Draft Annual Report for the Toronto Transit Commission for 2017

Total Page:16

File Type:pdf, Size:1020Kb

Draft Annual Report for the Toronto Transit Commission for 2017 For Action Draft Annual Report for the Toronto Transit Commission for 2017 Date: May 29, 2018 To: TTC Audit & Risk Management Committee From: Chief Financial Officer Summary Each year, the TTC prepares an Annual Report which provides a summary of key accomplishments for the year and the consolidated financial statements of the TTC and its subsidiaries. This report presents the non-financial statement information to be contained within the 2017 Annual Report. Note that the 2017 financial statements are being submitted to the Audit & Risk Management Committee for approval at this meeting through a separate report. Recommendations It is recommended that the TTC Audit and Risk Management Committee: 1. Approve the report. Implementation Points This report must be approved at the May 29, 2018 TTC Audit & Risk Management Committee Meeting to ensure timely publication and distribution of the 2017 Annual Report. Financial Summary There are no financial implications resulting from the adoption of this report. Equity/Accessibility Matters Once approved, TTC will post an AODA-compliant version of the 2017 Annual Report on the TTC website. Draft Annual Report for the TTC for 2017 Page 1 of 3 Decision History TTC’s Corporate Policy 6.2.0 Financial Reporting to the Board, paragraph 4.1 states that annual audited financial statements must be included in the TTC’s Annual Report. Furthermore, at its meeting on February 9, 2017, the TTC Audit & Risk Management Committee approved that the terms of reference of the Audit & Risk Management Committee, which includes a requirement to “review other sections of the annual report before release and consider the accuracy and completeness of the information” as set out in item 2 at: https://www.ttc.ca/About_the_TTC/Commission_reports_and_information/Committee_m eetings/Audit_Risk_Management/2017/February_9/Reports/2_TTC_Audit_%20and_Ris k_Management_Committee_Terms_Of_Referenc.pdf Issue Background The report presents the non-financial statement information to be contained within the 2017 Annual Report. Comments The attached 2017 Annual Report contains the following: 1. Chair’s Letter 2. CEO’s Statement 3. 10-Year Non-consolidated Financial and Operating Statistics 4. 2017 Corporate Communications Content 5. Management Directory – 2017 The 2017 Annual Report will be issued following approval of the consolidated financial statements at the June 12, 2018 TTC Board meeting. Contact Stephen Conforti, Head of Finance & Treasurer (416) 393-3654 [email protected] Signature Dan Wright Chief Financial Officer Draft Annual Report for the TTC for 2017 Page 2 of 3 Attachments Attachment 1 - 2017 TTC Draft Annual Report Draft Annual Report for the TTC for 2017 Page 3 of 3 2017 Annual Report Toronto Transit Commission Contents Chair’s Letter 3 The TTC Board 7 CEO’s Statement 9 Executive Team 13 Line 1 Extension opens to the public 15 Corporate Plan Achievements 2017 18 Consolidated Financial Statements of TTC 21 Year ended December 31, 2017 Notes to the Consolidated Financial Statements 29 for the Year ended December 31, 2017 Consolidated Financial Statements – 64 As at and for the Year ended December 31, 2017 Conventional System – 10 Year Non-Consolidated 66 Financial and Operating Statistics (Unaudited) Management Directory – December 31, 2017 69 TTC’s Line 1 Extension to York Region opened to the public on December 17, 2017. 2 | Toronto Transit Commission – Annual Report 2017 Chair’s Letter To: Mayor John Tory and Councillors of the City of Toronto As Chair of North America’s Transit System of the Year, it is my privilege to submit the 2017 Annual Report for the Toronto Transit Commission. It was a great honour for the TTC, Commissioners and all staff to accept the American Public Transportation Association’s award for Outstanding Public Transit System for 2017. The entire organization was proud to be recognized by our industry peers who selected the TTC for the monumental work that was achieved over the past five years to modernize the network on all fronts: Safety; Customer; People; Assets; Reputation; Financial Sustainability; and Growth. We improved all aspects of TTC service to achieve our vision of a transit system that makes Toronto proud. A year of significant accomplishments was capped off on December 15, Subway riders were 2017 as the TTC stood with our federal, provincial and municipal funding partners to celebrate the much-anticipated and long-awaited served by nine official opening of the Line 1 subway extension into Vaughan, in York more accessible Region. The 8.6-kilometre extension from Sheppard West to Vaughan stations – St Clair, Metropolitan Centre opened to the public two days later. It was truly a milestone for rapid transit in Toronto and neighbouring Woodbine, Coxwell York Region. The Toronto-York Spadina Subway Extension is the first and the six on the subway to cross the Toronto