Metro a Line Schedule
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
中國中車股份有限公司 CRRC CORPORATION LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 1766)
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國中車股份有限公司 CRRC CORPORATION LIMITED (a joint stock limited company incorporated in the People’s Republic of China with limited liability) (Stock Code: 1766) ANNOUNCEMENT ON CONNECTED TRANSACTION ESTABLISHMENT OF A PROJECT COMPANY IN RELATION TO PPP PROJECT The Board hereby announces that, CRRC Construction Engineering, Suzhou CRRC Construction Engineering and Times Electric (all of which are subsidiaries of the Company) formed a Consortium with CRRC GROUP, Construction and Investment Company and City Investment Fund Management Company and jointly participated in the tender of Wuxi-Jiangyin Intercity Railway Construction PPP Project. The tender award notification of such project was received on 8 October 2019. ESTABLISHMENT OF PROJECT COMPANY On 19 December 2019, CRRC Construction Engineering, Suzhou CRRC Construction Engineering and Times Electric (all of which are subsidiaries of the Company) formed a Consortium with CRRC GROUP, Construction and Investment Company and City Investment Fund Management Company and entered into the Investment Agreement with Government Implementation Authorities of the PPP Project as well as the Shareholders’ Agreement with Government Funding Representatives, respectively. Pursuant to such agreements, the Consortium and Government Funding Representatives would establish the Project Company with joint capital contribution to invest in PPP Project. Upon establishment of the Project Company, CRRC Construction Engineering, Suzhou CRRC Construction Engineering, Times Electric, CRRC GROUP, Construction and Investment Company and City Investment Fund Management Company will hold 5.48%, 1%, 4%, 0.1%, 2.4% and 67.02%, respectively of the equity interests of the Project Company. -
Annual Report 2019 Mobility
(a joint stock limited company incorporated in the People’s Republic of China with limited liability) Stock Code: 1766 Annual Report Annual Report 2019 Mobility 2019 for Future Connection Important 1 The Board and the Supervisory Committee of the Company and its Directors, Supervisors and Senior Management warrant that there are no false representations, misleading statements contained in or material omissions from this annual report and they will assume joint and several legal liabilities for the truthfulness, accuracy and completeness of the contents disclosed herein. 2 This report has been considered and approved at the seventeenth meeting of the second session of the Board of the Company. All Directors attended the Board meeting. 3 Deloitte Touche Tohmatsu CPA LLP has issued standard unqualified audit report for the Company’s financial statements prepared under the China Accounting Standards for Business Enterprises in accordance with PRC Auditing Standards. 4 Liu Hualong, the Chairman of the Company, Li Zheng, the Chief Financial Officer and Wang Jian, the head of the Accounting Department (person in charge of accounting affairs) warrant the truthfulness, accuracy and completeness of the financial statements in this annual report. 5 Statement for the risks involved in the forward-looking statements: this report contains forward-looking statements that involve future plans and development strategies which do not constitute a substantive commitment by the Company to investors. Investors should be aware of the investment risks. 6 The Company has proposed to distribute a cash dividend of RMB0.15 (tax inclusive) per share to all Shareholders based on the total share capital of the Company of 28,698,864,088 shares as at 31 December 2019. -
Jiangsu(PDF/288KB)
