Revitalizing the economy and region; ensuring safety Grants and security

Comprehensive social Introduction of disaster prevention/safety grant and comprehensive social infrastructure development grant infrastructure development grant Comprehensive grant by incorporating subsidies given to local governments under the jurisdiction of the Ministry of Land, (Business to lead to strengthening growth or Infrastructure and Transport so that local governments can use it more flexibly and freely and make use of inventive ideas. regional activation))

Upgrading the townscape A grant to intensively support the measures against aging of facilities for protecting lives and livelihoods of Unoccupied housing measures Disaster prevention/safety grant (An example in ) Traffic base maintenance around the station (Support intensively “Infrastructure rebuilding to local residents, the measures for preventing/reducing disaster, and the action of the ensuring safety of the (An example in ) (An example in Prefecture) maintain life and living” and “Ensuring safety of the life space”) general life space in the area.

Flood, landslides disaster measures Maintenance of the Earthquake measures for the road, storm and Disaster prevention-related Promotion of the basic investigation tsunami refuge place flood damage measures improvement of the crowded city area for the designation of a landslide based on recent heavy rain with an artificial hill (An example in Nara Prefecture) (An example in Osaka City) disaster caution area River channel Transmissive erosion (An example in Prefecture) (An example of a steep slope) After measure (Utilize as Before development After development Before interchange base facilities)) excavation control dam maintenance measure (An example in (An example in ) Hyogo Prefecture) P Steep slope IC access road maintenance Before development 堤防決壊 After development (An example in Hyogo Prefecture) Promotion of Park-and-Ride Before measure After measure Before development After development

Landslide disaster special caution area Landslide disaster caution area

Highway Development of the access Station Cloud The low-cost hydrograph Earthquake resistance of houses and buildings road between sightseeing, Setting of the maintenance that is specialized sightseeing sign in flooding (An example in Nara Prefecture) Before development After development industrial areas Development Acceptance measures Upgrading the waterside scene of IC access road Control module of a large cruise ship Communication (An example in Osaka City) module Local public entity (An example in Hyogo Prefecture) river manager Smart IC Hydrograph Maintenance of the harbor facilities Maintenance such as Before earthquake resistance After earthquake resistance Maintenance of such as a river, adjustment pond the bank of rivers (An example in Hyogo Prefecture) (An example in Osaka Prefecture) Before Offers such as development the river information Road safety measures (An example in Nara Prefecture) Liquefaction measures River Before development After development Maintenance of the disaster prevention base IC International Terminal (写真提供:神戸市) Development of the city park Earthquake resistance (An example in Osaka Prefecture) The formation of出入 口 the area base by of the harborside road “the roadside station” Underground flow Adjustment pond (An example in Hyogo Prefecture) Maintenance of the earthquake Before measure After measure Maintenance such as coastal levees Tsunami, storm and flood damage resistance wharf measures for the harbor クルーズ船係留状況 Mooring pole (An example in Osaka Prefecture) (An example in Wakayama Prefecture) Utilization of the effect reinforcement promotion business 5 3 m Setting of signboards After development (a rest station) After Shore about the assumed Before development Development (Maintenance of the floating pier) Harbors depth at the time and course to the refuge

Maintenance防波堤 防波堤 Expansion 3.5m of the breakwater 想定浸水深 Flood Water Depth (Projected) (An example in 200年に一度の大雨(時間最大131mm Before After 程度の雨)が降った場合に予想される 浸水の深さです ) development development 洪水時避難場所 信楽荘

Flood evacuation shelter for this area is Shigarakiso. この場所は標高 262.4mです

甲賀圏域 水害・土砂災害に 強い地域づくり協議会 H29.03 Plans < > Measures based on plans to extend the life of infrastructure (image) Conceptual drawing of the ideal future image of Kansai ◆Measures to address aging roadway facilities ◆ The general interchange, fusion of Measures to address aging coastal Promotion of eight main projects aimed at three major urban areas and local protection facilities Kansai Regional Plan image realization in the future of Kansai fusion with the area (Prepared in March 2016) Wall repairs Wide area cooperation project Metropolitan area Regular inspections Bridge repairs Cooperation with the West area

Aged concrete and exposed rebar Asia, cooperation promotion project with West Japan and the super mega Chugoku area Chubu area Measures to address aging region to assume Kinki as a nodal point erosion control facilities Kinki area Kyushu area Super mega region Placing the Kinki region as a terminal of West Japan for the super area mega region and strengthening the function of nodes for the Kinki Tunnel repairs Bridge removal Measures to address aging region, the convection of people, goods and the information 〇Reinforcement of the access between the main traffic nodal point become activated, so that the vitalization of the sphere by To Asia including Kansai Airport roadway facilities 〇Solution for the missing link of roads Inspection for hollowing-out promotion of innovation and the increase of in-bound. 〇Promotion such as health, the medical industry based on private needs ◆Measures to address aging sewer facilities Regional activation which utilized an in-bound Measures to address aging river control facilities Countermeasures ◆Measures to address aging river control facilities via restoration Measures to address aging work public housing Future Kansai projects

Sluice gate ・・・・・・Measures to address aging 2019 2020 2021 2022 2023 2024 2025 2031 Approx. 2045 G20 Osaka Summit Rugby World Cup 2019 Games Olympic and Paralympic World Masters Games (Kanazawa to Tsuruga) train opens bullet all routes opened Shin-, Shiga Pref. Japan Games Osaka, Kansai Expo 2025 opens Umekita Phase 2 ( to Osaka) (scheduled) Chuo Shinkansen maglev train Advance opening of select areas renewal Agency for Cultural Affairs relocation sewer facilities Roadway collapse 8 years early) (May be completed up to ◆Measures to address aging port and

harbor facilities 2021 Kansai (May) (Sept. to Nov.) (July to Sept.) Pump

Repair of (scheduled) (scheduled) (scheduled) (scheduled)

wharf Measures to address aging Measures to address aging repairs (scheduled) undersides port and harbor facilities coastal protection facilities (June)