Referenzliste
Total Page:16
File Type:pdf, Size:1020Kb
Selected references of the ALENSYS Group: Aerobic treatment of industrial wastewater with the SBR (Sequencing batch reactor) - process Anaerobic treatment of industrial wastewater, UASB (upflow anaerobic sludge blanket) - reactors Bio waste treatment plants as fermentation facilities Biogas plants (renewable primary products); power and heat generation Bio methane plants for upgrading biogas, feeding biomethane into the gas distribution system according to natural gas quality standards of DVGW (German Technical and Scientific Association for Gas and Water) The following biogas plants were acquired, planned, monitored and/ or realised by ALENSYS-associates and employees. Scope of work: feasibility studies, project monitoring, project management, technical approval according to the Federal Immission Control Act, preliminary- and implementation planning, tendering and placing, site management, commissioning, acceptance und support of the constructors 1 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Contact: Alensys Engineering GmbH Zum Wasserwerk 12 D-15537 Erkner/Berlin Germany Mrs. Dipl.-Ing. Ilona Paulick CEO Phone: +49 33 62 88 59 -141 Mobile: +49 172 9810567 Fax: +49 3362 88 59 -151 E-mail: [email protected] Mr. Dipl.-Ing. Andree Baganz Authorized signatory Phone: +49 33 62 88 59 -143 Mobile: +49 173 2858523 Fax: +49 3362 88 59 -153 E-mail: [email protected] Mr. Dipl.-Ing. Tobias Burgstaller Project manager international Phone: +49 33 62 88 59 -141 / -142 Mobile: +49 172 73 76 455 Fax: +49 3362 88 59 -150 / -152 E-mail: [email protected] Mr. Dipl.-Ing. Mathias Uslar Project manager international Phone: +49 33 62 88 59 -148 Fax: +49 3362 88 59 -158 E-mail: [email protected] 2 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Bio methane plant Botswana - Africa location: BW-21250 Gaborone, Botswana process type: wet digestion process size of plant: 700Nm³/h bio methane (local bottling plant and fuel station) input materials: chicken abattoir effluent, cow manure, wheat bran scope of service: alpha-engineering, basic- and detail-engineering, staff training, commissioning, knowledge transfer process engineering: basic and detail project start: 4. quarter 2012 planned start of construction: 3. quarter 2013 3 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Biogas plant Agro-on PhaYao – Thailand location: Th – 56000 PhaYao process type: wet digestion process size of plant: 1,5MW electrical input materials: maize waste, elephant grass, cow manure and dung scope of service: general planning, blueprint planning, preliminary planning, implementation planning, site management and realisation of the plant process engineering: basic and detail project start: 3. quarter 2012 planned start of construction: 4. quarter 2013 4 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Biogas plant ChiangRai – Thailand: location: Th – 57000 ChiangRai process type: wet digestion process size of plant: about 1,0 MW electrical input materials: liquid manure and renewable primary products (RPP) scope of service: general planning, blueprint planning, preliminary planning, implementation planning, site management and realisation of the plant process engineering: basic and detail project start: 2. quarter 2010 planned start of construction: 2. quarter 2013 5 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Biogas research centre (BRC) Tineo – Spain: location: ES – 33877 Tineo process type: wet digestion process, thermophilic main digester and mesophilic post digester size of plant: 248 kW electrical input materials: leftovers and organic waste scope of service: general planning, blueprint planning, preliminary planning, implementation planning, site management and realisation of the plant process engineering: basic and detail project start: 4. quarter 2010 planned start of construction: 4. quarter 2011 6 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Biogas plant Tanzania – Africa: location: Tanzania process type: wet digestion process size of plant: 2 * 150 kW electrical input materials: sisal (plant residues) scope of service: project management, consulting, training process engineering: basic and detail Biogas in Switzerland: client: Erdgas Zürich AG in 8010 Zürich sector: technology comparison of wet and dry digestion process Biogas plant agricultural products Dedelow – Mecklenburg-West Pomerania: location: D – 17291 Prenzlau size of plant: 700 Nm3/h raw biogas input materials: liquid manure and renewable primary products (RPP) client: Agrarprodukte Dedelow GmbH scope of service: extension and conversion of the gas technique, 2.5 km long gas line to an external CHP: blueprint planning, approval planning, construction supervision engineering: basic and detail project start: 2. quarter 2011 planned start of construction: 2. quarter 2011 7 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Bio methane in Hesse: location: Willinghausen input materials: renewable primary products size of plant: 350 Nm³/h bio methan client: Städtische Werke Kassel AG scope of service: comparison of different biogas treatment methods with sensitivity analysis, technical and economic assessment, network topology and clarify the feeding conditions location: Bad Arolsen input material: renewable primary products size of plant: 1250Nm³/h raw biogas client: Städtische Werke Kassel AG scope of service: project development das treatment and feeding, collaboration and consultation, delivery contract raw biogas, network topology interface coordination of gas network operators 8 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de location: D – 61200 Wölfersheim process type: wet digestion process size of plant: 1000 Nm3/h raw biogas, 500 Nm3/h biomethane input materials: mixed liquid manure, turkey manure and renewable primary products (RPP) client: OVAG Energie AG scope of service: economic and technical feasibility study, raw material organization, general planning, blueprint planning, approval planning according to the Federal Immission Control Act (BImSchG), construction supervision (gas treatment: amine gas treating) process engineering: basic and detail project start: 2007 planned start of construction: 2. quarter 2011 9 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de 10 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Biogas plant Neubukow – Mecklenburg-West Pomerania: location: D –18233 Neubukow process type: wet digestion process size of plant: 938 kW electrical input materials: liquid manure and co-ferments, organic waste scope of service: blueprint planning, preliminary planning, implementation planning, Construction, construction management, commissioning, final inspections, conversion planning for new waste legislation, planning modification of the plant process engineering: basic and detail Bio methane plant Wulften – Lower Saxony: location: D – 37199 Wulften process type: wet digestion process size of plant: 700 Nm3/h raw biogas, 350 Nm3/h biomethane input materials: liquid manure and renewable primary products (RPP) client: Stadtwerke Lemgo scope of service: economic and technical feasibility study, approval planning according to the Federal Immission Control Act (BImSchG) process engineering: basic and detail project start: 4. quarter 2010 planned start of construction: open 11 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de GreenGas plant Rathenow – Brandenburg: location: D –14704 Rathenow process type: wet digestion process size of plant: 1100 Nm3/h raw biogas, 520 Nm3/h biomethane input materials: liquid manure and renewable primary products (RPP) client: GreenGas Produktionsanlage Rathenow GmbH & Co. KG partner: EMB GmbH Potsdam und GASAG Berliner Gaswerke AG scope of service: economic and technical feasibility study, raw material organization, finance consulting, general planning, blueprint planning, approval planning according to the Federal Immission Control Act (BImSchG), construction supervision process engineering: basic and detail 12 of 29 ALENSYS Engineering GmbH e-mail: [email protected] Zum Wasserwerk 12 Phone: 0049 – (0)3362 88 59 141 15537 Erkner Fax: 0049 – (0)3362 88 59 150 www.alensys.de Bio methane plant Homberg(Efze) – Hesse: location: D – 34576 Homberg process type: wet digestion process size of plant: 700 Nm3/h raw biogas, 350 Nm3/h biomethane