municipal boundary. It is also the first new extension. subway expansion to open in 15 years. Along with our funding partners, we are determined to see more major transit projects get built sooner in our great city. In 2017, we saw continued improvements in the planning and scheduling of TTC services. More than 250 schedule adjustments were made to the network last year. Many of these adjustments were aimed at improving overall performance and resulted in less overcrowding and more reliable service for customers. Subway riders were served by nine more accessible stations – St Clair, Woodbine, Coxwell and the six on the new extension. Our streetcar network saw nearly 60 new accessible cars in service and the bus network was reinvigorated by hundreds of new clean diesel buses. Over the next few years, we’re set to receive more than a thousand low-emission and zero-emission buses as the TTC accelerates its green bus procurement program. | 3 This is what the new TTC looks like: modern, accessible and connected. These improvements are all part of creating a better, more reliable public transit service for Toronto, which already carries well over half a billion people each year. I would like to thank Mayor Tory and Toronto City Council for their continued support for the TTC and public transit in Toronto. I would also like to thank my fellow Commissioners who served with me in 2017: Vice-Chair Alan Heisey Q.C., John Campbell (Ward 4 Etobicoke Centre), Mary Fragedakis (Ward 29 Toronto-Danforth), Vincent Crisanti (Ward 1 Etobicoke North), Deputy Mayor-East Glenn De Baeremaeker (Ward 38 Scarborough Centre), Joe Mihevc (Ward 21 St. Paul’s), Deputy Mayor-North Denzil Minnan-Wong (Ward 34 Don Valley East), and Rick Byers, Ron Lalonde and Joanne De Laurentiis. Lastly, thank you to the thousands of women and men at the TTC who work every day to keep our city moving. Sincerely, Josh Colle TTC Chair April 2017 4 | Toronto Transit Commission – Annual Report 2017 The Line 1 Extension has six accessible stations and is 8.6 kilometres in length. | 5 From Sheppard West (formerly Downsview) Station, the Line 1 Extension runs northwest through York University and north into York Region. 6 | Toronto Transit Commission – Annual Report 2017 The TTC Board As at December 2017 Josh Colle Alan Heisey Q.C. Chair Vice-Chair Commissioners Joanne De Rick Byers John Campbell Mary Fragedakis Vincent Crisanti Laurentiis Glenn Ron Lalonde Joe Mihevc Denzil De Baeremaeker Minnan-Wong | 7 The Line 1 Extension is the first subway expansion crossing the municipal boundary of Toronto. 8 | Toronto Transit Commission – Annual Report 2017 CEO’s Statement To: TTC Chair and Commissioners, Mayor John Tory and Councillors of the City of Toronto In 2017 we saw truly a transformative year for the TTC. We can all look back with pride at the results of our hard work and the unparalleled transit service that we delivered to the people of Toronto and beyond. I give tremendous credit to our dedicated and hard-working employees who build, maintain and operate a world-class and award-winning public transit network. Our first goal is to always provide great service to our customers – and that is what we achieved. As a result we can call ourselves North America’s Outstanding Public Transit System for 2017. We have accomplished a great deal to keep Toronto moving forward. From reversing service cuts and increasing service to making incredible strides on accessibility across the system, I’m proud of the efforts that we have made over the last five years. And our peers at the American Public Transportation Association have 2017 will be acknowledged it with Transit System of the Year honours. remembered for 2017 will be remembered for the grand opening of the Line 1 subway the grand opening extension to Vaughan. It was an awesome event that saw the launch of the newest stretch of track to our subway network since Line 4 of the Line 1 Sheppard opened in 2002. And for the first time the TTC subway subway extension reached across to serve our riders beyond Toronto’s border. to Vaughan. The extension is an incredible, state-of-the-art subway. Six beautiful and accessible stations feature a modern fare collection system, an abundance of unique public art, bike facilities and commuter parking. The line enables numerous new transit connections to help move commuters more seamlessly across the Greater Toronto Area with links to GO rail service, TTC, York Region Transit, Viva and Brampton bus services, and future connections to the Highway 407 Transitway and Finch West LRT. Even more impressive, the extension features state-of-the-art, communications-based train control, also known as Automatic Train Control, the modern signalling system that will enable the TTC to run trains closer together safely when it is fully fitted throughout Line 1 in the near future. | 9 It was a personal thrill to witness on the first day of service the first northbound and southbound trains deliver our funding partners to Pioneer Village Station for a celebratory Toronto-York greeting.
