Chapter 1 Introduction
Total Page:16
File Type:pdf, Size:1020Kb
SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR CHAPTER 1 INTRODUCTION 1 INTRODUCTION 1.1 TITLE OF PROJECT This Second Schedule Environmental Impact Assessment (S2EIA) Report is for the proposed “Logging and Oil Palm Plantation at PT 11675 (854.31 hectares) in Mukim Keratong District of Rompin, Pahang Darul Makmur” hereinafter referred as “Project”. 1.2 PROJECT LOCATION The proposed project site with an area of 854.31 ha (2111.06 ac) is located at Mukim Keratong, District of Rompin, Pahang as shown in Figure 1-1. This area is owned by a private company; Asyadihan Plantations Sdn. Bhd. (Land Grant in Appendix A). The area has an irregular shaped boundary; thus, the boundary points have been labelled with numbering from 1 to 22. The geographical coordinates are as listed in Table 1-1 below: Table 1-1: Geographical Coordinates No Longitude Latitude 1 2° 40' 30.999" N 103° 3' 26.912" E 2 2° 40' 31.085" N 103° 4' 13.373" E 3 2° 39' 44.811" N 103° 4' 13.660" E 4 2° 39' 43.622" N 103° 5' 17.339" E 5 2° 38' 19.765" N 103° 5' 17.793" E 6 2° 38' 4.701" N 103° 5' 33.766" E 7 2° 38' 3.971" N 103° 4' 57.524" E 8 2° 38' 14.023" N 103° 4' 44.552" E 9 2° 38' 21.762" N 103° 4' 43.015" E 10 2° 38' 26.172" N 103° 4' 40.936" E 11 2° 38' 29.585" N 103° 4' 37.700" E 12 2° 39' 9.011" N 103° 3' 54.792" E 13 2° 39' 9.780" N 103° 3' 46.449" E 14 2° 39' 7.686" N 103° 3' 41.059" E 15 2° 39' 8.327" N 103° 3' 39.262" E 16 2° 39' 16.931" N 103° 3' 30.597" E 17 2° 39' 19.603" N 103° 3' 15.098" E 18 2° 39' 24.219" N 103° 3' 12.018" E 19 2° 39' 29.091" N 103° 3' 13.558" E 20 2° 39' 43.922" N 103° 3' 33.790" E 21 2° 39' 58.378" N 103° 3' 40.966" E 22 2° 40' 13.250" N 103° 3' 42.763" E Source: Forestry Department Office, Rompin January 2019 1-1 SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR The proposed project area is known as Kawasan Sudah Kerja (KSK) bekas lesen in 2006. There is also area of bekas lesen which was CR-02-26-16 (KP/K), CR 02-16-17 (TPS) and CR-02-32- 16 (KP)(K) as shown in demarcation plan (Figure 1-2). A survey conducted by the Rompin District Forestry Office in December 2018 found that nearly 780 hectares in the area were protected by less than 30 cm of perepang, while 73.50 hectares still contained productive and economically viable forests with an estimated 5 to 6 tonnes per acre. The location of these productive areas is in patches and scattered within the proposed project site as marked by block i.e Block A to G. 1-2 SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR Figure 1-1: Project Location 1-3 SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR DAERAH : ROMPIN H.S LESONG & TANAH KERAJAAN NO. KOMPARTMENT : 399, 411 & 421 LUAS : ± 854.31 HA BLOK A ± 11.4 HA BLOK B ± 32.4 HA T 563738.000 U 294754.000 399 BLOK G BLOK D ± 1.8 HA ± 8.8 HA BLOK C ± 4.3 HA 100-21/1/1276 (K) CR-02-26-16(KP/K) 854.31 HA sg sesat BLOK E ± 5.2 HA CR-02-16-17(TPS) 202.35 HA T 564960.000 U 292649.000 411 CR-02-32-16(KP)(K) PETUNJUK: 54.52 HA T 564992.000 U 292309.000 Sempadan Kawasan Kerja T 565192.000 U 292156.000 Sempadan Hutan Simpan Kawasan Berhasil seluas + 73.5 Ha 421 Kawasan Lesen CR-02-16-17(TPS) seluas 202.35 Ha T 565004.000 U 291777.000 T 566278.000 U 291708.000 Kawasan Lesen CR-02-32-16(KP)(K) seluas 54.52 Ha T 566420.000 U 291661.000 Kawasan Lesen CR-02-26-16(KP)(K) BLOK F ± 9.6 HA Kawasan Semakan di Lapangan Figure 1-2: Demarcation Plan of PT 11675 1-4 SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR 1.3 PROJECT PROPONENT AND QUALIFIED PERSONS 1.3.1 Project Proponent The Project Proponent or owner is Asyadihan Plantations Sdn. Bhd. with their correspondence address and contact person as follows: - Asyadihan Plantations Sdn. Bhd. No. 28, Ground Floor, Jalan Gambut, 25000 Kuantan, Pahang Darul Makmur. Tel. No. : 09-513 2505 Fax No. : 09 513 2446 Contact Person : En. Rizal Bin Chek Hashim Designation : Director E-mail : [email protected] 1.3.2 EIA Consulting Firm Golden Ecosystem Sdn. Bhd. was appointed by Asyadihan Plantations Sdn. Bhd. through a logging contractor; Thayagaalif Bersatu Trading as an EIA Consultant to carry out the environmental studies for this project. Enquiries and correspondence pertaining to this report can be made to:- Golden Ecosystem Sdn. Bhd. D-06-01 – D-06-08, Menara Mitraland, No. 13A, Jalan PJU 5/1, PJU 5, Kota Damansara, 47810 Petaling Jaya, Selangor Darul Ehsan Tel. No. : 03-7629 4112 Fax No. : 03-7629 4113 Contact Person : Dato’ Azemi Abu Bakar Designation : Project Director E-mail : [email protected] Contact Person : Pn. Rozilah Ibrahim Designation : Project Manager/EIA Team Leader E-mail : [email protected] GESB’s team members involved in this EIA report and their fields of expertise are listed in Table 1-2 and Table 1-3 below. 