Report Summary

Total Page:16

File Type:pdf, Size:1020Kb

Report Summary STATE TRANSPORTATION COMMISSION Summary of Public Participation Public Hearing Testimony for the 2011 Twelve Year Program Revised December 28, 2009 2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 Sample Report and Format Instructions This list reflects project requests or comments regarding the 2011 Twelve Year Program submitted at public hearings and through other written and electronic submissions to the State Transportation Commission during the fall of 2009. This list is sorted alphabetically by Planning Organization. Below is a sample of the State Transportation Commission Public Hearing Testimony list. Requested Presented Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 DVRPC MPO Chester Ms. Judy L. DiFilippo, Chairman Chester County Planning Commission French Creek Parkway Support 57659 1 1 2 2 $23,850 $45,300 Stated in the upper left corner of every page is the name of the Planning Partner. The County for which the testimony pertains is located along the left side of the page. The next line in the body of the report contains the name and organization of the testifier. After each testifier are a specific project(s) requests or comments. Each project is listed with six pieces of information placed in separate columns on the report. These are: REQUESTED ACTION – Is the action that the testifier would like to see happen to the project regarding its status in the Twelve Year Program. General categories of action are added, retain, advance, oppose, delete, and support. PRESENTED - If the Project was presented at a Scheduled Public Hearing a check is printed. PROJECT ID - Is a unique number given to a project list in the currently approved Twelve Year Program and the applicable project inventory system. CURRENT TYP PERIOD/ PE, FD, UTL, ROW, CON – Columns representing the following: PE= Preliminary Engineering, FD= Final Design, UTL= Utilities, ROW= Right-of-Way, CON= Construction phases of the project displayed in which period 1st , 2nd or 3rd four years of the currently approved Twelve Year Program the phase is scheduled (if applicable). TOTAL PROGRAM $(000) -The total cost in thousands of the project in the current approved Twelve Year Program. TOTAL ESTIMATED $(000) -The total estimated cost in thousands of the project as provided by the Testifier or from PennDOT’s Multi-Modal Project Management System i Table of Contents Adams RPO ‐‐‐ 1 Altoona MPO ‐‐‐ 2 Centre MPO ‐‐‐ 3 DVRPC MPO ‐‐‐ 5 Erie MPO ‐‐‐ 18 Franklin RPO ‐‐‐ 20 Harrisburg MPO ‐‐‐ 21 Johnstown MPO ‐‐‐ 23 Lancaster MPO ‐‐‐ 24 Lebanon MPO ‐‐‐ 25 Lehigh Valley MPO ‐‐‐ 25 NEPA RPO ‐‐‐ 26 North Central RPO ‐‐‐ 31 Northern Tier RPO ‐‐‐ 32 Northwest RPO ‐‐‐ 33 Reading MPO ‐‐‐ 37 Scranton ‐ Wilkes Barre MPO ‐‐‐ 39 SEDA COG RPO ‐‐‐ 41 Shenango Valley MPO ‐‐‐ 45 Southern Alleghenies RPO ‐‐‐ 46 SPC MPO ‐‐‐ 47 Williamsport MPO ‐‐‐ 53 York MPO ‐‐‐ 54 Revised 12/28/2009 Requested Presented: Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 Adams RPO Adams Mr. John Lawver, Borough Manager Borough of Gettysburg Gettysburg Gateway Transportation Support $7,000 Improvements Mr. John Lerew, Chairman Adams County Planning Commission Priority Projects for Adams County Support PA 116 Corridor Support US 15/30 Interchange Support US Route 15 Corridor Support US Route 30 Corridor Support Mr. Richard Schmoyer, AICP, Director Office of Planning and Development Regional Overview Support Mr. George A. Weikert, Commissioner Adams County Replace an orphan bridge (Belmont Road Bridge) Support $1,200 2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 1 of 54 Requested Presented: Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 Altoona MPO Blair Senator John H. Eichelberger, Jr., State Senator 30th Senatorial District 30th Senatorial District Transportation Priorities Support Mr. Joe Hurd, President/CEO Blair County Chamber Commerce Altoona Transportation Improvement Project Support Park Avenue Connector Support Plank Road Interchange Support Mr. Karl R. King, Greenway Coordinator Allegheny Ridge Corp. For Allegheny Ridge Corp. Enhancement Program Restoration Support Ms. Bonnie T. Lewis, Township Manager