Sewerage and Water Board of New Orleans

Total Page:16

File Type:pdf, Size:1020Kb

Sewerage and Water Board of New Orleans SEWERAGE AND WATER BOARD OF NEW ORLEANS ADVERTISEMENT AND DESCRIPTION CONTRACT 30207 New Orleans, Louisiana, October 19, 2016 Sealed Bids addressed to the Sewerage & Water Board of New Orleans, will be received at the office of its Purchasing Agent, Room 133, 625 St. Joseph Street, New Orleans, Louisiana 70165, up to 11:00 o'clock A.M., Local Time, of Friday, November 18, 2016 and publicly opened and read immediately thereafter, for: CONTRACT 30207: NEW ORLEANS EAST BASIN – READ BLVD EAST/ VIAVANT NEIGHBORHOODS - SEWER REHABILITATION In the City of New Orleans, according to the accompanying plans and these specifications. The project will include the rehabilitation of existing main line sanitary sewers via full-length Cured-in-Place Pipe (CIPP) lining, full length mainline replacements including sanitary sewer service connections, mainline sewer point repairs, mainline cleaning and CCTV inspections, and manhole rehabilitation. The project is generally located in the Read Blvd East – Viavant Neighborhood within Orleans Parish. The project work area is generally bounded by Jourdan Rd/ Read Blvd. to the west, Chef Menteur Hwy/ Interstate 10 to the north, Interstate 510/ Industrial Pkwy to the east, and Mississippi River Gulf Outlet to the south. Substantial Completion of the work shall be achieved within 270 calendar days and Final Completion of the work within 300 calendar days of “Notice to Proceed”. Contract drawings, specifications and proposal forms will be issued only to Contractors and/or Subcontractors who are licensed by Louisiana State Licensing Board for Contractors, under Louisiana Revised Statutes 37:2150 through 37:2163 as amended. Bids will be accepted from only those Contractors who possess a Municipal and Public Works license. Contract drawings, specifications and proposal forms are available gratis from Sewerage & Water Board Web site: www.swbno.org (Click on Bids and Business, then Bids Ads & Spec) OR through Sewerage & Water Board’s Purchasing Department, 625 St. Joseph St. Room 133, New Orleans, LA 70165. Bids must be submitted on forms provided by the Owner. Envelopes containing bids and bid guarantee must be sealed, marked with the project name and with the Contract name, the Contractor’s name as it appears on the license and the Louisiana Contractor’s License number. The right is reserved to reject any and all bids or proposals for just cause and to waive informalities. CEDRIC S. GRANT JOSEPH BECKER EXECUTIVE DIRECTOR GENERAL SUPERINTENDENT The Drawings governing the work of this Contract are: Drawing No. 8617-S, Sheets 1 thru 107. The amount of the deposit or Bid Bond amount for this Contract 30207 shall be not less than five percent (5%) of the total proposal. Revised 10/4/2016 AD-1 A MANDATORY pre-bid conference will be held at 1:00 P.M. of Thursday , November 3, 2016 in the Sewerage and Water Board Room, Room No. 240, 625 Saint Joseph St, New Orleans, Louisiana. Any Bidder failing to attend this pre-bid conference shall be considered a non-responsive bidder. * * * END OF ADVERTISEMENT AND DESCRIPTION * * * Revised 10/4/2016 AD-2 .
