6. Team Composition and Acknowledgements ................................................. 1-9 1.7. Methodology ............................................................................................... 1-10 1.7.1. Data Collection........................................................................................ 1-10 1.7.2. Onsite Monitoring and Strip Map Preparation .......................................... 1-11 1.7.3. Public Consultation ................................................................................. 1-11 1.7.4. Statutory Clearances Required ............................................................... 1-12 2. Description of the Project ................................................................................... 2-1 2.1. Category of the Project ................................................................................. 2-1 2.2. Need for the Project ...................................................................................... 2-1 2.3. Location and Characteristic of the Project Section ........................................ 2-2 2.4. Project Implementation Schedule and Cost .................................................. 2-3 2.5. Key Project Components and Activities......................................................... 2-3 3. Description of the Environment ......................................................................... 3-1 3.1. Physical Environment ................................................................................... 3-1 3.1.1. Meteorology and Climate .......................................................................... 3-1 3.1.2. Natural Hazards ........................................................................................ 3-3 3.1.3. Air Quality ................................................................................................. 3-3 3.1.4. Noise and Vibration ................................................................................... 3-4 3.1.5. Physiography and Topography ................................................................. 3-4 3.1.6. Geology and Seismicity ............................................................................. 3-5 3.1.7. Soil ............................................................................................................ 3-6 3.1.8. Water Resources ...................................................................................... 3-7 3.2. Ecological Resources ................................................................................. 3-10 3.2.1. Terrestrial Ecology .................................................................................. 3-10 3.2.2. Aquatic Ecology ...................................................................................... 3-15 3.3. Economic Development .............................................................................. 3-16 3.3.1. Industries ................................................................................................ 3-16 3.3.2. Infrastructure Facilities ............................................................................ 3-17 Source: Orissa Tourism Department ....................................................................... 3-20 3.4. Social and Cultural Resources .................................................................... 3-20 3.4.1. Population and Communities .................................................................. 3-20 3.4.2. Health Facilities ....................................................................................... 3-20 3.4.3. Education Facilities and Literacy ............................................................. 3-21 3.4.4. Socio-Economic Conditions .................................................................... 3-21 3.4.5. Current use of lands and resources for traditional purposes by Indigenous Peoples ................................................................................................... 3-22 3.4.6. Structures or sites of historical, archaeological, paleontological, or architectural significance ......................................................................... 3-22 4. Anticipated Environmental Impacts and its Mitigation Measures ................... 4-1 4.1. Impact on Physical Environment ................................................................... 4-1 4.1.1. Climate and Natural Hazard ...................................................................... 4-1 4.1.2. Air Quality ................................................................................................. 4-2 4.1.3. Noise and Vibration ................................................................................... 4-5 i Initial Environmental Examination for Doubling of Sambalpur-Titlagarh Rail Section Railway Investment Program India (PPTA-4998-IND) 4.1.4. Impact on Land and Soil ........................................................................... 4-6 4.1.5. Water Resources .................................................................................... 4-12 4.2. Impact on Biological Environment ............................................................... 4-15 4.2.1. Terrestrial Ecology .................................................................................. 4-15 4.2.2. Aquatic Ecology ...................................................................................... 4-20 4.3. Socio-Economic Impact .............................................................................. 4-21 4.4. Accident Risk and Safety ............................................................................ 4-22 4.5. Impacts due to Construction Camp ............................................................. 4-23 4.6. Impacts due to Proposed Residential Buildings .......................................... 4-24 4.7. Impact on Existing Common Property Resources/Utilities ........................... 4-24 4.8. Right-of –Way Maintenance .......................................................................