Recommended publications
  • Upper Canada Railway Society the Cover
    Upper Canada Railway Society The Cover Rapid transit comes to tbe suburbs I A westbound TTC Bloor-Danforth train is sbown bere on tbe newly-opened eastern extension of tbe subway, between Warden and Victoria Park Stations. It is skirting Bell's Busb Park and tbe Massey Creek Ravine — scenery wbicb no doubt newsletter comes as a pleasant surprise to many commuters formerly used to traffic jams on their way to work. See page 55. Number 268 May, 1968 — Ted Wickson Published monthly by the Upper Canada Railway Society, Inc., Box 122, Terminal A, Toronto, Ont. Coming Events James A. Brown, Editor ^xo:OT•^x•:•x•>x•:•>^>^^^^:•:•^^^^:^^ Regular meetings of the Society are held on the third Friday of each month (except July and August) at 589 Mt. Pleasant Road, Authorized as Second Class Matter by the Post Office Department, Toronto, Ontario. 8.00 p.m. Ottawa, Ont. and for payment of postage In cash. Members are asked to give the Society at least five weeks notice June 1: Steam excursion to Stratford, leaves Toronto of address changes. (Sat) at 0815 EDT. FARES: Adult S9.75; Child S5.00; Infant $1.00. June 9: A visit to tbe OERHA property at Rockwood is (Sun) being arranged. Write tbe Entertainment Com• Please address NEWSLETTER contributions to the Editor at mittee for details. 3 Bromley Crescent, Bramalea, Ontario. No responsibility is June 13: NOTE CHANGE OF DATE! assumed for loss or nonreturn of material. (Tburs) Outdoor meeting: A visit to CN's new Express Terminal at Toronto Yard, Keele Street at Hwy All other Society business, including membership Inquiries, should 7.
    [Show full text]
  • Service Improvements for 2002
    SERVICE IMPROVEMENTS FOR 2002 Subway Streetcars Buses RT October 2001 Service Improvements for 2002 - 2 - Table of contents Table of contents Summary................................................................................................................................................................4 Recommendations ..............................................................................................................................................5 1. Planning transit service ...............................................................................................................................6 2. Recommended new and revised services for the Sheppard Subway .......................................10 Sheppard Subway.................................................................................................................................................................................10 11 BAYVIEW – Service to Bayview Station...........................................................................................................................................10 25 DON MILLS – Service to Don Mills Station ....................................................................................................................................11 Don Mills/Scarborough Centre – New limited-stop rocket route ....................................................................................................11 Finch East – Service to Don Mills Station...........................................................................................................................................11
    [Show full text]
  • July 2018 Activity Calendar
    Activity Calendar July 2017 You must sign up for all activities www.studyquest.net/studentarea.htm Day Date Name Description Cost Meeting place Sun 1 ! Happy Canada Day!! ! Celebrate Canada's birthday at Downsview Park with live entertainment, games, face painting, Sun 1 Canada Day Celebration! FREE College Station @ 5PM and an incredible fireworks display! Mon 2 No Class today! See you on Tuesday! Kensington Market and Check out the delicious (and cheap!) food selection, art, crafts, live performances, and more! An Tu e s 3 FREE/ PYOW Quest Lounge @ 4PM China Town awesome place to pick up souvenirs! Watch the Toronto Blue Jays face off against the New York Mets! Experience the excitement of Wed 4 Blue Jays Game $30 Union Station @ 6:30PM watching a baseball game in Canada! Have a blast as you cheer for your favourite team! Come out to Quest’s first ever Karaoke event! Have fun and sing your heart out while your friends Thurs 5 Karaoke at Quest! FREE Quest Lounge @3PM cheer you on! Taste hamburgers from the best burger chefs in Toronto! Located on West Island! Come and enjoy Fri 6 BurgerMania on West Island! FREE/ PYOW Quest Lounge @3PM the live music, desserts, beer (19+), and of course, BURGERS! Vegetarian options also available. Come out to this Award winning event! Enjoy the non-stop Salsa dancing and latin music in the Sat 7 Salsa on Saint Clair Street FREE St. Clair Station @6PM streets alongside some of the best local and international entertainers! Afrofest Is the Largest Free African Music Festival In North America! Enjoy the incredible diversity Sun 8 Afrofest 2018 FREE Woodbine Station @4PM of African music while celebrating and learning about African culture.