Mizuho Bank China Business Promotion Division Jiangsu Province Overview Abbreviated Name Su Provincial Capital Nanjing Administrative 13 cities and 45 counties Divisions Secretary of the Luo Zhijun; Provincial Party Li Xueyong Committee; Mayor 2 Size 102,600 km Shandong Annual Mean 16.2°C Jiangsu Temperature Anhui Shanghai Annual Precipitation 861.9 mm Zhejiang Official Government www.jiangsu.gov.cn URL Note: Personnel information as of September 2014 [Economic Scale] Unit 2012 2013 National Share (%) Ranking Gross Domestic Product (GDP) 100 Million RMB 54,058 59,162 2 10.4 Per Capita GDP RMB 68,347 74,607 4 - Value-added Industrial Output (enterprises above a designated 100 Million RMB N.A. N.A. N.A. N.A. size) Agriculture, Forestry and Fishery 100 Million RMB 5,809 6,158 3 6.3 Output Total Investment in Fixed Assets 100 Million RMB 30,854 36,373 2 8.2 Fiscal Revenue 100 Million RMB 5,861 6,568 2 5.1 Fiscal Expenditure 100 Million RMB 7,028 7,798 2 5.6 Total Retail Sales of Consumer 100 Million RMB 18,331 20,797 3 8.7 Goods Foreign Currency Revenue from Million USD 6,300 2,380 10 4.6 Inbound Tourism Export Value Million USD 328,524 328,857 2 14.9 Import Value Million USD 219,438 221,987 4 11.4 Export Surplus Million USD 109,086 106,870 3 16.3 Total Import and Export Value Million USD 547,961 550,844 2 13.2 Foreign Direct Investment No. of contracts 4,156 3,453 N.A. -
Bus Rapid Transit (BRT) and Light Rail Transit
Bus Rapid Transit (BRT) and Light Rail Transit (LRT) Performance Characteristics Stations Mixed Traffic Lanes* Service Characteristics Newest Corridor End‐to‐End Travel Departures Every 'X' Travel Speed (MPH) City Corridor Segment Open length (mi) # Spacing (mi) Miles % Time Minutes BRT Systems Boston Silver Line Washington Street ‐ SL5 2002 2.40 13 0.18 1.03 42.93% 19 7 7.58 Oakland San Pablo Rapid ‐ 72R 2003 14.79 52 0.28 14.79 100.00% 60 12 14.79 Albuquerque The Red Line (766) 2004 11.00 17 0.65 10.32 93.79% 44 18 15.00 Kansas City Main Street ‐ MAX "Orange Line" 2005 8.95 22 0.41 4.29 47.92% 40 10 13.42 Eugene Green Line 2007 3.98 10 0.40 1.59 40.00% 29 10 8.23 New York Bx12 SBS (Fordham Road ‐ Pelham Pkwy) 2008 9.00 18 0.50 5.20 57.73% 52 3 10.38 Cleveland HealthLine 2008 6.80 39 0.17 2.33 34.19% 38 8 10.74 Snohomish County Swift BRT ‐ Blue Line 2009 16.72 31 0.54 6.77 40.52% 43 12 23.33 Eugene Gateway Line 2011 7.76 14 0.55 2.59 33.33% 29 10 16.05 Kansas City Troost Avenue ‐ "Green Line" 2011 12.93 22 0.59 12.93 100.00% 50 10 15.51 New York M34 SBS (34th Street) 2011 2.00 13 0.15 2.00 100.00% 23 9 5.22 Stockton Route #44 ‐ Airport Corridor 2011 5.50 8 0.69 5.50 100.00% 23 20 14.35 Stockton Route #43 ‐ Hammer Corridor 2012 5.30 14 0.38 5.30 100.00% 28 12 11.35 Alexandria ‐ Arlington Metroway 2014 6.80 15 0.45 6.12 89.95% 24 12 17.00 Fort Collins Mason Corridor 2014 4.97 12 0.41 1.99 40.00% 24 10 12.43 San Bernardino sbX ‐ "Green Line" 2014 15.70 16 0.98 9.86 62.79% 56 10 16.82 Minneapolis A Line 2016 9.90 20 0.50 9.90 100.00% 28 10 21.21 Minneapolis Red Line 2013 13.00 5 2.60 2.00 15.38% 55 15 14.18 Chapel Hill N‐S Corridor Proposed 8.20 16 0.51 1.34 16.34% 30 7.5 16.40 LRT Systems St. -
00 Month Year
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. (Singapore Registration No.: 200009758W) (Incorporated in Singapore with limited liability) (Hong Kong Stock Code: 1021) (Singapore Stock Code: 5EN) OVERSEAS REGULATORY ANNOUNCEMENT INSIDE INFORMATION This announcement is issued pursuant to Part XIVA of the Securities and Futures Ordinance and Rules 13.09 and 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. Please refer to the attached news release on the next page which has been published by Midas Holdings Limited (the “Company”) on the website of the Singapore Exchange Securities Trading Limited on 11 October 2017. On behalf of the Board Midas Holdings Limited Chew Hwa Kwang, Patrick Executive Director and Chief Executive Officer Hong Kong, 11 October 2017 As at the date of this announcement, the executive directors of the Company are Mr. Chen Wei Ping and Mr. Chew Hwa Kwang, Patrick; and the independent non- executive directors of the Company are Mr. Chan Soo Sen, Dr. Xu Wei Dong and Mr. Tong Din Eu. (Singapore Registration No.: 200009758W) NEWS RELEASE MIDAS’ JV UNIT NPRT CLINCHES THREE METRO TRAIN CONTRACTS WORTH RMB2.37 BILLION Singapore & Hong Kong, 11 October 2017 – Midas Holdings Limited (麦达斯控股有 限公司) (“Midas” or the “Company”, together with its subsidiaries, the “Group”; SGX- ST stock code: 5EN; SEHK stock code: 1021) is pleased to announce that its joint venture company, CRRC Nanjing Puzhen Rail Transport Co., Ltd. -
