3D Numerical Settlement Analysis of a New Subway Station Close to an Existing Subway Station

Total Page:16

File Type:pdf, Size:1020Kb

3D Numerical Settlement Analysis of a New Subway Station Close to an Existing Subway Station 3D Numerical Settlement Analysis of a New Subway Station Close to an Existing Subway Station Jidong Li* Lianjin Tao** Junhai An*** Binglin Wu**** Key Laboratory of Urban Security and Disaster Engineering, Ministry of Education, Beijing University of Technology, Beijing 100124, China *PhD student Dept. of Civil Engineering, Beijing University of Technology, Beijng (100124) ,China (Corresponding Author, e-mail: [email protected]) **PhD student, Dept. of Civil Engineering, Beijing University of Technology , Beijng (100124) ,China; e-mail: [email protected] ***Professor,Dept. of Civil Engineering, Beijing University of Technology , Beijng (100124) , China; e-mail: [email protected] **** PhD student, Dept. of Civil Engineering, Beijing University of Technology , Beijng (100124) , China; e-mail: [email protected] ABSTRACT This paper presents a case analysis of the settlement value of the existing Subway Station during the construction of a new subway station close-attached undercrossing in Beijing, China. A micro-distortion excavation control method is proposed, that is the flat-top straight wall Cross Diaphragm (CRD) + multiple pre-top bracing concealed excavation construction methods. Furthermore, a numerical analysis using a finite difference program, FLAC3D, was conducted to analyze the settlement value of the existing Subway Station. .The results show that the maximum accumulated settlement value distribution was a shape of “W”; the largest settlement value is 2.96 mm, occurred above 5 drift; The accumulative deformation of the existing station was largest when the excavation of 1-drift and 2-drift was completed; Jacks plays an important role in the active controlling the settlement value of the existing station. The excavation of 1-drift destroys original crustal stress equilibrium, the plastic zone is formed; The plastic zone scope of soil above excavation section is largest, the thickness is about 12.5m. KEYWORDS: construction method; settlement; the existing subway stations; jacks INTRODUCTION The project of Beijing metro line 10 2nd-phase Gongzhufen Station which pass through line1 the existing station is the biggest beneath closely attached the existing lines engineering in Beijing, in order to guarantee normal operation of the existing subway, it requests the existing station sedimentation value caused by the new station construction is not more than 3 - 5785 - Vol. 19 [2014], Bund. T 5786 mm, the differential settlement value of deformation joint on both sides is not greater than 2 mm, the engineering is extremely difficult. Under the strict requirements, the flat-top straight wall CRD + multiple pre-back shore underground excavation construction method is proposed. As the technology is put forward and implemented, it is expected to solve a big difficulty in underground engineering and break through the bottleneck in beneath engineering, and provide an important foundation for the development of domestic subway construction. Although there exist some studies on the interaction between new excavations and existing tunnels (Lo and Ramsay, 1991; Dolezˇalová, 2001; Sharma et al., 2001; Liu et al., 2008, 2009; Ishihara,2001; Takeshi,2003; Qian Fang,2012) , studies focused specifically on the effect of new subway station close-attached undercrossing existing subway station are surprisingly scarce. Therefore, there are pressing needs for in-depth study on this subject. PROJECT PROFILE Engineering Background Gongzhufen subway station is an interchange station connecting Line 1 and Line 2 of Beijing subway. It is located at the intersection between Fuxing Street and West Sanhuan Street (Figure 1) . The length of the Line 1 part and the Line 10 part of this station is 169.7m and 193.65m respectively. The undercrossing section of Line 10 was single layer double span flat-straight-wall rectangle shape structure, which was 26.1m in length, 14.05m in width and 9.32m in height. The Gongzhufen station of Line 1 was built in 1967, reinforced concrete rectangular frame structure, which was 20.3m in width and 7.95m in height. The cover depth to the middle crown is about 4.5m for Line 1, and 12.5m for Line 10. There are four deformation joints of the existing Line 1 station in the undercrossing construction influence scope, the distance that new station away from deformation joints is 1.271 m, 11.659m, 2.409m and 10.521m respectively. The profiles reveal that the undercrossing excavation area was located mostly in conglomerate layer, mudstone layer and pebble bed layer. 