Date: 5/28/20 3:53PM Page 1 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Lackawanna

PennDOT Project Id: 7764

Project Administrator: PENNDOT Title: West Lackawanna Ave. Bridge over Conrail Railroad Improvement Type: Replace/Rehab State Route: 7302 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/22/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 7302 (West Lackawanna Avenue) Project Description: Bridge rehabilitation/replacement on State Route 7302 (West Lackawanna Avenue) over Conrail Railroad in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $0 $0 $120 $0 $0 $0 Final Design 185 $0 $0 $30 $0 $0 $0 Construction STU $0 $0 $0 $800 $0 $0 Construction 185 $0 $0 $0 $200 $0 $0

Federal: $0 $0 $120 $800 $0 $0 State: $0 $0 $30 $200 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $150 $1,000 $0 $0

Total FFY 2021-2032 Cost $1,150

PennDOT Project Id: 7911

Project Administrator: PENNDOT Title: North Main Avenue Bridge over Leggetts Creek Improvement Type: Replace/Rehab State Route: 7302 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/22/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, North Main Avenue Bridge Project Description: Bridge rehabilitation/replacement on North Main Avenue Bridge over Leggetts Creek in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $0 $0 $240 $0 $0 $0 Preliminary Engineering 185 $0 $0 $60 $0 $0 $0 Final Design NHPP $0 $0 $0 $60 $0 $0 Final Design 185 $0 $0 $0 $240 $0 $0 Construction NHPP $0 $0 $0 $0 $0 $300 Construction 185 $0 $0 $0 $0 $0 $1,200

Federal: $0 $0 $240 $60 $0 $300 State: $0 $0 $60 $240 $0 $1200

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $300 $300 $0 $1,500

Total FFY 2021-2032 Cost $2,100 Date: 5/28/20 3:53PM Page 2 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 8156

Project Administrator: PENNDOT Title: SR 3012 over Keyser Creek Improvement Type: Replace/Rehab State Route: 3012 Municipality: Taylor (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Taylor Borough, State Route 3012 ( Street) Project Description: Bridge rehabilitation/replacement on State Route 3012 (Oak Street) over Keyser Creek in Taylor Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction 185 $750 $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $750 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $750 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $750

PennDOT Project Id: 8174

Project Administrator: PENNDOT Title: SR 690 over Van Brunt Creek Improvement Type: Bridge Rehabilitation State Route: 690 Municipality: Moscow (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/10/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Moscow Borough, State Route 690 (Church Street) Project Description: Bridge rehabilitation on State Route 690 (Church Street) over Van Brunt Creek, in Moscow Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Final Design STU $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STU $0 $0 $0 $0 $600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $320 $0 $0 $240 $600 $0 State: $80 $0 $0 $60 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $0 $300 $1,000 $0

Total FFY 2021-2032 Cost $1,700

PennDOT Project Id: 8182

Project Administrator: PENNDOT Title: SR 3017 over Improvement Type: Bridge Rehabilitation State Route: 3017 Municipality: Old Forge (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/10/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Old Forge Borough, State Route 3017 (Main Street) Project Description: Bridge preservation on State Route 3017 (Main Street) over Lackawanna River in Old Forge Borough, Lackawanna County. Date: 5/28/20 3:53PM Page 3 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $800 $0 Construction 185 $0 $0 $0 $0 $200 $0

Federal: $320 $0 $0 $240 $800 $0 State: $80 $0 $0 $60 $200 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $0 $300 $1,000 $0

Total FFY 2021-2032 Cost $1,700

PennDOT Project Id: 8191

Project Administrator: PENNDOT Title: SR 435 over Lackawanna County Railroad Authority Improvement Type: Bridge Replacement State Route: 435 Municipality: Elmhurst (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/13/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Elmhurst Township, State Route 435 (Drinker Pike) Project Description: Bridge replacement on State Route 435 (Drinker Pike) over Lackawanna County Railroad Authority in Elmhurst Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $280 $0 $0 $0 $0 $0 Preliminary Engineering 185 $70 $0 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $4,000 $0 Construction 185 $0 $0 $0 $0 $1,000 $0

Federal: $280 $0 $0 $240 $4000 $0 State: $70 $0 $0 $60 $1000 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $0 $0 $300 $5,000 $0

Total FFY 2021-2032 Cost $5,650

PennDOT Project Id: 8230

Project Administrator: PENNDOT Title: SR 3015 over Lackawanna River Improvement Type: Bridge Rehabilitation State Route: 3015 Municipality: Old Forge (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/15/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Moosic and Old Forge Boroughs, State Route 3015 (Moosic Road) Project Description: Bridge rehabilitation on State Route 3015 (Moosic Road) over Lackawanna River in Moosic and Old Forge Boroughs, Lackawanna County. Date: 5/28/20 3:53PM Page 4 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $0 $1,000 $1,240 $0 $0 $0 Construction 185 $0 $250 $310 $0 $0 $0

Federal: $0 $1000 $1240 $0 $0 $0 State: $0 $250 $310 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $1,250 $1,550 $0 $0 $0

Total FFY 2021-2032 Cost $2,800

PennDOT Project Id: 8238

Project Administrator: PENNDOT Title: SR 307 over Interstate 380 Improvement Type: Bridge Preservation Activities State Route: 307 Municipality: Covington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/25/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Covington Township, State Route 307 (Scranton Pocono Highway) Project Description: Bridge preservation on State Route 307 (Scranton Pocono Highway) over Interstate 380 in Covington Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $240 $0 $0 $0 $0 $0 Preliminary Engineering 185 $60 $0 $0 $0 $0 $0 Construction STP $0 $0 $0 $0 $2,600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $240 $0 $0 $0 $2600 $0 State: $60 $0 $0 $0 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $0 $0 $0 $3,000 $0

Total FFY 2021-2032 Cost $3,300

PennDOT Project Id: 8242

Project Administrator: PENNDOT Title: SR 407 over Lackawanna Improvement Type: Bridge Rehabilitation State Route: 407 Municipality: North Abington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 11/5/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, North Abington and Benton Townships, State Route 407 (Philly Great Bend Turnpike) Project Description: Bridge rehabilitation on State Route 407 (Philly Great Bend Turnpike) over Lackawanna Lake in North Abington and Benton Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $600 $600 $600 $600 $0 $0 Construction 185 $150 $150 $150 $150 $0 $0

Federal: $600 $600 $600 $600 $0 $0 State: $150 $150 $150 $150 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $750 $750 $750 $750 $0 $0

Total FFY 2021-2032 Cost $3,000 Date: 5/28/20 3:53PM Page 5 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 8245

Project Administrator: PENNDOT Title: SR 438 over South Branch Tunkhannock Creek Improvement Type: Bridge Preservation Activities State Route: 438 Municipality: Scott (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/12/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Scott Township, State Route 438 (Montdale Rd) Project Description: Bridge preservation on State Route 438 (Montdale Rd) over South Branch of Tunkhannock Creek in Scott Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $80 $0 $0 $0 $0 $0 Preliminary Engineering 185 $20 $0 $0 $0 $0 $0 Construction STU $0 $0 $480 $0 $0 $0 Construction 185 $0 $0 $120 $0 $0 $0

Federal: $80 $0 $480 $0 $0 $0 State: $20 $0 $120 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $600 $0 $0 $0

Total FFY 2021-2032 Cost $700

PennDOT Project Id: 8256

Project Administrator: PENNDOT Title: SR 8001 ramp over Route 11 Improvement Type: Bridge Replacement State Route: 8001 Municipality: Moosic (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Moosic Borough, State Route 8001 (Ramp B Road) Project Description: Bridge replacement on State Route 8001 (Ramp B Road) over State Route 11 in Moosic Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $560 $0 $0 $0 $0 $0 Preliminary Engineering 185 $140 $0 $0 $0 $0 $0 Final Design NHPP $0 $0 $0 $0 $100 $0 Final Design 185 $0 $0 $0 $0 $400 $0 Construction NHPP $0 $0 $0 $0 $0 $1,400 Construction 185 $0 $0 $0 $0 $0 $5,600

Federal: $560 $0 $0 $0 $100 $1400 State: $140 $0 $0 $0 $400 $5600

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $700 $0 $0 $0 $500 $7,000

Total FFY 2021-2032 Cost $8,200 Date: 5/28/20 3:53PM Page 6 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 8257

Project Administrator: PENNDOT Title: SR 8008 over I-84 / I-380 Improvement Type: Bridge Preservation Activities State Route: 8008 Municipality: Roaring Brook (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 6/4/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Roaring Brook Township, State Route 8008 (Ramp D Road) Project Description: Bridge preservation on State Route 8008 (Ramp D Road) over Interstates 84 and 380 in Roaring Brook Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $800 $0 $0 $0 $0 $0 Construction 185 $200 $0 $0 $0 $0 $0

Federal: $800 $0 $0 $0 $0 $0 State: $200 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,000 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 8308

Project Administrator: PENNDOT Title: SR 3006 over Gardner Creek Improvement Type: Bridge Replacement State Route: 3006 Municipality: Newton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/9/25 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Newton Township, State Route 3006 (Milwaukee Road) Project Description: Bridge replacement on State Route 3006 (Milwaukee Road) over Gardner Creek in Newton Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design BOF $0 $240 $0 $0 $0 $0 Final Design 185 $0 $60 $0 $0 $0 $0 Construction BOF $0 $0 $800 $0 $0 $0 Construction 185 $0 $0 $200 $0 $0 $0

Federal: $0 $240 $800 $0 $0 $0 State: $0 $60 $200 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $300 $1,000 $0 $0 $0

Total FFY 2021-2032 Cost $1,300

PennDOT Project Id: 8312

Project Administrator: PENNDOT Title: SR 307 over Green Run Improvement Type: Replace/Rehab State Route: 307 Municipality: Roaring Brook (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/10/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Roaring Brook Township, State Route 307 (Scranton Pocono Highway) Project Description: Bridge replacement/rehabilitation on State Route 347 (Scranton Pocono Highway) over Green Run in Roaring Brook Township, Lackawanna County. Date: 5/28/20 3:53PM Page 7 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction 185 $1,000 $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $1000 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,000 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 8384

Project Administrator: PENNDOT Title: SR 3020 over Lackawanna County Rail Authority Improvement Type: Replace/Rehab State Route: 3020 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/10/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 3020 (Linden Street) Project Description: Bridge rehabilitation/replacement on State Route 3020 (Linden Street) over Lackawanna County Rail Authority in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $240 $0 $0 $0 $0 $0 Preliminary Engineering 185 $60 $0 $0 $0 $0 $0 Final Design STU $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STU $0 $0 $0 $0 $4,000 $0 Construction 185 $0 $0 $0 $0 $1,000 $0

Federal: $240 $0 $0 $240 $4000 $0 State: $60 $0 $0 $60 $1000 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $0 $0 $300 $5,000 $0

Total FFY 2021-2032 Cost $5,600

PennDOT Project Id: 57729

Project Administrator: PennDOT Title: Scranton-NYC RR Line Item Improvement Type: Transportation Study State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: X1 - Actvtys not leading to constr. (plan & tech study) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton - Passenger rail study Project Description: Study - Connection with the Central Railroad in the City of Scranton, Lackawanna County. Date: 5/28/20 3:53PM Page 8 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $8 $0 $0 $0 $0 $0 Preliminary Engineering LOC $2 $0 $0 $0 $0 $0

Federal: $8 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $2 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $10 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $10

PennDOT Project Id: 61813

Project Administrator: PennDOT Title: SR 6 (Robert P. Casey Highway) to SR 6006 Improvement Type: Restoration State Route: 6 Municipality: Dunmore (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/11/21 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, Dunmore, Throop, Olyphant, Jessup, Archbald, and Mayfield Boroughs and Carbondale Township, State Route 6 (Robert P. Casey Highway) Project Description: Highway restoration on State Route 6 (Robert P. Casey Highway) from Interstate 81 to Roosevelt Highway, Dunmore, Throop, Olyphant, Jessup, Archbald and Mayfield Boroughs and Carbondale Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $12,000 $16,400 $0 $0 $0 $0 Construction 581 $3,000 $4,100 $0 $0 $0 $0

Federal: $12000 $16400 $0 $0 $0 $0 State: $3000 $4100 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $15,000 $20,500 $0 $0 $0 $0

Total FFY 2021-2032 Cost $35,500

PennDOT Project Id: 67085

Project Administrator: PennDOT Title: T437 College Av Marcomis Improvement Type: Bridge Replacement State Route: 0 Municipality: La Plume (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/28/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, La Plume Township, State Route 7211 (Township Road 437, College Ave) Project Description: Bridge rehabilitation/replacement on State Route 7211 (Township Road 437, College Ave) over Marcomis Creek in La Plume Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design BOF $280 $0 $0 $0 $0 $0 Final Design 185 $70 $0 $0 $0 $0 $0 Construction BOF $0 $1,040 $0 $0 $0 $0 Construction 185 $0 $260 $0 $0 $0 $0

Federal: $280 $1040 $0 $0 $0 $0 State: $70 $260 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $1,300 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,650 Date: 5/28/20 3:53PM Page 9 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 67170

Project Administrator: PennDOT Title: Goers Hill Bridge No. 3 over White Oak Run Improvement Type: Bridge Replacement State Route: 7401 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 11/7/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Archbald Borough, Local Road 7401 (Goers Hill Bridge No. 3) Project Description: Bridge replacement on Local Road 7401 (Goers Hill Road) over White Oak Run in Archbald Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $360 $0 $0 $0 Preliminary Engineering 185 $0 $0 $90 $0 $0 $0 Final Design BOF $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction BOF $0 $0 $0 $0 $0 $4,000 Construction 185 $0 $0 $0 $0 $0 $1,000

Federal: $0 $0 $360 $240 $0 $4000 State: $0 $0 $90 $60 $0 $1000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $450 $300 $0 $5,000

Total FFY 2021-2032 Cost $5,750

PennDOT Project Id: 67199

Project Administrator: PennDOT Title: SR 3023 over Roaring Brook Improvement Type: Replace/Rehab State Route: 3023 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/10/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 3023 (Cedar Ave) Project Description: Bridge rehabilitation/replacement on State Route 3023 (Cedar Avenue) over Roaring Brook in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Final Design NHPP $0 $0 $240 $0 $0 $0 Final Design 185 $0 $0 $60 $0 $0 $0 Construction 185 $0 $0 $0 $0 $6,000 $0

Federal: $320 $0 $240 $0 $0 $0 State: $80 $0 $60 $0 $6000 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $300 $0 $6,000 $0

Total FFY 2021-2032 Cost $6,700 Date: 5/28/20 3:53PM Page 10 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 67203

Project Administrator: PennDOT Title: SR 307 over Williams Bridge Reservoir Improvement Type: Replace/Rehab State Route: 307 Municipality: Roaring Brook (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/9/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Roaring Brook Township, State Route 307 (Scranton Pocono Highway) Project Description: Bridge rehabilitation/replacement on State Route 307 (Scranton Pocono Highway) over Williams Bridge Reservoir in Roaring Brook Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $280 $0 $0 $0 $0 $0 Final Design 185 $70 $0 $0 $0 $0 $0 Construction STU $0 $1,360 $0 $0 $0 $0 Construction 185 $0 $340 $0 $0 $0 $0

Federal: $280 $1360 $0 $0 $0 $0 State: $70 $340 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $1,700 $0 $0 $0 $0

Total FFY 2021-2032 Cost $2,050

PennDOT Project Id: 67227

Project Administrator: PennDOT Title: SR 107 over Branch Tunkhannock Creek Improvement Type: Replace/Rehab State Route: 107 Municipality: Benton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/31/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Benton Township, State Route 107 (Benton Road) Project Description: Bridge rehabilitation/replacement on State Route 107 (Benton Road) over Branch of Tunkhannock Creek in Benton Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $0 $160 $0 $0 $0 $0 Final Design 185 $0 $40 $0 $0 $0 $0 Construction STU $0 $0 $340 $0 $0 $0 Construction 185 $0 $0 $85 $0 $0 $0

