Dhaka Water Supply Network Improvement Project – ICB Package 2.11 (DMA: 307, 320, 408 and 311) 1St Batch
Total Page:16
File Type:pdf, Size:1020Kb
Resettlement Plan Document stage: Updated Project number: 47254-003 September 2019 BAN: Dhaka Water Supply Network Improvement Project – ICB Package 2.11 (DMA: 307, 320, 408 and 311) 1st Batch Prepared by Dhaka Water Supply and Sewerage Authority, Government of Bangladesh for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 9 September 2019) Currency Unit – Tk Tk1.00 = $0.012 $1.00 = Tk 84.59 ABBREVIATIONS ADB –- Asian Development Bank AP – Affected Person ARIPA – Acquisition and Requisition of Immovable Properties Act ADD Average Daily Demand (water supply) BBS Bangladesh Bureau of Statistics BPL Below Poverty Level BGB Border Guard Bangladesh CRO – Complaint Receiving Officer CBO Community Based Organization DC – Deputy Commissioner DMA – District Metered Area DMC Development Member Countries DPHE Department of Public Health Engineering DPP Development Project Proforma DNCC Dhaka North City Corporation DTW Deep Tubewell DWASA Dhaka Water Supply and Sewerage Authority DWSNIP Dhaka Water Supply Network Improvement Project EMP – Environmental Management Plan FGD – Focus Group Discussion EMP Environmental Management Plan GoB Government of Bangladesh GRC – Grievance Redress Cell GRM – Grievance Redress Mechanism HDD Horizontal Directional Drilling HDPE High-Density Polyethylene HEED Health Education and Economic Development ICB International Competitive Bidding IR – Involuntary Resettlement IEE Initial Environmental Examination IRP Iron Removal plant IWM Institute of Water Modeling JVC Joint Verification Committee LGD – Local Government Division NGO Nongovernmental Organization NRW Non Revenue Water PB Pipe Bursting PDB – Power Development Board PIU – Project implementation unit PMU – Project Management Unit PVAC Property Valuation Advisory Committee PPTA – Project Preparatory Technical Assistance RAC – Resettlement Advisory Committee RAJUK Rajdhani Unnayan Kartripakkha RoW Right of Way 1 RF – Resettlement Framework RP – Resettlement Plan SSMR Social Safeguards Monitoring Report SPS – Safeguard Policy Statement ToR – Terms of Reference UPVC Unplasticized Polyvinyl Chloride WEIGHTS AND MEASURES Km - Kilometer m2 - Square Meter Mm - Millimeter m3 - Micrograms Per Cubic Meter 2 CONTENT CURRENCY EQUIVALENTS ....................................................................................................................................... 1 ABBREVIATIONS......................................................................................................................................................... 1 WEIGHTS AND MEASURES ....................................................................................................................................... 2 CONTENT ..................................................................................................................................................................... 3 EXECUTIVE SUMMARY .............................................................................................................................................. 4 TABLE 1:IR IMPACT BETWEEN CENSUS CONDUCTED ON NOV ’18 AND AUGUST ’19 IN 2.11 (1ST BATCH) ... 5 I. PROJECT DESCRIPTION ................................................................................................................................... 7 A. INTRODUCTION ................................................................................................................................................. 7 B. PROPOSED WATER NETWORK COMPONENTS ............................................................................................. 9 TABLE 2: MAJOR COMPONENT OF 4 DMAS UNDER PACKAGE ICB 2.11 ........................................................... 10 FIGURE 1: PROJECT LOCATION MAP WITH ZONE AND DMA LOCATIONS ........................................................ 12 FIGURE 2: PROJECT LOCATION MAP FOR 2.11 .................................................................................................... 13 II. SCOPE OF LAND ACQUISITION AND RESETTLEMENT ................................................................................ 14 A. METHODOLOGY, SCOPE OF LAND ACQUISITION AND IMPACTS. .............................................................. 14 B. INVOLUNTARY RESETTLEMENT AND IMPACT DURING CONSTRUCTION ................................................. 15 TABLE 3: DETAIL INVOLUNTARY RESETTLEMENT IMPACTS IN PACKAGE 2.11 ................................................ 