Logan Township For Logan Township Park Avenue Connector Support 22150 1 $7,410 $25,122 Mr. David McFarland, III, AICP,GISP, Interim Director Blair County Planning Commission Priority Projects Support Mr. Patrick M. Miller, Executive VP Altoona‐Blair County Development Corp. Downtown Altoona Parking Garage Support $7,000 Hollidaysburg Car Shop Access Improvement Support $5,000 Project Mr. Eric B. Prendergast, Supervisor/Roadmaster Blair Township Newry Lane Bike/Pedestrian Path Support $35 Mr. Phillip D. Sipes, Vice President Innovative Consulting Group For Blair Co Chamber of Commerce Altoona Pedestrian Facility Improvements Support $250 Altoona Transportation Improvement Project Support 62166 1 $100 $67,306 Park Avenue Connector Support 70035 111 $824 $20,964 Plank Road Interchange Support 22146 1 $12,897 $16,699 Mr. Eric Wolf, General Manager AMTRAN Altoona Blair County Dev Corp & Blair County Support Chamber Commerce Statewide Continuation of Act 44 Support 2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 2 of 54 Requested Presented: Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 Centre MPO Mr. Thomas P. Zilla, Senior Transportation Planner Centre County MPO State of the Transportation System Centre Mr. Dan Abruzzo, P.E., VP of Government Affairs CBICC Airport Connector Road ‐ From I‐99 Support Rt 322 between Seven Mountains and Mount Support Nittany Mr. Adam Brumbaugh, Township Manager College Township Millbrook Marsh Bikeway Support Park Avenue Corridor Improvements Support Mr. Douglas J. Erickson, Township Manager Patton Township For Patton Township Waddle Road Support 83541 1 $3,000 $18,250 Ms. Elizabeth A. Goreham, Council President Borough of State College Intermodal Transportation Center Support Mr. Ray Gutshall, Supervisor/Head Roadmaster Marion Township For Marion Township Route 26 Lick Run Bridge Support $1,800 Route 26 Section 147(Jacksonville Road) Support 85965 1 $250 $250 Betterment RT 26 (Jacksonville Road/Walnut Street) Support Betterment SR 80 Section B18 I‐99/I‐80 Support 3142 $131,874 SR80 Section A18‐I‐80/Rt 26 (Exit 163) Oppose 51466 $50,310 Mr. Albert G. Horvath, Senior VP for Finance Pennsylvania State University I‐80/I‐99 Interchange Support Keystone West Corridor Support Millbrook Marsh Bikeway Support $3,400 Park Avenue Corridor Improvements Support Public Transportation Improvements Support 2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 3 of 54 Requested Presented: Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 Continued ‐ Centre MPO Centre Mr. Albert G. Horvath, Senior VP for Finance Pennsylvania State University U.S. 322 from Seven Mtns to Mt. Nittany Support Expressway University Park Airport Access Support Ms. Betsey Howell, Executive Director Central PA Convention & Visitors Park Avenue Corridor Improvements Support Mr. James Meyer, Director Centre County Airport Authority Airport Connector Road Support Mr. John C. Spychalski, Chairman Centre Area Transp. Authority Public Transportation Funding Support Mr. Richard J. Wisniewski, President/CEO Mount Nittany Medical Center Widening of Park Avenue Support Mr. Ronald J. Woodhead, Director Centre Region Parks & Recreation Millbrook Marsh Bikeway Support Mr. Thomas P. Zilla, Senior Transportation Planner Centre County MPO Route 322 Corridor Safety Improvements Support 78994 111 11 $2,537 $2,475 SR 80 Sec A18 I‐80/SR 26 Local Access Support 51466 $50,310 Interchange SR 80 Sec B18 I‐99/I‐80 High Speed Interchange Support 3142 $131,874 2011 Twelve Year Transportation Program Public Hearing Testimony ‐ Summary By Planning Partner Revised 12/28/2009 ‐‐ Page 4 of 54 Requested Presented: Project PE FD UTL ROW CON Total Total Action ID Program Estimated $000 $000 DVRPC MPO Bucks Mr. Jeff Bartlett, Managing Director Bristol Township US Route 13 Redevelopment Phase 2 Support $2,300 Ms. Marilyn J. Becker, Mayor Chalfont Borough Council Bristol Road Extension Support 12923 122 22 $17,750 $16,900 Ms. Eileen M. Bradley, Township Manager New Britain Township For New Britain Township Bristol Road Extension Support 12923 122 22 $17,750 $16,900 Ms. Lynn T. Bush, Executive Director Bucks County Planning Commission For Bucks County Bristol Road