Deck Equipment and Handling Systems
Total Page:16
File Type:pdf, Size:1020Kb
DECK EQUIPMENT AND HANDLING SYSTEMS Offshore cranes Equipment and Handling Systems Lifeboat systems Cranes Deck equipment Launch & Recovery Winches Dive System Handling Deck equipment Systems www.shgroup.dk SH Group is a manufacturer and global supplier of tailor made handling systems and deck equipment BRANDS for the marine, offshore and wind industry Handling systems for ROV Complete supplier of Cranes Lifeboat and rescue boat and Research equipment and deck machinery systems for ships, oil rigs, and special vessels Units in operation worldwide 1000+ Svendborg, Lindø, Esbjerg, FOCUS AREAS Stavanger, Houston and Singapore Year of establishment Wind Industry Bridge systems Service Special designed equipment Hydraulic design and automation for Worldwide service of equipment 1974 and handling systems advanced bridge systems on ships and oil rigs Turn over EURO 55M We are a Service company operating worldwide 2 3 Why We belive you could benefit from working with us. With more than 50 highly experienced engineers and technicians, We are skilled in designing solutions that technically and economically meet any demands you might have. We have our own Inhouse production- and test facilities with up-to-date machinery and educated workers. Combined, We are able to run production faster and under constant surveilance and dialog between all people involved. As a result, We can resolve issues faster and deliver a better result on time! Our project managers all have relevant backgrounds from the Offshore, Marine and Wind industries. That allows Us to put the right person on the job, often acting as your single point of contact. Inhouse production facilities Engineering department Steel workshop Hydraulic and Mechanical workshop Electrical and Automation workshop A-Frame FAT Welding workshop Assembly workshop 4 5 LAUNCH & RECOVERY SYSTEMS ROV HANDLING SYSTEMS Sepro™ has got one the most comprehensive product portfolios in the market for LARS (Launch & Recovery Systems) and has an extensive experience and knowledge within design, engineering, project management and production. Sepro™ offers turnkey system deliveries including system integration as well as single product deliveries. Design, production, assembly and testing are carried out at one of SH Group’s locations. This is done deliberately in order to ensure optimum control of quality and functionality for each individual delivery. We have an excellent track record with the majority of these systems in daily operations worldwide. Deck mounted Overside system Moonpool Handling System FAT - Electrical Winch 6 7 ROV HANDLING WINCHES OceanObserver™ OceanFighter™ OceanMaster™ OceanFighter™ OceanMaster™ 10ft container dimension. Free flying ROV Bespoke Design Zone II Zone II Zone II. Replacable Drum Bespoke Design Bespoke Design Bespoke Design Bespoke Design Example Example Example Example Example SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY FRONT 1.900 M - Ø28.6 FRONT 3.400 M - Ø35 FRONT 1.200 M - Ø40 RIGHT ANGLE 2.100 M - Ø40 RIGHT ANGLE 4.300 M - Ø40 DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL Ø 1.200 mm YES Ø 1.300 mm YES Ø 1.200 mm YES Ø 1.600 mm YES Ø 1.500 mm YES AHC AHC AHC AHC AHC NO YES NO YES NO 8 9 ROV HANDLING Deck mounted HPL™ - Suitable for limited deck space and narrow hangars. Deck mounted DPL™ - Compact solution for limited deck space. Overhead Rail System ORS™ - Gantry type of LARS with extensive lowering Wall-mounted Rail System WRS™ - Increased lowering capabilities and clean Extensive outreach and excellent dipping functionality. The DPL™ lifts the ROV and TMS between the legs. capabilities along the ship-side rails making launch of ROV possible below deck area giving space to ROV operation, service and maintenance. splash zone. 10 11 1 32 OCEANOGRAPHIC 7 RESEARCH VESSEL 6 Handling systems and deck equipment from SH Group 1 1. Oceanographic winch system 2. A-Frame Overside - Compact will meet any requirements whether the research for deploying and towing solution for limited deck space. scientific devices to the seabed. vessel is on a seismic or hydrographic survey, construction or dredging job or oil exploration. All our equipment is reliable, safe and easy to operate in any type of weather - even the toughest conditions at sea. 3 4 Design, production, assembly and testing is carried 5 out in Denmark. This is done deliberately in order to ensure optimum control of quality and functionality for each individual delivery, hence reducing installation and testing time on site. 3. Small ROV Hangar - Custom made hangar for easy storage 4 3. A-Frame of ROV. installed in hangar when clean deck area is needed for ROV maintenance. 