Bilten 16 I 17 Putevi Srbije ENGLESKI.Indd

Total Page:16

File Type:pdf, Size:1020Kb

Bilten 16 I 17 Putevi Srbije ENGLESKI.Indd Riga – signed contracts for Surcin-Obrenovac motorway and Belgrade bypass On the Fift h Summit of Heads of the Gov- ernment of China and 16 Central and Eastern European countries held in Riga, Deputy Prime Minister and Minister of Construction, Trans- port and Infrastructure, Prof dr Zorana Miha- jlović and president of the Eksim Bank, Liu Liang signed the contract on fi nancing the construction of Surčin-Obrenovac motorway on 05.11.2016 in the value of EUR 208 million. Deputy Prime Minister, together with acting director of the PE “Roads of Serbia” Zoran Drob- njak, signed commercial contract with the Chi- nese company "Power Construction Corporation of China” for the continuation of Belgrade By- pass construction in the value of EUR 207 mil- lion. Th is contract covers the works on the sec- tion from Ostružnica Bridge to Bubanj Potok. Th e contract also foresees that national compa- nies take part in the works with 49 percent. Photos taken from the MCTI website Conclusion of the contract with Eksim Bank on fi nancing the construction of Surčin-Obren- ovac motorway enables the start of works on the fi nal section of the motorway from Belgrade to Čačak. Construction of Belgrade Bypass will also be continued in cooperation with China, namely, the works will be executed on 19.5 km long sec- tion from Ostružnica Bridge to Bubanj Potok. As a part of this project, four tunnels will be con- structed in the total length of 2.7 km, as well as 22 bridges in the length of 5.3 km. Second Serbian Road Congress Th e Second Serbian Road Congress was held ister of Construction, Transport and Infrastruc- on June 9 and 10, 2016 in Belgrade, in the ho- ture stating the following: “I am proud of the tel Crowne Plaza organized by the Road Asso- construction and road workers in Serbia who ciation of Serbia “Via vita“ and the PE “Roads were diligent, because we realized everything we of Serbia”. had promised. Team work and strong position of Roads form life of a modern society and de- the Government that infrastructure is the prior- termine the paths of future development. Th e ity is the key to such success”. She informed that way a society relates to its environment and it- 170 km of motorways had been constructed in self refl ects from the way the society relates to Serbia since the previous First Road Congress, roads and the way the roads relate to the nature. while the construction of another 90 km and re- Responsible decision making, based on new habilitation of about 200 km of roads were ex- technologies in planning and designing, as well pected in 2016. as construction based on modern techniques of “With black and white lists in civil engineer- materialisation of these projects will turn good ing, we have introduced criteria for business ac- ideas into even better road infrastructure. Th e tivities, we have tightened the quality control of following topics were covered on the Congress: the roads, now we have to continue with all of • Planning and design that“, Mihajlović said estimating that the road workers did an excellent job. She highlighted • Construction and maintenance of roads that designs in road infrastructure were EUR • Road management 3.2 billion worth, however there were also po- • Traffi c, ITS and new technologies tential road projects awaiting us, with the value between EUR 2 and 2.5 billion, one of them be- • Road traffi c safety ing the construction of Niš-Merdare motorway. • Sustainable development and “We are not fully satisfi ed, it is the character- coming tasks in the near future because special environmental protection istic of us who always want more”, it was stated attention will be paid to design technical docu- Th e Congress was opened by Prof dr Zora- by Mihajlović; she informed the designers that ments of good quality, quality of roads and in- na Mihajlović, Deputy Prime Minister and Min- they would have to be more ready for the up- crease of traffi c safety. 2 Successful business year behind us Another successful year is behind us in habilitation and Safety Project, continuation of which new projects started and old projects fi n- the construction of Belgrade Bypass, expansion ished. Satisfi ed with the achieved, we are head- of 17 existing toll stations and many other. ing forward towards better and bigger results Cooperation with international fi nancial in- pursuant to the vision to be respectable and suc- stitutions is of extreme signifi cance as well as cessful company for the management and devel- the increase of revenues from fees for using state opment of state roads. roads through the construction and incorpora- Our imperative is to provide the users of tion of the new constructed motorway sections state roads with available, safe