4.5.m 9.32m The Line 1 Gongzhufen Station Deformation joint 1 Deformation joint 2 Deformation joint 4 Deformation joint 3 1.271 m 11.659m 10.521m 2.409m The Left Line The Right Line 14.05m Figure 1: Positional relation of two stations Vol. 19 [2014], Bund. T 5787 A NEW CONCEALED EXCAVATION CONSTRUCTION METHOD The construction method adopted for close-attached undercrossing part of Line 4 and Line 10, as shown in Figure 2. The main construction steps of which were: (1) Reinforcing 1-drift by advanced deep injection grouting before excavation; (2) excavating 1-drift, installing jacks at the top of grille, supporting the lower drift walls by advanced small catheter grouting; (3) excavating 2-drift, uploading 1-drift jacks force after grille closed, preloading layers and controlling deformation of existing station dynamically;(4) taking lateral deep-hole grouting for 3-drift and 5-drift through 1-drift; (5) shotcreting primary lining, and casting secondary lining within 1-drift and 2-drift, installing vertical steel-pipes supporting, with jacks, between roof and floor, and setting up horizontal steel-supporting between side walls. Erecting primary lining simultaneously with the secondary lining template, and exerting a little vertical jacking force to keep structure stick tightly; (6) repeating (3) , (4) , (5) in the 3-drift and 4-drift respectively; (7) excavating 5- drift, chiseling off local steel grating initial lining, setting up steel supporting between roofs; (8) excavating 6-drift, chiseling off local steel grating initial lining, setting up steel supporting between bottom plates; (9) increasing jacking force on both sides of vertical steel-pipes supporting, dismantling steel grille and jacks on both sides of 5-drift, chiseling off the rest of median lamella;(10) shotcreting primary lining and casting secondary lining in the 5-drift and 6-drift, when the second lining meets the design strength by more than 95%, reducing the vertical jacking force gradually, dismantling jacks. Jack Jack Steel Shotcrete 3 5 1 Steel Grating Lining 4 6 2 Steel Grating Figure 2: The construction step sequence diagram NUMERICAL CALCULATION Calculation Model In order to effectively control the existing station deformation value, numerical analyses using FLAC3D, a commercial finite difference program, was performed to calculate the deformation of the existing Line 1 station, and determined the displacement-distributing control index of the existing station in different stages and the jacking force that jacks Vol. 19 [2014], Bund. T 5788 undertook in each construction stage. Numerical model is shown in Figure 3, soil and structural calculation parameters are tabulated in table 1 and table 2. (a) The overall grid model (b) The cross grid model Figure 3: The calculation model Table 1: Soil calculated parameters Thickness Gravity Poisson's bulk modulus Frictional Cohesion Number Name /m /(kN/m3) ratio /MPa angle /(°) /kPa Miscellaneous 1 2.8 1750 0.3 10 8 10 fill 2 silt 3.4 1900 0.28 15 26 18 3 Silty clay 3 2050 0.28 20 14 30 4 Silty sand 4.3 2000 0.25 30 25 0 5 The pebble 3.5 2100 0.22 55 45 0 6 conglomerate 19 2400 0.2 1000 50 20 Table 2: Structure calculation parameters Number Name Poisson's ratio Gravity/(KN/m3) Modulus of Elasticity/ MPa 1 Grouting pebble 0.21 2300 90 The existing 2 0.2 2500 30000 structure 3 Primary support 0.2 2400 28000 4 Second lining 0.15 2500 30000 Calculation Data Analysis (1) The final cumulative settlement of the station structure is shown in Figure 4, the maximum accumulated settlement value distribution was a shape of “W”; the largest settlement value is 2.96 mm, occurred above 5 drift, meets the index of settlement is not more than 3 mm, that shows the flat-top straight wall CRD + the multiple pre-top bracing concealed excavation construction methods can effectively control the settlement of existing station structure. (2) The deformation value of each excavation stage is shown in Figure 5. When l-drift and 2-drift are break-though, the cumulative deformation value is 1.73mm, accounting for 58.8% of the total deformation; when pilot 3-drift and 4-drift are run-through, the cumulative deformation is 2.17 mm and accounting for 73.8% of the total deformation; the settlement is smaller during the excavation process of 5-drift and 6-drift; but the existing structure produced a larger settlement when parts of jacks is removed, that accounting for 31.5% of the total deformation. (3) The distribution curve of jacking force in each construction stage is shown in Figure 6. (1) A sharply change phase of jacking force in 1-drift is mainly focus on 2-drift is cutthrough, the sharply change phase of jacking force in 3-drift is mainly focus on 4-drift cutthrough, When the 5-drift and 6-drift is cut-through, the jacking force reaches 120t within 1-drift and 3- drift; Unloading jacking force after 6-drift is cutthrough, the existing station occurs sharply deformation, the stage sedimentation value is 1.2 mm, but the final deformation of the existing station is still stable within 3 mm. (4) The monitoring data shows that the maximum differential settlement value on both sides of deformation joint is less than 1mm in the construction process, is shown in Figure 7. So combining the closely attached undercrossing with the actively control of jack top-bracing can effectively avoid the defects that the differential settlement on both sides of deformation joint is too large in the traditional construction methods.
