Raisen District, Madhya Pradesh Field Visit Report

Total Page:16

File Type:pdf, Size:1020Kb

Raisen District, Madhya Pradesh Field Visit Report Raisen District, Madhya Pradesh Field Visit Report By: Dr. Arpana Kullu, Consultant NRHM-I MoHFW Introduction For the Action based Monitoring of High Focused Districts, first visit was made to the district of Raisen in Madhya Pradesh from 26th April 2010 to 30th April 2010. The facilities visited and key persons visited for monitoring are enumerated in the Table 1 shown below. The monitoring visit, out of 7 blocks, visit was made to 4 blocks and it included interaction with the Health staff including the Medical Officers, Block Programme Managers , Nursing Staff and few ASHA’s , to gain a better understanding of the processes and difficulties in functioning. DATE DISTRICT/BLOCK PLACE VISITED PERSONS VISITED 27.04.10 Raisen SPMU, Bhopal SPM- Mr. Kumar Sourav District Health Office, ASO- Mr. Raikward Raisen IEC Consultant- Mr.Amit Sharma 28.04.10 1).Obdullaganj CHC Mandideep & Block BMO- Dr.K.P.Yadav 2).Bareilly PHC(Obdullaganj) BPM- Mr.Sunil & CHC Bareilly Mr.Soni BMO- Dr.B.D.Khare 29.04.10 Raisen (Sanchi) CHC Sanchi & PHC BMO- Dr.Das Salamatpur BPM- Ms. Rashmi District Hospital MO 30.04.10 Silwani CHC Silwani BMO-Dr. Manre SC Itkhedi BPM- Deepak Singh LHV- Sulochana Table 1: Showing the Blocks and Persons visited for monitoring. Methodology Secondary Data was collected for the structured format from the state and district HMIS data format that was already available at the respective Programme Management Unit. The primary data was collected for the qualitative responses in the format through interactions with the health staff during the visits to the health facilities. In addition to the State Program Management Unit, the District Program Management Unit and the Block Program Management Unit, facilities from all the three level were randomly selected to conduct the monitoring. From the tertiary level the District Hospital was covered, from the secondary level , CHC Mandideep, Block PHC(Obdullaganj), CHC Bareilly, CHC Sanchi and CHC Silwani and from the primary level PHC Salamatpur and SC Itkhedi. And during these community visits the frontline workers including the ASHA’s, LHV and ANM’s were also interviewed. District Profile: Raisen , Madhya Pradesh The district caters to a population of 14 lakhs. The neighbouring districts are Vidisha, Sehore and Hoshangabad. Besides Bhopal, Vidisha district provides medical care to the patients referred out from Raisen block. The terrain in the district is plain and it has a good connectivity by roadways as shown in the map below. The distict is divided into 7 blocks namely, Sanchi-Raisen, Obdullaganj- Gohaganj, Silwani, Bareilly, Udaipura, Gairatganj and Begamganj. Figure 1: Road Map of Raisen District showing boundaries and road routes. District, Raisen Madhya Pradesh is one of the closest districts to the state capital of Bhopal. According to the Ranking and Mapping of Districts done by IIPs in 2006 the rank given to Raisen was 359 out of the total of 593 districts. The further elaboration of the indicators of the district is given in Figure 2 shown below. Figure 2: Rank of Raisen District, Source: Jansankhya Sthirta Kosh District Programme Management unit The DPMU at Raisen is headed by Dr. Chaubey, CDHO. The DPMU is stationed approximately 60kms from the State Programme Management Unit in Bhopal. It mainly monitors and supervises the functioning of the whole district. But the lack of staff being one of the universal problems across districts, Raisen is no different. Currently the position of District Programme Manager lies vacant since last one year hence the currently staff in position mainly the ASO and the IEC Consultant who have been working in the DPMU manage the responsibilities of the DPM, which often results in multi tasking by them. More over the DPMU as well as BPMU’s also lack data entry operator staff hence the burden falls on the existing staff. In addition, due to the non-availability and incomplete data leaves very limited baseline information to plan further. Thus lack of skilled staff results in compromised state of available data for any monitoring and evaluation. Hence forth there was a lot of information in the format that was unavailable. Besides the existing difficulties what is commendable is that the district is still able to upload their data within its limited capacities. The deputation of Block Program Managers also requires due appreciation since they are contributing immensely in providing managerial support for tracking funds and monitoring activities under the mission at the block level. But to further utilise their skills and capacities more effectively they need even more clear and focused guidelines on their roles and responsibilities, as told by them . Health Facilities in the District Health Facility Number District