and comfortable into the toll collection system. conditions for travelling, to create for the entire PE “Roads of Serbia” and I, being a part of society an infrastructural base for development, this big organization, are aspiring towards con- to provide long-term business to the partners stant improvement of each aspect of our busi- with the potential of development, to take care ness activities. of environment protection. Construction of Corridors 10 and 11 and It is not an easy task to stay on this positive other road infrastructure is the driver of the en- track having in mind the circumstances. Main- tire economic and social development in Serbia. tenance, rehabilitation and reconstruction of the Quality and effi cient, equal connection of indus- road network demand big investments of funds, trial regions as well as of provinces and regions which is only possible with the support of sta- in Serbia is an imperative. ble sources of fi nancing. It is all a part of the up- Th e objective is clear and common – strong grade of traffi c infrastructure. and stable Serbia networked with corridors and Great challenges and signifi cant projects are connected with the entire region. ahead; completion of the construction of the frontal toll station Vrčin, continuation of the re- Zoran Drobnjak, B.Sc.C.E. habilitation of state roads within the Road Re- Acting Director Certifi cates for high quality of business activities of the public enterprise “Roads of Serbia” In June 2016, Public Enterprise “Roads of Th e concept of quality as an effi cient means Th e fi rst is ISO 9001:2008 (Quality Management Serbia” was certifi ed for quality management sys- for successful management of the company and System) and OHSAS 18001:2008 (Occupational tem and occupational health and safety manage- achievement of signifi cant business objectives health and safety management systems). Accred- ment system, which is another high mark for suc- is also provided through the implementation of ited certifi cation body MSC (“Management Sys- cessful business activities of the enterprise. another two important international standards. tems Certifi cation” Belgrade) conducted a suc- cessful check of the quality system. Th e check involved all activities under the jurisdiction of the PE “Roads of Serbia” and our enterprise received the highest mark for compliance of business pro- cesses with the requirements set in the standards. Our enterprise established an integrated quality management system – IMS for the fi rst time, con- sisting of ISO 9001 and OHSAS 18001 standards. By applying the stated standards, PE “Roads of Serbia” performed the engineering, optimiza- tion and upgrade of all defi ned processes refer- ring to the activities of state road management in the Republic of Serbia. Entire documentation of the integrated management system – IMS con- sists of the Rules of Procedure, Quality Policies, 37 procedures, 10 integrated instructions and over 700 records, which enables successful busi- ness activities of the company not only in the fi eld of jurisdiction, but also from the aspect of the requirements of state institutions and wider community. Th e existing processes are still upgraded con- tinuously, new documents are created as well as procedures and instructions for the aff airs of in- tegrated management systems in all organization- al units of the enterprise. 3 Maintenance of the road network – preservation of the greatest capital value of the Republic of Serbia Road network is one of the biggest capital tures that had been damaged or partially demol- values in the Republic of Serbia, on the territory ished, in the value of RSD 1.3 billion. Bearing in mind the condition of roads of which there are 16,162.724 km of I and II cat- in our country, conclusion is imposed that egory state roads the value of which is estimated A lot of rehabilitated bridges investment in the existing road network at about EUR 4.5 billion. is absolutely necessary in order to provide On the roads in the Republic of Serbia there Sector for the Maintenance of I and II Cat- permanent and incessant preservation of are about 3000 bridges of various age, construc- egory State Roads performs extensive and re- previously invested capital and reduce the tion manner and static systems. sponsible tasks primarily directed towards the costs of users to an acceptable level. Th rough routine maintenance of road struc- preservation and maintenance of the existing For routine maintenance of the road tures on the state road network, inspections, road network with structures. network in Serbia under the jurisdiction of monitoring and recording of the changes of In 2016, RSD 20.2 billion was invested in the our enterprise, about RSD 25 billion annu- their condition are performed based on which maintenance of I and II category state roads. ally is required.