Recommended publications
  • Beijing Subway Map
    Beijing Subway Map Ming Tombs North Changping Line Changping Xishankou 十三陵景区 昌平西山口 Changping Beishaowa 昌平 北邵洼 Changping Dongguan 昌平东关 Nanshao南邵 Daoxianghulu Yongfeng Shahe University Park Line 5 稻香湖路 永丰 沙河高教园 Bei'anhe Tiantongyuan North Nanfaxin Shimen Shunyi Line 16 北安河 Tundian Shahe沙河 天通苑北 南法信 石门 顺义 Wenyanglu Yongfeng South Fengbo 温阳路 屯佃 俸伯 Line 15 永丰南 Gonghuacheng Line 8 巩华城 Houshayu后沙峪 Xibeiwang西北旺 Yuzhilu Pingxifu Tiantongyuan 育知路 平西府 天通苑 Zhuxinzhuang Hualikan花梨坎 马连洼 朱辛庄 Malianwa Huilongguan Dongdajie Tiantongyuan South Life Science Park 回龙观东大街 China International Exhibition Center Huilongguan 天通苑南 Nongda'nanlu农大南路 生命科学园 Longze Line 13 Line 14 国展 龙泽 回龙观 Lishuiqiao Sunhe Huoying霍营 立水桥 Shan’gezhuang Terminal 2 Terminal 3 Xi’erqi西二旗 善各庄 孙河 T2航站楼 T3航站楼 Anheqiao North Line 4 Yuxin育新 Lishuiqiao South 安河桥北 Qinghe 立水桥南 Maquanying Beigongmen Yuanmingyuan Park Beiyuan Xiyuan 清河 Xixiaokou西小口 Beiyuanlu North 马泉营 北宫门 西苑 圆明园 South Gate of 北苑 Laiguangying来广营 Zhiwuyuan Shangdi Yongtaizhuang永泰庄 Forest Park 北苑路北 Cuigezhuang 植物园 上地 Lincuiqiao林萃桥 森林公园南门 Datunlu East Xiangshan East Gate of Peking University Qinghuadongluxikou Wangjing West Donghuqu东湖渠 崔各庄 香山 北京大学东门 清华东路西口 Anlilu安立路 大屯路东 Chapeng 望京西 Wan’an 茶棚 Western Suburban Line 万安 Zhongguancun Wudaokou Liudaokou Beishatan Olympic Green Guanzhuang Wangjing Wangjing East 中关村 五道口 六道口 北沙滩 奥林匹克公园 关庄 望京 望京东 Yiheyuanximen Line 15 Huixinxijie Beikou Olympic Sports Center 惠新西街北口 Futong阜通 颐和园西门 Haidian Huangzhuang Zhichunlu 奥体中心 Huixinxijie Nankou Shaoyaoju 海淀黄庄 知春路 惠新西街南口 芍药居 Beitucheng Wangjing South望京南 北土城
    [Show full text]
  • DIA China Office Billing
    Company Contact Information Billing Information Exhibiting Company Name (for signage and directory listing) Check here if billing address is the same as the contact’s address Billing Company Name (for invoice) Contact Name (all correspondence will be sent to the contact information provided below) Contact Name Address Line 1 Address Line 1 Address Line 2 Address Line 2 City, State/Province, Postal Code, Country City, State/Province, Postal Code, Country Telephone Number Fax Number Email Address (where invoice should be sent) Email Address (required for confirmation) Payment Information Payment should be made by bank transfer only. Please note that booths are sold Exhibit Space Rates and Information on a first-come, first-served basis. All applications will be time/date stamped for Each 3m x 3m booth space includes one (1) complimentary full-meeting registra- archival reference. tion and three (3) exhibit booth personnel registrations. Each 2m x 2m booth A deposit of 50% of the total booth fee should be made within 2 weeks after the space includes one (1) complimentary full-meeting registration and two (2) contract is signed, otherwise the selected booth will be released for sale. The exhibit booth personnel registrations. balance is due within one month after the initial deposit is made, otherwise, DIA Additional exhibit booth personnel may be purchased for RMB 3,000 each. Limit reserves the right to reassign the booth. of three (3) additional exhibit booth personnel per booth space. Any additional Any booth contract signed after April 1, 2017 will be required to pay the total participants would be required to register as conference attendees.
