OXFORD TO CAMBRIDGE EXPRESSWAY STRATEGIC STUDY Deliverable 1 – Examination of the Strategic Case for New Expressway East-West Road Links 08/07/2016 Confidentiality: Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks First Issue Second Issue Third Issue Fourth Issue Date February 2016 April 2016 April 2016 July 2016 Prepared by Andi Redhead Andi Redhead Andi Redhead Andi Redhead Edward Shortridge Edward Shortridge Edward Shortridge Edward Shane Luck Shane Luck Shane Luck Shortridge Shane Luck Signature Checked by Adrian Hames Adrian Hames Adrian Hames Adrian Hames Signature Authorised by Mike Batheram Mike Batheram Mike Batheram Mike Batheram Signature Project number 70015095 70015095 70015095 70015095 Report number 1 1 1 1 Revision 1.4 1.5 1.6 1.7 1 | 144 OXFORD TO CAMBRIDGE EXPRESSWAY STRATEGIC STUDY Deliverable 1 – Examination of the Strategic Case for New Expressway East-West Road Links 08/07/2016 Client Highways England / Department for Transport Lead Consultant WSP | Parsons Brinckerhoff Limited Tel: 01223 558 050 www.wsp-pb.co.uk Registered Address WSP UK Limited 01383511 WSP House, 70 Chancery Lane, London, WC2A 1AF Integrated Delivery Team Contacts Adrian Hames –
[email protected] 07825643848 Helen Spackman –
[email protected] 01793 816555 Mike Batheram –
[email protected] Project number: 70015095 Dated: 08/07/2016 2 | 144 Table of Contents 1 Introduction and Study Objectives ......................................... 4 1.1 Introduction ...........................................................................