Recommended publications
  • Information Current As of November 18, 2020
    Information Current as of November 18, 2020 Table of Contents SOURCEREE PERSPECTIVE ............................................................................................3 OVERVIEW .........................................................................................................................6 WEBSITES ...........................................................................................................................6 OWNERSHIP .......................................................................................................................6 OBJECTIVES ......................................................................................................................6 FINANCIAL INTENTIONS .................................................................................................7 THE EFFECT ON AMERICA .............................................................................................8 ECONOMIC CORRIDORS .................................................................................................9 FUNDING .......................................................................................................................... 11 APPENDIX A: PROGRAM LEADERSHIP ....................................................................... 16 APPENDIX B: ASSOCIATED ENTITIES ......................................................................... 18 APPENDIX C: PARTICIPATING NATIONS.................................................................... 21 APPENDIX D: PROJECTS ...............................................................................................
    [Show full text]
  • Serbia 2029 Prospectus
    REPUBLIC OF SERBIA (represented by the Government of the Republic of Serbia, acting by and through the Ministry of Finance) €1,000,000,000 1.500 per cent. Notes due 2029 Issue price: 98.909 per cent. The €1,000,000,000 1.500 per cent. Notes due 2029 (the “Notes”) to be issued by the Republic of Serbia, represented by the Government of the Republic of Serbia acting by and through the Ministry of Finance (the “Issuer”) will mature on 26 June 2029 and, unless previously purchased and cancelled, will be redeemed at their principal amount on that date. The Notes will bear interest at a rate of 1.500 per cent. per annum. Interest will accrue on the outstanding principal amount of the Notes from and including 26 June 2019 and will be payable annually in arrear on 26 June in each year, commencing on 26 June 2020. All payments of principal and interest in respect of the Notes shall be made free and clear of, and without withholding or deduction for, any taxes, duties, assessments or governmental charges of whatever nature imposed, levied, collected, withheld or assessed by or within the Republic of Serbia (the “Republic of Serbia” or “Serbia”) or any political subdivision or any authority thereof or therein having power to tax, unless such withholding or deduction is required by law. In that event, the Issuer shall pay such additional amounts as will result in the receipt by the Noteholders of such amounts as would have been received by them if no such withholding or deduction had been required, subject to certain exceptions set out in the Conditions (as defined below).
    [Show full text]
  • ROADS of SERBIA” ZORAN DROBNJAK “When You Want to Develop an Area, Equip It with Good Roads”, Prof
    INTRODUCTION ACTING DIRECTOR OF THE PE “ROADS OF SERBIA” ZORAN DROBNJAK “When you want to develop an area, equip it with good roads”, prof. dr Milan Vujanić says and I entirely agree with this. Interdependence of industry and roads is quite evident because roads, in addition to their main function concerning the transport of people and goods, also generate growth and development of all places through which the road network passes as well as all other which are indirectly connected with motorways and other important routes in the Republic of Serbia. Thus it is the main dedication of the PE “Roads of Serbia” to achieve what is expected from us – to successfully finish all investments and provide the same level of quality of all the roads in Serbia with constant increase of the level of traffic safety, with cordial assistance of the Government of the Republic of Serbia and the Ministry of Construction, Transport and Infrastructure. This is an imperative of our work, not only because of the expectations in front of us regarding the accession to the European Union, but also because good roads are one of the pillars of every serious and modern country. Road towards the achievement of big results starts with the devotion of individuals, each one of us. Owing to an exceptional devotion of the employees in the PE “Roads of Serbia”, achievement of the adopted plans is possible, regardless of the difficulties and not always favourable work conditions which the time sets upon us. Daily perseverance, devotion and openness of our employees to new knowledge and changes is obvious.