1-5 SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR Table 1-2: List of Consultants DOE REGISTRATION /PROFESSIONAL ACADEMIC DECLARATION NAME REGISTERED AREAS EXPERIENCE AREA OF STUDY CERTIFICATE NO. BACKGROUND (SIGNATURES) Rozilah Ibrahim • EIA Consultant: C0792 • Ecology • B. Sc. Ecology (Hons), Universiti 24 Years • EIA Team Leader • Certified Environmental Auditor: • Water Quality Malaya, 1996. • Overall TOR and ESI Report Preparation EA0037 • Dip. In Science, Institute Technology • Ecology (Flora and Fauna) MARA, 1991 • Solid Waste Management • Environmental Management Plan Dato’ Azemi Abu Bakar • EIA Consultant: C0210 • Water Quality • B. Sc. Ecology (Hons), Universiti 25 Years • Scheduled Waste Management • Scheduled Waste Malaya, 1988. • Impact assessment and Mitigation Management Measures Mohd Jamil Abdul Samad • EIA Consultant: C0028 • Soil Erosion and Sediment • B.Sc. Ecology (Hons), Universiti 26 Years • LD-P2M2 • CPESC Reg. No.6250 Control Malaya, 1986 • Impact assessment and Mitigation • CISEC Reg. No. MY-0043 • Water Quality Measures Wazfarina Abdul Wahid • EIA Consultant: C0087 • Water Quality • B.Sc. (Hons) Environmental Science, 13 Years • Noise Level • CISEC Reg. No.MY-0143 • Noise Universiti Malaysia Sabah, 2003 • Air Quality • Air Quality • Water Quality • Impact assessment and Mitigation Measures Norashikin Noraini • EIA Consultant:C1028 • Solid Waste Management • M Sc Environmental Engineering, 10 years • Process Description • Air Quality Universiti Teknologi Mara, 2014. • Air Quality • B. Chemical Engineering, Universiti • Impact and mitigation measures. Technology Petronas, 2007. Zahir Yahya • Subject Specialist: SS1107 • Geology • B.Sc. (Hons) Geologi, Universiti 26 years • Geology • Registered Professional Geologist: PG Malaya, Malaysia, 1993 • Geomorphology 374 • Soil Suitability Dr Susheel Kaur • Subject Specialist: SS0445 • Social Impact Assessment • B.A (Hons) Geography, 1974, 35 years • Socio Economic • Master of Arts (Geography), 1978 • Public Survey • PhD (Social Sciences), 1984 Panjub University, Chandigarh, India Table 1-3: List of Assistant Consultant/Team Member DOE REGISTRATION /PROFESSIONAL ACADEMIC DECLARATION SUPERVISED BY NAME REGISTERED AREAS EXPERIENCE AREA OF STUDY CERTIFICATE NO. BACKGROUND (SIGNATURES) Assoc Prof Datuk Dr Azrae Haji • Member, National Committee on • PhD Ecology University of 27 Years • Flora and Fauna Study Idris Biosafety, Ministry of Science, - Aberdeen, Scotland, 1990 Technology & Environment (2007- • B Sc Ecology Universiti Present) Malaya,1982) Nur Azimah Hussin • Assistant Consultant: AC1286 • Geology • B. Sc. (Hons) Geophysics, 5 Years • Geology • Registered Graduate Geologist: Universiti Science Malaysia, 2010 • Meteorology GG129 Mohd Zulfahmie Mohamat Zawawi • Master of Philosophy 7 years • Land Use Survey - - (Geography), Universiti • Geographic Kebangsaan Malaysia, 2015 Information System • Bachelor of Social Science (GIS) and Mapping (Hons) Geography, Universiti Kebangsaan Malaysia, 2011 1-6 SECOND SCHEDULE EIA FOR THE PROPOSED LOGGING AND OIL PALM PLANTATION AT PT 11675 (854.31 HECTARES) IN MUKIM KERATONG DISTRICT OF ROMPIN, PAHANG DARULMAKMUR 1.4 LEGAL ASPECTS 1.4.1 Prescribed Activity is subjected to Section 34A, Environmental Quality Act, 1974 The proposed project is a “Prescribed Activity” under First and Second Schedule of the Environmental Quality (Environmental Impact Assessment) Order 2015 as listed below: FIRST SCHEDULE Activity 13: Development In Development or land clearing less than 50 per cent of an area 0 0 Slope Area with slope greater than or equal to 25 but less than 35 SECOND SCHEDULE Activity 1: Agriculture a) Land development schemes covering an area of 500 hectares or more to bring forest into agricultural production. Activity 5: Forestry d) Logging, or cutting or taking of timber covering an area of 500 hectares or more An EIA Report is prepared to comply with the legal requirement under section 34A, Environmental Quality Act, 1974 (Act 127) which requires the submission of a Second Schedule of EIA (S2EIA) Report for the approval of the Director General of Environment prior to commencement of the project.