Federal: $0 $160 $340 $0 $0 $0 State: $0 $40 $85 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $200 $425 $0 $0 $0

Total FFY 2021-2032 Cost $625

PennDOT Project Id: 69172

Project Administrator: PennDOT Title: SR 8041 over SR 11 Improvement Type: Bridge Preservation Activities State Route: 8041 Municipality: South Abington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 5/6/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, South Abington Township, State Route 8041 (Ramp F) Project Description: Bridge preservation on State Route 8041 (Ramp F) over US Route 11 in South Abington Township, Lackawanna County. Date: 5/28/20 3:53PM Page 11 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $800 $0 $0 $0 $0 $0 Construction 185 $200 $0 $0 $0 $0 $0

Federal: $800 $0 $0 $0 $0 $0 State: $200 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,000 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 69210

Project Administrator: PennDOT Title: SR 8015 over Leggett's Creek Improvement Type: Replace/Rehab State Route: 8015 Municipality: South Abington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/15/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, South Abington Township, State Route 8015 (Ramp F) Project Description: Bridge replacement on State Route 8015 (Ramp F) over Leggett's Creek in South Abington Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction NHPP $0 $800 $800 $600 $0 $0 Construction 185 $0 $200 $200 $150 $0 $0

Federal: $240 $800 $800 $600 $0 $0 State: $60 $200 $200 $150 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $1,000 $1,000 $750 $0 $0

Total FFY 2021-2032 Cost $3,050

PennDOT Project Id: 70194

Project Administrator: PennDOT Title: FAS-Loc, Lackawanna Co. Improvement Type: Restoration State Route: 0 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lakawanna County, City of Scranton, various Local Federal Aid Routes Project Description: Milling, resurfacing, drainage improvements on various Local Federal Aid Routes in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $320 $320 $320 $320 $0 $0 Construction LOC $80 $80 $80 $80 $0 $0

Federal: $320 $320 $320 $320 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $80 $80 $80 $80 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $400 $400 $400 $0 $0

Total FFY 2021-2032 Cost $1,600 Date: 5/28/20 3:53PM Page 12 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 73300

Project Administrator: PennDOT Title: LLTS Highway Reserve Improvement Type: Reconstruct State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna and Luzerne Counties Project Description: Lackawanna and Luzerne Counties Highway Reserve.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction BOF $288 $238 $201 $261 $1,484 $725 Construction HSIP $0 $0 $0 $0 $12,388 $12,597 Construction NHPP $992 $155 $442 $329 $1,634 $244 Construction STP $218 $273 $311 $307 $5,508 $549 Construction STU $76 $24 $34 $14 $7,248 $1,707 Construction TAU $399 $399 $399 $399 $1,596 $1,595 Construction 185 $244 $510 $962 $1,196 $5,416 $1,633 Construction 581 $158 $603 $1,558 $465 $3,978 $929

Federal: $1973 $1089 $1387 $1310 $29858 $17417 State: $402 $1113 $2520 $1661 $9394 $2562

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $2,375 $2,202 $3,907 $2,971 $39,252 $19,979

Total FFY 2021-2032 Cost $70,686

PennDOT Project Id: 73359

Project Administrator: PennDOT Title: Lck Co 'K' Rts Line Item Improvement Type: Resurface State Route: 0 Municipality: Carbondale (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, various County owned Federal Aid Routes Project Description: Milling, resurfacing, drainage improvements on various county owned Federal Aid Routes in Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $320 $320 $320 $320 $0 $0 Construction LOC $80 $80 $80 $80 $0 $0

Federal: $320 $320 $320 $320 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $80 $80 $80 $80 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $400 $400 $400 $0 $0

Total FFY 2021-2032 Cost $1,600 Date: 5/28/20 3:53PM Page 13 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 74716

Project Administrator: PennDOT Title: Dunmore Boro 5 Leg Improvement Type: Miscellaneous State Route: 0 Municipality: Dunmore (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/20/20 Air Quality Exempt Reason: R2 - Intersection signalization prjcts at ind. inters. Actual Construction Bid Date: Location: Lackawanna County, Dunmore Borough, State Route K151 (Electric Street) Project Description: Intersection improvement

Dunmore Borough 5 Leg This project includes signal upgrade for one signal for a 5 leg intersection at Electric Street, Quincy Avenue and Drinker Street. Upgrades include sidewalks, crosswalks, ADA ramps, signal upgrades, and signal pole replacements.

Dunmore Borough Lackawanna County Earmark Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $320 $0 $0 $0 $0 $0 Construction LOC $80 $0 $0 $0 $0 $0

Federal: $320 $0 $0 $0 $0 $0

State: $0 $0 $0 $0 $0 $0

Local/Other: $80 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $400

PennDOT Project Id: 79521

Project Administrator: PennDOT Title: SR 2013 over Meadow Brook Improvement Type: Bridge Replacement State Route: 2013 Municipality: Clifton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/10/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Clifton Township, State Route 2013 (Clifton Beach Road) Project Description: Bridge replacement on State Route 2013 (Clifton Beach Road) over Meadow Brook in Clifton Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $80 $0 $0 $0 $0 Preliminary Engineering 185 $0 $20 $0 $0 $0 $0 Final Design BOF $0 $0 $240 $0 $0 $0 Final Design 185 $0 $0 $60 $0 $0 $0 Construction BOF $0 $0 $0 $0 $1,200 $0 Construction 185 $0 $0 $0 $0 $300 $0

Federal: $0 $80 $240 $0 $1200 $0 State: $0 $20 $60 $0 $300 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $100 $300 $0 $1,500 $0

Total FFY 2021-2032 Cost $1,900 Date: 5/28/20 3:53PM Page 14 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 80797

Project Administrator: PennDOT Title: Parker Street Bridge over Lackawanna River Improvement Type: Replace/Rehab State Route: 7302 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/26 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 7302 (Parker St. Bridge) Project Description: Bridge rehabilitation/replacement on State Route 7302 (Parker Street Bridge) over Lackawanna River in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $0 $280 $0 $0 Preliminary Engineering 185 $0 $0 $0 $70 $0 $0 Final Design 185 $0 $0 $0 $0 $300 $0 Construction 185 $0 $0 $0 $0 $0 $2,000

Federal: $0 $0 $0 $280 $0 $0 State: $0 $0 $0 $70 $300 $2000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $350 $300 $2,000

Total FFY 2021-2032 Cost $2,650

PennDOT Project Id: 84368

Project Administrator: PennDOT Title: SR 6011 Green Ridge Street over Lackawanna River Improvement Type: Bridge Replacement State Route: 6011 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/12/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 6011 (Green Ridge Street) Project Description: Bridge replacement on State Route 6011 (Green Ridge Street) over Lackawanna River in the City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $340 $0 $0 $0 $0 $0 Final Design 185 $85 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $2,000 $1,600 $880 $0 Construction 185 $0 $0 $500 $400 $220 $0

Federal: $340 $0 $2000 $1600 $880 $0 State: $85 $0 $500 $400 $220 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $425 $0 $2,500 $2,000 $1,100 $0

Total FFY 2021-2032 Cost $6,025

PennDOT Project Id: 84388

Project Administrator: PennDOT Title: LLTS Bridge Review Improvement Type: Bridge Rehabilitation State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna and Luzerne Counties Project Description: Review of bridges in various locations in Lackawanna and Luzerne Counties. Date: 5/28/20 3:53PM Page 15 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $20 $0 $0 $0 $0 $0 Construction 185 $80 $0 $0 $0 $0 $0

Federal: $20 $0 $0 $0 $0 $0 State: $80 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 86914

Project Administrator: PennDOT Title: LLTS Project Delivery Improvement Type: Restoration State Route: 0 Municipality: Clarks Green (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna and Luzerne Counties Project Description: Consultant assistance in project delivery, Lackawanna and Luzerne Counties.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $20 $0 $0 $0 $0 $0 Preliminary Engineering 581 $80 $0 $0 $0 $0 $0

Federal: $20 $0 $0 $0 $0 $0 State: $80 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 90260

Project Administrator: PennDOT Title: SR 6006 over Lackawanna River Improvement Type: Bridge Preservation Activities State Route: 6006 Municipality: Carbondale (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/4/26 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Carbondale, State Route 6006 (Scranton Carbondale Highway) Project Description: Bridge preservation on State Route 6006 (Scranton Carbondale Highway) over Lackawanna River, in the City of Carbondale, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $0 $0 $400 $0 $0 $0 Preliminary Engineering 185 $0 $0 $100 $0 $0 $0 Construction 185 $0 $0 $0 $0 $0 $3,000

Federal: $0 $0 $400 $0 $0 $0 State: $0 $0 $100 $0 $0 $3000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $500 $0 $0 $3,000

Total FFY 2021-2032 Cost $3,500 Date: 5/28/20 3:53PM Page 16 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 92949

Project Administrator: PennDOT Title: Tigue Street Park N Ride Improvement Type: Park and Ride Lot State Route: 8002 Municipality: Dunmore (BORO) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 8/26/21 Actual Construction Bid Date: Location: Lackawanna County, Dunmore Borough, State Route 8002 (Tigue Street) Project Description: Construction of a Park and Ride on State Route 8002 (Tigue Street) in Dunmore Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $0 $0 $1,500 $0 $0 $0

Federal: $0 $0 $1500 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $1,500 $0 $0 $0

Total FFY 2021-2032 Cost $1,500

PennDOT Project Id: 94567

Project Administrator: PennDOT Title: SR 348 Intersection Improvement Improvement Type: Safety Improvement State Route: 348 Municipality: Jefferson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/11/21 Air Quality Exempt Reason: S6 - Safety improvement program Actual Construction Bid Date: Location: Lackawanna County, Jefferson Township, State Route 348 Project Description: Safety improvements on State Route 348 from State Route 2002 (Wimmers Road) to State Route 2003 (Cortez Road) in Jefferson Township, Lackawanna County.

The project consists of the installation of a traffic signal at the intersection of PA 348 and Cortez Rd (SR 2003), sight distance improvements at the intersection with Wimmers Rd (SR 2002), minor roadway widening for a center turn lane between intersections and on the westbound approach to the signal, drainage improvements, sidewalk and pedestrian accommodations, and shoulder widening with edge line rumble strips Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction HSIP $800 $0 $0 $0 $0 $0 Construction 581 $1,000 $0 $0 $0 $0 $0

Federal: $800 $0 $0 $0 $0 $0 State: $1000 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,800 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,800

PennDOT Project Id: 95263

Project Administrator: PennDOT Title: Drinker St NB Exit Signal Improvement Type: Safety Improvement State Route: 81 Municipality: Moosic (BORO) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 9/26/19

Actual Construction Bid Date: 9/26/19 Location: Lackawanna County, Dunmore Borough, Interstate 81 (Exit 186 Northbound off ramp) and State Route 2020 (Drinker Street) Project Description: Traffic signal installation and intersection improvements at Interstate 81 Exit 186 Northbound off ramp (State Route 8007) at State Route 2020 (Drinker Street) in Dunmore Borough, Lackawanna County. Date: 5/28/20 3:53PM Page 17 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction HSIP $550 $0 $0 $0 $0 $0

Federal: $550 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $550 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $550

PennDOT Project Id: 95454

Project Administrator: PennDOT Title: US 11 over Railroad Improvement Type: Bridge Preservation Activities State Route: 11 Municipality: Moosic (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 6/24/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Moosic Borough, State Route 11 (Pittston Avenue) Project Description: Bridge preservation on State Route 11 (Pittston Avenue) over Luzerne County Rail Authority in Moosic Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $720 $0 $0 $0 $0 Construction 185 $0 $180 $0 $0 $0 $0

Federal: $0 $720 $0 $0 $0 $0 State: $0 $180 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $900 $0 $0 $0 $0

Total FFY 2021-2032 Cost $900

PennDOT Project Id: 95487

Project Administrator: PennDOT Title: Bridge Preservation Improvement Type: Bridge Preservation Activities State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: District wide, various municipalities, various State Routes Project Description: Bridge preservation on various State Routes, various municipalities, district wide.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $100 $100 $100 $100 $0 $0 Construction 185 $400 $1,500 $1,500 $400 $0 $0

Federal: $100 $100 $100 $100 $0 $0 State: $400 $1500 $1500 $400 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $1,600 $1,600 $500 $0 $0

Total FFY 2021-2032 Cost $4,200 Date: 5/28/20 3:53PM Page 18 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 96719

Project Administrator: PennDOT Title: SR 632 over Ackerly Creek Improvement Type: Replace/Rehab State Route: 632 Municipality: Waverly (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/17/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Waverly Township, State Route 632 (Carbondale Road) Project Description: Bridge rehabilitation/replacement on State Route 632 (Carbondale Road) over Ackerley Creek in Waverly Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $0 $200 $0 $0 $0 $0 Final Design 185 $0 $50 $0 $0 $0 $0 Construction STU $0 $0 $480 $0 $0 $0 Construction 185 $0 $0 $120 $0 $0 $0

Federal: $0 $200 $480 $0 $0 $0 State: $0 $50 $120 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $250 $600 $0 $0 $0

Total FFY 2021-2032 Cost $850

PennDOT Project Id: 97020

Project Administrator: PennDOT Title: SR 3002 over Gardner Creek Improvement Type: Bridge Rehabilitation State Route: 3002 Municipality: Ransom (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Ransom Township, State Route 3002 (Milwaukee Road) Project Description: Bridge rehabilitation on State Route 3002(Milwaukee Road) over Gardner Creek in Ransom Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $800 $0 $0 $0 $0 $0 Construction 185 $200 $0 $0 $0 $0 $0

Federal: $800 $0 $0 $0 $0 $0 State: $200 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,000 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 97930

Project Administrator: PennDOT Title: SR 435 over Interstate 84 Improvement Type: Bridge Preservation Activities State Route: 435 Municipality: Roaring Brook (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/9/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Roaring Brook Township, State Route 435 (Drinker Pike) Project Description: Bridge preservation on State Route 435 (Drinker Pike) over Interstate 84 in Roaring Brook Township, Lackawanna County. Date: 5/28/20 3:53PM Page 19 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $400 $0 $0 $0 $0 $0 Preliminary Engineering 185 $100 $0 $0 $0 $0 $0 Final Design STP $0 $280 $0 $0 $0 $0 Final Design 185 $0 $70 $0 $0 $0 $0 Construction STP $0 $0 $0 $0 $2,000 $0 Construction 185 $0 $0 $0 $0 $500 $0

Federal: $400 $280 $0 $0 $2000 $0 State: $100 $70 $0 $0 $500 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $350 $0 $0 $2,500 $0

Total FFY 2021-2032 Cost $3,350

PennDOT Project Id: 97932

Project Administrator: PennDOT Title: SR 4023 over Spillway Griffin Reservoir Improvement Type: Bridge Rehabilitation State Route: 4023 Municipality: South Abington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, South Abington Township, State Route 4023 (Scott Road) Project Description: Bridge rehabilitation on State Route 4023 (Scott Road) over Spillway at Griffin Reservoir in South Abington Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design BOF $0 $240 $0 $0 $0 $0 Final Design 185 $0 $60 $0 $0 $0 $0 Construction BOF $0 $0 $600 $0 $0 $0 Construction 185 $0 $0 $150 $0 $0 $0

Federal: $0 $240 $600 $0 $0 $0 State: $0 $60 $150 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $300 $750 $0 $0 $0

Total FFY 2021-2032 Cost $1,050

PennDOT Project Id: 100487

Project Administrator: PennDOT Title: SR 632 over Lily Lake Improvement Type: Bridge Rehabilitation State Route: 632 Municipality: Dalton (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Dalton Borough, State Route 632 (Main Street) Project Description: Bridge rehabilitation on State Route 632 (Main Street) over Tributary to Lily Lake in Dalton Borough, Lackawanna County. Date: 5/28/20 3:53PM Page 20 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STP $0 $240 $0 $0 $0 $0 Final Design 185 $0 $60 $0 $0 $0 $0 Construction STP $0 $0 $1,000 $0 $0 $0 Construction 185 $0 $0 $250 $0 $0 $0

