World Bank Documents Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: December 2019 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Public Disclosure Authorized ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO. 5. Any Other Special Procurement Arrangements [including advance procurement and retroactive financing, if applicable]: None Public Disclosure Authorized 6 Summary of the Procurement Packages planned during December 2019 . 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / thousand Post) Summary of the National Competitive Bidding (Works) Summary of the Shopping 850.75 2 Post (Works) Summary of the Shopping (Goods) Summary of the Shopping (Non- 402.99 3 Post Consultant Services) Cancellation (Works) Cancellation (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Greater than or equal to US$ 1,000,000 2. Single Source (Firms) Greater than or equal to US$ 1,000,000 3. Individual Greater than or equal to US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements [including advance procurement and retroactive financing, if applicable or delete if not applicable]: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Estimated Review Description of Ref. No. Cost by Bank Assignment Packages Comments US$ (Prior / thousand Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that 268.65 3 Post will be let under other methods Cancellation PROCUREMENT China : Hunan Integrated Management of Agricultural Land Pollution Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-09-04 Revised Plan Date(s): (comma delineated, leave blank if none)2019-12-20 Project ID: P153115 GPN Date: 2017-08-16 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project Loan / Credit No: IBRD / 87770, / Executing Agency(ies):Hunan Integrated Management of Agriculture PMO WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HNYDG001 / Construction Component 1: Demonstration Under of drainage ditches, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 495,870.00 0.00 Implementati 2017-09-15 2017-11-10 2018-05-09 irrigation ditches, sand and Quotations Envelope Land Pollution Management. on gravel traps. HNYXG001 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 347,610.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps, field roads. Land Pollution Management. HNYXG002 / Construction Component 1: Demonstration Request for Single Stage - One of drainage ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 171,190.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps. Land Pollution Management. HNYXG003 / Construction of irrigation ditches, Component 1: Demonstration drainage ditches, sand and Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 419,250.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 gravel traps, ecological Quotations Envelope Land Pollution Management. interception ditches and pumping stations. HNYXG004 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 60,150.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps. Land Pollution Management. HNYXG005 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches and IBRD / 87770 of Risk-based Agricultural Post Limited 224,030.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope drainage ditches. Land Pollution Management. HNHYG001 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 310,700.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches Land Pollution Management. HNHYG002 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 105,100.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches. Land Pollution Management. HNHYG003 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 154,210.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches. Land Pollution Management. HNHYG004 / Construction Component 1: Demonstration Request for Single Stage - One of Sand and gravel traps IBRD / 87770 of Risk-based Agricultural Post Limited 118,340.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope &Field roads. Land Pollution Management. Page 1 HNXXHYG001 / Construction of irrigation Component 1: Demonstration Pending Request for Single Stage - One system, gravel or dirt road, IBRD / 87770 of Risk-based Agricultural Post Open - National 316,190.00 0.00 Implementati 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope Sediment desilting and Land Pollution Management. on landfill in Huayuan county. HNXXHYG002 / Construction of irrigation Component 1: Demonstration Pending Request for Single Stage - One system, gravel or dirt road, IBRD / 87770 of Risk-based Agricultural Post Open - National 218,810.00 0.00 Implementati 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope Sediment desilting and Land Pollution Management. on landfill in Huayuan county. HNHNG001 / Construction of irrigation system, gravel Component 1: Demonstration Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 1,048,810.