Construction of Barangay Hall Brgy. Vi, Paluan, Occidental Mindoro

Total Page:16

File Type:pdf, Size:1020Kb

Construction of Barangay Hall Brgy. Vi, Paluan, Occidental Mindoro REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MINDORO OCCIDENTAL DISTRICT ENGINEERING OFFICE REGION IV-B MAMBURAO, OCCIDENTAL MINDORO CONSTRUCTION OF BARANGAY HALL BRGY. VI, PALUAN, OCCIDENTAL MINDORO LATITUDE (X) LONGITUDE (Y) COORDINATES : 13.41305556 120.4652778 PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF DISTRICT ENGINEERING OFFICE BARANGAY HALL, BRGY. VI 1 REGIONAL OFFICE IV - B PALUAN, OCC. MINDORO ARCHITECTURAL DPWH-IV-B Mamburao, Occidental Mindoro A 1 AUGUSTO T. VIRAY, JR. JOY L. HISTORILLO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : PALUAN, OCCIDENTAL MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DISTRICT ROAD MAP MINDORO OCCIDENTAL I DISTRICT ENGINEERING OFFICE REPUBLIC OF THE PHILIPPINES Mamburao, Occidental Mindoro OFFICE OF THE CITY/MUNICIPAL TABLE OF CONTENTS ENGINEER/BUILDING OFFICIAL N DISTRICT/CITY/MUNICIPALITY PALUAN LAND USE AND ZONING ARCHITECTURAL MAMBURAO SANTA CRUZ A -1 PERSPECTIVE LOCATION MAP TABLE OF CONTENTS SITE DEV'T. PLAN LINE & GRADE A -2 GROUND FLOOR PLAN CALINTAAN RIZAL A -3 LONGITUDINAL ELEVATION CROSS ELEVATION ARCHITECTURAL SAN JOSE LONGITUDINAL SECTION CROSS SECTION MAGSAYSAY PERSPECTIVE LOCATION MAP STRUCTURAL STRUCTURAL S-1 FOUNDATION LAYOUT WALL FOOTING DETAILS SC DETAILS CANOPY ROOF FRAMING DETAILS S-2 THIS SITE SANITARY ROOF FRAMING PLAN S-3 2 DETAILS 1 B A CONST. OF MULTI-PURPOSE BUILDING S-4 (TWO STOREY BRGY.HALL), BRGY.MAGBAY ELECTRICAL STRUCTURAL NOTES 3 MECHANICAL VICINITY MAP SITE DEV'T. PLAN PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF DISTRICT ENGINEERING OFFICE BARANGAY HALL, BRGY. VI 2 REGIONAL OFFICE IV - B PALUAN, OCC. MINDORO ARCHITECTURAL DPWH-IV-B Mamburao, Occidental Mindoro A 2 AUGUSTO T. VIRAY, JR. JOY L. HISTORILLO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : PALUAN, OCCIDENTAL MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 B A 3 2 1 4.00 4.00 0.60 0.50 2.20 0.88 0.93 2.20 0.60 B 0.50 0.65 1.10 3.05 1.10 1.47 1.10 0.80 1.18 1.33 5.50 0.88 1.20 1.20 1.20 0.80 2.40 1.10 2.10 1.10 0.90 0.90 0.90 0.90 1.50 0.75 1.10 A 0.40 1.20 1.20 1.20 1.98 1.85 0.50 2.40 2.10 0.95 0.90 0.90 0.90 0.50 0.60 0.60 0.55 0.43 0.50 4.00 2.50 1.50 SECOND FLOOR PLAN LEFT SIDE ELEVATION REAR ELEVATION 1 2 3 1 2 3 A B 4.00 4.00 2.20 0.88 0.36 0.80 1.10 0.82 5.04 B 5.04 1.10 1.90 2.36 1.10 1.47 1.18 1.33 0.30 5.50 1.10 0.60 1.20 0.80 1.10 2.40 2.10 2.10 1.60 0.90 0.90 1.50 1.10 A 0.40 0.60 1.98 1.20 1.85 2.40 1.25 2.10 1.60 0.95 0.95 0.90 0.50 0.60 1.81 0.55 0.43 0.50 4.00 2.50 1.50 GROUND FLOOR PLAN FRONT ELEVATION RIGHT SIDE ELEVATION PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF DISTRICT ENGINEERING OFFICE BARANGAY HALL, BRGY. VI 3 REGIONAL OFFICE IV - B PALUAN, OCC. MINDORO ARCHITECTURAL DPWH-IV-B Mamburao, Occidental Mindoro A 3 AUGUSTO T. VIRAY, JR. JOY L. HISTORILLO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : PALUAN, OCCIDENTAL MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 B A 5.04 1.47 0.10 1.20 2.40 2.10 2.10 0.90 0.90 0.40 0.15 2.40 2.10 1.40 0.95 0.90 0.60 LONGITUDINAL SECTION REAR ELEVATION 1.60 0.80 0.60 0.70 1.25 0.80 2.10 2.10 2.10 2.10 2.10 1.00 1.00 1.00 2.20 1.10 0.55 4.20(VERIFY) 0.60 1.90(VERIFY) 1.00 0.55 0.55 0.55 0.55 0.43 0.55 0.55 1.10 0.60 1.20 1.20 0.80 0.80 0.50 2.10 2.10 1.60 0.90 0.90 0.90 0.90 0.90 SCHEDULE OF DOORS & WINDOW PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF DISTRICT ENGINEERING OFFICE BARANGAY HALL, BRGY. VI 4 REGIONAL OFFICE IV - B PALUAN, OCC. MINDORO ARCHITECTURAL DPWH-IV-B Mamburao, Occidental Mindoro A 4 AUGUSTO T. VIRAY, JR. JOY L. HISTORILLO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : PALUAN, OCCIDENTAL MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4.00 4.00 0.60 0.50 2.20 0.88 0.93 2.20 S C H E D U L E O F F O O T I N G C O L U M N S C H E D U L E 0.60 B 0.50 0.65 1.10 300 600 1.10 1.10 0.80 1.18 1.33 5.50 250 0.88 200 1.10 1.10 1.50 400 1.10 A DETAIL OF WF-1 1.98 1.85 0.50 CANTILEVER L1 L2 0.60 0.55 0.43 0.50 L1/4 L1/4 L2/4 L2/4 4.00 2.50 1.50 BAR 'C' EXTRA TOP BAR 'C' EXTRA TOP BAR 'A' CONT TOP 300 2ND FLR FRAMING PLAN 175 1 2 3 BAR 'D' EXTRA BOTT BAR 'D' EXTRA BOTT 4.00 4.00 L1/5 L2/5 L2/5 2.20 0.88 0.36 0.80 1.10 0.82 L1/5 SPACING OF STIRRUPS SPACING OF STIRRUPS EXT SUPP EXT SPAN INT SUPP INT SPAN INT SUPP 0.30 B TYP R.C. BEAM ELEVATION 1.10 0.175 2.36 1.10 SPACING OF STIRRUPS 1.18 1.33 A- 10 MM STIR. 1 @ 0.05,6 @ 0.10,4 @ 0.15,2 @ 0.20 REST @0.30 175 5.50 B- 10 MM STIR. 1 @ 0.05,6 @ 0.10,4 @ 0.20, REST @ 0.30 1.10 C- 10 MM STIR. 1 @ 0.05,6 @ 0.10,4 REST @ 0.20 1.10 1.50 1.10 B B A EXTRA BOTT BARS 175 @ SUPPORT TOP BARS 1.98 1.85 0.50 DD DD 1.81 STIRRUPS STIRRUPS 0.55 0.43 0.50 EXTRA BOTT BARS BOTT BARS @ MID-SPAN 4.00 2.50 1.50 TYP. FOOTING DETAIL FOUNDATION PLAN TYP.R.C.BEAM SECTION TYP.R.C.BEAM SECTION @ SUPPORT @ MID-SPAN TYP.R.C.BEAM SECTION PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF DISTRICT ENGINEERING OFFICE BARANGAY HALL, BRGY. VI 5 REGIONAL OFFICE IV - B PALUAN, OCC. MINDORO STRUCTURAL DPWH-IV-B Mamburao, Occidental Mindoro S 1 AUGUSTO T. VIRAY, JR. JOY L. HISTORILLO GERARDO D. CLEMENTE RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : PALUAN, OCCIDENTAL MINDORO ARCHITECT II ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 5.04 0.85 1.47 1.47 0.30 0.30 1.20 1.20 1.20 1.00 1.00 1.00 0.30 6.75 TYP.DETAIL OF T-1 TYP.DETAIL