    [Show full text]
  • Modernizing the Ttc – a New Approach to Communications, Community Relations and Property Coordination for Construction Projects Action Item
    Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. Resubmitted December 19,2012 MEETING DATE: November 21, 2012 SUBJECT: MODERNIZING THE TTC – A NEW APPROACH TO COMMUNICATIONS, COMMUNITY RELATIONS AND PROPERTY COORDINATION FOR CONSTRUCTION PROJECTS ACTION ITEM RECOMMENDATION It is recommended that the Commission: 1. Endorse the initiatives outlined in this report establishing the TTC’s new approach for public consultation, community relationships of property coordination for construction projects. 2. Note the actions that have already been implemented to address issues noted in the Ombudsman’s report to Council dated October 31, 2012. FUNDING The recommendations in this report do not have any financial implications. BACKGROUND In January 2012, the Engineering and Construction Branch and the former Transit Expansion Department (Transit City) were amalgamated and renamed the Engineering, Construction and Expansion Group (ECE). The new ECE Group includes the establishment of a separate dedicated department, Strategic Partnerships, responsible for managing communications, community relations and third party, including property requirements for TTC construction projects. This report provides an overview of the Strategic Partnerships activities. DISCUSSION The TTC Capital Program includes about 500 contracts over the next five years. Most of these projects involve maintenance and rehabilitation work related to the state of good repair within TTC facilities (carhouses and garages) that have little or no impact on the MODERNIZING THE TTC – A NEW APPROACH TO COMMUNICATIONS, COMMUNITY RELATIONS AND PROPERTY COORDINATION FOR CONSTRUCTION PROJECTS Page 2 public. Over the past several years there are an increasing number of construction projects that involve upgrades and enhancements to existing subway stations with more impact on adjacent communities and the 1.6 million people that use the TTC on a daily basis.
    [Show full text]
  • TTC Investigation Report
    Report October 2012 Tunnel Vision: An Investigation into the Toronto Transit Commission Second Exit Project at Donlands and Greenwood Stations Fiona Crean Ombudsman TABLE OF CONTENTS 1.0 Executive Summary ................................................................................................ 4 2.0 The Complaint ........................................................................................................ 7 3.0 The Investigation .................................................................................................... 7 4.0 The Facts 8 4.1 History of the Second Exit Project .................................................................. 8 4.1.1 TTC Reports ................................................................................................... 8 4.1.2 TTC's Preferred Options ................................................................................. 9 4.1.3 TTC Policy – Property Acquisition & Notification Protocol .............................. 9 4.2 Notice to Councillor and Community ............................................................. 10 4.2.1 Community Response to Notice ................................................................... 14 4.2.2 TTC's Response to Notice ............................................................................ 16 4.2.3 Community's Request for Information ........................................................... 17 4.2.4 TTC Meeting with the Owner of Property Y .................................................. 18 4.3 Community Information
    [Show full text]