Recommended publications
  • Bargarh District
    Orissa Review (Census Special) BARGARH DISTRICT Bargarh is a district on the Western border of The district of Bargarh is one of the newly Orissa. Prior to 1992, it was a subdivision of created districts carved out of the old Sambalpur Sambalpur district. Bargarh has been named after district. It has a population of 13.5 lakh of which the headquarters town Bargarh situated on the 50.62 percent are males and 49.38 percent left bank of the Jira river. The town is on the females. The area of the district is 5837 sq. Km National Highway No.6 and located at 59 km to and thus density is 231 per sq.km. The population the west of Sambalpur district. It is also served growth is 1.15 annually averaged over the decade by the D.B.K railway running from Jharsuguda of 1991-2001. Urban population of the district to Titlagarh. The railway station is about 3 kms constitute 7.69 percent of total population. The off the town. A meter gauge railway line connects Scheduled Caste population is 19.37 percent of Bargarh with the limestone quarry at Dunguri. The total population and major caste group are Ganda main Hirakud canal passes through the town and (54.82), Dewar (17.08) and Dhoba etc. (6.43 is known as the Bargarh canal. percent) among the Scheduled Castes. Similarly The District of Bargarh lies between the Scheduled Tribe population is 19.36 percent 200 45’ N to 210 45’N latitude and 820 40’E to of total and major Tribes groups of the total Tribes 830 50’E longitude.
    [Show full text]
  • Sub-Centre Status of Balangir District
    SUB-CENTRE STATUS OF BALANGIR DISTRICT Sl No. Name of the Block Name of the CHC Name of Sector Name of PHC(N) Sl No. Name of Subcenter 1 Agalpur 1 Agalpur MC 2 2 Babupali 3 3 Nagaon 4 4 Rengali 5 5 Rinbachan 6 Salebhata Salebhata PHC(N) 6 Badtika 7 7 Bakti CHC 8 AGALPUR 8 Bendra Agalpur 9 9 Salebhata 10 10 Kutasingha 11 Roth Roth PHC(N) 11 Bharsuja 12 Dudka PHC(N) 12 Duduka 13 13 Jharnipali 14 14 Roth 15 15 Uparbahal 1 Sindhekela 16 Alanda 2 Sindhekela 17 Arsatula 3 Sindhekela 18 Sindhekela MC 4 Sindhekela 19 Dedgaon 5 Bangomunda Bangomunda PHC(N) 20 Bangomunda 6 Bangomunda Bhalumunda PHC(N) 21 Bhalumunda 7 Bangomunda Belpara PHC(N) 22 Khaira CHC 8 BANGOMUNDA Bangomunda 23 Khujenbahal Sindhekela 9 Chandotora 24 Batharla 10 Chandotora 25 Bhuslad 11 Chandotora 26 Chandutara 12 Chandotora 27 Tureikela 13 Chulifunka 28 Biripali 14 Chulifunka Chuliphunka PHC(N) 29 Chuliphunka 15 Chulifunka 30 Jharial 16 Chulifunka 31 Munda padar 1 Gambhari 32 Bagdor 2 Gambhari 33 Ghagurli 3 Gambhari Gambhari OH 34 Ghambhari 4 Gambhari 35 Kandhenjhula 5 Belpada 36 Belpara MC 6 Belpada 37 Dunguripali 7 Belpada 38 Kapani 8 Belpada 39 Nunhad 9 Mandal 40 Khairmal CHC 10 BELPARA Mandal Khalipathar PHC(N) 41 Khalipatar Belpara 11 Mandal 42 Madhyapur 12 Mandal Mandal PHC(N) 43 Mandal 13 Mandal 44 Dhumabhata 14 Mandal Sulekela PHC(N) 45 Sulekela 15 Salandi 46 Bahabal 16 Salandi 47 Banmal 17 Salandi 48 Salandi 18 Salandi 49 Sarmuhan 19 Salandi 50 Kanut 1 Chudapali 51 Barapudugia 2 Chudapali Bhundimuhan PHC(N) 52 Bhundimuhan 3 Chudapali 53 Chudapali MC 4 Chudapali 54
    [Show full text]
  • MFF Railway Sector Investment Program
    Social Monitoring Report Semiannual Report July 2016 IND: Railway Sector Investment Program Prepared by Rail Vikas Nigam Limited for the Government of India and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Indian Government Ministry of Railways Asian Development Bank Multitranche Financing Facility No. 0060-IND Loans No. 2793-IND, 3108-IND Railway Sector Investment Program Track Doubling and Electrification on Critical Routes Resettlement and Rehabilitation Implementation Status Semi Annual Report October 2015 – March 2016 Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 6 March 2016 ADB Loans No. 0060-IND / 2793-IND, 3108-IND i Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes Egis Rail – Egis India – TUC RAIL R&R Implementation Status No. 6 March 2016 Contents Executive Summary .............................................................................................................................. 5 1. Background .....................................................................................................................................