Recommended publications
  • Facing the Future in St. Bernard Parish, Louisian: Planning and Development
    University of New Orleans ScholarWorks@UNO University of New Orleans Theses and Dissertations Dissertations and Theses Summer 8-1984 Facing the Future in St. Bernard Parish, Louisian: Planning and Development Gregory L. Chase University of New Orleans, [email protected] Follow this and additional works at: https://scholarworks.uno.edu/td Part of the Urban Studies and Planning Commons Recommended Citation Chase, Gregory L., "Facing the Future in St. Bernard Parish, Louisian: Planning and Development" (1984). University of New Orleans Theses and Dissertations. 1718. https://scholarworks.uno.edu/td/1718 This Thesis is protected by copyright and/or related rights. It has been brought to you by ScholarWorks@UNO with permission from the rights-holder(s). You are free to use this Thesis in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights- holder(s) directly, unless additional rights are indicated by a Creative Commons license in the record and/or on the work itself. This Thesis has been accepted for inclusion in University of New Orleans Theses and Dissertations by an authorized administrator of ScholarWorks@UNO. For more information, please contact [email protected]. FACING THE FUTURE IN ST. BERNARD PARISH, LOUISIANA: PLANNING AND DEVELOPMENT A Thesis Submitted to the Graduate Faculty of the University of New Orleans In partial fulfillment of the Requirements for the degree of Master of Science in Urban Studies In The School of Urban and Regional Studies by Gregory L. Chase Bachelor of General Studies University of New Orleans, 1978 August 1984 ACKNOWLEDGMENTS I wish to express my sincere thanks to the members of my thesis committee, Dr.
    [Show full text]
  • Jefferson Parish
    JEFFERSON PARISH 2015 MULTIJURISDICTIONAL HAZARD MITIGATION PLAN UPDATE MARCH 2015 Table of Contents Section 1 Executive Summary 6 1.1 Organization of the Plan 7 1.2 Background 7 1.3 Hazards and Risks 8 1.3.1 Hazards 8 1.3.2 Risks 9 1.4 Summary of Goals, Objectives, Strategies and Actions 9 1.4.1 Hazard Mitigation Goals 9 1.4.2 Hazard Mitigation Objectives 10 1.4.3 Hazard Mitigation Strategies 10 1.4.4 Action Items 11 1.5 The Planning Process 11 1.6 Approval and Adoption Process 12 1.7 Implementation Process 12 1.8 Monitoring and Updating Processes 12 Section 2 Background 13 2.1 Introduction 13 2.1.1 Scope of the Plan 13 2.2 Organization, Objectives and Mission 14 2.3 Background Information 15 2.3.1 Geography 15 2.3.2 Parish History 18 2.3.3 Climate 19 2.3.4 Transportation 19 2.3.5 Community Assets 19 2.3.6 Population and Growth 21 2.4 The Louisiana State Hazard Mitigation Plan 24 Section 3 Planning Process 25 3.1 Interim Final Rule Requirements 25 3.2 Federal Mitigation Planning Requirements 26 3.3 Description of the Planning Process 27 3.3.1 How the Plan was Prepared and Updated 27 3.3.2 Step 1 – Organize Resources 28 3.3.3 Step 2 – Assess Risks 31 3.3.4 Step 3 – Identify and Scope Potential Projects 31 3.3.5 Step 4 – Develop the Mitigation Plan 32 2 3.3.6 Step 5 – Implement Plan and Monitor Progress 32 3.4 How the Public and Jurisdictions were Involved 32 3.5 Other Local Planning Mechanisms 33 3.6 Review/Incorporation of Plans, Studies, Reports, and 34 other information Section 4 Hazard Identification, Ranking, and Risk Assessments
    [Show full text]
  • Introduction
    Introduction More than ten years after the worst disaster to befall any U.S. city in American history—necessitating the almost total evacuation of the population—the City of New Orleans has exceeded expectations in population recovery. 1 By the end of 2015, the city had regained nearly 86% of its pre-Katrina population, with nearly 390,000 people calling the city home.1 More than half of neighborhoods have recovered over 90 percent of the population they had before the levees failed.2 Only four neighborhoods have less than half the population they had prior to Katrina; the Lower Ninth Ward, one of the City’s most damaged neighborhoods; and three neighborhoods which include three public housing sites that have been demolished to make way for new mixed–income housing.3 Despite the City’s remarkable population recovery, there are still challenges that remain as we shift our focus from recovery to resilience. This chapter describes the post-World War II demographic and land use trends that shaped the New Orleans of today. This period in New Orleans’ history is part of a larger story of urban decline which lasted through the 1990s and affected all American cities—and the beginning of an urban renaissance that gathered steam in the early 2000s and continues today. New Orleans was part of this story, including the beginnings of urban renaissance, in its own way and based on its own history. While Hurricane Katrina and the failure of the levee system severely impacted the progress of the City, more than 10 years after the storm the City has overcome many challenges.