Hospital 1 Community Health Centre 9 Primary Health Centre 19 Sub Health Centre 176 Currently the number of health facilities in the district is not sufficient to meet the needs the whole population of 14lakhs. And there hasn’t been any proposal in the district health plan within last year for construction of any PHC or CHC. Capacity Building Along with ensuring availability of the health staff in the facilities NRHM focuses on build on the capacities of the existing staff. For which there are provisions for trainings at all levels. As mentioned in the monitoring format the trainings for doctors in EmOC, LSAS, Abdominal Tubectomy (Minilap) and IMNCI in the last one year has been nil. Human Resource The problem of shortage of specialists in the districts is not any different to Raisen. Currently in the district, there are 40 regularly employed MBBS doctors and there are another 40 MBBS doctors who are deputed on contractual positions. For specialists there are 20 specialists available in the whole district. And even with the ones available the services provided are not adequate. For example, the number Of caesareans performed in 2009-2010 in the District hospital: 48. Moreover when combined with other problems of lack of supportive staff it becomes even more difficult to provide essential care also. The area under the field staff on average is 7-8 villages which in terms of population constitutes a population of up to 600 people. There has been a significant addition of ANM’s in the district. A total of 216 ANM’s were added in the year 2009-2010. The current state of vacant and filled positions of ASHA’s and AWW’s is given in the following table.( Source: State HMIS data, updated till Feb 2010) ASHA’s AWW Total No of Villages Filled Vacant Filled Vacant Bareilly 145 108 260 -7 253 Sanchi 173 24 197 53 262 Silwani 120 129 112 137 249 Obdullaganj 145 108 195 58 253 Udaipura 137 30 157 8 155 Gairatganj 85 77 98 64 162 Begumganj 118 78 116 80 196 Communitization Process: Community participation is an important component of NRHM for which many strategies have been incorporated in the programme so as to ensure that the health mission reaches the underserved communities and involve people in planning process also. Broadly these strategies include Selection of ASHA’s, Rogi Kalyan Samiti and Village Health and Sanitation Committee. Even after five years of NRHM the programme has not been able to reach completely up till the community level. (i). ASHA’s The observations and concerns regarding ASHAs’s that were found out in the district are as follows: There are a total of 940 ASHA’s in the district against the sanctioned positions of 1477. Hence a huge need of almost 537 ASHA’s still remains unmet. For which strategies like making the eligibility criterion more flexible needs to be adopted. On interactions with the DPMU staff it was told that 625 drug kits given to ASHA’s was supplied only once in the year 2007, hence the newly selected ASHA’s in the last couple year did not receive these drug kits. Whereas, the data shows that all the 940 ASHA’s have received drug kits. This information requires further probing at the PHC and Sub Centre levels. Moreover the ASHA’s when inducted in the system they were supposed to be the between the beneficiaries and the providers, and support the system to generate demand for the services amongst the people, hence they were chosen as voluntary workers and not regular employees. But now they have become a part of the system, this was substantiated when the ASHA’s who were interviewed and asked about their roles and responsibilities they would reply that they are expected to get all the pregnant women in their village to the health facility for delivery. (ii). RKS To upgrade facilities in the public health system and with a purpose to provide sustainable quality care with accountability and people’s participation along with total transparency. The RKS is in place in all the health facilities as per the guidelines in the framework. But their meetings do not happen regularly as told by one of the Block Medical Officers and thus utilization of funds for which the RKS was formed is very difficult to mobilise. Therefore currently the funds are not utilised with complete efficiency. (iii). Village and Health Sanitation Committee There are 664 VHSC’s in the district and the target for the next year is 736 which are still less when we equate them to the number of Gram Panchayats in the district. The committees are formed wherever there are ASHA’s thus places where an ASHA is not there VHSC’s are also absent. The VHSC’s that are already in place they have a joint bank account in the name of ASHA and the Women representative from the PRI. And the fund utilized only requires the signatory to produce a utilization certificate, there is no monitoring mechanism to ensure that the money is utilized for the purpose it is released.