OF T-3 A B 1 0.60 0.50 5.04 1.47 0.30 1.00 1.00 1.00 0.30 TYP.DETAIL OF T-2 1 2 3 4.00 4.00 0.60 0.50 2.20 0.88 0.93 2.20 SPOT DETAIL-1 0.60 0.50 B SIZES R E I N F O R C E M E N T S 0.65 1.10 BEAM SPACING WIDTH DEPTH BAR 'A' BAR 'B' BAR 'C' EXTRA TOP BAR 'D' EXTRA BOTT OF 1.10 MARK STIRRUPS 1.10 B D CONT TOP CONT BOTT EXT SUPP INT SUPP EXT SPAN INT SPAN 0.80 1.18 1.33 5.50 TB-1 0.2O 0.40 2-16 MM 2-16 MM 2-16 MM 2-16 MM B 0.88 1.10 1.10 1.50 1.10 2FB-1 2-16 MM A A 0.20 0.40 3-16 MM 3-16 MM 2-16 MM A 1.98 2FB-2 0.40 2-16 MM 2-16 MM 1.85 0.20 2-16 MM 2-16 MM 6.75 0.85 0.50 2FB-3 0.175 0.30 2-16 MM 2-16 MM 2-16 MM 2-16 MM C 0.60 0.55 0.43 0.50 RB-1 0.175 0.30 2-16 MM 2-16 MM 2-16 MM 2-16 MM B 4.00 2.50 1.50 FB-1 0.175 0.20 2-16 MM 2-16 MM C ROOF FRAMING PLAN TYP.R.C.BEAM SECTION PROJECT TITLE SHEET CONTENTS REVISION(S) DATE PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMENDED BY: APPROVED BY: SET NO.
Recommended publications
  • PUNONG BARANGAY TASKS and RESPONSIBILITIES Checklist
    PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist NOT FOR SALE a PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist NOT FOR SALE Punong Barangay Tasks and Responsibilities Checklist Copyright@2018 Local Government Academy (LGA) Department of the Interior and Local Government (DILG) All rights reserved. All rights reserved. No portions of this book may be copied or reproduced in books, pamphlets, typewritten, xeroxed, or in any other form for distribution or sale, without permission from the Academy. ISBN: 978-971-0576-81-4 Printed and bounded in Manila, Philippines. Published by: Local Government Academy Department of the Interior and Local Government 8/F Agustin I Bldg., F. Ortigas, Jr. Road, (formerly Emerald Ave.) Ortigas Center, Pasig City 1605 Philippines Tel Nos. (632) 634-8430 / 634-8436 www.lga.gov.ph Technical Working Group: Alfonso A. Maralli, Jr. Sally S. Jumalon Maria Louisa B. Bite Cover and Layout: Iris A. Igrobay PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist TABLE OF CONTENTS I Messages iii - vi II List of Acronyms vii III Tasks and Responsibilities as Mandated by the Local Government Code 1 IV Tasks and Responsibilities Pursuant to Presidential Directives 5 V List of Presidential Directives and DILG Memorandum Circulars 31 i PUNONG BARANGAY TASKS AND RESPONSIBILITIES Checklist MESSAGE The public offices are public trusts. They are a manifestation of the will of the people. This is at the very core of democracy that we enjoy today. Both local and national officials are in the same situation, they are accountable to the people, the constituents that voted for them. The funds that are utilized are from the people and the natural resources that belong to the nation and its future generations.