    [Show full text]
  • A Blueprint for Diversification and Growth at the NASA Michoud Assembly Facility
    Progress and Promise: A Blueprint for Diversification and Growth at the NASA Michoud Assembly Facility Prepared By: Louisiana Center for Manufacturing Sciences January 2013 ________________________________________________________________________ January 29, 2013 Michael C. Dawson Vice President Jacobs/NASA MSFOC 13800 Old Gentilly Road New Orleans, LA 70129 Dear Mike: As President of the Louisiana Center for Manufacturing Sciences (LCMS), I am pleased to send you the study which our organization executed for the U.S. Office of Naval Research to examine assets and opportunities that could lead to an expanded and more diverse manufacturing enterprise at the Michoud Assembly Facility. “Progress and Promise: A Blueprint for Diversification and Growth at the NASA Michoud Assembly Facility” is the result of several months of research, interviews and analysis by an LCMS team led by Stuart McAvoy of UPS, with support from his UPS colleagues, and significant contributions from other LCMS members, including Radiance Technologies and the National Center for Defense Manufacturing and Machining; from our affiliate member, the Manufacturing Extension Partnership of Louisiana, and from several outside partners who are cited in the report. As our team discussed with you and your Jacobs/NASA colleagues over the course of our study, we believe that Michoud is well-positioned to contribute in new and significant ways to strengthen the Defense industrial base and thereby to continue to add great value to the Greater New Orleans and Louisiana economy. The presence of the National Center for Advanced Manufacturing alone represents an asset of immense value for Michoud, and NASA’s new flexibility and the strengths of the Jacobs team constitute powerful tools to grow the “new” Michoud.
    [Show full text]
  • St. Bernard Parish Environmental Information Document Riverbend Oxidation Pond Pump Station Upgrades & Force Main
    St. Bernard Parish Environmental Information Document Riverbend Oxidation Pond Pump Station Upgrades & Force Main St. Bernard Parish Government February 2021 Prepared By: 3012 26th Street Metairie, LA 70002 504.454.3866 Table of Contents Section 1 Description of the Problem 1-1 1.1 Background 1-1 1.2 Description of the Problem 1-1 Section 2 Proposed Project 2-1 Section 3 Alternatives to Proposed Project 3-1 3.1 Description Criteria 3-1 3.1.1 Long Term Impacts on Surface Water Quality 3-1 3.1.2 Project Life Cycle Costs 3-1 3.1.3 Annual Operational Costs and Staffing Needs 3-1 3.1.4 Long Term Permitting and Regulatory Compliance 3-1 3.1.5 Wetlands Impacts 3-2 3.2 No Action Alternative 3-2 3.2.1 Long Term Impacts on Surface Water Quality 3-2 3.2.2 Project Life Cycle Costs 3-2 3.2.3 Annual Operational Costs and Staffing Needs 3-3 3.2.4 Long Term Permitting and Regulatory Compliance 3-3 3.2.5 Wetlands Impacts 3-3 3.3 Transfer of Flows to the Munster Treatment Plant 3-3 3.3.1 Long Term Impacts on Surface Water Quality 3-5 3.3.2 Project Life Cycle Costs 3-5 3.3.3 Annual Operational Costs and Staffing Needs 3-5 3.3.4 Long Term Permitting and Regulatory Compliance 3-5 3.3.5 Wetlands Impacts 3-5 3.4 The Proposed Project 3-5 3.4.1 Long Term Impacts on Surface Water Quality 3-5 3.4.2 Project Life Cycle Costs 3-6 3.4.3 Annual Operational Costs and Staffing Needs 3-6 3.4.4 Long Term Permitting and Regulatory Compliance 3-6 3.4.5 Wetlands Impacts 3-7 3.5 Evaluation of Alternatives Summary 3-7 Section 4 Environment Setting of the Proposed Project 4-1
    [Show full text]
  • Exhibit 1B Geographical Definitions of Zones
    Case 2:10-md-02179-CJB-SS Document 6430-4 Filed 05/03/12 Page 1 of 23 EXHIBIT 1B Case 2:10-md-02179-CJB-SS Document 6430-4 Filed 05/03/12 Page 2 of 23 GEOGRAPHICAL DEFINITIONS OF ZONES This document contains a written description of the boundaries of the proposed zones for the Economic Loss Class. The descriptions for the zones are organized to move roughly from westernmost geographical area within the class definition for which there is a zone to the easternmost geographical area within the class definition for which there is a zone, beginning with Zone A, followed by Zone B, and concluding with Zone C. Each zone is given a name which corresponds to the general geographical area or areas it covers; these names are intended for reference purposes only. Each zone is also given a number which indicates the type of zone and the order in which it appears in this document. The names of streets and highways are written to correspond as closely as possible with those which appear on the “base map” on which these zones were drawn. The base map used in the creation of the zones is the Microsoft Bing Hybrid map. ZONE A DEFINITIONS A‐1, South Louisiana, Zone 1: This zone consists of two sections divided roughly in the middle by the Vermilion Bay/Atchafalaya Bay. The western zone is bounded by the Texas/Louisiana state line (Sabine Pass) to the west, the Gulf of Mexico to the south, and the eastern shore of Marsh Island to the east.