Recommended publications
  • Construction of 6-Lane Bhopal – Indore Green Field Expressway – 146.880 Kms in the State of Madhya Pradesh Alternative Option Analysis- Annexure-III
    Construction of 6-Lane Bhopal – Indore Green Field Expressway – 146.880 Kms in the State of Madhya Pradesh Alternative Option Analysis- Annexure-III Criteria for Fixing Alignment for Expressways 1. The Expressway between two terminal stations should be short and straight as far as possible, but due to engineering, social and environmental considerations some deviations may be required. 2. The project should be constructible and easy to maintain; the Greenfield project should reduce the vehicle operation cost with respect to the existing option already available i.e. using the NH/SHs in combination to reach from point A to point B. 3. It should be safe at all stages i.e. during design, construction and operation stages. Safety audits at each stage should confirm the same. 4. The project initial cost, maintenance cost, and operating cost should be optimum so as to be considered economical with respect to its options. 5. The alignment should be finalised giving due consideration to sitting/location of major structures including Major/Minor Bridges, Interchanges and ROBs. The space requirement of interchanges to be kept into consideration to avoid major resettlement. 6. Tunnel / Box cutting of Hills should be considered as the last option and should be provided only when it is absolutely necessary. 7. The location of spurs for connecting the important towns to be decided while fixing the alignment Options. 8. The alignment should follow the unused / barren land to the extent possible to reduce the cost of land acquisition. 9. The proposed options in the present case connects the under developed regions of Madhya Pradesh which would lead to the development of new growth centres along the proposed highway i.e.
    [Show full text]
  • Forest of Madhya Pradesh
    Build Your Own Success Story! FOREST OF MADHYA PRADESH As per the report (ISFR) MP has the largest forest cover in the country followed by Arunachal Pradesh and Chhattisgarh. Forest Cover (Area-wise): Madhya Pradesh> Arunachal Pradesh> Chhattisgarh> Odisha> Maharashtra. Forest Cover (Percentage): Mizoram (85.4%)> Arunachal Pradesh (79.63%)> Meghalaya (76.33%) According to India State of Forest Report the recorded forest area of the state is 94,689 sq. km which is 30.72% of its geographical area. According to Indian state of forest Report (ISFR – 2019) the total forest cover in M.P. increased to 77,482.49 sq km which is 25.14% of the states geographical area. The forest area in MP is increased by 68.49 sq km. The first forest policy of Madhya Pradesh was made in 1952 and the second forest policy was made in 2005. Madhya Pradesh has a total of 925 forest villages of which 98 forest villages are deserted or located in national part and sanctuaries. MP is the first state to nationalise 100% of the forests. Among the districts, Balaghat has the densest forest cover, with 53.44 per cent of its area covered by forests. Ujjain (0.59 per cent) has the least forest cover among the districts In terms of forest canopy density classes: Very dense forest covers an area of 6676 sq km (2.17%) of the geograhical area. Moderately dense forest covers an area of 34, 341 sqkm (11.14% of geograhical area). Open forest covers an area of 36, 465 sq km (11.83% of geographical area) Madhya Pradesh has 0.06 sq km.