    [Show full text]
  • China's Economic Footprint in the Western Balkans
    Jacob Mardell ASIA POLICY BRIEF China's Economic Footprint in the Western Balkans Geopolitics has returned to vogue, and the EU does not enjoy a monopoly on inuence in the Western Balkans. China is the latest player on the scene, and although its economic footprint is still relatively small, Beijing’s growing presence is a new reality that Brussels needs to contend with. China’s “no-strings attached” nancing of infrastructure potentially undermines the EU’s reform-orientated approach. Relevance Bertelsmann Stiftung Focus Bertelsmann Stiftung Forecast Bertelsmann Stiftung Information Bertelsmann Stiftung Options Bertelsmann Stiftung About the author Jacob Mardell is a freelance researcher and journalist who has recently travelled Eurasia exploring China’s Belt and Road Initiative. He is writing a series of articles, "On the New Silk Road,". Since March, he has traveled overland from the UK to Beijing. Over the next ve months he will be travelling in Southeast Asia, returning to Europe over sea, via Djibouti and Ethiopia. Beijing’s approach China’s economic presence in the Western Balkans Six (WB6) countries of Albania, Bosnia & Herzegovina, Kosovo, Montenegro, North Macedonia, and Serbia is framed in terms of the Belt and Road Initiative (BRI), a foreign policy slogan and development concept announced by Xi Jinping in 2013. Although China maintained active diplomatic relations with Yugoslavia during the 1980s and 1990s and vocally opposed the NATO bombing of Serbia and Montenegro in the late 1990s, economic outreach in the countries of former Yugoslavia only truly began (with Serbia) in the second decade of the 21st Century. Beijing’s relationship with Albania – not part of former Yugoslavia – was very close until the Sino-Albanian split of the 1970s, but this historical curiosity has little bearing on contemporary Sino-Albanian relations.
    [Show full text]
  • Corridor 10 – Better Links Between the Region and Europe
    Corridor 10 – Better Links Between the Region and Europe Dr Dušan Mladenović Association of Transport and Telecommunications Tradition Valleys of the Rivers Danube, Sava and Morava, have been some of the most important transportation corridors in the South East Europe for more than 2,000 years. Pan-European Corridors in the Balkans Corridor 10 With Its Branches крацима It runs from Austria to Greece. It includes both the railway corridor, 2,528 km long, and the road corridor, 2,300 km long. Salzburg (A) – Ljubljana (SLO) – Zagreb (HR) – Belgrade (SRB) – Niš (SRB) – Skopje (MK) – Veles (MK) – Thessaloniki (GR). * Branch A: Graz (A) - Maribor (SLO) – Zagreb (HR) * Branch B: Budapest(SRB) – Novi Sad (SRB) - Belgrade (SRB) * Branch C: Nis (SRB) – Dimitrovgrad (SRB) – Sofia (BG) - Istanbul (TR) – via corridor 4 * Branch D: Veles (MK) – Prilep (MK) - Bitola (MK) - Florina (GR) - Igoumenitsa (GR) Priority Projects of the EU Road Network 2005 New Reality 1. EU has defined its priority axes that run parallel with Corridor 10 in Serbia. The neighbouring countries construct speedily the infrastructure network in the close vicinity. 2. Road transit transport on Corridor 10 has stagnated, and an increasing trend is recorded only on the directions east-west and northeast-southwest. Network Traffic Load and Regional Traffic Flows The largest traffic load is on the passage through Belgrade, which is why construction of Belgrade Bypass is one of the priorities. Regional traffic flows through Serbia include both transit flows and Serbia’s bilateral exchange; they are most expressed on the east-west direction. Izvor: JP Putevi Srbije Freight Traffic Intensity on the Serbian Borders AADT (Trucks per day) Source: JP Putevi Srbije Traffic Volume on Corridor 10 and Number of TIR Transits Goods Vehicles 600000 500000 400000 300000 200000 100000 ec.