Federal: $0 $240 $1000 $0 $0 $0 State: $0 $60 $250 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $300 $1,250 $0 $0 $0

Total FFY 2021-2032 Cost $1,550

PennDOT Project Id: 100499

Project Administrator: PennDOT Title: SR 4036 over Branch Falls Creek Improvement Type: Replace/Rehab State Route: 4036 Municipality: Newton (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/25/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Newton Township, State Route 4036 (Falls Road) Project Description: Bridge replacement on State Route 4036 (Falls Road) over Branch of Falls Creek in Newton Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction STU $0 $300 $0 $0 $0 $0 Construction 185 $0 $75 $0 $0 $0 $0

Federal: $240 $300 $0 $0 $0 $0 State: $60 $75 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $375 $0 $0 $0 $0

Total FFY 2021-2032 Cost $675

PennDOT Project Id: 100540

Project Administrator: PennDOT Title: Group 4-18-ST 10 Improvement Type: Restoration State Route: 11 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, PA 632 from SR 4018 (Abington Road) to SR 0247 (Wildcat Road) and SR 11 from Mifflin Avenue to US 6 (Northern Boulevard) in Waverly, Scott, and South Abington Townships and Dalton Borough. Project Description: Resurface State Route 632 from State Route 4018 (Abington Road) to State Route 0247 (Wildcat Road) and State Route 11 from Mifflin Avenue to State Route 6 (Northern Boulevard) in Waverly, Scott, and South Abington Townships and Dalton Borough, Lackawanna County Date: 5/28/20 3:53PM Page 21 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $0 $0 $0 $400 $0 $0 Construction 581 $0 $0 $0 $1,600 $0 $0

Federal: $0 $0 $0 $400 $0 $0 State: $0 $0 $0 $1600 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $2,000 $0 $0

Total FFY 2021-2032 Cost $2,000

PennDOT Project Id: 102012

Project Administrator: PennDOT Title: Group 4-22-ST 1 Improvement Type: Resurface State Route: 590 Municipality: Elmhurst (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/31/22 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, Elmhurst, Roaring Brook, Madison, Newton, Brook and Jefferson Townships, Moscow Borough and the City of Scranton, State Route 590 (Main Street and Hamlin Road), State Route 3021 (Stafford Avenue), State Route 690 (Church St) Project Description: Resurface on State Route 590 (Main Street and Hamlin Road) from PA 435 (Drinker Pike) to the Wayne County Line, State Route 3021 (Stafford Avenue) from The Strafford Meadow Brook Bridge to PA 307 (Moosic Street), State Route 690 (Church Street) from PA 307 (Scranton Daleville Highway) to PA 435 (Main Street) in Elmhurst, Roaring Brook, Madison, Newton, Spring Brook and Jefferson Townships, Moscow Borough and the City of Scranton, Lackawanna County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $0 $0 $400 $0 $0 $0 Construction 581 $0 $0 $1,600 $0 $0 $0

Federal: $0 $0 $400 $0 $0 $0 State: $0 $0 $1600 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $2,000 $0 $0 $0

Total FFY 2021-2032 Cost $2,000

PennDOT Project Id: 102096

Project Administrator: PennDOT Title: Group 4-21-ST 1 Improvement Type: Restoration State Route: 106 Municipality: Greenfield (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, SR 106, SR 1008, SR 1012, SR 1014, SR 1015, SR 1023, SR 3029, SR 4004, and SR 4030 Project Description: Resurfacing on State Route 106 (Fallbrook Road) from Susquehanna/Lackawanna County Line to State Route 247 (Wildcat Road), Greenfield Township, State Route 1008 (Chestnut Street) from State Route 1023 (Plank Road) to Lackawanna Avenue, Mayfield Borough, State Route 1012 (Kennedy Drive, Main Street, Wayne Street, Salem Road) from State Route 1023 (Main Street) to State Route 6 (Robert P Casey Highway), Archbald Borough, State Route 1014 (Hill Street) from State Route 1016 (Constitution Avenue) to State Route 247, Jessup Borough, State Route 1015 (Creamery Road) from Stillmeadow Road to State Route 2008, Greenfield Township, State Route 1023 (Depew Avenue, Plank Road) from Washington Avenue to State Route 6006 (Scranton-Carbondale Highway), Mayfield and Jermyn Boroughs, State Route 3029 (Seventh Street, Providence Road) from State Route 3020 (Linden Street) to State Route 3013 (Main Avenue), City of Scranton, State Route 4004 (Clarkson Road) from State Route 4005 (Seamans Road) to State Route 407, Benton Township, State Route 4030 (Vernard Street) from State Route 407 (South Abington Road) to State Route 4019 (Edella Road), South Abington Township, Clarks Green Borough, Lackawanna County. Date: 5/28/20 3:53PM Page 22 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $0 $0 $0 $400 $0 $0 Construction 581 $0 $0 $0 $1,600 $0 $0

Federal: $0 $0 $0 $400 $0 $0 State: $0 $0 $0 $1600 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $2,000 $0 $0

Total FFY 2021-2032 Cost $2,000

PennDOT Project Id: 102117

Project Administrator: PennDOT Title: Group 4-22-ST 1 Improvement Type: Restoration State Route: 438 Municipality: La Plume (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, Benton, North Abington, La Plume Townships, SR 438, Vandling Borough, Fell Township, SR 1001, Olyphant, Jessup Boroughs, SR 1016, Benton Township, SR 4005, La Plume Township, SR 4009 Project Description: Resurfacing on State Route 438 (La Plume Road, Wallsville Road) from State Route 6 (Grand Army of the Republic Highway) to Franklin Valley Road, Benton, North Abington and La Plume Townships, State Route 1001 (Valley View Terrace, Main Street) from State Route 171 (Main Street) to State Route 2025 (Hudson Street), Vandling Borough and Fell Townships, State Route 1016 from PA 347 (Scott Road) to Main Street, Olyphant and Jessup Boroughs, State Route 4005 (Seamans Road) from State Route 1033 (Watkins Street) to State Route 107 (Benton Road), Benton Township, State Route 4009 (Sunset Road) from Road to State Route 438 (LaPlume Road), La Plume Township, Lackawanna County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $0 $0 $0 $400 $0 $0 Construction 581 $0 $0 $0 $1,600 $0 $0

Federal: $0 $0 $0 $400 $0 $0 State: $0 $0 $0 $1600 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $2,000 $0 $0

Total FFY 2021-2032 Cost $2,000

PennDOT Project Id: 102866

Project Administrator: PennDOT Title: SR 3013 Main Street Signal Corridor Improvement Type: Safety Improvement State Route: 3013 Municipality: Scranton (CITY) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 3/11/21 Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 3013 (South Main Street) Project Description: Signal and safety improvements on State Route 3013 (South Main Street) at the intersections of Eynon Street, State Route 3014 (Luzerne Street), Washburn Street, Jackson Street, West Lackawanna Avenue, State Route 3020 (West Linden Street), Swetland Street, Oram Street, Providence Road, Wood Street and the Northbound and Southbound Ramps on the Scranton Expressway in the City of Scranton, Lackawanna County. There are 11 intersections and most will be interconnected. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction HSIP $0 $0 $1,893 $1,857 $0 $0 Construction STU $0 $0 $0 $2,500 $0 $0

Federal: $0 $0 $1893 $4357 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $1,893 $4,357 $0 $0

Total FFY 2021-2032 Cost $6,250 Date: 5/28/20 3:53PM Page 23 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 106131

Project Administrator: PennDOT Title: SR 3014 Dalton Street Railroad Lights /Gates Improvement Type: RR Warning Devices State Route: 3014 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/10/20 Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 3014 (Dalton Street) Project Description: Railroad grade crossing lights and gates updates on State Route 3014 (Dalton Street), City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $0 $0 $0 $300 $0 $0

Federal: $0 $0 $0 $300 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $300 $0 $0

Total FFY 2021-2032 Cost $300

PennDOT Project Id: 106134

Project Administrator: PennDOT Title: SR 3017 Main Street Railroad Lights /Gates Improvement Type: RR Warning Devices State Route: 3017 Municipality: Old Forge (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/10/20 Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Lackawanna County, Old Forge Borough, State Route 3017 (Main Street) Project Description: Railroad grade crossing lights and gates updates on State Route 3017 (Main Street), Old Forge Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $0 $0 $0 $300 $0 $0

Federal: $0 $0 $0 $300 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $300 $0 $0

Total FFY 2021-2032 Cost $300

PennDOT Project Id: 106314

Project Administrator: PennDOT Title: Elm Street Bridge over Lackawanna River Improvement Type: Bridge Rehabilitation State Route: 7302 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/22/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 7302 (Elm Street) Project Description: Bridge rehabilitation on State Route 7302 (Elm Street) over Lackawanna River in the City of Scranton, Lackawanna County. Date: 5/28/20 3:53PM Page 24 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $280 $0 $0 $0 Preliminary Engineering 185 $0 $0 $70 $0 $0 $0 Final Design BOF $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction BOF $0 $0 $0 $0 $0 $4,000 Construction 185 $0 $0 $0 $0 $0 $1,000

Federal: $0 $0 $280 $240 $0 $4000 State: $0 $0 $70 $60 $0 $1000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $350 $300 $0 $5,000

Total FFY 2021-2032 Cost $5,650

PennDOT Project Id: 106664

Project Administrator: PennDOT Title: SR 8025 over Roaring Brook and Service Road Improvement Type: Bridge Rehabilitation State Route: 8025 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/10/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 8025 (Ramp B) Project Description: Bridge rehabilitation on State Route 8025 (Ramp B) over Roaring Brook, in City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Final Design NHPP $0 $0 $240 $0 $0 $0 Final Design 185 $0 $0 $60 $0 $0 $0 Construction 185 $0 $0 $0 $0 $5,000 $0

Federal: $320 $0 $240 $0 $0 $0 State: $80 $0 $60 $0 $5000 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $300 $0 $5,000 $0

Total FFY 2021-2032 Cost $5,700

PennDOT Project Id: 106681

Project Administrator: PennDOT Title: SR 247 Expand Jessup Borough Park and Ride Improvement Type: Park and Ride Lot State Route: 247 Municipality: Jessup (BORO) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 10/7/21 Actual Construction Bid Date: Location: Lackawanna County, Jessup Borough, State Route 247 Project Description: Construction of a Park and Ride Extension on State Route 247 in Jessup Borough, Lackawanna County. Date: 5/28/20 3:53PM Page 25 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $0 $0 $100 $0 $0 $0

Federal: $0 $0 $100 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $100 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 109778

Project Administrator: PennDOT Title: SR 435 over Roaring Brook Improvement Type: Bridge Replacement State Route: 435 Municipality: Elmhurst (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/13/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Elmhurst Township, State Route 435 (Drinker Pike) Project Description: Bridge replacement on State Route 434 (Drinker Pike) over Roaring Brook in Elmhurst Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $280 $0 $0 $0 $0 $0 Preliminary Engineering 185 $70 $0 $0 $0 $0 $0 Final Design STP $0 $240 $0 $0 $0 $0 Final Design 185 $0 $60 $0 $0 $0 $0 Construction STP $0 $0 $0 $0 $2,400 $0 Construction 185 $0 $0 $0 $0 $600 $0

Federal: $280 $240 $0 $0 $2400 $0 State: $70 $60 $0 $0 $600 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $300 $0 $0 $3,000 $0

Total FFY 2021-2032 Cost $3,650

PennDOT Project Id: 111112

Project Administrator: PennDOT Title: Archbald Corridor Improvement Type: RR Warning Devices State Route: 0 Municipality: Archbald (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Lackawanna County, Archbald Borough, Salem Street, Pike Street, Hill Street Project Description: Installation of Railroad Lights, Gates, Bells, Circuitry and Housing on Salem Street, Pike Street, Hill Street, Archbald Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $0 $79 $300 $250 $0 $0

Federal: $0 $79 $300 $250 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $79 $300 $250 $0 $0

Total FFY 2021-2032 Cost $629 Date: 5/28/20 3:53PM Page 26 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 111469

Project Administrator: PennDOT Title: Dickson City Main Street; Enterprise Street Imp Improvement Type: Transportation Enhancement State Route: 0 Municipality: Dickson City (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/22/20 Air Quality Exempt Reason: X12 - Trns enhnc acts (excpt rehab, opr. of hist. trans) Actual Construction Bid Date: Location: Lackawanna County, Dickson City, Main Street from Hallstead Street to Boulevard Avenue, and Enterprise Street from Boulevard Avenue to Eagle Lane., Project Description: Streetscape and safety improvements connecting with the Lackawanna heritage Valley trail on Main Street and Enterprise Street in Dickson City Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction TAP $500 $491 $0 $0 $0 $0

Federal: $500 $491 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $491 $0 $0 $0 $0

Total FFY 2021-2032 Cost $991

PennDOT Project Id: 111472

Project Administrator: PennDOT Title: Lack River Heritage Trail to Steamtown Ped Bridge Improvement Type: Transportation Enhancement State Route: 0 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 5/1/21 Air Quality Exempt Reason: A2 - Bicycle and pedestrian facilities Actual Construction Bid Date: Location: Lackawanna County, Lackawanna River Heritage Trail to Steamtown National Historic Site, City of Scranton Project Description: Pedestrian bridge connecting Lackawanna River Heritage Trail to Steamtown National Historic Site, City of Scranton, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction TAP $500 $500 $0 $0 $0 $0

Federal: $500 $500 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $500 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 112288

Project Administrator: PennDOT Title: SR 2107 over I-81 NB & SB Improvement Type: Bridge Removal State Route: 2107 Municipality: Scranton (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: NRS - "Not Rgnlly Significant" - do not fit exempt ctgry Actual Construction Bid Date: Location: Lackawanna County, City of Scranton, State Route 2107 (Rockwell Avenue) Project Description: Bridge removal on State Route 2107 (Rockwell Avenue) over Interstate 81, in City of Scranton, Lackawanna County. Date: 5/28/20 3:53PM Page 27 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $200 $0 $0 $0 $0 Preliminary Engineering 185 $0 $50 $0 $0 $0 $0

Federal: $0 $200 $0 $0 $0 $0 State: $0 $50 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $250 $0 $0 $0 $0

Total FFY 2021-2032 Cost $250

PennDOT Project Id: 112436

Project Administrator: PennDOT Title: SR 6006 over Racketbrook Improvement Type: Bridge Rehabilitation State Route: 6006 Municipality: Carbondale (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, City of Carbondale, State Route 6006 (Main Street) Project Description: Bridge rehabilitation on State Route 6006 (Main Street) over Racket Brook in the City of Carbondale, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $500 $500 $500 $500 $0 $0 Construction 185 $125 $125 $125 $125 $0 $0

Federal: $500 $500 $500 $500 $0 $0 State: $125 $125 $125 $125 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $625 $625 $625 $625 $0 $0

Total FFY 2021-2032 Cost $2,500

PennDOT Project Id: 113723

Project Administrator: PennDOT Title: Roadway Improvements SR 632 Improvement Type: Intersection Improvement State Route: 632 Municipality: Scott (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 6/26/23 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna County, Scott Township, State Route 632 (Carbondale Road), State Route 347 (Justus Boulevard) Project Description: Roadway improvements on State Route 632 (Carbondale Road) between Quinton Road and Sams Road and State Route 347 (Justus Boulevard) between Dragons Lane and Kennedy Creek, Scott Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design 581 $0 $225 $0 $0 $0 $0 Utility 581 $0 $50 $0 $0 $0 $0 Right of Way 581 $0 $100 $0 $0 $0 $0 Construction 581 $0 $0 $0 $2,275 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $0 $375 $0 $2275 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $375 $0 $2,275 $0 $0

Total FFY 2021-2032 Cost $2,650 Date: 5/28/20 3:53PM Page 28 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 113985