    [Show full text]
  • Modeling the First Train Timetabling Problem with Minimal Missed Trains
    Modeling the first train timetabling problem with minimal missed trains and synchronization time differences in subway networks Liujiang Kang1, 2; Xiaoning Zhu1; Huijun Sun1; Jakob Puchinger3, 4; Mario Ruthmair5; Bin Hu6 1 MOE Key Laboratory for Urban Transportation Complex Systems Theory and Technology, Beijing Jiaotong University, Beijing 100044, China 2Centre for Maritime Studies, National University of Singapore, Singapore 117576, Singapore 3Institut de Recherche Technologique SystemX, Palaiseau, France 4Laboratoire Genie Industriel, CentraleSupélec, Université Paris-Saclay, Chatenay-Malabry, France 5Department of Statistics and Operations Research, University of Vienna, Vienna 1090, Austria 6Mobility Department, AIT Austrian Institute of Technology, Vienna 1210, Austria Abstract Urban railway transportation organization is a systematic activity that is usually composed of several stages, including network design, line planning, timetabling, rolling stock and staffing. In this paper, we study the optimization of first train timetables for an urban railway network that focuses on designing convenient and smooth timetables for morning passengers. We propose a mixed integer programming (MIP) model for minimizing train arrival time differences and the number of missed trains, i.e., the number of trains without transfers within a reasonable time at interchange stations as an alternative to minimize passenger transfer waiting times. This is interesting from the operator’s point of view, and we show that both criteria are equivalent. Starting from an intuitive model for the first train transfer problem, we then linearize the non-linear constraints by utilizing problem specific knowledge. In addition, a local search algorithm is developed to solve the timetabling problem. Through computational experiments involving the Beijing subway system, we demonstrate the computational efficiency of the exact model and the heuristic approach.
    [Show full text]
  • Beijing Travel Guide
    BEIJING TRAVEL GUIDE FIREFLIES TRAVEL GUIDES BEIJING Beijing is a great city, famous Tiananmen Square is big enough to hold one million people, while the historic Forbidden City is home to thousands of imperial rooms and Beijing is still growing. The capital has witnessed the emergence of more and higher rising towers, new restaurants and see-and-be-seen nightclubs. But at the same time, the city has managed to retain its very individual charm. The small tea houses in the backyards, the traditional fabric shops, the old temples and the noisy street restaurants make this city special. DESTINATION: BEIJING 1 BEIJING TRAVEL GUIDE The Beijing Capital International Airport is located ESSENTIAL INFORMATION around 27 kilometers north of Beijing´s city centre. At present, the airport consists of three terminals. The cheapest way to into town is to take CAAC´s comfortable airport shuttle bus. The ride takes between 40-90 minutes, depending on traffic and origin/destination. The shuttles leave the airport from outside gates 11-13 in the arrival level of Terminal 2. Buses depart every 15-30 minutes. There is also an airport express train called ABC or Airport to Beijing City. The airport express covers the 27.3 km distance between the airport and the city in 18 minutes, connecting Terminals 2 and 3, POST to Sanyuanxiao station in Line 10 and Dongzhimen station in Line 2. Jianguomen Post Office Shunyi, Beijing 50 Guanghua Road Chaoyang, Beijing +86 10 96158 +86 10 6512 8120 www.bcia.com.cn Open Monday to Saturday, 8 am to 6.30 pm PUBLIC TRANSPORT PHARMACY The subway is the best way to move around the Shidai Golden Elephant Pharmacy city and avoid traffic jams in Beijing.