    [Show full text]
  • District Census Handbook, Raisen, Part X
    CENSUS OF INDIA 1971 SERIES 10 MADHYA PR ADESH DISTRICT CENSUS HANDBOOK PART X (A) & (B) VILLAGE AND TOWN DIRECTORY VILLAGE AND TOWN-WISE PRIMARY CENSUS ABSTRACT RAISEN DISTRICT A. K. PANDYA OP THE INDIAN ADMINISTRATIVE SERVICE DIRECTOR OF CENSUS OPERATIONS. MADHYA PRADESH PUBLISHED BY THE GOVERNMENT OF MADHYA PRA.DESH 1974 CONTENTS Page 1. Preface i-ii 2. List of Abbreviations 1 3. Alphabetical List of Villages 3-19 ( i ) Raisen Tahsil 3-5 ( ii) Ghairatganj Tahsil 5-7 ( iii) Begmaganj Tahsil 7-9 (iv) Goharganj Tahsil 9-12 ( v) Baraily Tahsil 12-15 (vi) Silwani Tahsil 15-17 ( vii) Udaipura Tahsil 17-19 PART A 1. Explaaatory Note 23-33 2. Village Directory (Amenities and Land-use) 34·101 ( i ) Raisen Tahsil 34-43 ( ii) Ghairatganj Tahsil 44-51 ( iii) Begamganj Tahsil 52·61 (iv) Goharganj Tahsil, 62-71 (v ) Baraily Tahsil 72-81 (vi), Silwani Tahsil 82-93 (vii ) Udaipura Tahsil 94-101 3. Appendix to Village Directery 102-103 4. Town Directory 104-107 ( i) Status, Growth History and Functional Category of Towns 104 (ii) Physical Aspects and Location of Towns 104 ( iii) Civic Finance 105 ( iv) Civic and other Amenities 105 ( v) Medical, Educational, Recreational and Cultural Facilities in Towns 106 (vi) TradCt Commerce, Industry and Banking 106 t vii) Population by R.eligion and Scheduled Castes/Scheduled Tribes in Towns 107 PART B tJago 1. Explaaatory Note 111·112 2. Figures at a Glance 113 3. Primary Census Abstract 114·201 District Abstract 114-117 Raisen Tahsil 118·133 (Rural) Il8·133 (Urban) 132·133 Ghairatganj Tahsil 134-141 (Rural) 134·141 Begamganj Tahsil 142.153 (Rural) 142·151 (Urban) ISO-I53 Goharganj Tahsil 154-167 (Rural) 154-167 Baraily Tahsil 168-181 (Rural) 168-181 (Urban) 180·181 Silwani Tahsil 182·193 (Rural) 182-193 Udaipura Tahsil 194-201, (Rural) 194-201 LIST OF ABBREVJATIONS I.
    [Show full text]
  • Download Article
    International Journal of Information Research and Review, January, 2020 International Journal of Information Research and Review Vol. 07, Issue, 01, pp.6668-6674, January, 2020 RESEARCH ARTICLE STUDY OF GROUND WATER QUALITY OF MANDIDEEP INDUSTRIAL AREA, MADHYA PRADESH, INDIA Reeta Kori, Alok Saxena, Harish Wankhade, Asad Baig, Ankita Kulshreshtha*, Saket Mishra and Smriti Sen Central Laboratory, Madhya Pradesh Pollution Control Board, Paryavaran Parisar, E-5, Arera Colony, Bhopal, India ARTICLE INFO ABSTRACT Article History: Ground water quality, especially within industrial area is increasing interest for study. This paper is th focus on the ground water quality status of Mandideep industrial area of Madhya Pradesh India. Study Received 10 October, 2019 of physico-chemical parameters of ground water was carried out during different quarters of year Received in revised form 07th November, 2019 2018- 2019. In present study, total thirteen ground water samples were collected from selected Accepted 29th December, 2019 locations at Mandideep industrial area. Ground water was monitored and samples were analyzed by Published online 30th January, 2020 standard methods. It is concluded that trace amount of pollutant in ground water was observed at few locations in Mandideep industrial area. The results are compared with BIS: 10500 (2012). Parameters Keywords: like fluoride and ammonical nitrogen were not detected in ground water at all monitoring locations Mandideep Industrial area, during this study. Anthropogenic activities (mainly industrial), in the area may have direct or indirect Ground Water, impact on the groundwater quality. Water Pollutants, Water quality. Copyright © 2020, Reeta Kori et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricte d use, distribution and reproduction in any medium, provided the original work is properly cited.