  • Annual Report 1968
    TORONTO TRANSIT COMMISSION ANNUAL REPORT TO THE MUNICIPALITY OF METROPOLITAN TORONTO 1968 RALPH C. DAY TORONTO TRANSIT COMMISSION COMMISSIONERS RALPH C. DAY, Chairman FORD G. BRAND, Vice-Chairman D. F. HAMILTON J. T. FISHER, Commissioner D. F. HAMILTON, Commissioner b. C. SMYTH, Commissioner OFFICIALS JAMES H. KEARNS, General Manager of Operations W. H. PATERSON, General Manager--Subway Construction H. E. PETTETT, General Secretary R. G. WAITE, Assistant General Manager of Operations JAMES H. KEARNS L. 0. MORLEY, Treasurer 01!·· D. A. ELLIOTT, Q.C., General Counsel H. E. PETTETT . '\"'' J Wm. R. Alien, Esq., Q.C., Chairman And Members of the CGuncil of The Municipality of Metropolitan Toronto City Hall, TORONTO 100. Ladies and Gentlemen: ANNUAL REPORT- 1968 The high point of the year was the opening of the easterly and west­ erly extensions to the Bloor-Danforth subway. Formal opening ceremonies were held on May 10 and the extensions were opened for passenger service on Saturday, May 11. The easterly extension runs from Woodbine station to Warden station, at St. Clair and Warden Avenues in the Borough of Scarborough, a distance of 2.72 miles. The westerly extension runs from Keele station to Islington station, at Bloor Street West and Islington A venue in the Borough of Etobicoke, a distance of 3.44 miles. The two extensions increased the length of Metro's crosstown subway line to fourteen miles. Passenger response to the new subway extensions has been excellent. Subway riding increased by an estimated 7.7% over 1967. The subway extensions and the accompanying extensive surface route expansion helped to boost the total number of revenue passengers carried by the system to an all-time high, 323,481,655, an increase of 9,068,169 over the previous year.
    [Show full text]
  • Completed Monitoring Projects
    Frontop Engineering Limited 101 Amber Street, Units 1 & 2, Markham, Ontario, L3R 3B2, Canada Telephone: (905) 497-0900; Fax: (905) 305-9370 Website: www.frontop.ca; Email: [email protected] List of Our Completed Projects: Project 1: Name of Project: Government Canada - Injection Grouting of the Hasting Swing Bridge Replacement, Project Number R.055746.001, PWGSC Ontario. Location: Hasting Swing, Ontario, Canada Client: Public Works and Government Services Canada Main project features: Injection Grouting of the Hasting Swing Bridge Activities performed: install and monitoring following instrument Prepared the monitoring program for owner approve. Supply and installation ten (10) structures Monitoring Points and two (2) biaxial Tiltmeter and set up the automatic data collection and management system for monitoring during the injection grouting of the bridge. Project 2: Name of Project: TTC Lawrence West Station – Key Station Accessibility Project, Location: Toronto, Ontario, Canada Client: TTC Main project features: TTC Lawrence West Subway Station – Subway Station Renovation Work project. Activities performed: install and monitoring following instrument Prepared the geotechnical monitoring program for TTC approve. Prepared the noise and vibration monitoring program for TTC approve. Designed the monitoring instrumentation and installed two (2) inclinometers in soldier piles; Installed and monitored the one (1) real-time vibration stations and one (1) real-time noise control station; Precision survey and three dimensions monitoring data reporting for ten (10) surfaces monitoring for ground movement, subway slabs, buildings and shafts shoring system. Project 3: Name of Project: TTC – Wilson Yard Modifications - Site Services Stage 2, Phase 5 Location: Toronto, Ontario, Canada Client: TTC Main project features: Wilson Yard Modifications Construction Project.