    [Show full text]
  • Analysis and Evaluation of the Beijing Metro Project Financing Reforms
    Advances in Social Science, Education and Humanities Research, volume 291 International Conference on Management, Economics, Education, Arts and Humanities (MEEAH 2018) Analysis and Evaluation of the Beijing Metro Project Financing Reforms Haibin Zhao1,a, Bingjie Ren2,b, Ting Wang3,c 1Ministry of Transport Research Institute, Chaoyang, Beijing, China,100029; 2Beijing Urban Construction Design & Development Group Co., Limited, Xicheng, Beijing, China,100037; 3School of Civil Engineering, Beijing Jiaotong University, Haidian, Beijing, China, 100044. [email protected], [email protected], [email protected] Keywords: metro; financing; marketisation; reform Abstract. The construction and operation of a metro system are costly, and the sustainable development of a metro system is difficult using government funding alone, particularly for developing countries. The main source for metro system financing in China is, currently, government budget and bank debt. Many cities have begun to seek new ways to attract funds from finance markets, which is increasing the need for the evaluation of metro financing. This study uses Beijing as a case study that utilises various financing modes with impressive results. As participants of the financing reform, the authors collected all the relative government documents and interviewed stakeholders to accomplish this work. This article reviews the development of financing modes for the Beijing Metro system during the last four decades and analyses the role of the government in the reformed financing system within the Chinese social political environment. The study addresses the advantages and challenges of the reforms in this context. To further analyses the technical processes of typical financing modes, the public-private partnership mode of Line 4, the BT mode of Olympic Branch Line, the insurance claim mode of Line 10 and the failure of the market oriented financing for Capital Airport Line are analysed and evaluated in detail.
    [Show full text]
  • Beijing Railway Station 北京站 / 13 Maojiangwan Hutong Dongcheng District Beijing 北京市东城区毛家湾胡同 13 号
    Beijing Railway Station 北京站 / 13 Maojiangwan Hutong Dongcheng District Beijing 北京市东城区毛家湾胡同 13 号 (86-010-51831812) Quick Guide General Information Board the Train / Leave the Station Transportation Station Details Station Map Useful Sentences General Information Beijing Railway Station (北京站) is located southeast of center of Beijing, inside the Second Ring. It used to be the largest railway station during the time of 1950s – 1980s. Subway Line 2 runs directly to the station and over 30 buses have stops here. Domestic trains and some international lines depart from this station, notably the lines linking Beijing to Moscow, Russia and Pyongyang, South Korea (DPRK). The station now operates normal trains and some high speed railways bounding south to Shanghai, Nanjing, Suzhou, Hangzhou, Zhengzhou, Fuzhou and Changsha etc, bounding north to Harbin, Tianjin, Changchun, Dalian, Hohhot, Urumqi, Shijiazhuang, and Yinchuan etc. Beijing Railway Station is a vast station with nonstop crowds every day. Ground floor and second floor are open to passengers for ticketing, waiting, check-in and other services. If your train departs from this station, we suggest you be here at least 2 hours ahead of the departure time. Board the Train / Leave the Station Boarding progress at Beijing Railway Station: Station square Entrance and security check Ground floor Ticket Hall (售票大厅) Security check (also with tickets and travel documents) Enter waiting hall TOP Pick up tickets Buy tickets (with your travel documents) (with your travel documents and booking number) Find your own waiting room (some might be on the second floor) Wait for check-in Have tickets checked and take your luggage Walk through the passage and find your boarding platform Board the train and find your seat Leaving Beijing Railway Station: When you get off the train station, follow the crowds to the exit passage that links to the exit hall.