Status of External Contracts Signed from January 2018 to December 2018
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. China Railway Signal & Communication Corporation Limited* 中國鐵路通信信號股份有限公司 (A joint stock limited liability company incorporated in the People’s Republic of China) (Stock Code: 3969) STATUS OF EXTERNAL CONTRACTS SIGNED FROM JANUARY 2018 TO DECEMBER 2018 This announcement is made pursuant to Rule 13.09 of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited and the Inside Information Provisions under Part XIVA of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong). In order to enable the shareholders and potential investors of China Railway Signal & Communication Corporation Limited* (the “Company”) to have a better understanding on the recent business performance of the Company and its subsidiaries (the “Group”), the Company hereby announces the status of external contracts signed from January 2018 to December 2018. As of 31 December 2018, the total aggregate amount of external contracts signed by the Group was RMB68.29 billion, representing an increase of 12.4% over the same period in 2017. In particular, the total amount of external contracts signed by the Group in the railway sector was RMB25.08 billion, representing -
Bus Schedule in El Paso Tx
Bus Schedule In El Paso Tx Needier and defenseless Gil always fractionises blatantly and praises his bluecoats. Baird uptearing not. Clean-cut Jeremy bodge very segmentally while Mace remains uncapped and tippiest. EL PASO 1159 AM ROSWELL View upcoming trip schedules next bus 1015 PM. Routing number identifies the perfect el paso county jail annex top of your browsing experience with at the south toward portland? Passengers should be volatile the lookout for a Amistad branded bus. Patrick crusius was convenient for bus schedule in el paso tx. Walmart store in bus schedule in el paso tx. In el paso police officer arreola, news from detroit, activities or less on the only your information about el. We do is. The mission statement of the heart of El Paso Parks Recreation his is possible provide indoor and justice leisure services to persons of all ages so car can. Martin luther king, bus schedule in el paso tx depends on which cities around you be necessary when traveling for. As of bus schedule in el paso tx. TX El Paso TXSanta Teresa NM Zone Forecast TheHour. Have some providers helps young people? Selecciona una dirección de caso, please enter numbers? Route 0 EPCC Express yet provide express offer from El Paso Community. Kiosk El Paso from multiple carriers with ease. Length 145 miles Beginning its route Downtown Transit Center advantage of route Mission Valley Transit Center roll number of buses 14 Number of stations 29. Try building new Trip Planner to get scheduled and real-time bus information on your. Jiquilpan de tapia, tx have an external web part page? Like with you spare just type. -
METRO B Line Update and Preliminary Recommendations
METRO B Line Update and Preliminary Recommendations Adam Smith, Senior Planner, BRT Projects Katie Roth, Manager, Arterial BRT Metro Transit October 28, 2019 1 B Line (Lake Street/Marshall Avenue) BRT • Planned 4th arterial bus rapid transit line • Substantial replacement of Route 21, region’s second-highest ridership but slowest in-service speed • 8.2-mile corridor (12.6 miles with potential extension to downtown St. Paul) • Service every 10 minutes, approximately 20% faster than existing Route 21 • Targeted opening 2023, pending full project funding • $26 million identified to date; budget to be updated following corridor definition 2 B Line initial planning questions • Should the B Line extend to downtown St. Paul? • If the B Line is extended to downtown St. Paul, how should it be routed? • Where should stops be placed to best balance speed and access? • Related question: based on the above, what should be the overall mix of service in the corridor? 