    [Show full text]
  • Phase 1 Investigation Louisiana Statewide Comprehensive Watershed Based Floodplain Management Program Development
    PHASE 1 INVESTIGATION LOUISIANA STATEWIDE COMPREHENSIVE WATERSHED BASED FLOODPLAIN MANAGEMENT PROGRAM DEVELOPMENT PHASE 1 INVESTIGATION LOUISIANA STATEWIDE COMPREHENSIVE WATERSHED BASED FLOODPLAIN MANAGEMENT PROGRAM DEVELOPMENT Lake, Water, Louisiana, Gulf Coast States, USA FOOTER TEXT GOES HERE JANUARY 2018 Acknowledgement This document was prepared in support of the development of the statewide, comprehensive Watershed-based Floodplain Management Program under the guidance of the Louisiana Watershed Cooperating Agencies. The following Louisiana Watershed Cooperating Agency members provided input and review of the document: Coastal Protection and Restoration Authority Governor’s Office of Homeland Security and Emergency Preparedness Michael Ellis Bren Haase Rod Scott Sam Martin Casey Tingle Jeffrey Giering Department of Transportation and Development Office of Community Development Ed Knight Danica Adams Chris Knotts Pat Forbes Pat Landry Laur#, Nichols Cindy O’Neal Doug Taylor Department of Wildlife and Fisheries Scott Longman Matthew Weigel In addition to the constant involvement, oversight, and feedback provided by cooperating agencies, this Phase I effort was supported by the input of a number of local jurisdictions, parish presidents, state legislators, federal agencies, national subject matter experts, state floodplain managers, and more who were gracious with their time and insights to help build a path forward to a clear and sustainable framework for floodplain management in the state of Louisiana. Senator Mack Bodi White, Jr.
    [Show full text]
  • City Planning Commission Public Hearing Notice
    CITY PLANNING COMMISSION PUBLIC HEARING NOTICE TUESDAY, OCTOBER 13, 2020 PUBLIC HEARING: 1:30 P.M. CITY COUNCIL CHAMBER (CITY HALL - 1E07) OR VIA TELECONFERENCE The City Planning Commission, in accordance with the provisions of Article 4 of the Comprehensive Zoning Ordinance, Ordinance No. 4,264 M.C.S., as amended, will hold a public hearing on October 13, 2020 at 1:30 pm. The public hearing will consider the following proposed amendments to the Comprehensive Zoning Law of the City of New Orleans. Under the authority granted in Act 302 of the 2020 Regular Legislative Session, the City Planning Commission certifies that it will convene a meeting on October 13, 2020 at 1:30 pm via teleconference/Zoom to hear matters that are critical to the continuation of the business of the Commission and that are not able to be postponed to a meeting due to a legal requirement or deadline in the Comprehensive Zoning Ordinance that cannot be changed. All efforts will be made to provide for observation and input by members of the public. ZONING DOCKET 077/20 - Request by City Council Motion No. M-20-237 for a zoning change from a C-1 General Commercial District to a C-3 Heavy Commercial District, for Prairie Lands Parcel 14 on an undesignated square in the Third Municipal District, bounded by Michoud Boulevard, Interstate 10, Six Flags Parkway, and Interstate 510. The municipal address is 14201 Michoud Boulevard. (PD 10) ZONING DOCKET 078/20 - Request by City Council Motion No. M-20-242 for a text amendment to the Comprehensive Zoning Ordinance to amend Article 19 to establish a new Interim Zoning District (IZD) to be named the Lower Ninth Ward Off-Street Parking Interim Zoning District, the intent of which is to amend the off-street parking regulations to: (1) only require one off-street vehicle parking space for two-family dwellings on lots of a certain width and no off-street parking for single and two-family dwellings on lots of a certain width; (2) require tree plantings beneficial to the neighborhood; and (3) set a new front yard build-to line; in the area bounded by N.