    [Show full text]
  • A Trip Purpose-Based Data-Driven Alighting Station Choice Model Using Transit Smart Card Data
    Hindawi Complexity Volume 2018, Article ID 3412070, 14 pages https://doi.org/10.1155/2018/3412070 Research Article A Trip Purpose-Based Data-Driven Alighting Station Choice Model Using Transit Smart Card Data Kai Lu ,1 Alireza Khani,2 and Baoming Han 1 1School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China 2Department of Civil, Environmental and Geo-Engineering, University of Minnesota, Minneapolis, MN 55455, USA Correspondence should be addressed to Kai Lu; [email protected] and Baoming Han; [email protected] Received 18 December 2017; Revised 2 June 2018; Accepted 15 July 2018; Published 28 August 2018 Academic Editor: Shuliang Wang Copyright © 2018 Kai Lu et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Automatic fare collection (AFC) systems have been widely used all around the world which record rich data resources for researchers mining the passenger behavior and operation estimation. However, most transit systems are open systems for which only boarding information is recorded but the alighting information is missing. Because of the lack of trip information, validation of utility functions for passenger choices is difficult. To fill the research gaps, this study uses the AFC data from Beijing metro, which is a closed system and records both boarding information and alighting information. To estimate a more reasonable utility function for choice modeling, the study uses the trip chaining method to infer the actual destination of the trip. Based on the land use and passenger flow pattern, applying k-means clustering method, stations are classified into 7 categories.
    [Show full text]
  • Infopackage Beijing Open 2016 English
    BEIJING FOOSBALL OPEN 2016 (ITSF Master Series) We are pleased to officially announce the BEIJING FOOSBALL OPEN 2016 (ITSF Master Series), from Oct.1st to Oct.3rd. The tournament will be held by CTSF, Kappa & FEIGE Games. Location Beijing Wukesong Culture and Sports Plaza, 69 Fuxing Road, Haidian District, Beijing, P.R.China. Location: https://www.google.nl/maps/place/MasterCard+Center/@39.9107251,116.2786573,16.37z/data =!4m5!3m4!1s0x35f04fd26ac845f5:0x2c72f11a5bf1d9d5!8m2!3d39.9111832!4d116.2807668 Duration: Start Date & Time: Oct. 1st , 13:00 hrs. End Date & Time: Oct. 3rd , 20:00 hrs. Event Format: Warm up and DYP* (Saturday Oct.1st, 13:00 – 20:00 hrs.) *DYP = Draw Your Partner, Teams are chosen randomly. This event will not count in the official ranking. Open Doubles (Sunday Oct.2nd, 13:00 – 20:00 hrs.) Open Doubles is open to everybody. Register as team. In Open Doubles, if teams are less than 12 teams, after Open Doubles we will have an Amateur Doubles. Amateur Doubles is open for all teams with exception of Top 3 teams from Open Doubles. (subject to modification if necessary). Both of Open Doubles and Amateur Doubles will be decided champion, runner up and third. If teams are 12 teams or more, there will be a Qualifier before Open Doubles. Half of teams(Top 50%) will get in the Pro. group. Left half teams(50%) will get in UnPro. group. Both of Pro. group and Unpro will be decided champion, runner up and third. Open Singles (Monday Oct.3nd, 13:00 – 20:00 hrs.) Open Singles is open to everybody.
    [Show full text]
  • Learning in Museums
    ICOM-ITC 2014 Autumn Training Workshop Learning in Museums Oct. 27-Nov. 4, 2014 Beijing, China Table of Content Welcome Address......................................................................................1 Introduction to the Training Workshop.....................................................2 Profile of Lecturers....................................................................................3 Workshop Agenda.........................................................................12 Museum Visit......................................................................................15 Chinese Participants................................................................................27 International Participants........................................................................29 ICOM-ITC Staff......................................................................................31 Useful Information..................................................................................32 Contact Information................................................................................37 Welcome Address Dear lecturers, dear participants, First of all, we would like to welcome you on behalf of ICOM China and the Palace Museum. The proposal of establishing an ICOM International Training Centre for Museum Studies (ICOM-ITC) was put forward in the 22nd General Conference of ICOM in Shanghai in 2010. After three years of planning, ICOM-ITC was founded on July 1, 2013 in the Palace Museum. Up to now, ICOM-ITC has held two training
    [Show full text]
  • A Case Study of Beijing Subway
    Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 137 ( 2016 ) 49 – 58 GITSS2015 Evaluating Disruption in Rail Transit Network: A Case Study of Beijing Subway Haodong Yina,b, Baoming Hana,b, Dewei Lib,*, Ying wangb aState key lab of rail traffic control & safety, Beijing Jiaotong University, Beijing, 100044, PR China bSchool of Traffic and Transportation, Beijing Jiaotong University, Beijing, 100044, PR China Abstract Disruption means serious deviation from the planned operations. In this paper, static disruption management problems of rail transit network are discussed: the importance evaluation problem and the disruption impact problem. For importance evaluation problem, betweenness based evaluation indexes of stations, edges and lines are established based on K shortest paths and passenger flow; for disruption impact problems, the global efficiency is adopted to evaluate how well the subway system works before and after the disruptions. And three levels of attack strategies are designed to describe the disruptions. Finally, Beijing subway is studied. The result of case study shows: (1)our proposed importation evaluation model based on expanded betweenness concepts can be used to evaluate the subway’s importance in different levels; (2)removal of even a few lines, stations or edges with a high betweenness will result in a big decline in the efficiency of subway network; (3)Beijing subway network is robust against random disruptions but fragile for intentional attacks. © 2016 PublishedThe Authors. by Elsevier Published Ltd. byThis Elsevier is an open Ltd. access article under the CC BY-NC-ND license Peer-review(http://creativecommons.org/licenses/by-nc-nd/4.0/ under responsibility of the Department).