3 2 1 2 51 61 37 1 Since a research voyage is planned many months ahead, it is very important that all launch and recovery equipment on board, are reliable and operational when required, as you only have a specific window to carry out the planned test, sample collecting, filming etc. The LARS delivered to us by SH Group has proven it’s self as being very reliable and easy to operate. Something which is vital 4. Lifeboat Handling - Low 5. Cranes - Fixed, knuckle 6. Deck Machinery for anchoring, when used and operated by different people on board our vessel. maintenace and reliable, safe or telescopic. For handling mooring or towing. Stig Vågenes, ROV Manager - University of Bergen and easy to operate in any type overboard operations. of weather. 12 13 OCEANOGRAPHIC WINCHES OceanObserver™ OceanEnviro™ OceanReacher™ SDC Winch Small Wire Winch Water Sampler Winch 10ft container dimension. Free flying ROV Super compact Bespoke Design Bespoke Design Bespoke Design Traction & Storage Bespoke Design Bespoke Design Bespoke Design Example Example Example Example Example Example SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY SPOOLING CABLE CAPACITY FRONT 1.900 M - Ø28.6 FRONT 1.900 M - Ø0 FRONT 780 M - Ø16 RIGHT ANGLE 8.000 M - Ø9.53 FRONT 4.000 M - Ø5 RIGHT ANGLE 7.000 M - Ø14 DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL DRUM UMBILLICAL Ø 1.200 mm YES Ø 700 mm YES Ø 460 mm YES Ø 1.250 mm YES Ø 800 mm NO Ø 900 mm YES AHC AHC AHC AHC AHC AHC NO NO NO YES NO NO 14 15 DIVE SYSTEM HANDLING Moonpool and Deck mounted Diving Support Module located on deck. Dive handling systems from SH Group meets the The DSM is a unit comprising of 4 A-frames, highest standards for performance, reliability and 2 Tugger winches and 4 Hose reels. safety. We design over-the-side systems and state- The DSM is a self-contained unit including of-the-art twin bell moonpool systems for SDC. The electrical power cabinet, hydraulic supply/ systems can contain A-Frame, Winch, Sheave Units, valves/handles/joysticks, socket outlets Moonpool cursors, Umbilical Service Winch, Umbilical and lightning with switches. Shock Absorber and HPU´s. Design, production, assembly and testing is carried out in Denmark. This is done deliberately in order to ensure optimum control of quality and functionality for each individual delivery, hence reducing installation and testing time on site. Deck mounted Diving Support Module 16 17 DIVE SYSTEM OUR SYSTEM DELIVERY 4 7 Our delivery supports the 24 man twin-bell diving system installed HANDLING on board DSV Deep Explorer, a DP3 1 3 5 6 class diving support vessel with a state-of-the-art dive control system. 1 1. Passive Cursor Frame and 3. Hydraulic support arms for SDC 3 8 Telescopic trunk to diver´s quaters 9 4 5 6 2 2 4. Shock Absorber 5. Umbilical Shock Absorber 6. Redundant HPU´s 7 8 9 Moonpool Dive Handling system 7. Umbilical Service Winch 8. 3 pcs. SDC lift winches 9. ? 18 19 CABLE ENGINES Cable laying is a complex task, because of the low tolerances on cable elongation. Dynamic forces such as cable weight in water, bottom tension caused by negative slack, and vessel speed, affect the elongation of the cable, thus the tension on the cable must be controlled at all times. SH Groups 4-track and 2-track tensioners are designed to give the best possible effectiveness, by using a feed-back loop to adjust the tension on the cable. This way we control the effects of the dynamic forces with our products. 4 Track Cable Engine 2 Track Cable Engine Drive: Electrical/Hydraulic Drive: Electrical/Hydraulic Cable diameters: ø50mm – ø800mm Cable diameters: ø20mm – ø500mm Speed: 0 – 1.000 m/h Speed: 0 – 1.000 m/h 20 21 CABLE ENGINES Carousels / Turntables Drive: Electrical/Hydraulic Cable diameters: ø50mm – ø800mm Speed: 0 – 1.000 m/h High Speed Wheel Tensioner Reel Drive Systems Drive: Electrical/Hydraulic Drive: Electrical/Hydraulic Cable diameters: ø20mm – ø500mm Cable diameters: ø50mm – ø800mm Speed: 0 – 11.000 m/h Speed: 0 – 1.000 m/h 22 23 LIFEBOAT AND RESCUE BOAT SYSTEMS NORSOK (R-002) SOLAS Artic System The Xervo™ NORSOK system is the top of the line. The Xervo™ SOLAS system has been developed on the For extreme environment, Xervo™ offers the Arctic The specification includes not less than four winch basis of the original Xervo design. The goal has been to upgrade as per the new IMO Polar Code. Implemented Brakes, mode-selector where the user can choose achieve the best possible safety level while complying 1. jan. 2017 to both SOLAS and NORSOK systems. between training and emergency modes for with commercial and regulatory requirements. The Specification is compliant with classification optimized safety in all situations, and use of standards for Arctic operation. redundancy and back-up systems. The system has been developed using risk assess- ments and our knowledge base from existing pro- The system includes: The result is a superior safety level with purely jects complying with the NORSOK safety standard.