    [Show full text]
  • S5-28 5.3 NEEDS ANALYSIS in Order to Comprehensively Sketch The
    The Study for Socio-Economic Reconstruction and Development of Conflict-Affected Areas in Mindanao in the Republic of the Philippines SUPPLEMENTARY CHAPTER 5.3 NEEDS ANALYSIS In order to comprehensively sketch the structure and depth of development needs in CAAM, various needs identified through the surveys were ranked and categorized. In doing so, the concept of a three-layer structure is introduced. First, the needs expressed by people were classified into the layer of “development needs,” as show in the right column of Table 5.3-1. Then, the “development needs” were grouped based on their similarity and proximity, and raised into the layer of “sectors.” Finally, these sectors were further combined to form the highest layer of “categories.” As a result, various development needs were then converged into the four broad need categories of: Basic Social Services, Public Facilities, Economic Infrastructure, and Livelihood. This process of categorization and structure construction were also repeated in the analysis of the IBNA. Table 5.3-1 Need Category and Sector of CAAM CATEGORY SECTOR DEVELOPMENT NEEDS Electrification Basic Utilities Water Systems Educational Facilities Day Care Centers Deployment of teachers Madrasahs Education Non-Formal Education Scholarships BASIC SOCIAL School buildings SERVICES School Dormitories School Pathways Barangay Pharmacies Health Centers Health Hospitals Medical Assistants Medicine and Medical Supplies Sanitary Toilets Housing/Sanitation Core Shelters PUBLIC FACILITIES Garbage Facilities Environment Reforestation
    [Show full text]
  • Resettlement Action Plan
    THE PREPARATORY STUDY FOR CENTRAL LUZON LINK EXPRESSWAY PROJECT IN THE REPUBLIC OF THE PHILIPPINES RESETTLEMENT ACTION PLAN August 2011 DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THE REPUBLIC OF THE PHILIPPINES Resettlement Action Plan CHAPTER 1 Description of the Project....................................................................................................1 CHAPTER 2 Objectives of the Resettlement Action Plan........................................................................6 CHAPTER 3 Relocation Policy.................................................................................................................6 CHAPTER 4 Summary of Relocation and Assets.....................................................................................9 CHAPTER 5 Household Survey Result..................................................................................................16 CHAPTER 6 Legal Framework...............................................................................................................25 CHAPTER 7 Compensation and Livelihood Restoration Plan...............................................................35 CHAPTER 8 Relocation Site Development Plan....................................................................................42 CHAPTER 9 PAP’s Willingness to Relocation and Preferred Sites.......................................................51 CHAPTER 10 Stakeholders Meeting/Consultation Meeting....................................................................52 CHAPTER 11 Grievance Redressing
    [Show full text]
  • Download Document (PDF | 853.07
    3. DAMAGED HOUSES (TAB C) • A total of 51,448 houses were damaged (Totally – 14,661 /Partially – 36,787 ) 4. COST OF DAMAGES (TAB D) • The estimated cost of damages to infrastructure, agriculture and school buildings amounted to PhP1,399,602,882.40 Infrastructure - PhP 1,111,050,424.40 Agriculture - PhP 288,552,458.00 II. EMERGENCY RESPONSE MANAGEMENT A. COORDINATION MEETINGS • NDRRMC convened on 17 December 2011which was presided over by the SND and Chairperson, NDRRMC and attended by representatives of all member agencies. His Excellency President Benigno Simeon C. Aquino III provided the