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2020-06-21 Envelope desilting and landfill in Land Pollution Management. Hengnan county. HNZFG001 / Construction of irrigation system, gravel Component 1: Demonstration Pending Request for Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Open - National 302,990.00 0.00 Implementati 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope desilting and landfill in Land Pollution Management. on Zhongfang county. HNZFG002 / Construction of irrigation system, gravel Component 1: Demonstration Pending Request for Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Open - National 320,930.00 0.00 Implementati 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope desilting and landfill in Land Pollution Management. on Zhongfang county. HNLSTG001 / Construction of irrigation system, gravel Component 1: Demonstration Pending Single Stage - One or dirt road,
Recommended publications
  • Corporate Social Responsibility White Paper
    2020 CEIBS CORPORATE SOCIAL RESPONSIBILITY WHITE PAPER FOREWORD The Covid-19 pandemic has brought mounting research teams, as well as alumni associations and com- uncertainties and complexities to the world economy. Our panies. The professors obtained the research presented globalized society faces the challenge of bringing the in the paper through the employment of detailed CSR virus under control while minimizing its impact on the parameters focused on business leaders, employee economy. Economic difficulties substantially heighten the behavior and their relationship to the external environ- urgency for a more equitable and sustainable society. ment. This granular and nuanced form of research is a powerful tool for guiding the healthy development of CSR. At the same time, there is an ever-pressing need to enrich and expand the CSR framework in the context of The five CEIBS alumni companies featured in the social and economic development. CEIBS has incorporat- white paper offer exceptional examples of aligning busi- ed CSR programs into teaching, research, and student/ ness practices with social needs. Their learning-based alumni activities since its inception. The international busi- future-proof business innovations are a powerful demon- ness school jointly founded by the Chinese government stration of how best to bring CSR to the forefront of busi- and the European Union has accelerated knowledge ness activities. These five firms all received the CSR creation and dissemination during the pandemic to sup- Award in April 2019 at the second CEIBS Alumni Corpo- port economic stability and business development. The rate Social Responsibility Award, organized by the CEIBS institution has also served as a key communication chan- Alumni Association.
    [Show full text]
  • World Bank Document
    Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: August 2017 to February 2019 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Public Disclosure Authorized ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO.
    [Show full text]
  • Environmental Impact Analysis in This Report
    Environmental Impacts Assessment Report on Project Construction Project name: European Investment Bank Loan Hunan Camellia Oil Development Project Construction entity (Seal): Foreign Fund Project Administration Office of Forestry Department of Hunan Province Date of preparation: July 1st, 2012 Printed by State Environmental Protection Administration of China Notes for Preparation of Environmental Impacts Assessment Report on Project Construction An Environmental Impacts Assessment (EIA) Report shall be prepared by an entity qualified for conducting the work of environmental impacts assessment. 1. Project title shall refer to the name applied by the project at the time when it is established and approved, which shall in no case exceed 30 characters (and every two English semantic shall be deemed as one Chinese character) 2. Place of Construction shall refer to the detailed address of project location, and where a highway or railway is involved, names of start station and end station shall be provided. 3. Industry category shall be stated according to the Chinese national standards. 4. Total Investment Volume shall refer to the investment volume in total of the project. 5. Principal Targets for Environment Protection shall refer to centralized residential quarters, schools, hospitals, protected culture relics, scenery areas, water sources and ecological sensitive areas within certain radius of the project area, for which the objective, nature, size and distance from project boundary shall be set out as practical as possible. 