3 B Line preliminary recommendations • Extend the B Line to Union Depot in downtown Saint Paul • Route the B Line along Marshall, Snelling, and Selby Avenues • 33 preliminary B Line station locations • Retain local service on Route 21 between Hennepin Avenue and Minnehaha Avenue; continue study of local bus service options between Midway, Selby Avenue, and downtown Saint Paul 4 Context for recommendations: existing bus service levels Service every 7-13 minutes during rush hour Service every 15-18 minutes during rush hour Service every 8-13 minutes midday/evening Service every 16-22 minutes -
Trams Der Welt / Trams of the World 2021 Daten / Data © 2021 Peter Sohns Seite / Page 1
www.blickpunktstrab.net – Trams der Welt / Trams of the World 2021 Daten / Data © 2021 Peter Sohns Seite / Page 1 Algeria ... Alger (Algier) ... Metro ... 1435 mm Algeria ... Alger (Algier) ... Tram (Electric) ... 1435 mm Algeria ... Constantine ... Tram (Electric) ... 1435 mm Algeria ... Oran ... Tram (Electric) ... 1435 mm Algeria ... Ouragla ... Tram (Electric) ... 1435 mm Algeria ... Sétif ... Tram (Electric) ... 1435 mm Algeria ... Sidi Bel Abbès ... Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF ... Metro ... 1435 mm Argentina ... Buenos Aires, DF - Caballito ... Heritage-Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Lacroze (General Urquiza) ... Interurban (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Premetro E ... Tram (Electric) ... 1435 mm Argentina ... Buenos Aires, DF - Tren de la Costa ... Tram (Electric) ... 1435 mm Argentina ... Córdoba, Córdoba ... Trolleybus Argentina ... Mar del Plata, BA ... Heritage-Tram (Electric) ... 900 mm Argentina ... Mendoza, Mendoza ... Tram (Electric) ... 1435 mm Argentina ... Mendoza, Mendoza ... Trolleybus Argentina ... Rosario, Santa Fé ... Heritage-Tram (Electric) ... 1435 mm Argentina ... Rosario, Santa Fé ... Trolleybus Argentina ... Valle Hermoso, Córdoba ... Tram-Museum (Electric) ... 600 mm Armenia ... Yerevan ... Metro ... 1524 mm Armenia ... Yerevan ... Trolleybus Australia ... Adelaide, SA - Glenelg ... Tram (Electric) ... 1435 mm Australia ... Ballarat, VIC ... Heritage-Tram (Electric) ... 1435 mm Australia ... Bendigo, VIC ... Heritage-Tram -
5G for Trains
5G for Trains Bharat Bhatia Chair, ITU-R WP5D SWG on PPDR Chair, APT-AWG Task Group on PPDR President, ITU-APT foundation of India Head of International Spectrum, Motorola Solutions Inc. Slide 1 Operations • Train operations, monitoring and control GSM-R • Real-time telemetry • Fleet/track maintenance • Increasing track capacity • Unattended Train Operations • Mobile workforce applications • Sensors – big data analytics • Mass Rescue Operation • Supply chain Safety Customer services GSM-R • Remote diagnostics • Travel information • Remote control in case of • Advertisements emergency • Location based services • Passenger emergency • Infotainment - Multimedia communications Passenger information display • Platform-to-driver video • Personal multimedia • In-train CCTV surveillance - train-to- entertainment station/OCC video • In-train wi-fi – broadband • Security internet access • Video analytics What is GSM-R? GSM-R, Global System for Mobile Communications – Railway or GSM-Railway is an international wireless communications standard for railway communication and applications. A sub-system of European Rail Traffic Management System (ERTMS), it is used for communication between train and railway regulation control centres GSM-R is an adaptation of GSM to provide mission critical features for railway operation and can work at speeds up to 500 km/hour. It is based on EIRENE – MORANE specifications. (EUROPEAN INTEGRATED RAILWAY RADIO ENHANCED NETWORK and Mobile radio for Railway Networks in Europe) GSM-R Stanadardisation UIC the International -