Project Administrator: PennDOT Title: Guiderail Mash Upgrades - LLTS Improvement Type: Safety Improvement State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S9 - Guardrails, median barriers, crash cushions Actual Construction Bid Date: Location: Lackawanna and Luzerne Counties Project Description: Guiderail Upgrades in Lackawanna and Luzerne Counties.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $80 $80 $80 $80 $0 $0 Construction 581 $20 $20 $20 $20 $2,500 $0

Federal: $80 $80 $80 $80 $0 $0 State: $20 $20 $20 $20 $2500 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $100 $100 $100 $2,500 $0

Total FFY 2021-2032 Cost $2,900

PennDOT Project Id: 114152

Project Administrator: PennDOT Title: Asset Management Phase 1 Improvement Type: Bridge Preservation Activities State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna, Luzerne Counties Project Description: Resurfacing on State Route

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $0 $0 $0 $0 $100 Construction STU $0 $0 $0 $0 $0 $6,500 Construction 185 $1,000 $0 $0 $0 $0 $0 Construction 581 $211 $0 $0 $0 $0 $400

Federal: $0 $0 $0 $0 $0 $6600 State: $1211 $0 $0 $0 $0 $400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,211 $0 $0 $0 $0 $7,000

Total FFY 2021-2032 Cost $8,211

PennDOT Project Id: 114153

Project Administrator: PennDOT Title: Asset Management Phase 2 Improvement Type: Bridge Preservation Activities State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna, Luzerne Counties Project Description: Resurfacing on State Route Date: 5/28/20 3:53PM Page 29 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $0 $0 $0 $0 $100 Construction STU $0 $0 $0 $0 $0 $6,500 Construction 185 $0 $2,000 $0 $0 $0 $0 Construction 581 $0 $211 $0 $0 $0 $400

Federal: $0 $0 $0 $0 $0 $6600 State: $0 $2211 $0 $0 $0 $400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $2,211 $0 $0 $0 $7,000

Total FFY 2021-2032 Cost $9,211

PennDOT Project Id: 114155

Project Administrator: PennDOT Title: Asset Management Phase 3 Improvement Type: Bridge Preservation Activities State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna, Luzerne Counties, Project Description: Resurfacing on State Route

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $0 $0 $0 $0 $100 Construction STU $0 $0 $0 $0 $0 $6,500 Construction 185 $0 $0 $1,000 $0 $0 $0 Construction 581 $0 $0 $1,000 $0 $0 $400

Federal: $0 $0 $0 $0 $0 $6600 State: $0 $0 $2000 $0 $0 $400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $2,000 $0 $0 $7,000

Total FFY 2021-2032 Cost $9,000

PennDOT Project Id: 114156

Project Administrator: PennDOT Title: Asset Management Phase 4 Improvement Type: Bridge Preservation Activities State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Lackawanna, Luzerne Counties Project Description: Resurfacing on State Route Date: 5/28/20 3:53PM Page 30 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $0 $0 $0 $0 $100 Construction STU $0 $0 $0 $0 $0 $6,500 Construction 581 $0 $0 $0 $2,000 $0 $400

Federal: $0 $0 $0 $0 $0 $6600 State: $0 $0 $0 $2000 $0 $400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $2,000 $0 $7,000

Total FFY 2021-2032 Cost $9,000

PennDOT Project Id: 114268

Project Administrator: PennDOT Title: SR 6 Drainage Improvement Type: Drainage Improvement State Route: 6 Municipality: Clarks Summit (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Clarks Summit Borough and South Abington Township, State Routes 6 (State Street) and 11 (Northern Boulevard) Project Description: Bridge replacements on State Route 6 (State Street) over Branch of Leggetts Creek (3 locations) and on State Route 11 (Northern Boulevard) over Leggetts Creek and over Summit Lake Creek in Clarks Summit Borough and South Abington Township, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $0 $0 $0 $120 $0 $0 Preliminary Engineering 185 $0 $0 $0 $480 $0 $0

Federal: $0 $0 $0 $120 $0 $0 State: $0 $0 $0 $480 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $600 $0 $0

Total FFY 2021-2032 Cost $600

PennDOT Project Id: 114323

Project Administrator: PennDOT Title: SR 4026 over Norfolk Southern Railroad Improvement Type: Bridge Preservation Activities State Route: 4026 Municipality: Clarks Summit (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/11/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Lackawanna County, Clarks Summit Borough, State Route 4026 (Grove Street) Project Description: Bridge preservation on State Route 4026 (Grove Street) over Norfolk Southern Railroad in Clarks Summit Borough, Lackawanna County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction 185 $1,050 $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $1050 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,050 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,050

Luzerne Date: 5/28/20 3:53PM Page 31 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 8608

Project Administrator: PENNDOT Title: Hillside-Huntsville CR 16 Improvement Type: Restoration State Route: 0 Municipality: Jackson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/10/24 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Luzerne County, Jackson Township, Kingston Township, County Road 16 Project Description: Highway Restoration on County Road 16 in Jackson Township, Kingston Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $80 $0 $0 $0 $0 $0 Construction LOC $20 $0 $0 $0 $0 $0

Federal: $80 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $20 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 8741

Project Administrator: PENNDOT Title: SR 2035 Suscon Road over Bear Creek Improvement Type: Replace/Rehab State Route: 2035 Municipality: Bear Creek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/19/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Bear Creek Township, State Route 2035 (Suscon Road) Project Description: Bridge rehabilitation/replacement on State Route 2035 (Suscon Road) over Bear Creek in Bear Creek Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $240 $0 $0 $0 $0 Preliminary Engineering 185 $0 $60 $0 $0 $0 $0 Final Design BOF $0 $0 $200 $0 $0 $0 Final Design 185 $0 $0 $50 $0 $0 $0 Construction BOF $0 $0 $0 $0 $800 $0 Construction 185 $0 $0 $0 $0 $200 $0

Federal: $0 $240 $200 $0 $800 $0 State: $0 $60 $50 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $300 $250 $0 $1,000 $0

Total FFY 2021-2032 Cost $1,550

PennDOT Project Id: 8757

Project Administrator: PENNDOT Title: T-482 over Huntington Creek Improvement Type: Bridge Replacement State Route: 7217 Municipality: Huntington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/25 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Huntington Township, State Route 7217 (Township Road 482, Ftorkowski Road) Project Description: Bridge replacement on State Route 7217 (Township Road 482, Ftorkowski Road) (Bridge #6) over Huntington Creek in Huntington Township, Luzerne County. Date: 5/28/20 3:53PM Page 32 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $0 $240 $0 $0 Preliminary Engineering 185 $0 $0 $0 $60 $0 $0 Final Design BOF $0 $0 $0 $0 $200 $0 Final Design 185 $0 $0 $0 $0 $50 $0 Construction BOF $0 $0 $0 $0 $0 $1,200 Construction 185 $0 $0 $0 $0 $0 $300

Federal: $0 $0 $0 $240 $200 $1200 State: $0 $0 $0 $60 $50 $300

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $300 $250 $1,500

Total FFY 2021-2032 Cost $2,050

PennDOT Project Id: 8758

Project Administrator: PENNDOT Title: T-338 over Little Improvement Type: Bridge Replacement State Route: 7230 Municipality: Sugarloaf (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/8/26 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Sugarloaf Township, State Route 7230 (Township Road 338, Center Hill Road) over Project Description: Bridge Replacement on State Route 7230 (Township Road 338, Center Hill Road) over Little Nescopeck Creek in Sugarloaf Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $0 $240 $0 $0 Preliminary Engineering 185 $0 $0 $0 $60 $0 $0 Final Design BOF $0 $0 $0 $0 $240 $0 Final Design 185 $0 $0 $0 $0 $60 $0 Construction BOF $0 $0 $0 $0 $800 $0 Construction 185 $0 $0 $0 $0 $200 $0

Federal: $0 $0 $0 $240 $1040 $0 State: $0 $0 $0 $60 $260 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $300 $1,300 $0

Total FFY 2021-2032 Cost $1,600

PennDOT Project Id: 8759

Project Administrator: PENNDOT Title: SR 7204 over Nescopeck Creek Improvement Type: Bridge Replacement State Route: 7204 Municipality: Butler (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/21/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Butler Township, State Route 7204 (Township Road 358) Project Description: Bridge replacement on State Route 7204 (Township Road 358) over Nescopeck Creek, in Butler Township, Luzerne County. Date: 5/28/20 3:53PM Page 33 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design OTH-S $0 $1,000 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $0 $1000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $1,000 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 8765

Project Administrator: PENNDOT Title: T-392 over Wapwallopen Creek Bridge Improvement Type: Bridge Replacement State Route: 7215 Municipality: Hollenback (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/26 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Hollenback Township, State Route 7215 (Township Road 392, Kingsberry Road) Project Description: Bridge replacement on State Route 7215 (Township Road 392, Kingsberry Road) over Wapwallopen Creek Bridge in Hollenback Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $0 $160 $0 $0 Preliminary Engineering 185 $0 $0 $0 $40 $0 $0 Final Design BOF $0 $0 $0 $0 $160 $0 Final Design 185 $0 $0 $0 $0 $40 $0 Construction BOF $0 $0 $0 $0 $0 $800 Construction 185 $0 $0 $0 $0 $0 $200

Federal: $0 $0 $0 $160 $160 $800 State: $0 $0 $0 $40 $40 $200

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $200 $200 $1,000

Total FFY 2021-2032 Cost $1,400

PennDOT Project Id: 8766

Project Administrator: PENNDOT Title: T 451 Huntington Bridge 3 Improvement Type: Bridge Replacement State Route: 7217 Municipality: Huntington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Huntington Township, Township Road 451 over Huntington Creek Project Description: Bridge replacement on Township Road 451 over Huntington Creek in Huntington Township, Luzerne County. Date: 5/28/20 3:53PM Page 34 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $70 $0 $0 $0 $0 $0 Preliminary Engineering 185 $280 $0 $0 $0 $0 $0 Final Design BOF $0 $0 $0 $60 $0 $0 Final Design 185 $0 $0 $0 $240 $0 $0 Construction 185 $0 $0 $0 $0 $0 $1,000

Federal: $70 $0 $0 $60 $0 $0 State: $280 $0 $0 $240 $0 $1000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $0 $0 $300 $0 $1,000

Total FFY 2021-2032 Cost $1,650

PennDOT Project Id: 8767

Project Administrator: PENNDOT Title: T-472 over Huntington Creek Improvement Type: Bridge Replacement State Route: 7217 Municipality: Huntington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/26 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Huntington Township, State Route 7217 (Township Road 472, Everetts Road) Project Description: Bridge replacement on State Route 7217 (Township Road 472, Everetts Road, Bridge #2) over Huntington Creek in Huntington Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $0 $0 $160 $0 $0 Preliminary Engineering 185 $0 $0 $0 $40 $0 $0 Final Design 185 $0 $0 $0 $0 $200 $0 Construction 185 $0 $0 $0 $0 $0 $1,000

Federal: $0 $0 $0 $160 $0 $0 State: $0 $0 $0 $40 $200 $1000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $200 $200 $1,000

Total FFY 2021-2032 Cost $1,400

PennDOT Project Id: 8868

Project Administrator: PENNDOT Title: SR 3014 over Nescopeck Creek Improvement Type: Replace/Rehab State Route: 3014 Municipality: Nescopeck (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/28/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Nescopeck Township, State Route 3015 (Dump Hill Road) Project Description: Bridge rehabilitation/replacement on State Route 3014 (Dump Hill Road) over Nescopeck Creek in Nescopeck Township, Luzerne County. Date: 5/28/20 3:53PM Page 35 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction BOF $2,400 $0 $0 $0 $0 $0 Construction 185 $600 $0 $0 $0 $0 $0

Federal: $2400 $0 $0 $0 $0 $0 State: $600 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $3,000 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $3,000

PennDOT Project Id: 8999

Project Administrator: PENNDOT Title: SR 2005 over Bowman Spring Run Improvement Type: Bridge Preservation Activities State Route: 2005 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/26/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, City of Wilkes Barre, State Route 2005 (Blackman Street) Project Description: Bridge preservation on State Route 2005 (Blackman Street) over Bowman Spring Run in the City of Wilkes Barre, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $80 $0 $0 $0 $0 $0 Preliminary Engineering 185 $20 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $110 $0 $0 $0 Construction 185 $0 $0 $440 $0 $0 $0

Federal: $80 $0 $110 $0 $0 $0 State: $20 $0 $440 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $550 $0 $0 $0

Total FFY 2021-2032 Cost $650

PennDOT Project Id: 9006

Project Administrator: PENNDOT Title: SR 2026 over Gardner's Creek Improvement Type: Bridge Preservation Activities State Route: 2026 Municipality: Laflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/14/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Laflin Borough, State Route 2026 (Main Street) Project Description: Bridge preservation on State Route 2026 (Main Street) over Gardner's Creek in Laflin Borough, Luzerne County. Date: 5/28/20 3:53PM Page 36 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $360 $0 $0 $0 $0 $0 Preliminary Engineering 185 $90 $0 $0 $0 $0 $0 Construction STP $0 $0 $0 $0 $800 $0 Construction 185 $0 $0 $0 $0 $200 $0

Federal: $360 $0 $0 $0 $800 $0 State: $90 $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $1,000 $0

Total FFY 2021-2032 Cost $1,450

PennDOT Project Id: 9024

Project Administrator: PENNDOT Title: SR 1036 over Leonards Creek Improvement Type: Bridge Preservation Activities State Route: 1036 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/25/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, State Route 1036 (Caverton Road) Project Description: Bridge preservation on State Route 1036 (Carverton Road) over Leonards Creek in Kingston Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Construction STU $0 $600 $0 $0 $0 $0 Construction 185 $0 $150 $0 $0 $0 $0

Federal: $320 $600 $0 $0 $0 $0 State: $80 $150 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $750 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,150

PennDOT Project Id: 9025

Project Administrator: PENNDOT Title: SR 4004 over Improvement Type: Bridge Replacement State Route: 4004 Municipality: Salem (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 5/26/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Salem Township, State Route 4004 (Shickshinny Valley Road) Project Description: Bridge replacement on State Route 4004 (Shickshinny Valley Road) over Little Shickshinny Creek in Salem Township, Luzerne County. Date: 5/28/20 3:53PM Page 37 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction 185 $0 $1,200 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $0 $1200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $1,200 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,200

PennDOT Project Id: 9084

Project Administrator: PENNDOT Title: SR 924 over SR 81 Improvement Type: Bridge Preservation Activities State Route: 924 Municipality: Hazle (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Hazle Township, State Route 924 (Can Do Expressway) Project Description: Bridge preservation on State Route 924 (Can Do Expressway) over Interstate 81 in Hazle Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $340 $0 $0 $0 $0 $0 Preliminary Engineering 185 $85 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $800 $0 $0 Construction 185 $0 $0 $0 $3,200 $0 $0

Federal: $340 $0 $0 $800 $0 $0 State: $85 $0 $0 $3200 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $425 $0 $0 $4,000 $0 $0

Total FFY 2021-2032 Cost $4,425

PennDOT Project Id: 9128

Project Administrator: PENNDOT Title: SR 115 over I-81 Improvement Type: Interchange Improvement State Route: 115 Municipality: Plains (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/14/22 Air Quality Exempt Reason: R3 - Interchange reconfiguration projects Actual Construction Bid Date: Location: Luzerne County, Wilkes Barre Township, State Route 115 (Bear Creek Boulevard) Project Description: The proposed project includes a fly over ramp to Interstate 81 Southbound, from State Route 115 (Bear Creek Boulevard) Northbound. Work also will include the replacement of bridges carrying State Route 115 (Bear Creek Boulevard) over Interstate 81, and also drainage improvements of the interchange in Plains Township and Wilkes Barre Township, Luzerne County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $13,192 $10,000 $0 $0 $0 Construction 185 $0 $5,000 $0 $0 $0 $0

Federal: $0 $13192 $10000 $0 $0 $0 State: $0 $5000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $18,192 $10,000 $0 $0 $0