Extension Project Support 12923 122 22 $17,750 $16,900 PA Turnpike / I‐95 Interchange Support 13347 1 $6,129 $1,126,880 Route 13 Project Support 47392 111 2 $31,045 $35,100 Mr. Joseph Czajkowski, Township Manager Newtown Township Newtown‐Yardley Road Support 57639 $1,000 Ms. Brandi Eng‐Rohrbach, Bethlehem & Stony Creek Branch Rail Support $200,000 Restoration Mr. Jon P. Frey, SEPTA R8 Newtown Commuter Rail reactivation Support $100,000 Mr. Paul R. Iverson, SEPTA R8 FOX CHASE‐NEWTOWN RAIL SERVICE Support $150,000 Ms. Marilyn Jacobson, Council Member Chalfont Borough Council Bristol Road Extension Support 12923 122 22 $17,750 $16,900 Mr. Peter LaMontagne, Council Member New Britain Borough For New Britain Borough Bristol Road Extension Project Support 12923 122 22 $17,750 $16,900 Ms. Stephanie J. Mason, Township Manager Doylestown Township Easton Road / South
Recommended publications
  • Ridge Pike Update
    SECTION C RIDGEImprovement Project PIKE in Plymouth UPDATE& Whitemarsh Townships ////////////////////// JUNE 2020 What is the Ridge Pike Improvement Project? Ridge Pike is a major roadway through The Ridge Pike Improvement reduce congestion. The project will Montgomery County dating back to Project in Plymouth and Whitemarsh also improve pedestrian safety and Pennsylvania’s colonial era, when it Townships will rebuild the road from transit accessibility by providing a connected Philadelphia and Reading. the bottom up, improve safety and continuous sidewalk along the road. Today, the county owns Ridge Pike between Philadelphia and Norristown, Project Area: Butler Pike to Crescent Avenue a stretch of road that passes through TPKE numerous suburban communities, GERMANTOWN PIKE ANIA connects to I-476 and provides an V alternative to I-76, the Schuylkill CRESCENT Expressway. It was originally pavedPENNSY inL AVE the 1930’s. EXPY Y Parts of Ridge Pike have not changed RIDGE PIKE much since the early 1900’s. Some sections were widened in the 1970’s or BUTLER PIKE as development occurred but much of this MID-COUNT portion of Ridge Pike needs extensive repair, additional travel lanes and drainage upgrades. Ridge Pike accommodates daily Whitemarsh Township traffic volumes of 30,000 vehicles, and thousands more when incidents on the Schuylkill Expressway divert traffic. HARMON RD The Ridge Pike reconstruction will provide numerous What are the project’s benefits? benefitsMontgomery to citizens, drivers and businesses, including: County 0 900 1,800
    [Show full text]
  • Maple Grove Transit 2016 “Expressbusservice”
    Maple Grove Transit 2016 “Express Bus Service” Customer Survey Report of Results December 2016 Prepared by: 2955 Valmont Road • Suite 300 • Boulder, Colorado 80301 • t: 303-444-7863 • www.n-r-c.com Maple Grove Transit “Express Bus Service” Customer Survey December 2016 Table of Contents Executive Summary ................................................................................................................... 1 Survey Background ...................................................................................................................4 Survey Results ...........................................................................................................................4 Appendix A: Verbatim Responses to Open-ended Survey Questions .................................... 34 Appendix B: Select Results Compared by Respondent Race/Ethnicity .................................. 92 Appendix C: Copy of Survey Questionnaire .......................................................................... 107 National Research Center, Inc. Report of Results Prepared by Maple Grove Transit “Express Bus Service” Customer Survey December 2016 List of Tables Table 1: Question 1................................................................................................................................................ 4 Table 2: Question 2 ............................................................................................................................................... 4 Table 3: Question 3 Compared by Question 1 ....................................................................................................