    [Show full text]
  • State Zone Commissionerate Name Division Name Range Name
    Commissionerate State Zone Division Name Range Name Range Jurisdiction Name Gujarat Ahmedabad Ahmedabad South Rakhial Range I On the northern side the jurisdiction extends upto and inclusive of Ajaji-ni-Canal, Khodani Muvadi, Ringlu-ni-Muvadi and Badodara Village of Daskroi Taluka. It extends Undrel, Bhavda, Bakrol-Bujrang, Susserny, Ketrod, Vastral, Vadod of Daskroi Taluka and including the area to the south of Ahmedabad-Zalod Highway. On southern side it extends upto Gomtipur Jhulta Minars, Rasta Amraiwadi road from its intersection with Narol-Naroda Highway towards east. On the western side it extend upto Gomtipur road, Sukhramnagar road except Gomtipur area including textile mills viz. Ahmedabad New Cotton Mills, Mihir Textiles, Ashima Denims & Bharat Suryodaya(closed). Gujarat Ahmedabad Ahmedabad South Rakhial Range II On the northern side of this range extends upto the road from Udyognagar Post Office to Viratnagar (excluding Viratnagar) Narol-Naroda Highway (Soni ni Chawl) upto Mehta Petrol Pump at Rakhial Odhav Road. From Malaksaban Stadium and railway crossing Lal Bahadur Shashtri Marg upto Mehta Petrol Pump on Rakhial-Odhav. On the eastern side it extends from Mehta Petrol Pump to opposite of Sukhramnagar at Khandubhai Desai Marg. On Southern side it excludes upto Narol-Naroda Highway from its crossing by Odhav Road to Rajdeep Society. On the southern side it extends upto kulcha road from Rajdeep Society to Nagarvel Hanuman upto Gomtipur Road(excluding Gomtipur Village) from opposite side of Khandubhai Marg. Jurisdiction of this range including seven Mills viz. Anil Synthetics, New Rajpur Mills, Monogram Mills, Vivekananda Mill, Soma Textile Mills, Ajit Mills and Marsdan Spinning Mills.
    [Show full text]
  • Download in Pdf Size
    State District Town State District Name Town Name Code Code Code A & N Islands 35 640 South Andaman 804041 Port Blair Andhra Pradesh 28 553 Anantapur 803009 Anantapur Andhra Pradesh 28 553 Anantapur 803010 Dharmavaram Andhra Pradesh 28 553 Anantapur 594760 Gooty Andhra Pradesh 28 553 Anantapur 803007 Guntakal Andhra Pradesh 28 553 Anantapur 803012 Hindupur Andhra Pradesh 28 553 Anantapur 803011 Kadiri Andhra Pradesh 28 553 Anantapur 594956 Kalyandurg Andhra Pradesh 28 553 Anantapur 595357 Madakasira Andhra Pradesh 28 553 Anantapur 594864 Pamidi Andhra Pradesh 28 553 Anantapur 595448 Puttaparthi Andhra Pradesh 28 553 Anantapur 803006 Rayadurg Andhra Pradesh 28 553 Anantapur 803008 Tadpatri Andhra Pradesh 28 554 Chittoor 803019 Chittoor Andhra Pradesh 28 554 Chittoor 803015 Madanapalle Andhra Pradesh 28 554 Chittoor 803016 Nagari Andhra Pradesh 28 554 Chittoor 803020 Palamaner Andhra Pradesh 28 554 Chittoor 803018 Punganur Andhra Pradesh 28 554 Chittoor 803017 Puttur Andhra Pradesh 28 554 Chittoor 803013 Srikalahasti Andhra Pradesh 28 554 Chittoor 803014 Tirupati Andhra Pradesh 28 545 East Godavari 802958 Amalapuram Andhra Pradesh 28 545 East Godavari 587337 Gollaprolu Andhra Pradesh 28 545 East Godavari 802955 Kakinada Andhra Pradesh 28 545 East Godavari 802956 Mandapeta Andhra Pradesh 28 545 East Godavari 587758 Mummidivaram Andhra Pradesh 28 545 East Godavari 802951 Peddapuram Andhra Pradesh 28 545 East Godavari 802954 Pithapuram Andhra Pradesh 28 545 East Godavari 802952 Rajahmundry Andhra Pradesh 28 545 East Godavari 802957 Ramachandrapuram