Total FFY 2021-2032 Cost $28,192 Date: 5/28/20 3:53PM Page 38 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 9174

Project Administrator: PENNDOT Title: SR 309 over Branch Fern Creek Improvement Type: Bridge Rehabilitation State Route: 309 Municipality: Dallas (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 5/6/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Dallas Borough, State Route 309 (Tunkhannock Highway) Project Description: Bridge rehabilitation on State Route 309 (Tunkhannock Highway) over Branch of Fern Creek, Dallas Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $440 $0 $0 $0 $0 $0 Construction 185 $110 $0 $0 $0 $0 $0

Federal: $440 $0 $0 $0 $0 $0 State: $110 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $550 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $550

PennDOT Project Id: 9175

Project Administrator: PENNDOT Title: SR 1050 over Improvement Type: Bridge Replacement State Route: 1050 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/11/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, State Route 1050 Project Description: Bridge replacement on State Route 1050 over Toby Creek in Kingston Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction BOF $300 $300 $0 $0 $0 $0 Construction 185 $75 $75 $0 $0 $0 $0

Federal: $300 $300 $0 $0 $0 $0 State: $75 $75 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $375 $375 $0 $0 $0 $0

Total FFY 2021-2032 Cost $750

PennDOT Project Id: 9181

Project Administrator: PENNDOT Title: SR 315 over Tributary Gardners Creek Improvement Type: Bridge Rehabilitation State Route: 315 Municipality: Laflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 4/22/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Laflin Borough, State Route 315 (DuPont Highway) Project Description: Bridge rehabilitation on State Route 315 (Dupont Highway) over the Tributary to Gardners Creek, in Laflin Borough, Luzerne County. Date: 5/28/20 3:53PM Page 39 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $0 $560 $0 $0 $0 $0 Construction 185 $0 $140 $0 $0 $0 $0

Federal: $0 $560 $0 $0 $0 $0 State: $0 $140 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $700 $0 $0 $0 $0

Total FFY 2021-2032 Cost $700

PennDOT Project Id: 56623

Project Administrator: PennDOT Title: SR 309 over Toby Creek Improvement Type: Bridge Replacement State Route: 309 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/13/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, State Route 309 (Memorial Highway) Project Description: Bridge replacement on State Route 309 (Memorial Highway) over Toby Creek in Kingston Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $400 $0 $0 $0 $0 $0 Final Design 185 $100 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $2,600 $2,600 $0 $0 Construction 185 $0 $0 $650 $650 $0 $0

Federal: $400 $0 $2600 $2600 $0 $0 State: $100 $0 $650 $650 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $0 $3,250 $3,250 $0 $0

Total FFY 2021-2032 Cost $7,000

PennDOT Project Id: 57671

Project Administrator: PennDOT Title: SR 1012 over Harvey's Creek Bridge Improvement Type: Replace/Rehab State Route: 1012 Municipality: Jackson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 6/23/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Jackson Township, State Route 1012 (Chase Road) Project Description: Bridge rehabilitation/replacement on State Route 1012 (Chase Road) over Branch of Harvey's Creek in Jackson Township, Luzerne County. Date: 5/28/20 3:53PM Page 40 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction STU $0 $400 $0 $0 $0 $0 Construction 185 $0 $100 $0 $0 $0 $0

Federal: $240 $400 $0 $0 $0 $0 State: $60 $100 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $500 $0 $0 $0 $0

Total FFY 2021-2032 Cost $800

PennDOT Project Id: 64481

Project Administrator: PennDOT Title: Butler Twp. Park & Ride Improvement Type: Park and Ride Lot State Route: 309 Municipality: Butler (TWP) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 1/13/22 Actual Construction Bid Date: Location: Luzerne County, Butler Township, State Route 309 (North Hunter Highway) Project Description: Construction of a Park and Ride Lot on State Route 309 (North Hunter Highway) at the Interstate 80 Interchange in Butler Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $0 $100 $0 $0 $0 $0

Federal: $0 $100 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $100 $0 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 67283

Project Administrator: PennDOT Title: SR 309 over Leonards Creek Improvement Type: Bridge Replacement State Route: 309 Municipality: Dallas (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/15/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Dallas Township, State Route 309 (Tunkhannock Highway) Project Description: Bridge replacement on State Route 309 (Tunkhannock Highway) over Leonards Creek in Dallas Township, Luzerne County. Date: 5/28/20 3:53PM Page 41 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $240 $0 $0 $0 $0 $0 Preliminary Engineering 185 $60 $0 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $1,200 $0 Construction 185 $0 $0 $0 $0 $300 $0

Federal: $240 $0 $0 $240 $1200 $0 State: $60 $0 $0 $60 $300 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $0 $0 $300 $1,500 $0

Total FFY 2021-2032 Cost $2,100

PennDOT Project Id: 67291

Project Administrator: PennDOT Title: SR 1415 over Tributary Harvey's Lake Creek Improvement Type: Bridge Replacement State Route: 1415 Municipality: Harveys Lake (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Harvey's Lake Borough, State Route 1415 (Lakeside Drive) Project Description: Bridge replacement on State Route 1415 (Lakeside Drive) over Tributary to Harvey's Lake Creek in Harvey's Lake Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $100 $0 $0 $0 $0 $0 Construction 185 $0 $0 $0 $0 $750 $0

Federal: $0 $0 $0 $0 $0 $0 State: $100 $0 $0 $0 $750 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $750 $0

Total FFY 2021-2032 Cost $850

PennDOT Project Id: 67296

Project Administrator: PennDOT Title: SR 11 over Improvement Type: Bridge Replacement State Route: 11 Municipality: Hunlock (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/27/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Hunlock Township, State Route 11 Project Description: Bridge replacement on State Route 11 over Hunlock Creek, in Hunlock Township, Luzerne County. Date: 5/28/20 3:53PM Page 42 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $240 $0 $0 $0 $0 $0 Preliminary Engineering 185 $60 $0 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $1,600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $240 $0 $0 $240 $1600 $0 State: $60 $0 $0 $60 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $0 $0 $300 $2,000 $0

Total FFY 2021-2032 Cost $2,600

PennDOT Project Id: 67304

Project Administrator: PennDOT Title: SR 115 over Reading Blue Mt and Northern Railroad Improvement Type: Bridge Replacement State Route: 115 Municipality: Plains (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/19/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Plains Township, State Route 115 (Bear Creek Boulevard) Project Description: Bridge replacement on State Route 115 (Bear Creek Boulevard) over Reading Blue Mountain and Northern Railroad in Plains Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $0 $0 $240 $0 $0 $0 Preliminary Engineering 185 $0 $0 $60 $0 $0 $0 Final Design NHPP $0 $0 $0 $0 $240 $0 Final Design 185 $0 $0 $0 $0 $60 $0 Construction 185 $0 $0 $0 $0 $0 $3,000

Federal: $0 $0 $240 $0 $240 $0 State: $0 $0 $60 $0 $60 $3000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $300 $0 $300 $3,000

Total FFY 2021-2032 Cost $3,600

PennDOT Project Id: 67329

Project Administrator: PennDOT Title: SR 4016 over Reyburn Creek Improvement Type: Replace/Rehab State Route: 4016 Municipality: Union (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/14/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Union Township, State Route 4016 (Main Road) Project Description: Bridge replacement on State Route 4016 (Main Road) over Reyburn Creek in Union Township, Luzerne County. Date: 5/28/20 3:53PM Page 43 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction STU $0 $240 $0 $0 $0 $0 Construction 185 $0 $60 $0 $0 $0 $0

Federal: $240 $240 $0 $0 $0 $0 State: $60 $60 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $300 $0 $0 $0 $0

Total FFY 2021-2032 Cost $600

PennDOT Project Id: 67333

Project Administrator: PennDOT Title: SR 3040 over Tributary Nescopeck Creek Improvement Type: Replace/Rehab State Route: 3040 Municipality: Sugarloaf (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/14/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Sugarloaf Township, State Route 3040 (Saint Johns Road) Project Description: Bridge replacement on State Route 3040 (Saint Johns Road) over Tributary to Nescopeck Creek in Sugarloaf Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction STU $0 $160 $0 $0 $0 $0 Construction 185 $0 $40 $0 $0 $0 $0

Federal: $240 $160 $0 $0 $0 $0 State: $60 $40 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $200 $0 $0 $0 $0

Total FFY 2021-2032 Cost $500

PennDOT Project Id: 67366

Project Administrator: PennDOT Title: SR 309 over SR 2022 and Railroad Improvement Type: Bridge Preservation Activities State Route: 309 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 6/24/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, City of Wilkes Barre, State Route 309 (North Cross Valley Expressway) Project Description: Bridge preservation on State Route 309 (North Cross Valley Expressway) over State Route 2022 and Railroad in the City of Wilkes-Barre, Luzerne County. Date: 5/28/20 3:53PM Page 44 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $340 $0 $0 $0 $0 $0 Preliminary Engineering 185 $85 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $0 $1,400 Construction 185 $0 $0 $0 $0 $0 $5,600

Federal: $340 $0 $0 $0 $0 $1400 State: $85 $0 $0 $0 $0 $5600

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $425 $0 $0 $0 $0 $7,000

Total FFY 2021-2032 Cost $7,425

PennDOT Project Id: 67408

Project Administrator: PennDOT Title: SR 2002 over Warrior Creek Improvement Type: Bridge Replacement State Route: 2002 Municipality: Hanover (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/28/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Hanover Township, State Route 2002 (San Souci Parkway) Project Description: Bridge replacement on State Route 2002 (San Souci Parkway) over Warrior Creek in Hanover Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $48 $0 $0 $0 $0 $0 Preliminary Engineering 185 $12 $0 $0 $0 $0 $0 Final Design NHPP $0 $0 $60 $0 $0 $0 Final Design 185 $0 $0 $240 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $600 $0 Construction 185 $0 $0 $0 $0 $2,400 $0

Federal: $48 $0 $60 $0 $600 $0 State: $12 $0 $240 $0 $2400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $60 $0 $300 $0 $3,000 $0

Total FFY 2021-2032 Cost $3,360

PennDOT Project Id: 67409

Project Administrator: PennDOT Title: SR 3007 over Improvement Type: Replace/Rehab State Route: 3007 Municipality: Slocum (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/14/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Slocum Township, State Route 3007 (Blue Ridge Trail) Project Description: Bridge replacement on State Route 3007 (Blue Ridge Trail) over Little Wapwallopen Creek in Slocum Township, Luzerne County. Date: 5/28/20 3:53PM Page 45 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design 185 $300 $0 $0 $0 $0 $0 Construction 185 $0 $300 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $300 $300 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $300 $0 $0 $0 $0

Total FFY 2021-2032 Cost $600

PennDOT Project Id: 67410

Project Administrator: PennDOT Title: SR 6309 over Luzerne County Rail Authority Improvement Type: Replace/Rehab State Route: 6309 Municipality: Hanover (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Ashley Borough/Hanover twp., State Route 6309 (Mountain Boulevard) Project Description: Bridge rehabilitation/replacement on State Route 6309 (Mountain Boulevard) over Luzerne County Rail Authority in Ashley Borough/ Hanover twp, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $450 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $800 $1,100 Construction 581 $0 $0 $0 $0 $3,200 $4,400

Federal: $0 $0 $0 $0 $800 $1100 State: $450 $0 $0 $0 $3200 $4400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $4,000 $5,500

Total FFY 2021-2032 Cost $9,950

PennDOT Project Id: 67417

Project Administrator: PennDOT Title: SR 309 over Wilkes Barre Boulevard Improvement Type: Bridge Preservation Activities State Route: 309 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/11/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, City of Wilkes Barre, State Route 309 (North Cross Valley Expressway) Project Description: Bridge preservation on State Route 309 (North Cross Valley Expressway) over Wilkes Barre Boulevard in the City of Wilkes Barre, Luzerne County. Date: 5/28/20 3:53PM Page 46 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $1,200 $1,200 $0 Construction 185 $0 $0 $0 $300 $300 $0

Federal: $320 $0 $0 $1200 $1200 $0 State: $80 $0 $0 $300 $300 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $0 $1,500 $1,500 $0

Total FFY 2021-2032 Cost $3,400

PennDOT Project Id: 67456

Project Administrator: PennDOT Title: TR 924 Over Conrail, Hazle Improvement Type: Bridge Rehabilitation State Route: 924 Municipality: Hazle (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/10/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Hazle Township, State Route 924 (Hazelton Shepton Highway) Project Description: Bridge rehabilitation on State Route 924 (Hazelton Shepton Highway) over Conrail in Hazle Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $600 $0 $0 $0 $0 $0 Final Design 185 $150 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $1,100 $1,100 $0 $0 Construction 185 $0 $0 $275 $275 $0 $0

Federal: $600 $0 $1100 $1100 $0 $0 State: $150 $0 $275 $275 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $750 $0 $1,375 $1,375 $0 $0

Total FFY 2021-2032 Cost $3,500

PennDOT Project Id: 67471

Project Administrator: PennDOT Title: SR 92 over Lewis Creek Improvement Type: Replace/Rehab State Route: 92 Municipality: Exeter (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/21/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Exeter Township, State Route 92 (Sullivan Trail) Project Description: Bridge rehabilitation/replacement on State Route 92 (Sullivan Trail) over Lewis Creek in Exeter Township, Luzerne County. Date: 5/28/20 3:53PM Page 47 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STP $0 $240 $0 $0 $0 $0 Final Design 185 $0 $60 $0 $0 $0 $0 Construction STP $0 $0 $400 $400 $0 $0 Construction 185 $0 $0 $100 $100 $0 $0

Federal: $0 $240 $400 $400 $0 $0 State: $0 $60 $100 $100 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $300 $500 $500 $0 $0

Total FFY 2021-2032 Cost $1,300

PennDOT Project Id: 67491

Project Administrator: PennDOT Title: SR 315 over Reading Blue Mt and Northern Railroad Improvement Type: Bridge Preservation Activities State Route: 315 Municipality: Laflin (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Laflin Borough, State Route 315 (Dupont Highway) Project Description: Bridge preservation on State Route 315 (Dupont Highway) over Reading Blue Mountain and Northern Railroad, in Laflin Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $450 $0 $0 $0 $0 $0 Construction 185 $0 $0 $0 $0 $2,500 $0

Federal: $0 $0 $0 $0 $0 $0 State: $450 $0 $0 $0 $2500 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $2,500 $0

Total FFY 2021-2032 Cost $2,950

PennDOT Project Id: 68918

Project Administrator: PennDOT Title: SR 118 over Tributary Huntsville Reservoir Improvement Type: Bridge Replacement State Route: 118 Municipality: Lehman (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 9/17/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Lehman Township, State Route 118 Project Description: Bridge replacement on State Route 118 over Tributary to Huntsville Reservoir in Lehman Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $400 $400 $0 $0 $0 $0 Construction 185 $100 $100 $0 $0 $0 $0

Federal: $400 $400 $0 $0 $0 $0 State: $100 $100 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $500 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000 Date: 5/28/20 3:53PM Page 48 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 68933

Project Administrator: PennDOT Title: SR 239 over Branch Huntington Creek Improvement Type: Replace/Rehab State Route: 239 Municipality: Huntington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/1/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Huntington Township, State Route 239 ( Hill Road) Project Description: Bridge replacement on State Route 239 (Pond Hill Road) over Branch of Huntington Creek in Huntington Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $0 $560 $0 $0 $0 $0 Construction 185 $0 $140 $0 $0 $0 $0

Federal: $0 $560 $0 $0 $0 $0 State: $0 $140 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $700 $0 $0 $0 $0

Total FFY 2021-2032 Cost $700

PennDOT Project Id: 68966

Project Administrator: PennDOT Title: SR 1012 over Branch Harvey's Creek Improvement Type: Replace/Rehab State Route: 1012 Municipality: Jackson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 4/22/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Jackson Township, State Route 1012 (Chase Road) Project Description: Bridge replacement on State Route 1012 (Chase Road) over Branch of Harvey's Creek, in Jackson Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $0 $880 $0 $0 $0 $0 Construction 185 $0 $220 $0 $0 $0 $0