6. Conclusion and suggestions shall include analysis results for clean production, up-to-standard discharge and total volume control of the project; a determination on effectiveness of pollution control measures; an explanation on environmental impacts by the project, and a clear-cut conclusion on feasibility of the construction project.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Attached Figure 1-1 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Baojing County 1 Public Disclosure Authorized Attached Figure 1-2 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Jishou City 2 Attached Figure 1-3 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Yongshun County 3 Diagrammatic Sketch of Location of Demonstration Area of Integrated Management of Agricultural Land Pollution Project with World Bank Loan in Huayuan County Attached Figure 1-4 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Huayuan County 4 Attached Figure 1-5 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Cili County 5 Attached Figure 1-6 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Huayuan County 6 Attached Figure 1-7 Diagrammatic Sketch of Location of Demonstration Area and Distribution of Environmental Sensitive Points and Scope of Evaluation in Anhua County 7 Schematic Diagram for Demonstration Areas of Integrated Management of Agricultural Land Pollution in Hengnan County
    [Show full text]
  • Addition of Clopidogrel to Aspirin in 45 852 Patients with Acute Myocardial Infarction: Randomised Placebo-Controlled Trial
    Articles Addition of clopidogrel to aspirin in 45 852 patients with acute myocardial infarction: randomised placebo-controlled trial COMMIT (ClOpidogrel and Metoprolol in Myocardial Infarction Trial) collaborative group* Summary Background Despite improvements in the emergency treatment of myocardial infarction (MI), early mortality and Lancet 2005; 366: 1607–21 morbidity remain high. The antiplatelet agent clopidogrel adds to the benefit of aspirin in acute coronary See Comment page 1587 syndromes without ST-segment elevation, but its effects in patients with ST-elevation MI were unclear. *Collaborators and participating hospitals listed at end of paper Methods 45 852 patients admitted to 1250 hospitals within 24 h of suspected acute MI onset were randomly Correspondence to: allocated clopidogrel 75 mg daily (n=22 961) or matching placebo (n=22 891) in addition to aspirin 162 mg daily. Dr Zhengming Chen, Clinical Trial 93% had ST-segment elevation or bundle branch block, and 7% had ST-segment depression. Treatment was to Service Unit and Epidemiological Studies Unit (CTSU), Richard Doll continue until discharge or up to 4 weeks in hospital (mean 15 days in survivors) and 93% of patients completed Building, Old Road Campus, it. The two prespecified co-primary outcomes were: (1) the composite of death, reinfarction, or stroke; and Oxford OX3 7LF, UK (2) death from any cause during the scheduled treatment period. Comparisons were by intention to treat, and [email protected] used the log-rank method. This trial is registered with ClinicalTrials.gov, number NCT00222573. or Dr Lixin Jiang, Fuwai Hospital, Findings Allocation to clopidogrel produced a highly significant 9% (95% CI 3–14) proportional reduction in death, Beijing 100037, P R China [email protected] reinfarction, or stroke (2121 [9·2%] clopidogrel vs 2310 [10·1%] placebo; p=0·002), corresponding to nine (SE 3) fewer events per 1000 patients treated for about 2 weeks.
    [Show full text]
  • World Bank Document
    Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019; 6th Revision: March 4, 2020; 7th Revision: March 30, 2020; 8th Revision: April 9, 2020; 9th Revision: May 21, 2020; 10th Update: June 5, 2020; 11th Update: June 28, 2020; 12th Update: July 13, 2020; 13th Update: August 28, 2020; 14th Update: January 10, 2021] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: January 2021 to December 2021 Public Disclosure Authorized II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Procurement Method Procurement Method Threshold Threshold US$ US$ ICB and LIB (Goods and Greater than or equal to 1. All Non-Consulting Services ) US$ 10 million Greater than or NCB (Goods and Non- Greater than or equal to Public Disclosure Authorized 2. equal to Consulting Services ) US$ 0.5 million 2 million Greater than or equal to 3. ICB (Works) All US$ 40 million Greater than or Greater than or equal to 4. NCB (Works) equal to US$ 0.5 million 10 million to be specified in Community participation in 5 No Threshold procurement the operation manual 2. Prequalification.