    [Show full text]
  • Industrial Land Bank 2016
    22 - 23 2016 22 - 23 2016 INDUSTRIAL LAND BANK 2016 22 - 23 2016 INDUSTRIAL LAND BANK 2016 22 - 23 2016 22 - 23 2016 Publisher: MP Trade and Investment Facilitation Corporation Limited “CEDMAP BHAWAN” 16-A, Arera Hills Bhopal - 462001, M.P(India) Tel. :(91) 755-2575618, 2571830 Fax : (91) 755-2559973 E-mail : [email protected] http://www.mptrifac.gov.in http://www.invest.mp.gov.in/ INDUSTRIAL LAND BANK 2016 CONTENT 1. Preface 2 2. Introduction 3 3. Industrial land bank available with Government of Madhya Pradesh 5 4. Industrial land bank with Audyogik Kendra Vikas Nigam (AKVN) 6 4a. Developed/Developing land bank available with AKVNs 9 • Bhopal AKVN 9 • IIDC Gwalior 22 • Indore AKVN 36 • Jabalpur AKVN 70 • Rewa AKVN 81 • Sagar AKVN 89 • Ujjain AKVN 99 4b. Undeveloped land bank available with AKVNs 113 4c. Undeveloped land allotment guidelines 131 5. Developed Industrial land bank with department of Micro Small and Medium Enterprises (MSME) 137 6. Industrial land bank available with Madhya Pradesh State Electronic Development Corporation (MPSEDC) 143 1 INDUSTRIAL LAND BANK 2016 1 2 INDUSTRIAL LAND BANK 2016 2 INTRODUCTION Madhya Pradesh has emerged as a Growth Centre of the country in the last decade. Madhya Pradesh has witnessed a radical transformation in terms of economic and social development. Madhya Pradesh’s central location makes it an ideal destination as a manufacturing and sourcing hub to tap the constantly growing Indian market. Owing to its rich soil, several rivers and large irrigation projects, Madhya Pradesh is a thriving destination for agriculture and food processing business.
    [Show full text]
  • Highlights of the Railway Budget - 2013-14
    HIGHLIGHTS OF THE RAILWAY BUDGET - 2013-14 Thrust 1. Safety; 2. Consolidation; 3. Passenger Amenities; 4. Fiscal Discipline. Some Achievements/Initiatives . IR enters the one billion tonne Select Club joining Chinese, Russian and US Railways; . IR also joins Select Club running freight trains of more than 10000 tonne load; . ‘Fuel Adjustment Component’ concept to be implemented linking tariffs with movement of fuel prices; . Target of Rs 1000 crore each fixed for Rail Land Development Authority and IR Station Development Corporation to be raised through PPP in 2013-14; . New fund – Debt Service Fund – to be set up to meet committed liabilities of debt servicing for WB and JICA loans for DFC and other future liabilities. Measures for improving Safety & Security . Making a Corporate Safety Plan for a ten year period (2014-2024). Elimination of 10797 level crossings during the 12th Plan and no addition of new LCs to the IR system henceforth. Introduction of Train Protection Warning System on Automatic Signalling Systems. Rigorous trials of the indigenously developed Train Collision Avoidance System. Using 60 kg rails, 260 meter long welded rail panels and improved flash butt welding technology. Introduction of 160/200 kmph Self Propelled Accident Relief Trains. Induction of crash worthy LHB coaches with anti-climb feature. Rehabilitation of identified 17 distressed bridges over next one year. Provision of comprehensive fire and smoke detection systems. Provision of portable fire extinguishers in Guard-cum-Brake Vans, AC Coaches and Pantry Cars in all trains. Use of fire retardant furnishing materials in coaches. Measures initiated to deal with elephant related accidents.