    [Show full text]
  • Title of the Project:” Risk Reduction and Livelihood Promotion in Western Orissa”: a Consortium Initiative
    Title of the Project:” Risk Reduction and Livelihood Promotion in Western Orissa”: A Consortium Initiative estern Orissa is the home to W situation of more chronically food insecurity than any other region in the state of Orissa. Visiting of droughts and flash floods are recurrent and common phenomena in Western Orissa. It is estimated that around two- third of the total population in this region face the problems of food insecurity for around nine months, as a result migration to towns and cities in search of livelihood is rampant. During the current decade in the year 2002 this area visited severe drought making the situation of people vulnerable. 81° 82° 83° 84° 85° 86° 87° 88° N ORISSA JHARKHAND W E District Wise Rain Fall Trend S DROUGHT HISTORY In Western Orissa WEST BENGAL July - 2002 22° 22° Sundargarh 1950-60 Twice Jharsuguda Mayurbhanj Keonjhar Deogarh 1960-70 Twice Balasore Baragarh Sambalpur CHHATISH GARH 21° 21° Bhadrak 1970-80 Five times Sonepur Angul Dhenkanal Jajpur Boudh Kendrapara Cuttack 1980-90 Six times Bolangir Jagatsinghpur Nuapada Khurda Nayagarh 20° 1990-2001 Thrice 20° Phulbani Puri l a g Kalahandi n 2002-2003 Statewide e Ganjam B Nawarangpur Rayagada 19° f o Drought 19° Gajapati Koraput y Reference a Rain Fall ANDHRA PRADESH Rain Fall Normal B Scanty (-60% and above) Malkangiri Rain Fall Actual Highly Deficient (-40% to -59%) National Boundary 18° 18° Deficient (-20% to -39% ) State Boundary Normal (+19% to -19%) District Boundary Composed and Printed at SPARC Pvt. ltd., Bhubaneswar Continuous erratic rainfall, undulated terrain, 81° 82° 83° 84° 85° 86° 87° 88° fragmented ecology followed by frequent droughts has severely affected the economic condition of the poor in Orissa, especially in the districts of Western Orissa since last few decades.
    [Show full text]
  • SPATIAL DISTRIBUTION of HOUSING and HOUSEHOLD AMENITIES: a DISTRICT LEVEL ANALYSIS, ODISHA. a Dissertation Submitted to the Depa
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by ethesis@nitr SPATIAL DISTRIBUTION OF HOUSING AND HOUSEHOLD AMENITIES: A DISTRICT LEVEL ANALYSIS, ODISHA. A Dissertation Submitted to the Department of Humanities and Social Sciences, National Institute of Technology, Rourkela, in Partial Fulfillment of Requirement of the Award of the Degree of MASTER OF ARTS IN DEVELOPMENT STUDIES Submitted by Leesa Vandana Toppo 412HS1012 Under the Guidance of Prof. Jalandhar Pradhan Department of Humanities and Social Sciences NATIONAL INSTITUTE OF TECHNOLOGY ROURKELA – 769008, ODISHA May 2014 1 SPATIAL DISTRIBUTION OF HOUSING AND HOUSEHOLD AMENITIES: A DISTRICT LEVEL ANALYSIS, ODISHA. A Dissertation Submitted to the Department of Humanities and Social Sciences, National Institute of Technology, Rourkela, in Partial Fulfillment of Requirement of the Award of the Degree of MASTER OF ARTS IN DEVELOPMENT STUDIES Submitted by Leesa Vandana Toppo 412HS1012 Under the Guidance of Prof. Jalandhar Pradhan Department of Humanities and Social Sciences NATIONAL INSTITUTE OF TECHNOLOGY ROURKELA – 769008, ODISHA May 2014 2 CERTIFICATE This is to certify that the dissertation entitled “Spatial Distribution of Housing and Household Amenities: A District Level Analysis, Odisha” which is being submitted by Leesa Vandana Toppo, MA student, Studentship Roll No. 412HS1012, in the Department of Humanities and Social Sciences, National Institute of Technology, Rourkela-769008(INDIA) for the Degree of MA in Development Studies is a bonafide research work done by her under my supervision. To the best of my knowledge, the dissertation contains neither materials published or written by another person, nor the material which to a substantial extent has been accepted for the award of MA degree at Humanities and Social Sciences, NIT Rourkela or any other educational institute except where acknowledgement is made in the dissertation.