Federal: $0 $880 $0 $0 $0 $0 State: $0 $220 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $1,100 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,100

PennDOT Project Id: 68977

Project Administrator: PennDOT Title: SR 1014 Overbrook over SR 309 Improvement Type: Bridge Rehabilitation State Route: 1014 Municipality: Dallas (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/15/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Dallas Township, State Route 1014 (Overbrook Avenue) Project Description: Bridge rehabilitation on State Route 1014 (Overbrook Avenue) over State Route 309 in Dallas Township, Luzerne County. Date: 5/28/20 3:53PM Page 49 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $80 $0 $0 $0 $0 $0 Preliminary Engineering 185 $20 $0 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $1,600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $80 $0 $0 $240 $1600 $0 State: $20 $0 $0 $60 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $300 $2,000 $0

Total FFY 2021-2032 Cost $2,400

PennDOT Project Id: 68992

Project Administrator: PennDOT Title: SR 1048 over Harvey's Creek Improvement Type: Bridge Replacement State Route: 1048 Municipality: Lehman (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/7/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Lehman Township, State Route 1048 (Meeker Road) Project Description: Bridge replacement on State Route 1048 (Meeker Road) over Harvey's Creek in Lehman Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design BOF $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction BOF $0 $800 $0 $0 $0 $0 Construction 185 $0 $200 $0 $0 $0 $0

Federal: $240 $800 $0 $0 $0 $0 State: $60 $200 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $1,000 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,300

PennDOT Project Id: 69001

Project Administrator: PennDOT Title: SR 2019 over Interstate 81 Improvement Type: Bridge Preservation Activities State Route: 2019 Municipality: Pittston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Pittston Township, State Route 2019 (Oak Street) Project Description: Bridge preservation on State Route 2019 (Oak Street) over Interstate 81 in Pittston Township, Luzerne County. Date: 5/28/20 3:53PM Page 50 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $0 $320 $0 $0 $0 $0 Preliminary Engineering 185 $0 $80 $0 $0 $0 $0 Construction STU $0 $0 $0 $0 $920 $0 Construction 185 $0 $0 $0 $0 $230 $0

Federal: $0 $320 $0 $0 $920 $0 State: $0 $80 $0 $0 $230 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $400 $0 $0 $1,150 $0

Total FFY 2021-2032 Cost $1,550

PennDOT Project Id: 69228

Project Administrator: PennDOT Title: SR 29 over New Commerce Boulevard Improvement Type: Bridge Preservation Activities State Route: 29 Municipality: Hanover (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Sugar Notch Borough/ Hanover twp, State Route 29 (South Cross Valley Expressway) Project Description: Bridge preservation on State Route 29 (South Cross Valley Expressway) over New Commerce Boulevard in Sugar Notch Borough / Hanover twp, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $450 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $500 $0 Construction 581 $0 $0 $0 $0 $2,000 $0

Federal: $0 $0 $0 $0 $500 $0 State: $450 $0 $0 $0 $2000 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $2,500 $0

Total FFY 2021-2032 Cost $2,950

PennDOT Project Id: 70467

Project Administrator: PennDOT Title: Extension of SR 424 to SR 924 Improvement Type: New Roadway State Route: 424 Municipality: Hazle (TWP) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 10/22/20 Actual Construction Bid Date: Location: Luzerne County, Hazle Township, State Route 424 (Arthur Gardner Highway) Project Description: New alignment of State Route 424 (Arthur Gardner Highway) to State Route 924 in Hazle Township, Luzerne County. Date: 5/28/20 3:53PM Page 51 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $237 $2,250 $2,000 $2,000 $0 $0 Construction STU $800 $1,250 $1,000 $1,000 $0 $0 Construction 581 $2,336 $2,914 $2,000 $2,000 $0 $0

Federal: $1037 $3500 $3000 $3000 $0 $0 State: $2336 $2914 $2000 $2000 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $3,373 $6,414 $5,000 $5,000 $0 $0

Total FFY 2021-2032 Cost $19,787

PennDOT Project Id: 73756

Project Administrator: PennDOT Title: Rogers Avenue over Improvement Type: Bridge Replacement State Route: 7401 Municipality: Ashley (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Ashley Borough, State Route 7401 (Rogers Avenue) Project Description: Bridge replacement on State Route 7401 (Rogers Avenue) over Solomon Creek, in Ashley Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $240 $0 $0 $0 $0 Preliminary Engineering 185 $0 $60 $0 $0 $0 $0 Final Design BOF $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction BOF $0 $0 $0 $0 $400 $0 Construction 185 $0 $0 $0 $0 $100 $0

Federal: $0 $240 $0 $240 $400 $0 State: $0 $60 $0 $60 $100 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $300 $0 $300 $500 $0

Total FFY 2021-2032 Cost $1,100

PennDOT Project Id: 73757

Project Administrator: PennDOT Title: Carey Street over Solomon Creek Improvement Type: Replace/Rehab State Route: 7401 Municipality: Ashley (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Ashley Borough, State Route 7401 (Carey Street) over Solomon's Creek Project Description: Bridge rehabilitation/replacement on State Route 7401 (Carey Street) over Solomon's Creek in Ashley Borough, Luzerne County. Date: 5/28/20 3:53PM Page 52 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $0 $320 $0 $0 $0 $0 Preliminary Engineering 185 $0 $80 $0 $0 $0 $0 Final Design BOF $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction BOF $0 $0 $0 $0 $1,600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $0 $320 $0 $240 $1600 $0 State: $0 $80 $0 $60 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $400 $0 $300 $2,000 $0

Total FFY 2021-2032 Cost $2,700

PennDOT Project Id: 74761

Project Administrator: PennDOT Title: Nanticoke Streetscape Improvement Type: Transportation Enhancement State Route: 2002 Municipality: Nanticoke (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/12/21 Air Quality Exempt Reason: X12 - Trns enhnc acts (excpt rehab, opr. of hist. trans) Actual Construction Bid Date: Location: Luzerne County, City of Nanticoke, State Route 2002 (Main Street), State Route 3001 (Lower Broadway) Project Description: Streetscape improvements on State Route 2002 (East Main Street) from Market Street to South Street and State Route 3001 (Lower Broadway) to State Route 2002 (East Main Street) in the City of Nanticoke, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction SXF $100 $0 $0 $0 $0 $0

Federal: $100 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 79525

Project Administrator: PennDOT Title: SR 4024 over Laurel Run Improvement Type: Replace/Rehab State Route: 4024 Municipality: Ross (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/15/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Ross Township, State Route 4024 (Grassy Pond Road) Project Description: Bridge rehabilitation/replacement on State Route 4024 (Grassy Pond Road) over Laurel Run in Ross Township, Luzerne County. Date: 5/28/20 3:53PM Page 53 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $0 $400 $0 $0 $0 $0 Final Design 185 $0 $0 $0 $300 $0 $0 Construction 185 $0 $0 $0 $0 $500 $0

Federal: $0 $0 $0 $0 $0 $0 State: $0 $400 $0 $300 $500 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $400 $0 $300 $500 $0

Total FFY 2021-2032 Cost $1,200

PennDOT Project Id: 79532

Project Administrator: PennDOT Title: SR 2041 over Bear Creek Improvement Type: Bridge Replacement State Route: 2041 Municipality: Bear Creek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/19/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Bear Creek Township, State Route 2041 (Middleburg Road) Project Description: Bridge replacement on State Route 2041 (Middleburg Road) over Bear Creek in Bear Creek Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $0 $80 $0 $0 $0 $0 Preliminary Engineering 185 $0 $20 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $1,600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $0 $80 $0 $240 $1600 $0 State: $0 $20 $0 $60 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $100 $0 $300 $2,000 $0

Total FFY 2021-2032 Cost $2,400

PennDOT Project Id: 79534

Project Administrator: PennDOT Title: SR 3019 over Hazle Creek Improvement Type: Bridge Rehabilitation State Route: 3019 Municipality: Hazle (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Hazle Township, State Route 3019 (Stockton Mountain Road) Project Description: Bridge replacement on State Route 3019 (Stockton Mountain Road) over Hazle Creek in Hazle Township, Luzerne County. Date: 5/28/20 3:53PM Page 54 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $400 $400 $400 $400 $0 $0 Construction 185 $100 $100 $100 $100 $0 $0

Federal: $400 $400 $400 $400 $0 $0 State: $100 $100 $100 $100 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $500 $500 $500 $0 $0

Total FFY 2021-2032 Cost $2,000

PennDOT Project Id: 79594

Project Administrator: PennDOT Title: SR 309 over SR 2022 Improvement Type: Bridge Rehabilitation State Route: 309 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/26/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, City of Wilkes Barre, State Route 309 (North Cross Valley Expressway) Project Description: Bridge rehabilitation on State Route 309 (North Cross Valley Expressway) over State Route 2022 (Main Street) in the City of Wilkes-Barre, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $1,200 $0 $0 $0 $0 $0 Construction 185 $300 $0 $0 $0 $0 $0

Federal: $1200 $0 $0 $0 $0 $0 State: $300 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,500 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,500

PennDOT Project Id: 82906

Project Administrator: PennDOT Title: FAS-Loc, Luzerne Co. Improvement Type: Reconstruct State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Luzerne County, Various Local Federal Aid Routes Project Description: Milling, resurfacing, drainage improvements on various Local Federal Aid Routes in Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $320 $320 $320 $320 $0 $0 Construction LOC $80 $80 $80 $80 $0 $0

Federal: $320 $320 $320 $320 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $80 $80 $80 $80 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $400 $400 $400 $0 $0

Total FFY 2021-2032 Cost $1,600 Date: 5/28/20 3:53PM Page 55 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 85008

Project Administrator: PennDOT Title: Blackman St SB Ramp Improvement Type: Miscellaneous State Route: 81 Municipality: Wilkes Barre (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/10/20 Air Quality Exempt Reason: R4 - Changes in vertical and horizontal alignment Actual Construction Bid Date: Location: Luzerne County, Wilkes Barre Township, Interstate 81 South Bound Off Ramp 8013 Project Description: Safety improvement on Interstate 81 South Bound Exit 165 (Mountain Top / Wilkes Barre) off ramp and intersection of State Route 309; State Route 6309 and State Route 2005 (Blackman Street) in Wilkes Barre Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction HSIP $0 $0 $500 $0 $0 $0 Construction NHPP $0 $0 $301 $301 $601 $0 Construction 581 $0 $0 $1,202 $1,202 $2,404 $0

Federal: $0 $0 $801 $301 $601 $0 State: $0 $0 $1202 $1202 $2404 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $2,003 $1,503 $3,005 $0

Total FFY 2021-2032 Cost $6,511

PennDOT Project Id: 89712

Project Administrator: PennDOT Title: SR 1025 over Hicks Creek Improvement Type: Replace/Rehab State Route: 1025 Municipality: Exeter (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/7/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Exeter Township, State Route 1025 (Schooley Avenue) Project Description: Bridge rehabilitation/replacement on State Route 1025 (Schooley Avenue) over Hicks Creek in Exeter Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $350 $0 $0 $0 $0 $0 Final Design 185 $0 $350 $0 $0 $0 $0 Construction 185 $0 $0 $1,000 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $350 $350 $1000 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $350 $1,000 $0 $0 $0

Total FFY 2021-2032 Cost $1,700

PennDOT Project Id: 92444

Project Administrator: PennDOT Title: Cooks Store Intersection Improvement Type: Safety Improvement State Route: 118 Municipality: Lehman (TWP) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 12/9/21 Actual Construction Bid Date: Location: Luzerne County, Lehman Township, State Route 118, State Route 1049 (Fire House Rd) and Township Road 700 (Mountain View Drive); State Route 118 and Township Road 811 (Meeker Rd); State Route 118 and Township Road 806 (Outlet Rd) Project Description: Safety improvement at intersection of State Route 118, State Route 1049 (Fire House Road) and Township Road 700 (Mountain View Drive); intersection of State Route 118 and Township Road 811 (Meeker Road); and intersection of State Route 118 and Township Road 806 (Outlet Road) in Lehman Township, Luzerne County. Date: 5/28/20 3:53PM Page 56 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design HSIP $551 $0 $0 $0 $0 $0 Utility HSIP $40 $0 $0 $0 $0 $0 Right of Way HSIP $150 $0 $0 $0 $0 $0 Construction HSIP $0 $1,844 $756 $0 $0 $0

Federal: $741 $1844 $756 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $741 $1,844 $756 $0 $0 $0

Total FFY 2021-2032 Cost $3,341

PennDOT Project Id: 93006

Project Administrator: PennDOT Title: SR 309 over Nescopeck Ck Improvement Type: Bridge Replacement State Route: 309 Municipality: Butler (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/25/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Butler Township, State Route 309 (Hunter Highway) Project Description: Bridge replacement on State Route 309 (Hunter Highway) over Nescopeck Creek, in Butler Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $1,000 $1,000 $1,400 $1,000 $0 $0 Construction 185 $250 $250 $350 $250 $0 $0

Federal: $1000 $1000 $1400 $1000 $0 $0 State: $250 $250 $350 $250 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,250 $1,250 $1,750 $1,250 $0 $0

Total FFY 2021-2032 Cost $5,500

PennDOT Project Id: 93036

Project Administrator: PennDOT Title: SR 3010 over Branch Wapwallopen Creek Improvement Type: Replace/Rehab State Route: 3010 Municipality: Dorrance (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/25 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Dorrance Township, State Route 3010 (Alberdeen Road) Project Description: Bridge rehabilitation/replacement on State Route 3010 (Alberdeen Road) over Branch of Wapwallopen Creek in Dorrance Township, Luzerne County. Date: 5/28/20 3:53PM Page 57 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $0 $0 $0 $320 $0 $0 Preliminary Engineering 185 $0 $0 $0 $80 $0 $0 Construction STU $0 $0 $0 $0 $0 $1,600 Construction 185 $0 $0 $0 $0 $0 $400

Federal: $0 $0 $0 $320 $0 $1600 State: $0 $0 $0 $80 $0 $400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $400 $0 $2,000

Total FFY 2021-2032 Cost $2,400

PennDOT Project Id: 93038

Project Administrator: PennDOT Title: Union St @ 309 Park-N-Ride Improvement Type: Park and Ride Lot State Route: 309 Municipality: Luzerne (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/28/21 Air Quality Exempt Reason: X5 - Engr to assess effects of actn or alts to the actn Actual Construction Bid Date: Location: Luzerne County, Pringle and Luzerne Boroughs, State Route 309 Project Description: Construction of a Park and Ride at the intersection of State Route 309 and Union Street in Pringle and Luzerne Boroughs, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $0 $0 $100 $0 $0 $0

Federal: $0 $0 $100 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $100 $0 $0 $0

Total FFY 2021-2032 Cost $100

PennDOT Project Id: 93104

Project Administrator: PennDOT Title: SR 2007 over Branch Spring Run Creek Improvement Type: Bridge Deck Replacement State Route: 2007 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/22/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Wilkes Barre City, State Route 2007 (East Northampton Street) Project Description: Bridge replacement on State Route 2007 (East Northampton Street) over Branch Spring Creek in the City of Wilkes Barre, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $25 $25 $0 $0 $0 $0 Construction 185 $375 $375 $0 $0 $0 $0

Federal: $25 $25 $0 $0 $0 $0 State: $375 $375 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $400 $0 $0 $0 $0

Total FFY 2021-2032 Cost $800 Date: 5/28/20 3:53PM Page 58 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 93931

Project Administrator: PennDOT Title: SR 11 over SR 2037, and Railroad Improvement Type: Replace/Rehab State Route: 11 Municipality: West Pittston (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/26 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, West Pittston Borough, State Route 11 (Exeter Avenue) , Project Description: Bridge rehabilitation/replacement on State Route 11 (Exeter Avenue) over State Route 2037, Susquehanna River and Railroad in West Pittston Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design 185 $3,000 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $0 $5,000 Construction STP $0 $0 $0 $0 $0 $25,000 Construction 185 $0 $0 $0 $0 $0 $10,000 Construction 581 $0 $0 $0 $0 $0 $10,000