    [Show full text]
  • Transportation Plan
    CHAPTER EIGHT Transportation Plan Broadly defined, the transportation plan is a plan for the movement of people and goods throughout the township. More specifically, it documents township roadway classifications and traffic volumes, while providing recommendations on mitigating congestion and safety problems. It also examines alternative transportation modes such as public transit and pedestrian and bicycle pathways. With the degree to which the recommendations contained in this chapter are implemented, it would not only allow for the continued efficient flow of people and goods, but will also help to maintain and enhance the quality of life currently enjoyed in the township. This chapter is comprised of three main sections: roadways, public transit, and pedestrian/bicycle path- ways. Each section contains its own specific set of recommendations. Roadways The township’s original comprehensive plan of 1965 presents a bold, optimistic outlook on the future of Whitemarsh’s road network. Traffic congestion would be eliminated through the construction of new roads and bridges; expressways are envisioned bisecting the township and a bridge would provide a direct connec- tion to the Schuylkill Expressway. Hazardous intersections would be eliminated through improvements and realignments. An ambitious document, it is a reflection of a time when the answer to current woes was new construction that was bigger and therefore better. While the merits of new expressways and wider roads are still a debatable point, for the township it is moot. Despite the fact that this plan contained many valid ideas, most of the new roadway opportunities have been lost through subsequent development and a greater appre- ciation for older structures makes road widenings difficult.
    [Show full text]
  • Appendix IV: Regional Vision Project Lists for Southwestern Pennsylvania
    Appendix IV: Regional Vision Project Lists for Southwestern Pennsylvania IV-2: Projects Currently Beyond Fiscal Capacity Appendix IV-2: Projects Currently Beyond Fiscal Capacity The following projects are consistent with the Regional Vision of a world-class, safe and well maintained transportation system that provides mobility for all, enables resilient communities, and supports a globally competitive economy. While beyond current fiscal capacity, these projects would contribute to achievement of the Regional Vision. They are listed herein to illustrate additional priority projects in need of funding. Project Type Project Allegheny Port Authority of Allegheny West Busway BRT Extension – Downtown to County Pittsburgh International Airport Extend East Busway to Monroeville (including Braddock, East Pittsburgh, Turtle Creek) Improved Regional Transit Connection Facilities Enhanced Rapid Transit Connection – Downtown to North Hills Technological Improvements New Maintenance Garage for Alternative Fuel Buses Purchase of 55 New LRT Vehicles Park and Ride – Additional Capacity Pittsburgh International Airport Enlow Airport Access Road Related New McClaren Road Bridge High Quality Transit Service and Connections Clinton Connector US 30 and Clinton Road: Intersection Improvements Roadway / Bridge SR 28: Reconstruction PA 51: Flooding – Liberty Tunnel to 51/88 Intersection SR 22 at SR 48: Reconstruction and Drainage SR 837: Reconstruction SR 22/30: Preservation to Southern Beltway SR 88: Reconstruction – Conner Road to South Park SR 351: Reconstruction SR 3003 (Washington Pike): Capacity Upgrades SR 3006: Widening – Boyce Road to Route 19 Project Type Project Waterfront Access Bridge: Reconstruction Elizabeth Bridge: Preservation Glenfield Bridge: Preservation I-376: Bridge Preservation over Rodi Road Kennywood Bridge: Deck Replacement – SR 837 over Union RR Hulton Road Bridge: Preservation 31st Street Bridge: Preservation Liberty Bridge: Preservation Marshall Avenue Interchange: Reconstruction 7th and 9th St.