East-West Corridor High Capacity Transit Plan Rapid Transit Evaluation Results
East-West Corridor High Capacity Transit Plan Rapid Transit Evaluation Results About the Corridor The AECOM consultant team conducted a high-level analysis of commuter rail, light rail transit (LRT), streetcar and bus rapid transit (BRT) to determine the most appropriate mode for the East- West Corridor. Based on the corridor fit, ridership capacity, cost per mile to build/operate and available right-of-way, BRT will move forward for more detailed analysis. This fact sheet provides, in more detail, how BRT and LRT compared and why BRT was determined to be the best fit. BRT with LRT Screening Results Below are the similarities and differences between bus rapid transit (BRT) and light rail transit (LRT). Features Bus Rapid Transit (BRT) Light Rail Transit (LRT) Service Frequency Frequent service during peak hrs. (5–15 min.) Frequent service during peak hrs. (5–15 min.) Typical Corridor Length 5–25 mi. 10–20 mi. Range of Operating Speed 25–55 MPH 30–55 MPH Right-of-Way Dedicated lanes and/or mixed traffic Dedicated lanes with overhead electrical systems Typical Station Spacing ½ and one mile apart One mile apart, outside of downtowns Level boarding at high-quality stations Level boarding at high-quality stations Vehicle Types 40- or 60-ft. buses that have multiple doors 1–3 car trains; low floor vehicles Technology Traffic signal priority Traffic signal priority Real-time passenger info Real-time passenger info Off-board fare payment Off-board fare payment Typical Operating Cost per Hr. $100–$200 $200–$400 Typical Capital Cost per Mi. $2.5 million–$20 million $140 million+ Ridership Capacity by Mode Best Poor Current East-West Corridor Ridership (6.9k–8.7k riders) Modern Streetcar Light Rail Transit (1.5k–6k riders) (20k–90k riders) Bus Rapid Transit (4k–15k riders) Commuter Rail (3k–20k riders) Ridership Mode Capacity by 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 The chart above demonstrates that BRT and commuter rail both have the needed capacity to meet ridership needs. -
Support Material Agenda Item No
Support Material Agenda Item No. 17 Board of Directors Meeting November 4, 2020 10:00 AM MEETING ACCESSIBLE VIA ZOOM AT: https://gosbcta.zoom.us/j/99354182777 Teleconference Dial: 1-669-900-6833 Meeting ID: 993 5418 2777 CONSENT CALENDAR Transit 17. Task 3: Innovative Transit Review of the Metro-Valley Receive and file Task 3: Innovative Transit Review of the Metro-Valley Report. Task 3: Innovative Transit Review Report is being provided as a separate attachment. SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY CONSOLIDATION STUDY AND INNOVATIVE TRANSIT REVIEW TASK 3—INNOVATIVE TRANSIT ANALYSIS AND CONCEPTS OCTOBER 1, 2020 This page intentionally left blank. CONSOLIDATION STUDY AND INNOVATIVE TRANSIT REVIEW TASK 3—INNOVATIVE TRANSIT ANALYSIS AND CONCEPTS SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY SUBMITTAL (VERSION 2.0) PROJECT NO.: 12771C70, TASK NO. 3 202012771C70, TASK NO. 3 2020 DATE: OCTOBER 1, 2020 WSP SUITE 350 862 E. HOSPITALITY LANE SAN BERNARDINO, CA 92408 TEL.: +1 909 888-1106 FAX: +1 909 889-1884 WSP.COM This page intentionally left blank. October 1, 2020 Beatriz Valdez, Director of Special Projects and Strategic Initiatives San Bernardino County Transportation Authority 1170 W. Third Street, 1st Floor San Bernardino, CA 92410 Dear Ms.Valdez: Client ref.: Contract No. C14086, CTO No. 70 Contract No. C14086, CTO No. 70 WSP is pleased to submit this Draft Task 3 Innovative Service Analysis and Concepts Report as part of the Consolidation Study and Innovative Transit Review. Upon receipt of comments from SBCTA and your partners, we will prepare and submit a final version of this report. Yours sincerely, Cliff Henke AVP/Project Leader, Global ZEB/BRT Coordinator XX/xx Encl.