    [Show full text]
  • 6Th MI Census 2017-18
    6th MI Census 2017-18 District Stratum GP EARAS Thana Geographical 5th MI 6th MI District Name Stratum Name GP Name Village Name Thana Name H_S_No Code Code Code Village No Area Vill Code Vill Code 4 BARGARH 269 PAIKMAL 1 PAIKMAL 1 DANDAPAT PAIKMAL 59 29 72.39 1 1 4 BARGARH 269 PAIKMAL 1 PAIKMAL 2 DURGAPALI PAIKMAL 60 125 192.01 2 2 4 BARGARH 269 PAIKMAL 1 PAIKMAL 3 JARJAGAD PAIKMAL 61 672 1398.14 3 3 4 BARGARH 269 PAIKMAL 1 PAIKMAL 4 KOKANORA PAIKMAL 57 1313 993.26 5 5 4 BARGARH 269 PAIKMAL 1 PAIKMAL 5 KHANDIJHARAN PAIKMAL 62 456 515.25 6 6 4 BARGARH 269 PAIKMAL 1 PAIKMAL 6 PAIKMAL PAIKMAL 58 1052 889.95 9 9 4 BARGARH 269 PAIKMAL 1 PAIKMAL 7 RANJITAPUR PAIKMAL 74 621 1492.32 10 10 4 BARGARH 269 PAIKMAL 1 PAIKMAL 8 SALHEPALI PAIKMAL 63 665 831.65 11 11 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 9 BIJADIHI PAIKMAL 96 1403 1353.89 12 12 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 10 BHAGATPUR PAIKMAL 101 1051 908.14 13 13 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 11 DENGLIKENDU PAIKMAL 97 68 70.72 14 14 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 12 GANDAPALI PAIKMAL 99 721 592.24 15 15 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 13 HARIDATAL PAIKMAL 104 1389 2454.20 16 16 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 14 KEREMELIBAHAL PAIKMAL 103 621 362.21 17 17 4 BARGARH 269 PAIKMAL 2 KEREMELIBAHAL 15 KHANDASIBANJHI PAIKMAL 98 1348 1046.42 18 18 4 BARGARH 269 PAIKMAL 3 PALSADA 16 BUDHASAMBAR PAIKMAL 102 1244 1728.40 19 19 4 BARGARH 269 PAIKMAL 3 PALSADA 17 GOIBAHALI PAIKMAL 100 420 432.69 20 20 4 BARGARH 269 PAIKMAL 3 PALSADA 18 KHAIRA PAIKMAL 95 1687 1375.88 21 21 4 BARGARH
    [Show full text]
  • 1. I Will Be Coming to Rourkela from Outside Odisha, What Should I Do? 2
    1. I will be coming to Rourkela from outside Odisha, what should I do? After your arrival at Rourkela, you are required to report at the Covid-19 help desk in the Biju Patnaik University of Technology campus (Address: Annexure 1). After mandatory health check-up, if you are found to be symptomatic for COVID-19, the swab test will be conducted and you will be required to stay in government quarantine (paid/non-paid as per your preference) till the results are ready. If you are without symptoms, you will be allowed to stay in home quarantine for 14 days depending upon the availability of a separate bedroom and separate bathroom in your house. If such facilities are not available at your home, you will be required to stay in government quarantine (paid/non-paid as per your preference). The list of paid quarantine centres is attached at the end (Annexure 2). It must be noted that home quarantine shall be allowed only in urban area i.e. areas falling under Rourkela Municipal Corporation and Industrial Township. There is no provision for home quarantine in rural areas. 2. I will be coming to Rourkela from any of the 14 listed districts of Odisha i.e. Khordha, Bhadrak, Balangir, Puri, Jharsuguda, Jajpur, Mayurbhanj, Ganjam, Baleshwar, Nayagarh, Cuttack, Kendujhar, Gajapati and Jagatsinghpur, what should I do? After your arrival at Rourkela, you are required to report at the Covid-19 help desk in the Biju Patnaik University of Technology campus (Address: Annexure 1). After mandatory health check-up, if you are found to be symptomatic for COVID-19, the swab test will be conducted and you will be required to stay in government quarantine (paid/non-paid as per your preference) till the results are ready.