    [Show full text]
  • Touch & Go and Touch 2 with Go
    Touch & Go and Touch 2 with Go Autumn 2018 map update release notes 4 more pages required in Autumn edition to fit information Keeping up to date with The Toyota Map Update Release Notes Map update information these and many more features: Touch & Go (CY11) helps you stay on track with the map Full map navigation Release date: Autumn 2018 Driver-friendly full map pan-European navigation updates of the Touch & Go and Touch 2 Version: 2018 with clear visual displays for signposts, junctions and lane with Go navigation systems. Database: 2018.Q1 guidance. Media: USB stick or download by user Speed limit and safety Toyota map updates are released at least once a year System vendor: Harman camera alerts Drive safely with the help of a and at a maximum twice. Coverage: Albania, Andorra, Austria, Belarus, Belgium, Bosnia Herzegovina, speed limit display and warning, including an optional Bulgaria, Croatia, Czech Republic, Denmark, Estonia, Finland, Gibraltar, France, speed warning setting. Alerts Keep up with the product information, map changes, Germany, Greece, Hungary, Iceland, Ireland, Italy, Kazakhstan, Kosovo, Latvia, notify you of fixed safety Liechtenstein, Lithuania, Luxembourg, Macedonia (F.Y.R.O.M), Malta, Moldova, camera locations (in countries premium content and sales arguments. where it is legal). Monaco, Montenegro, Netherlands, Norway, Poland, Portugal, Romania, Russia, San Marino, Serbia, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Turkey, Ukraine, United Kingdom, Vatican. Intuitive detour suggestions Real-time traffic information Contents updates* alert you to Touch 2 with Go (CY13/16) congestion ahead on your planned route. The system Map update information 3 Release date: Autumn, 2018 calculates potential delay times and suggests a detour Navigation features 4 Version: 2018 to avoid the problem.
    [Show full text]
  • Kategorije Atraktivosti Linija GS Beograd
    LINIJE I KATEGORIJE ATRAKTIVNOSTI 27 Trg Republike - Mirijevo 3 407 Voždovac - Bela Reka SVE TRAMVAJSKE LINIJE 27 E Trg Republike - Mirijevo 4 503 Voždovac - Resnik AUTOBUSKE LINIJE: 32 Vukov spomenik - Višnjica 504 Kneževac - Resnik 24 Dorćol - Neimar 32 E Trg Republike - Višnjica 542 Miljakovac 1 - Petlovo Brdo 25 Karaburma 2 - Kumodraž 2 35 Trg Republike - Lešće 32 L Omladinski stadion - Lešće 37 Pančevački most - Kneževac 36 Trg Republike - Viline Vode - Dunav stanica 101 Omladinski stadion - Padinska Skela 42 Slavija - Banjica (VMA) 43 Trg Republike - Kotež 102 Padinska Skela - Vrbovsko 48 Pančevački most - Miljakovac 2 77 Zvezdara - Bežanijska kosa 104 Omladinski stadion - Crvenka 16 Karaburma 2 - Novi Beograd 96 Trg Republike - Borča 3 105 Omladinski stadion - Ovča 51 Slavija - Bele Vode Omladinski stadion - PKB Kovilovo 23 Karaburma 2 - Vidikovac 106 26 Dorćol - Braće Jerković 55 Zvezdara - Stari Železnik - Jabučki Rit 31 Studentski trg - Konjarnik 59 Slavija - Petlovo Brdo 107 PKB Direkcija - Dunavac 53 Zeleni venac - Vidikovac 60 Zeleni venac - Novi Beograd (Toplana) 108 Omladinski stadion - MZ Reva 58 Pančevački most - Novi Železnik 67 Zeleni venac - Novi Beograd (blok 24) 109 PKB Direkcija - Čenta 65 Zvezdara 2 - Novi Beograd 68 Zeleni Venac - Novi Beograd (blok 70) 110 Padinska Skela - Široka Greda 95 Novi Beograd - Borča 3 71 Zeleni venac - Bežanija (Ledine) 202 Omladisnki stadion - Veliko selo 17 Konjarnik - Zemun (Gornji grad) 72 Zeleni venac - aerodrom Beograd 302 L Ustanička - Restoran "Boleč" 18 Medaković 3 - Zemun (Bačka) 75 Zeleni venac - Bežanijska Kosa 54 Kanarevo Brdo - Železnik - Makiš 52 Zeleni venac - Cerak Vinogradi 88 Zemun (Kej oslobođenja) - Novi Železnik 57 Banovo Brdo - Naselje Golf 56 Zeleni venac - Petlovo Brdo 91 Glavna žel.