    [Show full text]
  • District Census Handbook, Hoshangabad, Part XIII-B, Series-11
    • 'lTtT XllI-v ~~t(ot;rr (fiT SlT'-Ifq ... m~m • ~. '". ~, ~ $l4Iief;ll", ~ ~, Ifi\tiOf;ll" ~. 1981 CENSUS-PUBUCATION PLAN ( 198 / Census Publications, Series J I in All India Series will be published ill tif! folltJw~ "Mfs) GOVERNMENT OF INDIA PUBLICATIONS Part I-A Administration Report-Enumeration Part I-B Administration Report-Tabulation Part II-A General Population Tables Part II-B Primary Census Abstract Part III Gel1eral Economic Tables Part IV Social and Cultural Tables Part V Migration Tables Part VI Fertility Tables P;:trt VII Tables on Houses and Disabled Population Part VIn Household Tables Part IX Special Tables on Scheduled Castes and Scheduled Tribes Part X-A Town Directory Part X-B Survey Reports on selected Towns Part X-C Survey Reports on selected Villages Part XI Ethnographic Notes and special studies on Scheduled Castes and Scheduled Tribes Part XII Census Atlas Paper 1 of 1982 Primary Census Abstract for Scheduled Castes an1 Scheduled Tribes Paperl of 1984 Household Population by Religion of H~ad of Household STATE GOVERNMENT PUBLICATIONS Part XIII-A and B District C~n5us Handbook for each of the 45 districts in the State (Village and Town Directory and Primary Census Abstract) CONTENTS 1 srfCfifi"A Foreword I-IV 2 ~T Preface V-VI 3 ~ Cfil i{CffiT District Map 4 q~~~ adCfi~ Important Statistics VII Analytical Note IX-XXXXIV 5 f?tffl'fUTTt'fCfi :-~) ~m~lI'Rlf'fi f~q-urr; ar~~f"ffi \iflfor Notes and Explanations: list of Scheduled atT~ ar:!.~f",cr \iiif\iflfcr 'liT ~"fr Castes and Scheduled Tribes Order ( ij'1!I'1WT).
    [Show full text]
  • Solar Multi Utility Centres in Madhya Pradesh: Baseline and Technology Details
    Final Report Project Code 2010DG02 and 2010ST03 Solar Multi Utility Centres in Madhya Pradesh: Baseline and Technology Details Supported by NFA © The Energy and Resources Institute 2013 Suggested format for citation T E R I. 2013 Solar Multi Utility centres in Madhya Pradesh: Baseline and change assessment New Delhi: The Energy and Resources Institute. For more information Project Monitoring Cell T E R I Tel. 2468 2100 or 2468 2111 Darbari Seth Block E-mail [email protected] IHC Complex, Lodhi Road Fax 2468 2144 or 2468 2145 New Delhi – 110 003 Web www.teriin.org India India +91 • Delhi (0)11 ii Table of contents 1. INTRODUCTION AND METHODOLOGY ................................................................................. 1 1.1 Scope of the Report .......................................................................................................... 3 1.2 A Brief Note on Institutional Framework ..................................................................... 3 1.3 Survey Design ................................................................................................................... 4 1.4 Utility of the Report ......................................................................................................... 4 2. SITUATIONAL ANALYSIS: REPORTING OF VILLAGE AND LIVELIHOOD PROFILE ............ 6 2.1 Chikali ................................................................................................................................ 6 2.2 Imaliya ..............................................................................................................................