following guidance to NDRRMC Member Agencies : ° to consider long-term mitigation measures to address siltation of rivers, mining and deforestation; ° to identify high risk areas for human settlements and development and families be relocated into safe habitation; ° to transfer military assets before the 3-day warning whenever a typhoon will affect communities at risks; ° to review disaster management protocols to include maintenance and transportation costs of these assets (air, land, and maritime); and ° need to come up with a Crisis Manual for natural disasters ° The President of the Republic of the Philippines visited RDRRMC X on Dec 21, 2011 to actually see the situation in the area and condition of the victims particularly in Cagayan de Oro and Iligan City and issued Proclamation No. 303 dated December 20, 2011, declaring a State of National Calamity in Regions VII, IX, X, XI, and CARAGA • NDRRMC formally accepted the offer of assistance from
    [Show full text]
  • Integrated Natural Resources and Environmental Management Project Rehabilitation and Improvement of Liguron Access Road in Talakag, Bukidnon
    Initial Environmental Examination January 2018 PHI: Integrated Natural Resources and Environmental Management Project Rehabilitation and Improvement of Liguron Access Road in Talakag, Bukidnon Prepared by Municipality of Talakag, Province of Bukidnon for the Asian Development Bank. i CURRENCY EQUIVALENTS (as of 30 November 2017 Year) The date of the currency equivalents must be within 2 months from the date on the cover. Currency unit – peso (PhP) PhP 1.00 = $ 0.01986 $1.00 = PhP 50.34 ABBREVIATIONS ADB Asian Development Bank BDC Barangay Development Council BUB Bottom-Up Budgeting CDORB Cagayan De Oro River Basin CNC Certificate of Non-Coverage CSC Construction Supervision Consultant CSO Civil Society Organization DED Detail Engineering Design DENR Department of Environment And Natural Resources DILG Department of Interior and Local Government DSWD Department of Social Welfare and Development ECA Environmentally Critical Area ECC Environmental Compliance Certificate ECP Environmentally Critical Project EHSM Environmental Health and Safety Manager EIA Environmental Impact Assessment EIS Environmental Impact Statement EMB Environmental Management Bureau ESS Environmental Safeguards Specialist GAD Gender and Development IEE Initial Environmental Examination INREMP Integrated Natural Resources and Environment Management Project IP Indigenous People IROW Infrastructure Right of Way LIDASAFA Liguron-Dagundalahon-Sagaran Farmers Association LGU Local Government Unit LPRAT Local Poverty Reduction Action Team MKaRNP Mt. Kalatungan Range Natural
    [Show full text]
  • Barangay Hall}, Brgy
    ~- REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION IV-A BATANGAS I DISTRICT ENGINEERING OFFICE KUMINTANG ILAYA, BATANGAS CITY C.Y. 2020 PROJECT PLAN FOR CONSTRUCTION OF MULTI-PURPOSE BUILDING, {BARANGAY HALL}, BRGY. MALALAY, BALAYAN,BATANGAS SUBMITTED: RECOMMENDED: APPROVED: FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER DATE: DATE: OATE: TABLE OF CONTENTS M A R K DESCRIPTION G - 1 PERSPECTIVE SITE DEVELOPMENT PLAN, LOCATION MAP, TABLE OF CONTENTS G-2 R A - 1 A - 2 SUMMARY OF QUANTITIES, FRONT ELEVATION, RIGHT SIDE ELEVATION, REAR ELEVATION, LEFT SIDE ELEVATION A-3 REFLECTED CEILING PLAN (SECOND FLOOR) DETAIL OF CEILING A-4 LONGITUDINAL SECTION THRU A - A, CROSS SECTION THRU B - B, TOILET DETAIL, SCHEDULE OF DOORS AND WINDOWS A-5 STAIR PLAN, SECTION, DETAIL OF RAILINGS S - 1 FOUNDATION PLAN, DETAIL OF Wl, Fl, DETAIL OF W2, F2, STAIR DETAIL - 1, STAIR DETAIL - 2, DETAIL OF TIE BEAM S-2 DETAIL OF Cl, F2, DETAIL OF Cl,Fl, DETAIL OF Cl,C3,F3, DETAIL OF C2,Fl S-3 SECOND FLOOR FRAMING PLAN, DETAIL OF CONCRETE SLAB, SCHEDULE OF BEAMS, ELEVATION OF BEAM S-4 ROOF FRAMING PLAN, DETAIL OF RAFTER, ROOF, BEAM DETAIL, DETAIL OF EAVES, DETAILED CONNECTION OF PARAPHET, DETAIL OF CEILING E - 1 GENERAL NOTES (ELECTRICAL), LEGEND, RISER DIAGRAM, LOAD SCHEDULE AND COMPUTATION, LOCATION MAP, GROUND FLOOR LIGHTING LAYOUT, SECOND FLOOR LIGHTING LAYOUT, GROUND FLOOR POWER LAYOUT, SECOND FLOOR ,. POWER LAYOUT :z p - 1 GROUND FLOOR WATER LAYOUT, SECOND FLOOR WATER LAYOUT " P - 2 GENERAL NOTES, LEGEND, DETAIL OF SEPTIC VAULT, ISOMETRIC VIEW, LOCATION MAP TO CALATAGAN, ~~~ LIAN, NASUGBU ~\S SITE DEVELOPMENT PLAN LOCATION MAP NDT TO SCALE TO SCALE PROJECT NAME AND LOCATION: SHEET CONTENT: ITTO: SUBMITTED BY: RECOMMEHOUIG APPROVAL APPROVEDBY : SET NO.