    [Show full text]
  • Sustainable Livelihood Development of Migrant Families Through Relief and Rehabilation Programme Affacted by Covid 19 in Kalhaandi and Nuapada District of Odisha”
    1. NAME OF THE PROJECT: “SUSTAINABLE LIVELIHOOD DEVELOPMENT OF MIGRANT FAMILIES THROUGH RELIEF AND REHABILATION PROGRAMME AFFACTED BY COVID 19 IN KALHAANDI AND NUAPADA DISTRICT OF ODISHA” 2.1. Organizational information (A) Name of the Organisation : KARMI (KALAHANDI ORGANISATION FOR AGRICULTURE AND RURAL MARKETING INITIATIVE) (B) Address AT/PO. – MAHALING (KADOBHATA) VIA. – BORDA, PIN - 766 036, ODISHA, INDIA E-mail: [email protected] Phone: 9777779248, 7978958677 (C) Contact Person Mr. Abhimanyu Rana Secretary, KARM (D) Legal Status i) Registered under Society Registration Act - XXI,1860 Regd.No.-KLD-2091/444- 1996-97, Dt. 28th Jan. 1997 ii) Regd. Under FCRA 1976, by the Ministry of Home Affairs, Govt. of India Regd. No. 104970037, Dt. 19th Nov. 1999 iii) Registered under Income Tax Act. 12A of 1961 Regd. No. - Judl/12A/99-2000/14326, Dt. 14th Feb. 2000 iv) Registered under Income Tax Act. 80G of 1961 Regd.No- CIT/SBP/Tech/80 G/2012-13/1849 Dt.16/07/2012 v). PAN No - AAATK4333L (E) Bank Particulars General - Ac/ No. - 118583 43699 FCRA A/C NO- 118583 43076 STATE BANK OF INDIA, CHANDOTARA BRANCH (Code - 8880) AT/PO - CHANDOTARA, PIN - 767 035 VIA - SINDHEKELA, DIST. – BALANGIR., ODISHA, INDIA Bank Branch Code – 8880 IFSC Code – SBIN0008880 MICR Code-767002014 Bank Swift Code- SBININBB270 (F) Area of Operation Sl. Project District Block G.P Village Population Total No ST SC OC 1 Golamunda Kalahandi Golamunda 20 62 13738 6296 18587 38621 2 M.Rampur Kalahandi M.Rampur 12 54 17633 12035 16054 45722 3 Boden Nuapada Boden 15 96 27621 9419 39630 76670 4 Titilagarh Bolangir Titilagarh 6 35 14670 9113 12595 36378 5 Narla Kalahandi Narla 5 20 7365 6050 16997 30412 TOTAL 3 District 5 Block 58 267 81027 42913 103863 227803 2.2.