    [Show full text]
  • ICAR-Indian Institute of Soil Science Nabibagh, Berasia Road, Bhopal-462 038, India
    ICAR-Indian Institute of Soil Science Nabibagh, Berasia road, Bhopal-462 038, India Report of the ICAR short course on “Advances in Assessment of Soil Pollution and its Remediation” The ICAR-IISS, Bhopal conducted a ICAR Short course on “Advances in Assessment of Soil Pollution and its Remediation” during 16-25th March, 2017. The training was inaugurated on 16th March morning by Dr A K Patra, Director, ICAR-IISS, Bhopal in the presence of participants, IISS scientific staff and training related persons. The Course director Dr J K Saha briefly elaborated the need of this course in present era and how to tackle to reduce or manage the adverse effects of environmental pollution with advanced techniques. All the resource persons delivered their assigned talk in a very effective way that has been reflected by participants’ feedback on the training. In this Short course, participants were exposed to modern instruments like ICP-OES, FT-IR, IR spectroscopy, GC, HPLC, TOC, Lypholyser etc through several practical classes and were properly explained/trained on the precautions and maintenance of the instruments. The feedback revealed that majority of the participants found the training most useful and lectures were of high quality. There has been overall improvement in knowledge level of participants on the subject as indicated by average score of 86.5% in evaluation test conducted at the end of the Short course as against the average score level 48.3% in evaluation test at the beginning. The boarding and lodging, laboratory facilities, resource persons and their way of teaching, behavior, decision making and selected topics were highly appreciated by the participants.
    [Show full text]
  • Social Safeguards Compliance Report
    Social Safeguards Compliance Report June 2018 IND: Second Rural Connectivity Investment Program Tranche 2 Madhya Pradesh Prepared by National Rural Road Development Agency, Ministry of Rural Development, Government of India for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 8 June 2018) Currency unit – Indian Rupees (INR/Rs) INR1.00 = $ 0.014835 $1.00 = INR 67.41 ABBREVIATIONS ADB : Asian Development Bank APs : Affected Persons BPL : Below Poverty Line FFA : Framework Financing Agreement GOI : Government of India GRC : Grievances Redressal Committee IA : Implementing Agency MFF : Multitranche Financing Facility MORD : Ministry of Rural Development MOU : Memorandum of Understanding NC : Not Connected NGO : Non-Government Organization NRRDA : National Rural Road Development Agency MGNREGA : Mahatma Gandhi National Rural Employment Guarantee Act MPRRDA : Madhya Pradesh Rural Road Development Agency PIU : Project Implementation Unit PIC : Project Implementation Consultants PFR : Periodic Finance Request PMGSY : Pradhan Mantri Gram Sadak Yojana RCIP : Rural Connectivity Investment Program ST : Scheduled Tribes TA : Technical Assistance TOR : Terms of Reference TSC : Technical Support Consultants VAP : Vulnerable Affected Person WHH : Women Headed Households GLOSSARY Affected Persons (APs): Affected persons are people (households) who may lose their land or source of livelihood due top the project. It may be all or part of their physical and non-physical assets, irrespective of legal or ownership titles. Encroacher: A person, who has trespassed government land, adjacent to his/her own land or asset, to which he/she is not entitled, by deriving his/her livelihood there. Such act is called “Encroachment.” Gramsabha Resolution: A resolution drawn up by unanimous and collective decision of villagers. The resolution drawn up for the purpose of the project refers to identification of the affected persons, extent of their losses by unique identification and signed consent of the affected persons to donate voluntarily the identified assets for the project purpose.
    [Show full text]