    [Show full text]
  • Protocol for Case Management of Child Victims of Abuse, Neglect, and Exploitation
    Protocol for Case Management of Child Victims of Abuse, Neglect, and Exploitation Committee for the Special Protection of Children Protocol for Case Management of Child Victims of Abuse, Neglect, and Exploitation 1 2 Protocol for Case Management of Child Victims of Abuse, Neglect, and Exploitation Contents MESSAGES Message from the Secretary of Justice.............................................................................................................5 Message from the Secretary of Social Welfare and Development...............................................................6 Acknowledgment...............................................................................................................................................7 CSPC Committee Resolution No. 1................................................................................................................ 8 THE CSPC PROTOCOL Introduction......................................................................................................................................................10 Case Management............................................................................................................................................11 Who May Report and to Whom May One Report a Case of Child Abuse..............................................14 The Mandatory Reporters...............................................................................................................................15 Reception of a Report......................................................................................................................................15
    [Show full text]
  • COVID-19 Response in BARMM (Sitrep 2)Pdf
    1 COVID-19 Response in BARMM Situational Report No. 2 (March 2021) Overview 2 newly-completed water systems to benefit 3,517 households and 3,219 students in 7 Barangays ►2,463 ►6,966 2 ongoing constructions with 83 per cent Short-term employment Households with and 82 per cent completion in two generated in BARMM access to safe Indigenous Peoples’ communities and reliable 108 tap stands constructed within water agricultural communities, schools, mini- market, barangay halls and birthing center. Green works through flood-control activities improved waterways, canals and ►Php3.4M ►5,744 tributaries in 70 communities Cost of Occupational Students with 706 (29 per cent) women of 2,463 workers Safety and Health (OSH) access to safe were engaged in the construction of 5 provisions such as water in school water systems and through partnership Personal Protective with MOLE’s Community Emergency Equipment (PPEs) Employment Program (CEEP) Skills enhancement facilitated to 53 men Data as of 31 March 2021 and 10 women plumbers and masons during onsite/hands-on Skills Training in South Upi, North Upi, Maguindanao and Wao, Lanao del Sur. 5 community-contractors trained in the technical, social and financial aspects of the project Php 25,331,124 and Php 14.9 million employment intensive investments in 5 water projects and CEEP respectively Two Implementing Partners, Bangsamoro Development Authority (BDA) and A Single Drop for Safe Water (ASDSW) were contracted to supervise and manage the water projects in 4 sites 6 water projects to start
    [Show full text]