    [Show full text]
  • INTEGRATED DISTRICT LEVEL MANAGEMENT of IRRIGATION and AGRICULTURE in Odisha
    Operational Plan and New Command Plan for INTEGRATED DISTRICT LEVEL MANAGEMENT OF IRRIGATION AND AGRICULTURE in Odisha 1 Operational Plan and New Command Plan for Integrated District level Management of Irrigation and Agriculture in Odisha i Disclaimer ACT (Action on Climate Today) is an initiative funded with UK aid from the UK government and managed by Oxford Policy Management. ACT brings together two UK Department for International Development programmes: The Climate Proofing Growth and Development (CPGD) programme and the Climate Change Innovation Programme (CCIP). The views expressed in this document do not necessarily reflect the UK government’s official policies. Operational Plan and New Command Plan for Integrated District level Plan for Integrated Plan and New Command Operational in Odisha and Agriculture of Irrigation management ii Contents Executive Summary vi Chapter 1 1 1. Introduction 1 1.1 Vulnerability of Odisha to climate change and drought 2 1.2 Impacts of Recent Droughts in Odisha 3 1.3 Rational for district integrated irrigation and agriculture plan 3 1.4 Objectives 4 1.5 Approach and Methodology 4 1.6 Limitations 4 Chapter 2 5 2. Operation Plan 5 2.1. Background Information 5 2.1.1 Potential created from different sources 6 2.2. Mapping System and Services for Canal Operation Techniques (MASSCOTE) 7 2.2.1. Presentation of the methodology 7 2.3 Coverage of irrigation in different blocks in pilot districts 8 2.4 Assessment of gap between irrigation potential and actual utilization in a district 10 2.5 Bridging the gap 10 2.6. DIAP planning in brief 11 2.6.1.
    [Show full text]
  • Gover Rnme Nt of Odish Ha
    Government of Odisha OUTCOME BUDGET 2013-14 Rural Development Department Hon’ble Chief Minister Odisha taking review of departmental activities of DoRD on 1st March 2013 ………………………….Outcome budget of 2012-13 Sl. Page No. No. CONTENTS 1. EXECUTIVE SUMMARY I-VII 2. 1-16 CHAPTER-I Introduction Outcome Budget, 2013-14 3. 17-109 CHAPTER-II Statement (Plan & Non-Plan) 4. Reform Measures & 110 -112 CHAPTER-III Policy Initiatives 5. Past performance of 113-119 CHAPTER-IV programmes and schemes 6. 120-126 CHAPTER- V Financial Review 7. Gender and SC/ST 127 CHAPTER-VI Budgeting EXECUTIVE SUMMARY The Outcome Budget of Department of Rural Development (DoRD) broadly indicates physical dimensions of the financial outlays reflecting the expected intermediate output. The Outcome budget will be a tool to monitor not just the immediate physical "outputs" that are more readily measurable but also the "outcomes" which are the end objectives. 2. The Outcome Budget 2013-14 broadly consists of the following chapters: • Chapter-I:Brief introduction of the functions, organizational set up, list of major programmes/schemes implemented by the Department, its mandate, goals and policy frame work. • Chapter-II:Tabular format(s)/statements indicating the details of financial outlays, projected physical outputs and projected outcomes for 2013-14 under Plan and Non-Plan. • Chapter-III:The details of reform measures and policy initiatives taken by the Department during the course of the year. • Chapter-IV:Write-up on the past performance for the year 2011-12 and 2012-13 (up to December, 2012). • Chapter-V:Actual of the year preceding the previous year, Budget Estimates and Revised Estimates of the previous year, Budget Estimates of the Current Financial year.