    [Show full text]
  • Financial Analysis
    Hunan Xiangxi Rural Environmental Improvement and Green Development Project (RRP PRC 53050-001) FINANCIAL ANALYSIS A. Introduction 1. Financial analysis was conducted to assess the financial viability and sustainability of the project in accordance with relevant Asian Development Bank (ADB) guidelines.1 The analysis mainly comprises (i) a financial viability assessment of revenue-generating subprojects (Table 1); and (ii) a financial sustainability assessment of (a) the Xiangxi Tujia and Miao Autonomous Prefectural Government (XPG, the executing agency); and (b) the Jishou City Government and the county governments of Baojing, Fenghuang, Guzhang, Huayuan, Longshan, Luxi, and Yongshun (the implementing agencies), which are responsible for the operation and maintenance (O&M) of the project, to assess their financial capacities in covering the recurrent costs of the project. 2. The project has three outputs that comprise 17 subprojects, of which 11 are revenue- generating subprojects and 6 are nonrevenue-generating subprojects (Table 1). They will be implemented by the XPG and the implementing agencies. Financial viability analysis was conducted to assess the viability of the 11 revenue-generating subprojects by comparing their financial internal rates of return (FIRRs) and weighted average costs of capital (WACCs). Financial sustainability analyses were conducted to assess if the XPG and the implementing agencies have adequate financial capacities to cover the incremental recurrent costs, including the O&M expenditures required to ensure sustainability of the project. Table 1: List of Subprojects Revenue-/ Nonrevenue- Generating Output Subproject Subproject Output 1: Rural 1.1. Wastewater management system waste and sanitation 1.2. Solid waste management Nonrevenue- management 1.3. Renovation of rural households’ unsanitary toilets to sanitary ones generating facilities and subprojects services improved Output 2: Local- 2.1.
    [Show full text]
  • Respiratory Healthcare Resource Allocation in Rural Hospitals in Hunan, China: a Cross-Sectional Survey
    11 Original Article Page 1 of 10 Respiratory healthcare resource allocation in rural hospitals in Hunan, China: a cross-sectional survey Juan Jiang1, Ruoxi He1, Huiming Yin2, Shizhong Li3, Yuanyuan Li1, Yali Liu2, Fei Qiu2, Chengping Hu1 1Department of Respiratory Medicine, National Key Clinical Specialty, Xiangya Hospital, Central South University, Changsha 410008, China; 2Department of Respiratory and Critical Care Medicine, First Affiliated Hospital of Hunan University of Medicine, Huaihua 418099, China; 3Health Policy and Management Office of Health Commission in Hunan Province, Changsha 410008, China Contributions: (I) Conception and design: C Hu; (II) Administrative support: C Hu, H Yin, S Li; (III) Provision of study materials or patients: C Hu, J Jiang; (IV) Collection and assembly of data: J Jiang, R He, Y Li, Y Liu, F Qiu; (V) Data analysis and interpretation: C Hu, J Jiang; (VI) Manuscript writing: All authors; (VII) Final approval of manuscript: All authors. Correspondence to: Chengping Hu, MD, PhD. #87 Xiangya Road, Kaifu District, Changsha 410008, China. Email: [email protected]. Background: Rural hospitals in China provide respiratory health services for about 600 million people, but the current situation of respiratory healthcare resource allocation in rural hospitals has never been reported. Methods: In the present study, we designed a survey questionnaire, and collected information from 48 rural hospitals in Hunan Province, focusing on their respiratory medicine specialty (RMS), basic facilities and equipment, clinical staffing and available medical techniques. Results: The results showed that 58.3% of rural hospitals established an independent department of respiratory medicine, 50% provided specialized outpatient service, and 12.5% had an independent respiratory intensive care unit (RICU).
    [Show full text]
  • Hunan Integrated Management of Agricultural Land Pollution Project with World Bank Loan
    The People’s Republic of China World Bank Public Disclosure Authorized Hunan Integrated Management of Agricultural Land Pollution Project with World Bank Loan Public Disclosure Authorized (The Second Batch of Project Counties) Environmental and Social Impact Report Public Disclosure Authorized Foreign Economic and Technical Cooperation Center, Agriculture Commission of Hunan Province Public Disclosure Authorized Hunan Research Institute for Nonferrous Metals July 2018 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project with World Bank Loan Client: Foreign Economic and Technical Cooperation Center, Agriculture Commission of Hunan Province Assessment Unit: Hunan Research Institute for Nonferrous Metals Institute Qualification Certificate No.: G.H.P.Z.Y.Zi No. 2711 Institute Director: Chen Wei Project Director: Ouyang Kun Project Technical Directors: Wang Wei and Wang Ying Project Compilers: Xiang Qiulai, Liu Jun, Yao Hui, Yuan Cuiyu, You Ping, Xun Zhou, Wu Huan and Tang Jinyao Contents Chapter 1 Project Overview ....................................................................................................................... 3 1.1 Project Background ......................................................................................................................... 3 1.2 Lessons Learned from Similar Projects ........................................................................................... 4 1.3 Category and Characteristics of the Project ....................................................................................