  • The Effect of Civic Leadership Training on Citizen Engagement and Government Responsiveness: Experimental Evidence from the Philippines
    JANUARY 2018 RESEARCH REPORT The effect of civic leadership training on citizen engagement and government responsiveness: experimental evidence from the Philippines Lily L. Tsai, Nina McMurry and Swetha Rajeswaran The effect of civic leadership training on citizen engagement and government RESEARCH REPORT responsiveness: experimental evidence from the Philippines Authors Lily L. Tsai is the Founder and Faculty Director of the MIT GOV/LAB and Associate Professor of Political Science at the MIT. Her research focuses on accountability, governance and political participation in developing contexts, particularly in Asia and Africa. In 2015, she was awarded MIT’s James A. and Ruth Levitan Prize for innovative and creative scholarship. Her book, Accountability Without Democracy: Solidary Groups and Public Goods Provision in Rural China, received the 2007/08 Dogan Award from the Society for Comparative Research for the best book published in the field of comparative research. She has a BA from Stanford University, USA, an MA from the University of California, Berkeley, USA, and a PhD in government from Harvard University, USA. Nina McMurry is a doctoral candidate in political science at the Massachusetts Institute of Technology (MIT) and an MIT Governance Lab (MIT GOV/LAB) Graduate Research Fellow. She studies political behaviour and government accountability in developing democracies, with a focus on the role of intermediaries and non-state actors. Her dissertation examines the effects of state recognition of indigenous political institutions on local governance in the Philippines. She has also conducted field research in Guatemala, South Africa and South Sudan. Prior to starting her PhD, Nina worked on civil society and local media development initiatives in South Sudan.
    [Show full text]
  • List-Of-Transiting-Hotels.Pdf
    TRANSITING HOTELS FOR RETURNING OVERSEAS FILIPINOS (ROFs) and BALIKBAYANS (As 21 of September 2021) Name of Establishment City Type Complete Address Contact Person Email Address Mobile Number Online Booking Portal Rates Php 1,888, Single room Php 2,688, Double [email protected]/ 09054772382/ http://www.facebook.com/F Felicity Island Hotel Lapu-Lapu Quarantine Basak, Lapu-Lapu City Honeylou Amores room with full boardt, additional Php 800 for [email protected] 09323640737 elicityIslandHotel airport transfers Php 1,800, single room, Php 2,500 twin 09178217154/ Dulcinea Hotel Lapu-Lapu Quarantine Pusok, Lapu-Lapu City Rowela Aguro [email protected] http://www.dulcineahotel.ph room, all rates include fullboard meals and 09064722628/ 495.2741 airport transfers Php 1500/night (superior) Php 1750 /night Queens Road, (deluxe) Php 1950/night (Deluxe plus) Quarantine/ Gieselle Abinales/ 09177107863/ https://www.stmarkhotel.ph St. Mark Hotel Cebu City Redemptorist Plaza, [email protected] Additional Php 750 for full board meals; Isolation Eunice Cadavis 09177294132 / Cebu City additional Php 800 (car) and Php 1500 (van) for airport transfers Php 2,100/night (Single), Standard Php 2,700/night (double), Standard Php 2,400/night (Single), Deluxe Quarantine/ N. Escario St. 032.520.2222/ http://www.facebook.com/e Escario Central Hotel Cebu City Merry An Alegre [email protected] Php 3,000/ngiht (double), Deluxe Rates include Isolation Kamputhaw, Cebu City 09177169981 scariocentralhotel full-board packed meals Airport Transfer (one-way): Php 900 (car), Php 1200 (Innova), Php 1500 (van) 032.402.5999/ Php 3,100.00 (single) Php 4,000.00 Archbishop Reyes Kristal Manalang-Catarroja/ cebuallreservation@questhotelsa https://questhotelsandresort Quest Hotel Cebu City Multi-Use 09989615734/ (double) Full board meals Avenue, Cebu City Mariel Daug-daug ndresorts.com s.com/cebu/ 09174017844 Php 750.00/way airport transfers #6 Junquera Ext cor R.R.
