Hunan Integrated Management of Agricultural Land Pollution (P153115) Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [original: June 27, 2017; 1st Revision: August 17, 2017; 2nd Revision: June 8, 2018; 3rd Revision: Aug. 10, 2018; 4th Revision: April 4, 2019; 5th Revision: December 20, 2019] 2. Date of General Procurement Notice: August 16, 2017 3. Period covered by this procurement plan: December 2019 II. Goods, Works, non-consulting services and Community participation in procurement under Component 1. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Procurement Method Threshold US$ US$ Public Disclosure Authorized ICB and LIB (Goods and Non- Greater than or equal to US$ 1. All Consulting Services ) 10 million NCB (Goods and Non-Consulting Greater than or equal to US$ Greater than or equal to 2. Services ) 0.5 million 2 million Greater than or equal to US$ 3. ICB (Works) All 40 million Greater than or equal to US$ Greater than or equal to 4. NCB (Works) 0.5 million 10 million Community participation in to be specified in the 5 No Threshold procurement operation manual Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Detailed procedures for community participation are specified in operation manual. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project P153115 has been prepared by Hunan PPMO. 5. Any Other Special Procurement Arrangements [including advance procurement and retroactive financing, if applicable]: None Public Disclosure Authorized 6 Summary of the Procurement Packages planned during December 2019 . 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ (yes/no) (Prior / thousand Post) Summary of the National Competitive Bidding (Works) Summary of the Shopping 850.75 2 Post (Works) Summary of the Shopping (Goods) Summary of the Shopping (Non- 402.99 3 Post Consultant Services) Cancellation (Works) Cancellation (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Greater than or equal to US$ 1,000,000 2. Single Source (Firms) Greater than or equal to US$ 1,000,000 3. Individual Greater than or equal to US$ 300,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements [including advance procurement and retroactive financing, if applicable or delete if not applicable]: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Estimated Review Description of Ref. No. Cost by Bank Assignment Packages Comments US$ (Prior / thousand Post) Summary of number of contracts that will be let under QCBS Summary of number of contracts that 268.65 3 Post will be let under other methods Cancellation PROCUREMENT China : Hunan Integrated Management of Agricultural Land Pollution Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-09-04 Revised Plan Date(s): (comma delineated, leave blank if none)2019-12-20 Project ID: P153115 GPN Date: 2017-08-16 Project Name: Hunan Integrated Management of Agricultural Land Pollution Project Loan / Credit No: IBRD / 87770, / Executing Agency(ies):Hunan Integrated Management of Agriculture PMO WORKS Bid Evaluation Activity Reference No. / Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents Proposal Submission / Report and Description Component Review Type Method Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation as Issued Opening / Minutes Recommendation for Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HNYDG001 / Construction Component 1: Demonstration Under of drainage ditches, Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 495,870.00 0.00 Implementati 2017-09-15 2017-11-10 2018-05-09 irrigation ditches, sand and Quotations Envelope Land Pollution Management. on gravel traps. HNYXG001 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 347,610.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps, field roads. Land Pollution Management. HNYXG002 / Construction Component 1: Demonstration Request for Single Stage - One of drainage ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 171,190.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps. Land Pollution Management. HNYXG003 / Construction of irrigation ditches, Component 1: Demonstration drainage ditches, sand and Request for Single Stage - One IBRD / 87770 of Risk-based Agricultural Post Limited 419,250.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 gravel traps, ecological Quotations Envelope Land Pollution Management. interception ditches and pumping stations. HNYXG004 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches, sand IBRD / 87770 of Risk-based Agricultural Post Limited 60,150.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope and gravel traps. Land Pollution Management. HNYXG005 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation ditches and IBRD / 87770 of Risk-based Agricultural Post Limited 224,030.00 0.00 Canceled 2017-09-15 2017-11-10 2018-05-09 Quotations Envelope drainage ditches. Land Pollution Management. HNHYG001 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 310,700.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches Land Pollution Management. HNHYG002 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 105,100.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches. Land Pollution Management. HNHYG003 / Construction Component 1: Demonstration Request for Single Stage - One of irrigation canals and IBRD / 87770 of Risk-based Agricultural Post Limited 154,210.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope ditches. Land Pollution Management. HNHYG004 / Construction Component 1: Demonstration Request for Single Stage - One of Sand and gravel traps IBRD / 87770 of Risk-based Agricultural Post Limited 118,340.00 0.00 Canceled 2017-10-10 2017-12-05 2018-06-03 Quotations Envelope &Field roads. Land Pollution Management. Page 1 HNXXHYG001 / Construction of irrigation Component 1: Demonstration Pending Request for Single Stage - One system, gravel or dirt road, IBRD / 87770 of Risk-based Agricultural Post Open - National 316,190.00 0.00 Implementati 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope Sediment desilting and Land Pollution Management. on landfill in Huayuan county. HNXXHYG002 / Construction of irrigation Component 1: Demonstration Pending Request for Single Stage - One system, gravel or dirt road, IBRD / 87770 of Risk-based Agricultural Post Open - National 218,810.00 0.00 Implementati 2019-03-06 2019-05-01 2019-10-28 Quotations Envelope Sediment desilting and Land Pollution Management. on landfill in Huayuan county. HNHNG001 / Construction of irrigation system, gravel Component 1: Demonstration Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Request for Bids Open - National 1,048,810.00 0.00 Canceled 2019-03-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2020-06-21 Envelope desilting and landfill in Land Pollution Management. Hengnan county. HNZFG001 / Construction of irrigation system, gravel Component 1: Demonstration Pending Request for Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Open - National 302,990.00 0.00 Implementati 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope desilting and landfill in Land Pollution Management. on Zhongfang county. HNZFG002 / Construction of irrigation system, gravel Component 1: Demonstration Pending Request for Single Stage - One or dirt road, Sediment IBRD / 87770 of Risk-based Agricultural Post Open - National 320,930.00 0.00 Implementati 2019-03-06 2019-05-01 2019-12-27 Quotations Envelope desilting and landfill in Land Pollution Management. on Zhongfang county. HNLSTG001 / Construction of irrigation system, gravel Component 1: Demonstration Pending Single Stage - One or dirt road,