    [Show full text]
  • 2013 River Towns Report
    When the Pennsylvania Environmental Council (PEC) first launched the River Town Program in 2010, its goal was to help communities to recognize the river as an asset around which potential community and economic development could background occur, and thus be recognized as a resource worthy of protection. For PEC, this program has evolved into a model for PEC originally launched the River Town Program along the Allegheny River just north of Pittsburgh as a pilot to apply implementing collaborative solutions to environmental protection and restoration, by recognizing the inextricable links the strategies used successfully in previous asset-based community development initiatives in river towns. Models between the environment, the economy and quality of life. included the trail town initiatives along the Great Allegheny Passage and the C&O Canal Towpath, traditional Main Street Programs and others. This report describes the River Town process and highlights the successes of many of the communities who have participated in the program. The successes described are the work of many partners and the credit for all achievements “River Towns,” the communities bordering rivers throughout Pennsylvania, were founded as manufacturing centers belongs to the communities themselves. close to river and rail transportation. With the decline of manufacturing, these communities suffered both job loss and population decline as generations that once prospered working in industries next to the river were forced to leave to find jobs elsewhere. The River Town model seeks to improve the vitality, stability, sustainability and prosperity of communities, businesses and neighborhoods. This is the foundation upon which related economic development, including recreational tourism and environmental initiatives, such as stormwater management, trail development and clean energy projects are built.
    [Show full text]
  • Maple Hill Site Information Sheet
    Maple Hill Site Information Sheet Address: 3047 Spring Mill Road Plymouth Meeting, PA 19462 o Lots and sizes: . 17 Single Family Detached Dwellings . 2 Existing Estate Homes . 1 Existing Barn . Approximately .25 to .50 Acre Lots o Open Space Preserve . Dixon Meadow Preserve – parking is located off of Flourtown Road o Homeowner’s Association (HOA) . Estimated annual fee per unit per year $1,768.64 . One time capital contribution $1,000 o Taxes: . Real Estate taxes for Whitemarsh Township’s millage rate for 2018 is 27.2909, which includes property tax and school tax . Earned Income tax 1.25% of earned income o Public Schools . Ridge Park Elementary (Grades K-3) 610-825-1083 200 Karrs Lane, Conshohocken, PA 19428 . Colonial Elementary School (Grades 4-5) 610-941-0426 230 Flourtown Road, Plymouth Meeting, PA 19462 . Colonial Middle School (Grades 6-8) 610-275-5100 716 Belvoir Road, Plymouth Meeting, PA 19462 . Plymouth-Whitemarsh High School (Grades 9-12) 610-825-1500 201 E Germantown Pike, Plymouth Meeting, PA 19462 o Local Private Schools . Chabad Jewish Education Center 215-591-9310 1311 Fort Washington Avenue, Fort Washington, PA 19034 . Chelten Child Development Center 215-646-5596 1601 N. Limekiln Pike, Dresher, PA 19025 . Germantown Academy (215) 646-3300 340 Morris Rd, Fort Washington, PA 19034 . La Salle College High School 215-233-2911 8605 W Cheltenham Ave, Glenside, PA 19038 . Mount St. Joseph Academy 215-233-3177 120 E Wissahickon Ave, Flourtown, PA 19031 . Open Door Christian Academy 215-542-9795 1260 Fort Washington Avenue, Fort Washington, PA 19034 . Play and Learn (K Certified) 215-628-4184 6024 Butler Pike, Blue Bell, PA 19422 .