    [Show full text]
  • Bloor Subway Extensions Bloor Shuttle - Keele Station to Jane Loop Inaugurated) Danforth Shuttle - Woodbine Station to Luttrell Loop Dundas North of Bloor
    TENTATIVE STREETCAR ROUTE ELIMINATION PROGRAMME Revised August 1966 DATE TENTATIVE ROUTE ELIMINATION 1968 (Bloor Subway Extensions Bloor Shuttle - Keele Station to Jane Loop Inaugurated) Danforth Shuttle - Woodbine Station to Luttrell Loop Dundas North of Bloor 1972 Dundas 1975 St. Clair Earlscourt Rogers Road - Converted to bus or trolley coach depending on completion dates for Spadina Subway 1978 Carlton 1980 (Queen Street Subway Balance of System inaugurated) (Bathurst, Queen, Long Branch, Kingston Road, King, Kingston Road Tripper) TENTATIVE STREETCAR ROUTE ELIMINATION PROGRAMME Revised August 1966 DATE STREET LOCATION 1968 Bloor Street Dundas to Jane (completed with opening of Bloor subway) Danforth Avenue Luttrell to Coxwell (completed with opening of Bloor- Danforth subway) Coxwell Avenue 100 feet (300 metres) north of Upper Gerrard to Danforth Avenue (compleed with opening of Bloor-Danforth subway) Dundas Street North of Dundas West Station to Runnymede Loop (completed with opening of Bloor subway) 1972 Bay Street South of Dundas including City Hall Loop (completed) Victoria Street Queen to Dundas (completed) 1975 Rogers Road Bicknell Loop to Oakwood (completed) Oakwood Avenue Rogers Road to St. Clair (completed) Keele Street Keele Loop to St. Clair (completed) St. Clair Keele to Mount Pleasant, except Wychwood to Bathurst (now part of the St. Clair streetcar dedicated right-of-way) Mount Pleasant St. Clair to Eglinton - Mount Pleasant Loop (completed) Old Weston Road St. Clair to Townsley Loop (completed) Robina Avenue St. Clair to Oakwood Loop (completed) 1976 Howard Park Ave. High Park Loop to Dundas Dundas Street Roncesvalles to Church College Street Dundas to Bathurst, Spadina to Parliament Ossington Avenue College to Dundas McCaul Street McCaul Loop to College Bay Street College to Dundas Church Street Carlton to Dundas Gerrard Street East Coxwell to Main Coxwell Avenue Lower Gerrard to 100 feet (30 metres) north of Upper Gerrard Main Street Gerrard to Main Loop Bathurst Street Hillcrest to St.
    [Show full text]
  • Retail for Sale Canvas Condos at the Corner of Danforth Ave & Morton Rd
    v 2301-2315 FOR SALE Danforth Avenue Retail For Sale Canvas Condos At the Corner of Danforth Ave & Morton Rd CBRE Limited, Real Estate Brokerage | 145 King Street West | Suite 1100 | Toronto, ON M5H 1J8 | 416 362 2244 | www.cbre.ca BRAND NEW DEVELOPMENT TRANSIT CONNECTED PROPERTY HIGHLIGHTS Currently under construction, Canvas Condos is an 8 Conveniently located, Canvas Condos is near accessible storey mixed-use building with 170 residential units public transportation with both the Woodbine and Main designed by Graziani + Corazza Architects. Street subway stations situated nearby. CBRE Limited is pleased to offer for sale on behalf of the Vendor, Danmor Developments Limited, ground floor retail space in Danforth Village. The Property is located at the base of the currently under-construction Canvas Condominium. The Property provides users and investors with an opportunity to acquire brand new, transit connected right-sized space. The property features 4,225 sq. ft. of commercial space below 170 residential units. 2301-2315 Danforth Avenue retail comprises of four units totalling 4,255 sq. ft. of prime retail space under a brand new 8 storey condominium building constructed by Marlin Springs. Located on the southwest corner of Danforth Avenue and Morton Road, this new development sits at the edge of the Danforth Village and adjacent to the Upper Beaches neighbourhood. AMAZING EXPOSURE USER OR INVESTOR OPPORTUNITY Fronting on Danforth Avenue this property has amazing The property lends itself as a unique opportunity for both exposure and very prominent and wide (over 180 ft.) investor or users to acquire right sized space. Purpose frontage on the corner built, condo retail space is ideal for a wide array of users who desire street front exposure as well as efficient floor *Price $425,000 - $2,899,999 space.
    [Show full text]
  • Smarttrack Ridership Analysis
    SMARTTRACK RIDERSHIP ANALYSIS PROJECT FINAL REPORT Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute Research Director, Travel Modelling Group University of Toronto James Vaughan & Monika Nasterska Travel Modelling Group, University of Toronto Transportation Research Institute June, 2016 i Executive Summary Project Objectives On December 11, 2014, City Council directed the City Manager in consultation with the Province/Metrolinx to develop a work plan to undertake an accelerated review of the SmartTrack and RER plans. Council also directed the City Manager to retain the specialized services of the University of Toronto Transportation Research Institute (UTTRI) to support the planning analysis and required transit ridership modelling as a component of the overall review.1 On February 10, 2015, City Council considered the report EX2.2 SmartTrack Work Plan (2015- 2016), and approved the accelerated work plan for the review of SmartTrack.2 The UTTRI component of this work was to provide transit ridership estimates and other key network performance measures using the City’s new Regional Travel Demand Model (GTAModel Version 4.0) developed at the University of Toronto by UTTRI. As detailed in the final Terms of Reference for the UTTRI work, this work included: • Confirming the integrated RER and SmartTrack Service Concept to be modelled. • Completion and validation of a new travel demand model system to be used by the City of Toronto in this and similar studies of transit ridership and travel demand. • Development and review of forecasting assumptions that provide key inputs into the transit ridership forecasts.