18 TABLE 4: SUMMARY OF VULNERABLE HOUSEHOLD ........................................................................................... 19 III. SOCIOECONOMIC INFORMATION AND PROFILE OF AP .............................................................................. 21 IV. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION ....................................................... 22 V. GRIEVANCE REDRESS MECHANISM ............................................................................................................. 27 VI. POLICY AND LEGAL FRAMEWORK ................................................................................................................ 30 VII. ENTITLEMENTS, ASSISTANCE AND BENEFITS ............................................................................................ 31 A. TYPES OF LOSSES AND AFFECTED PERSON CATEGORY ......................................................................... 31 B. PRINCIPLES, LEGAL, AND POLICY COMMITMENTS ..................................................................................... 31 C. ENTITLEMENT .................................................................................................................................................. 32 TABLE 5: ENTITLEMENT MATRIX ............................................................................................................................ 33 VIII. RELOCATION AND INCOME RESTORATION .................................................................................................. 33 IX. RESETTLEMENT BUDGET .............................................................................................................................. 34 TABLE 6: COST FOR RP IMPLEMENTATION AS PER THE IDENTIFIED IMPACTS ............................................... 35 X. INSTITUTIONAL ARRANGEMENTS ................................................................................................................. 35 TABLE 7: INSTITUTIONAL ROLES AND RESPONSIBILITIES FOR SAFEGUARDS IMPLEMENTATION ............... 36 XI. IMPLEMENTATION SCHEDULE ....................................................................................................................... 37 TABLE 8: IMPLEMENTATION SCHEDULE ............................................................................................................... 37 XII. MONITORING AND REPORTING ..................................................................................................................... 38 APPENDIX 1: RECORDS OF PUBLIC CONSULTATIONS .............................................................................................. 39 APPENDIX 2: PHOTOGRAPHS OF IMPACT & FIELD ACTIVITIES ............................................................................... 57 APPENDIX 3: SOCIO-ECONOMIC DETAILS OF LIKELY AFFECTED PERSONS ........................................................ 71 APPENDIX 4: DETAILS OF ROAD/PIPE IN ICB 2.11 (DMA 307, 320, 311, AND 408) .................................................. 90 APPENDIX 5: RECORDS OF ROAD CUTTING PERMISSION .....................................................................................100 APPENDIX 6: GAZETTE ON MINIMUM WAGE ISSUED BY BANGLADESH GOVERNMENT ...................................103 APPENDIX 7: SAMPLE GRIEVANCE REGISTRATION FORM .....................................................................................109 APPENDIX 8: MONITORING FORMAT FOR SOCIAL SAFEGUARDS COMPLIANCE ...............................................111 APPENDIX 9: DRAFT LEAFLET FOR PROJECT INFORMATION DISCLOSURE .......................................................112 APPENDIX 10: AWARENESS FLAYER FOR POJECT INFORMATION DISCLOSURE ..............................................115 3 EXECUTIVE SUMMARY Dhaka Water Supply Network Improvement Project (DWSNIP) aims to improve provision of sustainable, reliable, and climate-resilient water supply in Dhaka city. It will enhance the distribution network efficiency gains achieved under two previous Asian Development Bank (ADB) financed projects to Dhaka Water Supply and Sewerage Authority (DWASA) for improving service delivery and capacity building.1 DWSNIP impact will be (i) safe drinking water made available for all urban population, which is aligned with the Seventh Five-Year Plan, 2016-2020,2 and (ii) coping with disaster and adapting to climate change and safeguard environment in the National Strategy for Water Supply and Sanitation.3 The outcome will be sustainable provision of more reliable, improved, and climate-resilient