    [Show full text]
  • III. Ethnic Geographies
    Orleans New Orleans of Campanellaamazon.com on New of Campanellaamazon.com Richard order on by Geographies Richard order Please by Geographies E Please THNIC G EOGRAPHIES P ART III Orleans New Orleans of Campanellaamazon.com on New of Campanellaamazon.com Richard order on by Geographies Richard order Please by Geographies Please MERICA S IRST and Spaniards. It contained a mixed population well before A ’ F Chicago, Boston, New York or Cleveland....” New Orleans’ MULTICULTURAL SOCIETY? diversity “amazed early travelers...[who] could find com- parisons only in such crossroads of the world as Venice and No city perhaps on the globe, in an equal number of human Vienna.”7 Far more immigrants arrived to the United States beings, presents a greater contrast of national manners, language, and complexion, than does New Orleans. through New Orleans—over 550,000 from 1820 to 1860, —William Darby, 18161 with 300,000 in the 1850s alone—than any other South- The population is much mixed, consisting of foreign and na- ern city in the nineteenth century, and for most of the late tive French; Americans born in the state and from every state of antebellum era, it was the nation’s number-two immigrant the Union; a few Spaniards; and foreignersOrleans from almost every port, ahead of Boston and behind only New York.8 Moreover, nation...; there is a great “confusion of tongues,” and on the Levée, New Orleans “was an almost perfect microcosm...of the en- during a busy day, can be seen people of every grade, colour and condition: in short it is a world in miniature.
    [Show full text]
  • Article 18. Overlay Zoning Districts
    ARTICLE 18. OVERLAY ZONING DISTRICTS 18.1 APPLICATION OF OVERLAY ZONING DISTRICTS 18.2 PURPOSE STATEMENTS 18.3 SC SUBURBAN CORRIDOR USE RESTRICTION OVERLAY DISTRICT 18.4 ENORC EASTERN NEW ORLEANS RENAISSANCE CORRIDOR USE RESTRICTION OVERLAY DISTRICT 18.5 HUC HISTORIC URBAN CORRIDOR USE RESTRICTION OVERLAY DISTRICT 18.6 ST. CHARLES AVENUE USE RESTRICTION OVERLAY DISTRICT 18.7 RDO-1 RESIDENTIAL DIVERSITY OVERLAY DISTRICT 18.8 RDO-2 RESIDENTIAL DIVERSITY OVERLAY DISTRICT 18.9 AC-1 ARTS AND CULTURE DIVERSITY OVERLAY DISTRICT 18.10 AC-2 ARTS AND CULTURE DIVERSITY OVERLAY DISTRICT 18.11 AC-3 ARTS AND CULTURE DIVERSITY OVERLAY DISTRICT 18.12 AC-4 ARTS AND CULTURE DIVERSITY OVERLAY DISTRICT 18.13 RIV RIVERFRONT DESIGN OVERLAY DISTRICT 18.14 CPC CHARACTER PRESERVATION CORRIDOR DESIGN OVERLAY DISTRICT 18.15 EC ENHANCEMENT CORRIDOR DESIGN OVERLAY DISTRICT 18.16 CT CORRIDOR TRANSFORMATION DESIGN OVERLAY DISTRICT 18.17 GC GREENWAY CORRIDOR DESIGN OVERLAY DISTRICT 18.18 HU-B1A USE RESTRICTION OVERLAY DISTRICT 18.19 LAS LASALLE STREET OVERLAY DISTRICT 18.20 MAGAZINE STREET USE RESTRICTION OVERLAY DISTRICT 18.21 JACKSON AVENUE USE RESTRICTION OVERLAY DISTRICT 18.22 ANNUNCIATION STREET OVERLAY DISTRICT 18.23 CSH CANAL STREET HEIGHT OVERLAY DISTRICT 18.1 APPLICATION OF OVERLAY ZONING DISTRICTS A. Creation, Modification, and Removal of Overlay Zoning Districts 1. Overlay zoning districts may be created or removed through concurrent zoning text and map amendments in accordance with the process in Section 4.2. 2. Overlay zoning district regulations may be modified through a zoning text amendment in accordance with the process in Section 4.2.