    [Show full text]
  • Fortran Program for Regional-Residual Separation by Finite Element Method
    Appendix I 259 Appendix I Fortran Program for Regional-Residual Separation by Finite Element Method C AG-BOUGUER,GN-REGIONAL,D-RESIDUAL C PROGRAM FOR SEPARATION OF REGIONAL & RESIDUAL USING FEM METHOD C PROGRAM NEEDS THE GRAVITY VALUES ALSO IN ADDITION TO THE A(I)& B(I)VALUES DIMENSION G(12),X(12),Y(12) DIMENSION A(200000),B(200000),GN(200000),AG(200000),D(200000) OPEN(UNIT=3,FILE=‘F1-8.DAT’, STATUS=‘OLD’) OPEN(UNIT=4,FILE=‘A1.DAT’, STATUS=‘NEW’) OPEN(UNIT=11,FILE=‘A2.DAT’, STATUS=‘NEW’) OPEN(UNIT=12,FILE=‘A3.DAT’, STATUS=‘NEW’) OPEN(UNIT=13,FILE=‘A4.DAT’, STATUS=‘NEW’) READ (3,*) N,NN WRITE (*,*)‘GIVE OUTPUT DATA FILE NAME AS UNIT 4’ WRITE (4,*)‘NUMBER OF NODES{A(I)& B(I)} AND DATA(8 or 12) POINTS’ WRITE (4,*)N,NN WRITE (4,*)‘INPUT VALUES X,Y,AND GRAVITY DATA’ DO 10 I=1,NN READ (3,*) X(I),Y(I),G(I) 10 WRITE (4,*) X(I),Y(I),G(I) WRITE (4,*)‘INPUT VALUES OF A(I) & B(I)’ DO 20 I=1,N READ (3,*) A(I),B(I),AG(I) 20 WRITE (4,*)A(I),B(I),AG(I) WRITE (4,*)‘OUTPUT X , Y , REGIONAL GRAVITY & RESIDUAL VALUES’ DO 100 I=1,N A1=1+A(I) A2=1-A(I) AA=1-A(I)*A(I) K. Mallick et al., Bouguer Gravity Regional and Residual Separation: Application to Geology 259 and Environment, DOI 10.1007/978-94-007-0406-0, © Capital Publishing Company 2012 260 Bouguer Gravity Regional and Residual Separation B1=1+B(I) B2=1-B(I) BB=1-B(I)*B(I) C1=(9*AA)/32 C2=(9*BB)/32 C3=(-10+9*(2-AA-BB))/32 AN1=0.25*A2*B2*(A2+B2-3) AN3=0.25*A1*B2*(B2-A2-1) AN5=0.25*A1*B1*(1-A2-B2) AN7=0.25*A2*B1*(A2-B2-1) AN2=0.5*AA*B2 AN6=0.5*AA*B1 AN4=0.5*BB*A1 AN8=0.5*BB*A2 T1=AN1*G(1)+AN2*G(2)+AN3*G(3)+AN4*G(4)
    [Show full text]
  • Annual Report 2018-2019
    ANNUAL REPORT 2018-2019 STATE POLLUTION CONTROL BOARD, ODISHA A/118, Nilakantha Nagar, Unit-Viii Bhubaneswar SPCB, Odisha (350 Copies) Published By: State Pollution Control Board, Odisha Bhubaneswar – 751012 Printed By: Semaphore Technologies Private Limited 3, Gokul Baral Street, 1st Floor Kolkata-700012, Ph. No.- +91 9836873211 Highlights of Activities Chapter-I 01 Introduction Chapter-II 05 Constitution of the State Board Chapter-III 07 Constitution of Committees Chapter-IV 12 Board Meeting Chapter-V 13 Activities Chapter-VI 136 Legal Matters Chapter-VII 137 Finance and Accounts Chapter-VIII 139 Other Important Activities Annexures - 170 (I) Organisational Chart (II) Rate Chart for Sampling & Analysis of 171 Env. Samples 181 (III) Staff Strength CONTENTS Annual Report 2018-19 Highlights of Activities of the State Pollution Control Board, Odisha he State Pollution Control Board (SPCB), Odisha was constituted in July, 1983 and was entrusted with the responsibility of implementing the Environmental Acts, particularly the TWater (Prevention and Control of Pollution) Act, 1974, the Water (Prevention and Control of Pollution) Cess Act, 1977, the Air (Prevention and Control of Pollution) Act, 1981 and the Environment (Protection) Act, 1986. Several Rules addressing specific environmental problems like Hazardous Waste Management, Bio-Medical Waste Management, Solid Waste Management, E-Waste Management, Plastic Waste Management, Construction & Demolition Waste Management, Environmental Impact Assessment etc. have been brought out under the Environment (Protection) Act. The SPCB also executes and ensures proper implementation of the environmental policies of the Union and the State Government. The activities of the SPCB broadly cover the following: Planning comprehensive programs towards prevention, control or abatement of pollution and enforcing the environmental laws.
    [Show full text]