    [Show full text]
  • Report and Recommendation of the President to the Board of Directors Proposed Loan People's Republic of China: Hunan Xiangji
    Report and Recommendation of the President to the Board of Directors Project Number: 43031-013 November 2012 Proposed Loan People’s Republic of China: Hunan Xiangjiang Inland Waterway Transport Project CURRENCY EQUIVALENTS (as of 2 November 2012) Currency unit – yuan (CNY) CNY1.00 = $0.16024 $1.00 = CNY6.2405 ABBREVIATIONS ADB – Asian Development Bank dwt – deadweight ton GWh – gigawatt-hour HPDOT – Hunan provincial department of transport HPG – Hunan provincial government IWT – inland waterway transport km – kilometer m – meter MW – megawatt MOT – Ministry of Transport NPIWP – National Plan for Inland Waterways and Ports PRC – People’s Republic of China ton-km – ton-kilometer WTDC – waterway transport development committee XNCD – Hunan Xiangjiang Navigation Construction and Development Company NOTES (i) The fiscal year (FY) of the Government of the People’s Republic of China and its agencies ends on 31 December. (ii) In this report, "$" refers to US dollars. Vice-President S. Groff, Operations 2 Director General R. Wihtol, East Asia Department (EARD) Director T. Duncan, Transport and Communications Division, EARD Team leader X. Yang, Lead Transport Specialist, EARD Team members I. Ahsan, Counsel, Office of the General Counsel F. Asistin, Senior Operations Officer, EARD A. Barry, Senior Procurement Specialist, Central Operations Services Office S. Ferguson, Principal Social Development Specialist (Safeguards), EARD G. Gerilla-Teknomo, Senior Transport Sector Officer, EARD S. Noda, Transport Specialist, EARD A. Veron, Transport Economist, EARD H. Yang, Energy Specialist, EARD W. Zhu, Senior Safeguards Officer (Resettlement), People’s Republic of China Resident Mission J. Macrohon, Senior Operations Assistant, EARD R. Araojo, Senior Operations Assistant, EARD Peer reviewer P.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 67628-CN PROJECT APPRAISAL DOCUMENT ON THREE PROPOSED LOANS IN A TOTAL AMOUNT OF Public Disclosure Authorized US$150 MILLION (US$50 MILLION EACH TO FINANCE PROJECT ACTIVITIES IN GUANGDONG, HUNAN AND GANSU PROVINCES) TO THE PEOPLE’S REPUBLIC OF CHINA FOR THE Public Disclosure Authorized INTEGRATED ECONOMIC DEVELOPMENT OF SMALL TOWNS PROJECT April 23, 2012 China and Mongolia Sustainable Development Unit Sustainable Development Department East Asia and Pacific Region Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS (Exchange Rate Effective: December 9, 2011) Currency Unit = Renminbi (RMB) Yuan RMB Yuan 1.0 = US$ 0.156 US$ 1.0 = RMB Yuan 6.39 FISCAL YEAR July 1 – June 30 ABBREVIATIONS AND ACRONYMS AWP Annual Work Plan CAS Country Assistance Strategy CEA Cost-Effectiveness Analysis CHM Complain Handle Mechanism CNAO Chinese National Audit Office CPMO County Project Management Office CPS Country Partnership Strategy CQ Consultant Qualifications CWG Consulting Working Group DA Designated Account DIs Design Institutes EA Environmental Assessment ECOP Environmental Code of Practice EIA Environmental Impact Assessment EMDP Ethnic Minority Development Plan EMP Environmental Management Plan ERR Economic Rate of Return FM Financial Management FMM Financial Management
    [Show full text]