    [Show full text]
  • 5555 Bullard Ave New Orleans, LA Investment Advisors
    Bullard Corporate Center 5555 Bullard Ave New Orleans, LA Investment Advisors CONFIDENTIALITY ENRI PINTO AND DISCLOSURE Vice President Miami Office The information contained in the following Offering Memorandum (“OM”) is proprietary Phone: 305-924-3094 and strictly confidential. It is intended to be reviewed only by the party receiving it from [email protected] Vanni Capital, and should not be made available to any other person, entity, or affiliates without the written consent of Vanni Capital. By taking possession of and reviewing the information contained herein the recipient agrees to hold and treat all such information in the strictest confidence. The recipient further agrees that recipient will not photocopy STEVEN VANNI or duplicate any part of the offering memorandum. If you have no interest in the subject property at this time, please return this offering memorandum to Vanni Capital. This OM President has been prepared to provide summary, unverified information to prospective purchasers, Miami Office and to establish only a preliminary level of interest in the subject property. The information Phone: 305-989-7854 contained herein is not a substitute for a thorough due diligence investigation. Vanni Capital [email protected] has not made any investigation, and makes no warranty or representation, with respect to the income or expenses for the subject property, the future projected financial performance of the property, the size and square footage of the property, the physical condition of the improvements thereon, or the financial condition or business prospects of any tenant, or any tenant’s plans or intentions to continue its occupancy of the subject property.
    [Show full text]
  • Village De L'est Neighborhood, Planning District
    Village de L’est Neighborhood Planning District 10 Rebuilding Plan Village de L’Est Neighborhood, Planning District Ten Introduction Table of Contents Approximately 100 days after Hurricane Katrina Planning District 10 is the subject of the Acknowledgements A. Village de L’Est Neighborhood 3 struck, Motion M-05-592 was unanimously following report. With grateful appreciation the Planning team Location and History 3 passed by the City Council of New Orleans. would like to thank the residents of District 10, Recovery Vision and Goals 4 This motion ensured that community-based, Basic assumptions also formed the basis who participated in this planning process and Planning Process and Neighborhood Participation 5 neighborhood-by-neighborhood planning for the Planning District 10 Recovery Plan: without whom this effort would not have been Planning Efforts Pre-Hurricane Katrina 6 would be central to decisions associated with possible. the recovery of the most devastated areas of 1) That a flood protection system B. Pre-Hurricane Katrina Neighborhood New Orleans. The City Council was adamant will be designed to withstand future Project Directory Existing Conditions 9 that the people most impacted by the storm catastrophic loss from a 1 in 100 year Land Use and Zoning 9 would play a central role in defining the future storm and that this is a commitment by City of New Orleans Pre-Katrina Demographic Profile 9 of their communities. Overall, 47 of the 73 the Federal Government; C. Ray Nagin, Mayor Recreation and Open Space 11 neighborhoods delineated by the City’s 2) That stringent building codes New Orleans City Council: Roadway Hierarchy and Jurisdiction 11 Planning Commission have had plans prepared will be implemented to further limit wind Oliver M.
    [Show full text]