    [Show full text]
  • 1210 Main St Mt. Carmel BROCHURE
    Specialist in Commercial & Industrial Real Estate MIXED USE SPACE AVAILABLE FOR LEASE 1210 E. Ridge Pike | Plymouth | Montgomery County, PA 1,586 +/- SF Lower Level Space Conshohocken Bridgeport Lafayette Street Extension under construction to access new I476/276 Slip Ramp SITE Norristown Main Street 27,503 ADT Ridge Pike Blackhorse / Plymouth Twp 1 Mile 1,586 +/- SF: Lower Level Oce Professional Space AVAILABLE FOR LEASE Ready to be t out for tenant Popular Mt. Carmel Club has lower level space available for lease, previous tenant Public Sewer, Water, Gas, Central Air was a catering company. High traffic counts Pylon and Bldg Signage on Ridge Pike, minutes to all major highway systems, Public Transportation, minutes to 19 Parking Spaces, 17 additional Conshohocken, Bridgeport, King of Prussia, shared and Norristown. Less than a mile from the Very popular social / bocce club Montgomery County Court House, and 30 minutes to the Philadelphia International Zoned: Commercial Airport. Contact: Gene Mastrangelo 910 Germantown Pike, Plymouth Meeting, PA 19462 or Mike Mulroy 610-279-4000 / FAX: 610-275-6787 www.TORNETTA.com 610-279-4000 The foregoing information has been obtained from sources deemed to be reliable; however, no warranty or representation is made as to accuracy. This information is subject to errors, omissions, prior sale or lease, or withdrawal without notice. Specialist in Commercial & Industrial Real Estate AVAILABLE FOR LEASE Contact: 1210 E. Ridge Pike | Plymouth | Montgomery County, PA Gene Mastrangelo or Mike Mulroy 1,586 +/- SF Lower Level Space 610-279-4000 CARFAGNO CAR DEALERSHIP Property Line 284’ Lawn Driveway 26’ Parking Lot 24,000 SF Property Line 143’ 145’ 6” Frontage 6” 145’ Lawn 27,503 AADT27,503 Main Street / RidgeMain Pike Street Parking 128’ 61’ Banquet Hall Upper Level Meeting Room: Upper Level 40’ Basement Lower Level 26’ Bar Room: Lower Level 1,586 +/- SF AVAILABLE Side Walk The foregoing information has been obtained from sources deemed to be reliable; however, no warranty or representation is made as to accuracy.