    [Show full text]
  • Philippines: Transport Data on Barangay Caramay (IFRTD)
    Philippines: Transport data on barangay Caramay (IFRTD) These case studies are being compiled to draw lessons from the experience of a wide range of organizations. They are considered as works in progress and will be updated periodically. Comments on the cases are welcomed, as are suggestions on additional cases which could be included in the series. Thanks to the International Forum for Rural Transport and Development (IFRTD) for making the report available on which this case study is based. TRANSPORT DATA ON BARANGAY CARAMAY, ROXAS PROVINCE OF PALAWAN, PHILIPPINES The data collected by the author for this study makes a start in the assessment of gender and transport issues in the rural areas of the Philippines. It should be taken in comparison with the second of the case studies from this region, looking at a second rural 'barangay', which together offer a basis for further study. Barangay (a district encompassing a number of villages) Caramay is located along the shores of Northern Palawan. It is bounded on the north by Barangay Salvacion, on the south by Barangay Nicanor Zabala, on the west by Barangay Caruray of the Municipality of San Vicente,--portions of Caruray Central Ranges and Stripes Peak, and on the west by Sulu Sea. It is 115 kms. away from the city of Puerto Princesa and about 32 kms. from the town proper of Roxas, Palawan. It has a total land area of 7,899.34 hectares and encompasses 10 sitios, namely: Bonatan, Tabuyo, Upper Bonatan, Imtag, Baled, Caruray, Kabatakan/Nanabo, Poblacion,. Upper Baled and Busuang. Based on-their 1997,Barangay census Caramay has a total population of 2,174 people or 480 households, with an average size of 5 people per household.
    [Show full text]
  • Mindanao Displacement Dashboard AUG 2020
    SEPTEMBER 2020 ISSUE NO. 73 MINDANAO DISPLACEMENT DASHBOARD @Tanghal|UNHCR Lanao del Sur. UNHCR with support from TFBM distributed hygiene kits Sagonsongan, Marawi City. DISPLACEMENT OVERVIEW DISPLACEMENT IN SEPTEMBER th As of the 30 of September, a total number of 60,273 families (277,846 individuals) are currently displaced in Mindanao. Those displaced can be classified into three main groups, depending on the length of displacement: 1,057 Group A: 868 families (3,274 individuals) remain displaced out of 1,057 families Families displaced within the month; Group B: 1,263 families (6,299 individuals) remain displaced, and have been protractedly displaced for more than 30 days but less than 180 days; and 5,097 Individuals Group C: 58,354 families (268,294 individuals) remain displaced and have been protractedly displaced for more than 180 days. Those classified under CIVILIAN CASUALTIES Group C are concentrated in five main areas: since January 2020 Zamboanga City: 1,362 families (6,810 individuals) still displaced due to Zamboanga siege in September 2013. 18 Persons dead Lanao del Sur & Lanao del Norte: 25,367 families (126,835 individuals) still displaced due to Marawi siege in May 2017. Northern Mindanao: 29 families (145 individuals) still displaced due to 25 Severe Tropical Storm Vinta (Temblin) in December 2017 and 14 families Persons injured (62 individuals) still displaced due to Typhoon Facon in July 2019. LOCATIONS Eastern Mindanao: 491 families (2,304 individuals) still displaced due to armed conflict between Armed Forces of the Philippines (AFP) and New Breakdown of displaced individuals by region People’s Army (NPA) since February 2018.
    [Show full text]