Federal: $0 $0 $0 $0 $0 $30000 State: $3000 $0 $0 $0 $0 $20000

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $3,000 $0 $0 $0 $0 $50,000

Total FFY 2021-2032 Cost $53,000

PennDOT Project Id: 95494

Project Administrator: PennDOT Title: K-Route Luzerne County Improvement Type: Resurface State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Luzerne County, various county owned Federal Aid Routes Project Description: Resurfacing on various County owned Federal Aid Routes in Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STU $320 $320 $320 $320 $0 $0 Construction LOC $80 $80 $80 $80 $0 $0

Federal: $320 $320 $320 $320 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $80 $80 $80 $80 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $400 $400 $400 $0 $0

Total FFY 2021-2032 Cost $1,600

PennDOT Project Id: 96721

Project Administrator: PennDOT Title: SR 1012 over Tributary Harvey's Creek Improvement Type: Replace/Rehab State Route: 1012 Municipality: Jackson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 6/23/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Jackson Township, State Route 1012 (Chase Road) Project Description: Bridge rehabilitation/replacement on State Route 1012 (Chase Road) over Tributary to Harvey's Creek in Jackson Township, Luzerne County. Date: 5/28/20 3:53PM Page 59 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $240 $0 $0 $0 $0 $0 Final Design 185 $60 $0 $0 $0 $0 $0 Construction STU $0 $360 $0 $0 $0 $0 Construction 185 $0 $90 $0 $0 $0 $0

Federal: $240 $360 $0 $0 $0 $0 State: $60 $90 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $450 $0 $0 $0 $0

Total FFY 2021-2032 Cost $750

PennDOT Project Id: 96722

Project Administrator: PennDOT Title: SR 1044 over Abraham's Creek Improvement Type: Bridge Replacement State Route: 1044 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 9/16/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, State Route 1044 (Mt Olivet Road) Project Description: Bridge replacement on State Route 1044 (Mt Olivet Road) over Abrahams Creek in Kingston Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STP $0 $160 $0 $0 $0 $0 Final Design 185 $0 $40 $0 $0 $0 $0 Construction STP $0 $0 $880 $0 $0 $0 Construction 185 $0 $0 $220 $0 $0 $0

Federal: $0 $160 $880 $0 $0 $0 State: $0 $40 $220 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $200 $1,100 $0 $0 $0

Total FFY 2021-2032 Cost $1,300

PennDOT Project Id: 96724

Project Administrator: PennDOT Title: SR 2042 over Little Wapwallopen Creek Improvement Type: Replace/Rehab State Route: 2042 Municipality: Dorrance (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Dorrance Township, State Route 2042 (Stairville Rd) Project Description: Bridge rehabilitation/replacement on State Route 2042 (Stairville Road) over Little Wapwallopen Creek in Dorrance Township, Luzerne County. Date: 5/28/20 3:53PM Page 60 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $350 $0 $0 $0 $0 $0 Construction 185 $0 $0 $0 $0 $650 $0

Federal: $0 $0 $0 $0 $0 $0 State: $350 $0 $0 $0 $650 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $0 $0 $0 $650 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 97941

Project Administrator: PennDOT Title: SR 309 over SR 8039 Ramp A Improvement Type: Bridge Rehabilitation State Route: 309 Municipality: Kingston (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/13/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Borough, State Route 309 (North Cross Valley Expressway) Project Description: Bridge rehabilitation on State Route 309 (North Cross Valley Expressway) over State Route 8039 (Ramp A) in Kingston Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $0 $0 $600 $0 $0 $0 Final Design 185 $0 $0 $150 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $5,600 $800 Construction 185 $0 $0 $0 $0 $1,400 $200

Federal: $0 $0 $600 $0 $5600 $800 State: $0 $0 $150 $0 $1400 $200

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $750 $0 $7,000 $1,000

Total FFY 2021-2032 Cost $8,750

PennDOT Project Id: 97942

Project Administrator: PennDOT Title: SR 309 over Toby Creek 1 Improvement Type: Replace/Rehab State Route: 309 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/13/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, State Route 309 (Memorial Highway) Project Description: Bridge rehabilitation/replacement on State Route 309 (Memorial Highway) over Toby Creek in Kingston Township, Luzerne County. Date: 5/28/20 3:53PM Page 61 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $0 $0 $280 $0 $0 $0 Final Design 185 $0 $0 $70 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $5,200 $0 Construction 185 $0 $0 $0 $0 $1,300 $0

Federal: $0 $0 $280 $0 $5200 $0 State: $0 $0 $70 $0 $1300 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $350 $0 $6,500 $0

Total FFY 2021-2032 Cost $6,850

PennDOT Project Id: 97943

Project Administrator: PennDOT Title: SR 309 over Toby Creek 2 Improvement Type: Bridge Rehabilitation State Route: 309 Municipality: Courtdale (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/13/22 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Courtdale Borough, State Route 309 (Memorial Highway) Project Description: Bridge rehabilitation on State Route 309 (Memorial Highway) over Toby Creek in Courtdale Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design NHPP $0 $0 $280 $0 $0 $0 Final Design 185 $0 $0 $70 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $2,800 $0 Construction 185 $0 $0 $0 $0 $700 $0

Federal: $0 $0 $280 $0 $2800 $0 State: $0 $0 $70 $0 $700 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $350 $0 $3,500 $0

Total FFY 2021-2032 Cost $3,850

PennDOT Project Id: 100508

Project Administrator: PennDOT Title: SR 1005 over Becker's Creek Improvement Type: Replace/Rehab State Route: 1005 Municipality: Jackson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/21/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Jackson Township, State Route 1005 (Huntsville Road) Project Description: Bridge rehabilitation/replacement on State Route 1005 (Huntsville Road) over Becker's Creek in Jackson Township, Luzerne County. Date: 5/28/20 3:53PM Page 62 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STU $0 $200 $0 $0 $0 $0 Final Design 185 $0 $50 $0 $0 $0 $0 Construction STU $0 $0 $160 $0 $0 $0 Construction 185 $0 $0 $40 $0 $0 $0

Federal: $0 $200 $160 $0 $0 $0 State: $0 $50 $40 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $250 $200 $0 $0 $0

Total FFY 2021-2032 Cost $450

PennDOT Project Id: 101386

Project Administrator: PennDOT Title: SR 29 over Pikes Creek Improvement Type: Bridge Preservation Activities State Route: 29 Municipality: Lehman (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/15/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Lehman Township, State Route 29 Project Description: Bridge preservation on State Route 29 over Pikes Creek in Lehman Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $320 $0 $0 $0 $0 $0 Preliminary Engineering 185 $80 $0 $0 $0 $0 $0 Final Design STP $0 $0 $0 $240 $0 $0 Final Design 185 $0 $0 $0 $60 $0 $0 Construction STP $0 $0 $0 $0 $1,200 $0 Construction 185 $0 $0 $0 $0 $300 $0

Federal: $320 $0 $0 $240 $1200 $0 State: $80 $0 $0 $60 $300 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $400 $0 $0 $300 $1,500 $0

Total FFY 2021-2032 Cost $2,200

PennDOT Project Id: 101388

Project Administrator: PennDOT Title: SR 1036 over Abrahams Creek Improvement Type: Bridge Preservation Activities State Route: 1036 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, State Route 1036 (Caverton Road) Project Description: Bridge preservation on State Route 1036 (Carverton Road) over Abrahams Creek in Kingston Township, Luzerne County. Date: 5/28/20 3:53PM Page 63 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $340 $0 $0 $0 $0 $0 Preliminary Engineering 185 $85 $0 $0 $0 $0 $0 Construction 185 $0 $0 $0 $0 $650 $0

Federal: $340 $0 $0 $0 $0 $0 State: $85 $0 $0 $0 $650 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $425 $0 $0 $0 $650 $0

Total FFY 2021-2032 Cost $1,075

PennDOT Project Id: 101479

Project Administrator: PennDOT Title: SR 115 Pipe Replacement Improvement Type: Drainage Improvement State Route: 115 Municipality: Bear Creek (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S2 - Hazard elimination program Actual Construction Bid Date: Location: Luzerne County, Plains Township, State Route 115 (Bear Creek Boulevard) Project Description: Pipe Replacement on State Route 115 (Bear Creek Boulevard) between Township Road 457 (Old East End Boulevard) to State Route 2039 (Pittston Boulevard), in Bear Creek Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $360 $0 $0 $0 $0 $0 Preliminary Engineering 581 $90 $0 $0 $0 $0 $0 Construction 581 $0 $0 $0 $0 $2,500 $0

Federal: $360 $0 $0 $0 $0 $0 State: $90 $0 $0 $0 $2500 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $2,500 $0

Total FFY 2021-2032 Cost $2,950

PennDOT Project Id: 101925

Project Administrator: PennDOT Title: SR 4035 over Creek Improvement Type: Bridge Rehabilitation State Route: 4035 Municipality: Huntington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Huntington Township, State Route 403 (Register Road) Project Description: Bridge rehabilitation on State Route 4035 (Register Road) over Pine Creek in Huntington Township, Luzerne County. Date: 5/28/20 3:53PM Page 64 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering BOF $360 $0 $0 $0 $0 $0 Preliminary Engineering 185 $90 $0 $0 $0 $0 $0 Construction BOF $0 $0 $0 $0 $800 $0 Construction 185 $0 $0 $0 $0 $200 $0

Federal: $360 $0 $0 $0 $800 $0 State: $90 $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $1,000 $0

Total FFY 2021-2032 Cost $1,450

PennDOT Project Id: 101927

Project Administrator: PennDOT Title: SR 437 over Railroad Improvement Type: Bridge Preservation Activities State Route: 437 Municipality: Fairview (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 1/14/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Fairview Township, State Route 437 (Woodland Road) Project Description: Bridge preservation on State Route 437 (Woodland Road) over Reading Blue Mountain and Northern Railroad in in Fairview Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $80 $0 $0 $0 $0 $0 Preliminary Engineering 185 $20 $0 $0 $0 $0 $0 Construction NHPP $0 $0 $0 $0 $800 $0 Construction 185 $0 $0 $0 $0 $200 $0

Federal: $80 $0 $0 $0 $800 $0 State: $20 $0 $0 $0 $200 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $1,000 $0

Total FFY 2021-2032 Cost $1,100

PennDOT Project Id: 102000

Project Administrator: PennDOT Title: SR 2010, SR 1036, SR 3024 Bridge Preservation Improvement Type: Bridge Preservation Activities State Route: 2010 Municipality: Ashley (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/27/21 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Ashley Borough, State Route 2010 (South Main Street); Luzerne County, Kingston Township, State Route 1036 (Caverton Road); Luzerne County, Sugarloaf Township, State Route 3024 (Weston Road) Project Description: Bridge preservation on State Route 2010 (South Main Street) over Pocono Notheast Railroad in Ashley Borough, Luzerne County. Bridge preservation on State Route 1036 (Caverton Road) over Toby Creek in Kingston Township, Luzerne County. Bridge preservation on State Route 3024 (Weston Road) over Black Creek in Sugarloaf Township, Luzerne County. Date: 5/28/20 3:53PM Page 65 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 185 $100 $0 $0 $0 $0 $0 Construction 185 $0 $0 $0 $0 $1,000 $0

Federal: $0 $0 $0 $0 $0 $0 State: $100 $0 $0 $0 $1000 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $100 $0 $0 $0 $1,000 $0

Total FFY 2021-2032 Cost $1,100

PennDOT Project Id: 102007

Project Administrator: PennDOT Title: SR 2015 / 2004 Intersection Improvement Improvement Type: Safety Improvement State Route: 2015 Municipality: Plains (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/10/20 Air Quality Exempt Reason: R2 - Intersection signalization prjcts at ind. inters. Actual Construction Bid Date: Location: Luzerne County, Jenkins/Plains Township, State Route 2015 (Saylor Avenue) and State Route 2004 (River Road) Project Description: Intersection improvement at State Route 2015 (Saylor Avenue) and State Route 2004 (River Road) in Jenkins/Plains Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction 581 $1,200 $0 $0 $0 $0 $0

Federal: $0 $0 $0 $0 $0 $0 State: $1200 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,200 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,200

PennDOT Project Id: 102095

Project Administrator: PennDOT Title: Group 4-20-ST 4 Improvement Type: Restoration State Route: 11 Municipality: Forty Fort (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/22 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Luzerne County, State Route 11 from State Route 1019 (Dennison Street) to the Lackawanna County Line in Pittston Township, Forty Fort, Wyoming, Exeter, West Pittston, Hughestown, DuPont, and Avoca Boroughs, and the City of Pittston Project Description: Resurfacing on State Route 11 from State Route 1019 (Dennison Street) to the Lackawanna County Line in Pittston Township, Forty Fort, Wyoming, Exeter, West Pittston, Hughestown, DuPont, and Avoca Boroughs, and the City of Pittston, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $0 $400 $0 $0 $0 Construction 581 $0 $0 $1,600 $0 $0 $0

Federal: $0 $0 $400 $0 $0 $0 State: $0 $0 $1600 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $2,000 $0 $0 $0

Total FFY 2021-2032 Cost $2,000 Date: 5/28/20 3:53PM Page 66 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 102116

Project Administrator: PennDOT Title: SR 2005 Reconstruction Improvement Type: Restoration State Route: 2005 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 11/7/24 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Luzerne County, Wilkes Barre City, Wilkes Barre and Hanover Townships, State Route 2005 (Blackman Street) Project Description: Reconstruction on State Route 2005 (Blackman Street) from State Route 6309 (Mountain Boulevard) to State Route 2002 (Sans Souci Parkway) in the City of Wilkes Barre, and Wilkes Barre and Hanover Townships, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $0 $0 $80 $0 $0 $0 Preliminary Engineering 581 $0 $0 $320 $0 $0 $0 Final Design STU $0 $0 $0 $0 $240 $0 Final Design 581 $0 $0 $0 $0 $60 $0 Construction STU $0 $0 $0 $0 $6,000 $0 Construction 581 $0 $0 $0 $0 $1,500 $0

Federal: $0 $0 $80 $0 $6240 $0 State: $0 $0 $320 $0 $1560 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $400 $0 $7,800 $0

Total FFY 2021-2032 Cost $8,200

PennDOT Project Id: 103196

Project Administrator: PennDOT Title: CP Pittston / Dupont Corridor Improvement Type: RR Warning Devices State Route: 2017 Municipality: Yatesville (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 12/1/18 Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Luzerne County, Yatesville Borough, State Route 2017 (Pittston Avenue), Plains Township, Miners Street, City of Wilkes Barre, Mill Street Project Description: Replacement of existing antiquated flashing lights and gates on State Route 2017 (Pittston Avenue), Yatesville Borough, Miners Street, Plains Township, Mill Street, City of Wilkes Barre, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $500 $478 $0 $0 $0 $0

Federal: $500 $478 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $478 $0 $0 $0 $0

Total FFY 2021-2032 Cost $978

PennDOT Project Id: 103454

Project Administrator: PennDOT Title: N Washington St. over Luzerne/Susquehanna Railroad Improvement Type: Bridge Replacement State Route: 7304 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 11/7/24 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Wilkes Barre City, State Route 7304 (North Washington Street) Project Description: Bridge replacement on State Route 7304 (North Washington Street) over Luzerne and Susquehanna Railroad, in Wilkes Barre City, Luzerne County. Date: 5/28/20 3:53PM Page 67 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design BOF $0 $0 $0 $320 $0 $0 Final Design 185 $0 $0 $0 $80 $0 $0 Construction BOF $0 $0 $0 $0 $1,200 $0 Construction 185 $0 $0 $0 $0 $300 $0

Federal: $0 $0 $0 $320 $1200 $0 State: $0 $0 $0 $80 $300 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $400 $1,500 $0