    [Show full text]
  • The Best Places to Eat, Sleep and Play in Beijing This Fall and Winter
    BEIJING FALL & WINTER GUIDE 2008/2009 The best places to eat, sleep and play in Beijing this fall and winter With more than 20 million reviews and opinions, TripAdvisor makes travel planning a snap for the 25 million travelers visiting our site each month. INTRODUCTION TripAdvisor, the most trusted source for where to eat, sleep and play in thousands of destinations around the world, has collected the best insider tips from its 25 million monthly visitors to produce a unique series of travel guides. In addition to the best hotels, restaurants and attractions for every type of traveler, you’ll get great advice about what to pack, how to get around and where to find the best views. Be sure to check out the guides at www.tripadvisor.com. Inside You’ll find reviews for more than 230,000 BEIJING hotels, 76,000 attractions and 435,000 restaurants on TripAdvisor.com. Learn from other travelers what to expect before you make your plans. Fifteen million inhabitants call ever-changing Beijing home. As the economy booms and the Chinese capital prepares for the 2008 Olympic Games, Beijing’s skyline is one of cranes and multistory blocks. But behind this hubbub of activity lies an ancient civilization steeped in a tradition and a culture that is alien to most Westerners. PACKING TIPS Beijing sprouted as a frontier trading post frequented by Mongols, 1. You’ll appreciate remembering earplugs. Koreans and tribes from Shandong and central China around 1000 They’ll help combat bustling Beijing’s taxi and B.C. But its significance stems from the 13th century, when Kublai construction noise.
    [Show full text]
  • Time Prediction Model of Subway Transfer
    Zhou et al. SpringerPlus (2016) 5:44 DOI 10.1186/s40064-016-1686-7 RESEARCH Open Access Time prediction model of subway transfer Yuyang Zhou*, Lin Yao, Yi Gong and Yanyan Chen *Correspondence: zyy@bjut. edu.cn Abstract Beijing Key Laboratory Walking time prediction aims to deduce waiting time and travel time for passengers of Traffic Engineering, Beijing University of Technology, and provide a quantitative basis for the subway schedule management. This model is Beijing 100124, China founded based on transfer passenger flow and type of pedestrian facilities. Chaoyang- men station in Beijing was taken as the learning set to obtain the relationship between transfer walking speed and passenger volume. The sectional passenger volume of different facilities was calculated related to the transfer passage classification. Model parameters were computed by curve fitting with respect to various pedestrian facilities. The testing set contained four transfer stations with large passenger volume. It is vali- dated that the established model is effective and practical. The proposed model offers a real-time prediction method with good applicability. It can provide transfer scheme reference for passengers, meanwhile, improve the scheduling and management of the subway operation. Keywords: Time prediction, Subway transfer, Passenger flow, Pedestrian facilities Background As an indispensable transportation system of big cities, subway has the merit of time reliability and vast capacity. With the development of urban subway system, passen- ger flow has increased significantly on peak time. The great concentration of passenger flow in transfer station has put enormous pressure on the subway system. Not only the underground network design decision, but also a huge range of consequential informa- tion service for passengers including transfer waiting time, travel time, reliability and even mode choice depend on the assumption about how long passengers will spent on walking from one subway line to the other.
    [Show full text]