    [Show full text]
  • Scarborough Subway Extension Preliminary Design Business Case February 2020
    Scarborough Subway Extension Preliminary Design Business Case February 2020 Scarborough Subway Extension Preliminary Design Business Case February 2020 Contents Executive Summary 7 Scope 7 Method of Analysis 7 Findings 8 Recommendation 9 1 Introduction 10 Preliminary Design Business Case Scope and Objectives 11 Background 11 Business Case Overview 13 2 Problem Statement 15 Introduction 16 Case for Change 16 Business as Usual 16 Strategic Value 18 Strategic Outcomes 19 Strong Connections: 19 Complete Travel Experiences: 19 Sustainable and Healthy Communities: 19 Strategic Objectives 19 3 Investment Options 21 Introduction 22 iv Options Development 22 Summary of Assumptions Used in this Business Case for Analysis and Travel Demand Modelling 25 4 Strategic Case 26 Introduction 27 BENEFIT 1: Bring rapid transit closer to Scarborough residents 28 BENEFIT 2: Increase access to existing economic opportunities and support the important employment centre at Scarborough Centre 29 BENEFIT 3: Support planned development in Scarborough 33 Outcome 2: COMPLETE TRAVEL EXPERIENCES 35 BENEFIT 4: Improve Travel Time and Reliability 36 BENEFIT 5: Build an Integrated Transportation Network 40 Outcome 3: SUSTAINABLE AND HEALTHY COMMUNITIES 43 BENEFIT 6: Move People with Less Energy and Pollution 44 BENEFIT 7: Improve Quality of Life and Public Health 45 Strategic Case Summary 46 5 Economic Case 48 Introduction and Assumptions 49 Costs 51 6 Financial Case 57 Introduction 58 Assumptions 58 Capital Costs 58 7 Deliverability and Operations Case 63 Introduction
    [Show full text]
  • History of the Toronto Transit Commission
    History Of The Toronto Subway System James B. Alcock 1 2 TABLE OF CONTENTS Chapter Page Introduction 5 Before the TTC: Omnibus and Toronto Street Railway 6 Public Transit: Toronto Civic Railways 6 TTC: The early years 7 TTC: Post-war years 7 Subway boom 8 “Network 2011” 13 The St. Clair Controversy 17 ‘Transit City’ Plan 17 Transit Rebellion 22 ‘One City’ Plan 23 One City’ Proposed Lines 25 Subway Revival 25 'SmartTrack' Plan 27 Revival of the Queen Street Subway and LRT Lines 28 Long Term Transit Plan 28 TTC Official Opening Dates 30 TTC History Timeline 30 MAPS Metropolitan Toronto Subways 1966 9 Metropolitan Toronto ‘GO Urban’ I.C.T.S. Plan 1972 14 Metropolitan Toronto ‘Network 2011’ Subways Plan 1985 15 City of Toronto Subways 2004 21 City of Toronto Subways 2014 24 City of Toronto Subways & L.R.T. Today 29 3 4 History of the Toronto Subway System Introduction The Toronto Transit Commission (TTC) is the public transport authority that operates buses, streetcars, subways, and rapid transit lines in Toronto, Ontario, Canada. The TTC operates 149 surface transit routes, of which 148 routes make 243 connections with a subway or rapid transit station during the morning rush hour. 11 of these are streetcar (tram) routes and the remainder are buses. In 2005, the TTC carried 431,220,000 passengers, 2,368,000 passengers daily (1,397,000 revenue passengers). The TTC employed 10,650 personnel in 2005. The TTC operates the third most heavily-used urban mass transit system in North America (after New York City's New York City Transit Authority and the Mexico City Metro).
    [Show full text]