Total FFY 2021-2032 Cost $1,900

PennDOT Project Id: 104265

Project Administrator: PennDOT Title: SR 339 Reconstruction Improvement Type: Restoration State Route: 339 Municipality: Nescopeck (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 10/1/20 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Luzerne County, Nescopeck Township, State Route 339 Project Description: Highway restoration on State Route 339 from Luzerne/Columbia County Line to State Route 3015 (Broad Street) and bridge preservation on State Route 339 over Nescopeck Creek, Nescopeck Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $1,263 $0 $0 $0 $0 $0 Construction STU $850 $0 $0 $0 $0 $0 Construction 581 $528 $0 $0 $0 $0 $0

Federal: $2113 $0 $0 $0 $0 $0 State: $528 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $2,641 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $2,641

PennDOT Project Id: 105164

Project Administrator: PennDOT Title: SR 239 Safety Improvements Improvement Type: Safety Improvement State Route: 239 Municipality: Shickshinny (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 2/25/21 Air Quality Exempt Reason: S6 - Safety improvement program Actual Construction Bid Date: Location: Luzerne County, Union,Huntington Townships, Shickshinny Borough, State Route 239 (Union Street, Pond Hill Road) Project Description: Installation of Edge Line Rumble Strips on State Route 239 (Union Road, Pond Hill Road) between Fire Hall Road and Grange Road to West Vine Street, Union, Huntington Townships, Shickshinny Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction HSIP $0 $0 $0 $1,292 $208 $0

Federal: $0 $0 $0 $1292 $208 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $1,292 $208 $0

Total FFY 2021-2032 Cost $1,500 Date: 5/28/20 3:53PM Page 68 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 106127

Project Administrator: PennDOT Title: SR 2027 McAlpine Street over Mill Creek Improvement Type: RR Warning Devices State Route: 2027 Municipality: Avoca (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 4/13/20 Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Luzerne County, Duryea Borough, State Route 2027 (McAlpine Street) Project Description: Railroad grade crossing lights and gates updates on State Route 2027 (McAlpine Street) over Mill Creek, in Duryea Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $0 $0 $300 $0 $0 $0

Federal: $0 $0 $300 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $300 $0 $0 $0

Total FFY 2021-2032 Cost $300

PennDOT Project Id: 106130

Project Administrator: PennDOT Title: SR 2031 Stephenson Street Railroad Lights /Gates Improvement Type: RR Warning Devices State Route: 2031 Municipality: Duryea (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 3/9/18 Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Luzerne County, Duryea Borough, State Route 2031 (Stephenson Street) Project Description: Railroad grade crossing lights and gates replacement on State Route 2031 (Stephenson Street), Duryea Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $135 $0 $0 $0 $0 $0

Federal: $135 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $135 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $135

PennDOT Project Id: 106324

Project Administrator: PennDOT Title: Commerce Boulevard Crossing Improvement Type: RR Warning Devices State Route: 0 Municipality: Pittston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Luzerne County, Pittston Township, New Commerce Boulevard, New Hanover Street Project Description: Installation of Railroad Lights, Gates, Bells, Circuitry and Housing on New Commerce Boulevard, New Hanover Street, Pittston Township, Luzerne County. Date: 5/28/20 3:53PM Page 69 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $0 $0 $50 $250 $0 $0

Federal: $0 $0 $50 $250 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $50 $250 $0 $0

Total FFY 2021-2032 Cost $300

PennDOT Project Id: 110085

Project Administrator: PennDOT Title: SR 239 over Pine Creek Improvement Type: Bridge Replacement State Route: 239 Municipality: Huntington (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 7/27/23 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Huntington Twp, State Route 239 Project Description: Bridge replacement on State Route 239 over Pine Creek in Huntington Township, Luzerne County

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $240 $0 $0 $0 $0 $0 Preliminary Engineering 185 $60 $0 $0 $0 $0 $0 Final Design STU $0 $0 $240 $0 $0 $0 Final Design 185 $0 $0 $60 $0 $0 $0 Construction STU $0 $0 $0 $0 $1,600 $0 Construction 185 $0 $0 $0 $0 $400 $0

Federal: $240 $0 $240 $0 $1600 $0 State: $60 $0 $60 $0 $400 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $300 $0 $300 $0 $2,000 $0

Total FFY 2021-2032 Cost $2,600

PennDOT Project Id: 110327

Project Administrator: PennDOT Title: SR 309 Signal Corridor Improvement Type: Safety Improvement State Route: 309 Municipality: Kingston (TWP) Air Quality Status: Significant: Included in regional conformity analysis Estimated Construction Bid Date: 5/20/21 Actual Construction Bid Date: Location: Luzerne County, Kingston Township, Dallas Township, and Dallas Borough, State Route 309 (Memorial Highway/Tunkhannock Highway) Project Description: Safety improvements on State Route 309 (Memorial Highway/Tunkhannock Highway) between State Route 1050 and Wellington Avenue in Kingston Township, Dallas Township, and Dallas Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction HSIP $1,058 $1,305 $0 $0 $0 $0

Federal: $1058 $1305 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $1,058 $1,305 $0 $0 $0 $0

Total FFY 2021-2032 Cost $2,363 Date: 5/28/20 3:53PM Page 70 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 111134

Project Administrator: PennDOT Title: C and H Corridor Improvement Type: RR Warning Devices State Route: 0 Municipality: Hazle (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S8 - Railroad/highway crossing warning devices Actual Construction Bid Date: Location: Luzerne County, Hazle, Hanover Townships, State Route 424 (Arthur Gardner Highway), Township Road 466 (Sissock Drive), Schuylkill County, State Route 1009 (Blaine Street) Project Description: Installation of Railroad Lights with LED's, Gates, Bells, Circuitry and Housing on State Route 424 (Arthur Gardner Highway), Township Road 466 (Sissock Drive), Hazle, Hanover Townships, Luzerne County, State Route 1009 (Blaine Street), Kline Township, Schuylkill County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction RRX $0 $0 $0 $50 $450 $0

Federal: $0 $0 $0 $50 $450 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $50 $450 $0

Total FFY 2021-2032 Cost $500

PennDOT Project Id: 111473

Project Administrator: PennDOT Title: Pittston North Main Street Streetscape Improvement Type: Transportation Enhancement State Route: 0 Municipality: Pittston (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 11/5/20 Air Quality Exempt Reason: X12 - Trns enhnc acts (excpt rehab, opr. of hist. trans) Actual Construction Bid Date: Location: North Main Avenue in the city of Pittston, Luzerne County. Project Description: Drainage, curb, and sidewalk improvements on North Main Avenue in the city of Pittston, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction TAP $500 $500 $0 $0 $0 $0

Federal: $500 $500 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $500 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,000

PennDOT Project Id: 111478

Project Administrator: PennDOT Title: Wilkes University Pedestrian Safety Imp PH III Improvement Type: Transportation Enhancement State Route: 2007 Municipality: Wilkes Barre (CITY) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: 8/20/20 Air Quality Exempt Reason: A2 - Bicycle and pedestrian facilities Actual Construction Bid Date: Location: South Franklin Street and West South Street in the city of Wilkes-Barre, Luzerne County. Project Description: Replacement of damaged sidewalks and curbs, construction of concrete crosswalks, and the installation of pedestrian lighting in the city of Wilkes-Barre, Luzerne County. Date: 5/28/20 3:53PM Page 71 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction TAP $675 $482 $0 $0 $0 $0

Federal: $675 $482 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $675 $482 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,157

PennDOT Project Id: 113521

Project Administrator: PennDOT Title: Hillside Road over Tobys Creek Improvement Type: Bridge Replacement State Route: 7220 Municipality: Kingston (TWP) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Kingston Township, Hillside Road Project Description: Bridge replacement on Hillside Road over Tobys Creek in Kingston Township, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design STP $250 $0 $0 $0 $0 $0 Utility STP $50 $0 $0 $0 $0 $0 Right of Way STP $50 $0 $0 $0 $0 $0 Construction STP $0 $1,500 $0 $0 $0 $0

Federal: $350 $1500 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $350 $1,500 $0 $0 $0 $0

Total FFY 2021-2032 Cost $1,850

PennDOT Project Id: 113980

Project Administrator: PennDOT Title: MS4 Projects - LLTS Improvement Type: Environmental Mitigation State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: X1 - Actvtys not leading to constr. (plan & tech study) Actual Construction Bid Date: Location: Lackawanna and Luzerne Counties Project Description: Mitigation in Lackawanna and Luzerne Counties.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $1,600 $0 $0 $0 $0 $0 Construction 581 $400 $2,000 $0 $0 $0 $0

Federal: $1600 $0 $0 $0 $0 $0 State: $400 $2000 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $2,000 $2,000 $0 $0 $0 $0

Total FFY 2021-2032 Cost $4,000 Date: 5/28/20 3:53PM Page 72 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

PennDOT Project Id: 113981

Project Administrator: PennDOT Title: MS4 Inspections - LLTS Improvement Type: Environmental Mitigation State Route: 0 Municipality: Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: X5 - Engr to assess effects of actn or alts to the actn Actual Construction Bid Date: Location: Lackawanna and Luzerne Counties Project Description: Mitigation Inspection in Lackawanna and Luzerne Counties.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction STP $360 $0 $0 $0 $0 $0 Construction 581 $90 $0 $0 $0 $0 $0

Federal: $360 $0 $0 $0 $0 $0 State: $90 $0 $0 $0 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $450 $0 $0 $0 $0 $0

Total FFY 2021-2032 Cost $450

PennDOT Project Id: 114269

Project Administrator: PennDOT Title: SR 415 over Toby Creek Improvement Type: Replace/Rehab State Route: 415 Municipality: Dallas (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Dallas Borough, State Route 415 (Memorial Highway) Project Description: Bridge rehabilitation/replacement on State Route 415 (Memorial Highway) over Toby Creek in Dallas Borough, Luzerne County.

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STP $0 $0 $0 $280 $0 $0 Preliminary Engineering 185 $0 $0 $0 $70 $0 $0 Final Design STP $0 $0 $0 $0 $240 $0 Final Design 185 $0 $0 $0 $0 $60 $0 Construction STP $0 $0 $0 $0 $0 $1,600 Construction 185 $0 $0 $0 $0 $0 $400

Federal: $0 $0 $0 $280 $240 $1600 State: $0 $0 $0 $70 $60 $400

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $350 $300 $2,000

Total FFY 2021-2032 Cost $2,650

PennDOT Project Id: 114275

Project Administrator: PennDOT Title: SR 2005 over Susquehanna River Improvement Type: Bridge Rehabilitation State Route: 2005 Municipality: Plymouth (BORO) Air Quality Status: Exempt from Regional Conformity Analysis

Estimated Construction Bid Date: Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: Luzerne County, Larksville Borough, State Route 2005 (Carey Ave) Project Description: Bridge rehabilitation on State Route 2005 (Carey Ave) over Susquehanna River in Larksville Borough, Luzerne County. Date: 5/28/20 3:53PM Page 73 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering STU $0 $0 $0 $160 $0 $0 Preliminary Engineering 185 $0 $0 $0 $40 $0 $0

Federal: $0 $0 $0 $160 $0 $0 State: $0 $0 $0 $40 $0 $0

Local/Other: $0 $0 $0 $0 $0 $0

2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $0 $0 $200 $0 $0

Total FFY 2021-2032 Cost $200 Date: 5/28/20 3:53PM Page 74 of 74 Scranton/Wilke-Barre MPO TIP - Highway & Bridge Projects

Fund Category Appendix Fund Category Fund Category Code Fund Category Description Code Fund Category Description ACT13 Local at risk bridges - Marcellus Legacy Fund SSE Supportive Services Enterprise ACT3 Act 3 Public Transportation Grant STE Surface Transportation Enhancement ACT4A Act 4A Supplemental Operating Grant STN STP - Nonurbanized ACT83 Transit Bond STP Surface Transportation Prog-Flexible ADMUO Administration Use Only - Do Not Use STR Surface Transportation Rural AIP FAA Airport Improvement Program STU Surface Transportation Urban APD Appalachia Development SXF Special Federal Funds (Demo) APL Appalachia Local Access TAP Transportation Alternatives (TAP) Flexible BDP Bridge Discretionary Program TAU Tap > 200,000 Population BGENT FAA Block Grant Entitlement TCS Transpo & Community System Pres. BND Bridge Bonding TIGER Trans Investment Generating Economic Recovery BOF Bridge Off System TIGGR Transit Investment for Greenhouse Gas and Energy R CAQ Congestion Mitigation/Air Quality TPK Turnpike CB Capital Budget Nonhighway TTE Transit Transportation Enhancements DAR Defense Access Roads 073 Green Light-Go DBE Disadvantages Business Enterprise 137 Municipal Bridge Improvements and Bundling D4R Discretionary Interstate Maintenance 138 Rural Commercial Routes EB Equity Bonus 140 Intelligent Transportation System ECONR Economic Recovery 144 302-87-3 Transportation Assistance FAABG FAA Block Grant 160 Community Transport.-Equip Grant FAAD FAA Discretionary 163 Community Transport.- Equip Grant FAI Interstate Construction 164 PTAF FB Ferry Boat/Ferry Terminal Facilities 175 FTA- Capital Improvements FFL Federal 179 Local Bridge Construction (Act 26 Counties) FHA Public Lands Highways 183 Local Bridge Construction FLAP Federal Lands Access Program 184 Restoration - Hwy Transfer FLH Highways 185 State Bridge Construction FRA Federal Railroad Administration 208 FTA- Discretionary Capital FRB Ferry Boat 244 ARLE Projects FTAD FTA Discretionary Funds 278 Safety Admin GEN PA General Fund 338 PT - 1513 Mass Transit Operating HCB Historic Covered Bridge 339 PT - 1514 Asst Imprvmnt / Capitl Budg HPR Highway Planning/Research 340 PT - 1517 Capital Improvement HRRR High Risk Rural Roads 341 PT - 1516 Progrms of Statewide Signif HSIP Highway Safety Improvement Program 342 Transit Administration and Oversight H4L Highway for Life - 10% Limiting Amount 361 FTA- Capital Improvements INFRA INFRA Discretionary Award 383 DGS Delegated Facilities projects ITS Intelligent Transportation System 403 Act 89 - Aviation Grants IVB Innovative Bridge 404 Act 89 - Rail Freight Grants LOC Local Government Funds 405 Act 89 - Passenger Rail Grants LRFA Local Rail Freight Assistance 406 Act 89 - Port and Waterways Grants MSFF Marcellus Shale Fee Fund 407 Act 89 - Bicycle & Pedestrian Facilities Grants NFP National HWY Freight Program 408 Act 89 - Multimodal Admin and Oversight NHPP National Highway Performance Program 409 ACT 89 - Roadway Maintenance OTH Other Local Government Agencies 411 Act 89 - Statewide Program Grants - Non HWY OTH-F Other Federal Govt Agencies 5208 ITS OTH-S Other Pa State Government Agencies 5303 FTA Metropolitan Planning Program PIB State Infrastructure Bank - 100% state 5307 FTA Urban Area Formula Grants PL Planning 5308 FTA Clean Fuels Formula Grants PRIV Private Party 5309 FTA New Starts Capital Program PTAF Act 26 PA Transportation Assist Fund 5310 FTA Elderly & Handicapped Program REC Recreational Trails 5311 FTA Rural Area Formula Grants RES Funds Restoration 5312 FTA Low or No Emission Vehicle Deployment (LoNo) RFAP Rail Freight Assistance Program 5313 FTA State Planning and Research RRX Highway Safety 5316 Job Access & Reverse Commute SBY Scenic Byways 5317 New Freedom Program SECT9 FTA Federal Formula - Section 9 5320 Alternative Transp. in Parks & P. Land SIB State Infrastructure Bank 5329 FTA State Safety Oversight Program SPOPR Supplemental Operating Assistance 5337 State of Good Repair Grant Program SPR State Planning/Research 5339 FTA Alternatives Analysis SRTSF Federal Safe Routes to Schools 5340 Growing States SR2S State Safe Route to School 571 Airport Development HBFHWATIP