    [Show full text]
  • Country State Business
    Spotted Lanternfly Permit Participants These Participants have been trained on and found to be compliant with standards listed in the Order of Quarantine and Treatment regarding Spotted Lanternfly for operating in the quarantine area. The companies listed here have agreed to participate in and comply with the terms and conditions of the Order of Quarantine and Treatment which is designed to stop the movement of Spotted Lanternfly within or out of the current quarantine zone. Country State Business Canada AB 1763579 ON INC Canada AB 624889 BC LTD Canada AB 9958169 CANADA INC/LOHGARH TRANSPORT Canada AB ADMIRAL MERCHANTS MOTOR FREIGHT Canada AB BCD AB TRANSPORT LTD Canada AB CANEDA TRANSPORT LTD Canada AB CARAVAN AB INC Canada AB CBS TRUCKING INC Canada AB CERTARUS LTD Canada AB CODE LOGISTICS LTD Canada AB DAY AND ROSS INC Canada AB GILBERT TRUCKING LTD Canada AB JJ TRANSPORT INC Canada AB LANDSTAR Canada AB LOADSAFE CROSSBORDER FREIGHT INC Canada AB LOADSAFE/SL TRANSPORT LTD Canada AB MULLEN TRUCKING CORP Canada AB NORD-DECK TRANSPORT INC Canada AB SNOWY OWL TRANSPORTATION Canada BC 1063282 BC LTD Canada BC BERRY AND SMITH TRUCKING LTD Canada BC I-5 LOGISTICS SERVICES LTD Canada BC INTERNATIONAL MACHINE TRANSPORT INC Canada BC KDMS HOLDINGS INC Canada BC LODEXO LOGISTICS INC Canada BC MAVEN TRANSPORT LTD Canada BC PISTON TRANSPORT LTD Canada BC POWERLANE LOGISTICS INC Canada BC SKY BLUE TRANSPORT Canada BC SRT LOGISTICS Canada BC SYER TRANSPORTATION SERVICES LTD Canada BC TEN FOUR TRUCKING Canada BC THE DAY & ROSS TRANSPORTATION GROUP
    [Show full text]
  • Enhancing the Connectivity of High Speed Rail in the Orlando-Tampa Corridor with Local Public Transportation Systems: Issues and Opportunities
    Enhancing the Connectivity Of High Speed Rail in the Orlando-Tampa Corridor with Local Public Transportation Systems: Issues and Opportunities January 2011 Final Report DISCLAIMER The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the information presented herein. This document is disseminated under the sponsorship of the Department of Transportation University Transportation Centers Program and the Florida Department of Transportation, in the interest of information exchange. The U.S. Government and the Florida Department of Transportation assumes no liability for the contents or use thereof. Enhancing the Connectivity Of High Speed Rail in the Orlando-Tampa Corridor with Local Public Transportation Systems: Issues and Opportunities Final Report Prepared for State of Florida Department of Transportation Public Transit Office 605 Suwannee Street, MS 30 Tallahassee, Florida 32399-0450 Project Manager: Nazih Haddad Prepared by (Rob Gregg and Justin Begley) National Center for Transit Research Center for Urban Transportation Research (CUTR) University of South Florida 4202 East Fowler Avenue, CUT100 Tampa, Florida 33620-5375 January 2011 BDK85, RPWO #977-24 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. 977-24 4. Title and Subtitle 5. Report Date Enhancing the Connectivity of High Speed Rail in the Orlando- January 2011 Tampa Corridor with Local Public Transportation Systems: Issues and Opportunities 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Rob Gregg and Justin Begley 2117-77928-00 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) National Center for Transit Research Center for Urban Transportation Research 11.
    [Show full text]
  • Tri-State Trails Initiative
    18 County Workshop Report PA/WV/OH DRAFT March 29, 2011 Tri-State Trails Initiative Tri-State Trails Initiative March 29, 2011 The National Park Service – River, Trails and Conservation Assistance Program Ohio and West Virginia Field Offices coordinated the Tri State Trail Workshop on Tuesday, March 29, 2011, from 12:30-5pm. The purpose of the meeting was to build upon efforts started in 2002 and continue to make connections across state lines, to work with multiple groups to update existing and proposed trail maps, identify gaps, communicate needs and concerns, share successes and challenges and continue local efforts as part of a larger system of linking trails. The focus was on trail corridors across three states and eighteen (18) counties bordering Pennsylvania, Ohio, and West Virginia. The counties included in Pennsylvania: Beaver, Crawford, Erie, Greene, Lawrence, Mercer, Washington; in Ohio: Ashtabula, Belmont, Columbiana, Jefferson, Mahoning, Monroe, Trumbull; and in West Virginia: Brooke, Hancock, Marshall, and Ohio. All types of trails were included in the discussion -- land and water trails, motorized and non-motorized trails. Within this report… Introductions notes – organizations represented and trail efforts Breakout groups - challenges, successes, key stakeholders, opportunities and next steps Combined challenges Combined next steps Plus/Delta of the workshop for future planning OrganizationsSpokesperson represented introduce groupsand contact represented information or absent but important 2 | Page Tri-State Trails Initiative March 29, 2011 Each county, from north to south was given five minutes to discuss what organizations are represented and briefly report on trail efforts. ASHTABULA (OH) Western Reserve Greenway is the northern end of Great Ohio Lake to River Greenway (GOLRG), and runs to the southern border to Trumbull and Mahoning.
    [Show full text]
  • 10B-FY2020-Budget-Adoption-FINALIZED.Pdf
    Report by Finance and Capital Committee (B) 03-28-2019 Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number: Resolution: Action Information 202068 Yes No TITLE: Adopt FY2020 Operating Budget and FY2020-2025 CIP PRESENTATION SUMMARY: Staff will review feedback received from the public and equity analysis on the FY2020 Proposed Budget and request approval of the Public Outreach and Input Report, FY2020 Operating Budget and FY2020-2025 Capital Improvement Program (CIP). PURPOSE: The purpose of this item is to seek Board acceptance and approval of the Public Outreach and Input Report and Title VI equity analysis, and the FY2020 Operating Budget and FY2020-2025 CIP. DESCRIPTION: Budget Priorities: Keeping Metro Safe, Reliable and Affordable The budget is built upon the General Manager/CEO's Keeping Metro Safe, Reliable and Affordable (KMSRA) strategic plan. Metro is making major progress to achieve the goals of this plan by ramping up to average capital investment of $1.5 billion annually, establishing a dedicated capital trust fund exclusive to capital investment, and limiting jurisdictional annual capital funding growth to three percent. Metro continues to encourage the U.S. Congress to reauthorize the Passenger Rail Investment and Improvement Act (PRIIA) beyond FY2020, which provides $150 million in annual federal funds matched by $150 million from the District of Columbia, State of Maryland, and Commonwealth of Virginia. In order to establish a sustainable operating model, Metro is limiting jurisdictional operating subsidy growth to three percent and deploying innovative competitive contracting. The items on the KMSRA agenda that remain to be completed include restructuring retirement benefits and creating a Rainy Day Fund.
    [Show full text]
  • Directions to Other Schools
    TO: Pottstown Fans Due to the requests for directions to schools from parents and dedicated Pottstown fans, we have compiled this booklet from our direction file. Please take into consideration that the number of traffic lights and landmarks may have changed over the years, and we would appreciate if you would contact our office (484-941-9842) if directions are incorrect or not clear. You can also get directions to schools by using the athletic schedule feature on the school web page on the Activities link. Thank you. Pat Connors, Director of Co-Curricular Activities ABINGTON HIGH SCHOOL, Highland Avenue, Abington, PA Take PA Turnpike East to Willow Grove Exit No. 27 Get off turnpike and take Rt. 611 South (Easton Road & then Old York Road) Follow Rt. 611 South into Willow Grove (Rt. 611 will bear left past Burger King) * st Stay on Rt. 611 past Boston Market to 1 Street after overpass- Jerico Road -Turn right (Fitzpatrick Funeral Home) Follow Jerico Road directly into Abington Junior/Senior High School Campus Bear to right around high school - Field House (dome shape) is in the back of school. FOOTBALL STADIUM: Continue from * Stay on Route 611 (Old York Road) to Susquehanna Road. There is a First Union Bank on left corner. Make a left onto Susquehanna Road, then past Retirement Community Apartment to the next road – Huntingdon Road. Make a left onto Huntington Road and Memorial park (football stadium) will be on your right. Stadium is on the corner of Susquehanna & Huntingdon. (Approximate travel time – 50 minutes from Spring-Ford.) ACADEMY PARK HIGH SCHOOL, 300 Calcon Hook Road, Sharon Hill, PA 19079 Route 422 Bypass East to Route 202 North to Route 76 East (Schuylkill Expressway), to Route 476 South (Blue Route) to I- 95 North.
    [Show full text]