    [Show full text]
  • Belgrade Investor Guide
    BELGRADE INVESTOR GUIDE City of the future wishes you a warm Welcome Welcome ‘Belgrade Waterfront’ is the largest project development in the city. Investment of more than €3.0 billion, Construction of 1.8 million square metres of mixed-use space, o 5,700 residential units, o 600 hotel rooms, o 120,000 square metres of office space, o 170-metre tower. The works on two residential towers with 296 apartments and a total area of 68,000 square metres commenced in September 2015. Belgrade Investor Guide 2 Contents I Project Development Office of the City of Belgrade ................................................................................... 5 II City of Belgrade .......................................................................................................................................... 6 2.1 Basic Data ............................................................................................................................................ 6 2.1.1 Short SWOT Analysis .................................................................................................................... 6 2.1.2 Geography .................................................................................................................................... 7 2.1.3 Demographics, Human Capital and Purchasing Power ................................................................ 7 2.1.4 Infrastructure and Science ........................................................................................................... 8 III Belgrade as a Business
    [Show full text]
  • 15. Transport Infrastructure As Development Factor of Belgrade
    GeograFF 8 15. Transport infrastructure as development factor of Belgrade Bogdan Lukić, Velimir Šećerov Development of Belgrade has been directly caused by the development of transport sys- tems. Demographic, economic and spatial expansion of the city is connected with the de- velopment of forms and systems of transport infrastructure. The periods of the develop- ment of the city are connected with historical events, but the formation of Belgrade, from the border settlement to the Balkan metropolis, reached its development culmination by the end of the Second World War in the Socialist Federal Republic of Yugoslavia. The progress of transport and all other structures was recorded up to 1980. In that historical year, the stagnation in the development of Belgrade and whole Serbia had begun. The culmination was reached in the 1990s with all retrograde processes, followed by eco- nomic recession, disappearing of elementary social values and the wars. Nevertheless, during “golden seventies” of the 20th century, Belgrade succeeded to im- prove and develop transport function and transport infrastructure. Perhaps it was the consequence of the tradition of the development of the city in the period of the Kingdom of Yugoslavia, with the two following illustrative examples: • “Flying Belgrade citizen“, express train, functioning from 1936 as express steam train on route from Belgrade to Zagreb, when the travel took less than 5 hours and • the first night commercial flight from Belgrade to Bucharest, more precisely, from Pančevo to Bucharest, on September 9th 1923, as a part of the commercial air line Paris-Belgrade (Pančevo)-Bucharest-Istanbul. Progressive development of transport systems of the 1960s in Europe, the Balkans, the SFRY, Serbia and very Belgrade, enabled the city to valorise the following: • intercontinental patterns, i.e.
    [Show full text]
  • MAPMAKING Ǩ ARCHITECTURE Ǩ URBAN PLANNING ABOUT US Practice and Expertise
    MAPMAKING ǩ ARCHITECTURE ǩ URBAN PLANNING ABOUT US Practice and Expertise ABOUT US INAT is an international partnership with transdisciplinary teams based in Paris, Belgrade, Madrid and Hanoi. We provide our clients with innovative solutions adapted to their needs MAPMAKING through our creative research and development approach. Our experience encompasses ǩ,1$7PDSSLQJVWDQGDUG the fields of Mapmaking, Planninig and Urban design. ǩ3DULV ǩ7RN\R ǩ,QIRUPDWLRQV\VWHP Mapmaking Planning Urban design 3/$11,1* Schematic metro network diagrams Planning is a dynamic process of Successful urban environments are an essential tool for travelers discovery. It entails translating a become destinations when designed ǩ Existing network and authorities alike, they help the client's vision into a development to invite an abundance of foot traffic, ǩ Future network former navigate the transport strategy, providing a framework in programmed activities and lively network and the latter plan and which alternatives are evaluated, street scenes – combining develop- URBAN DESIGN implement urban development capacity in determined, feasibility is ment and open spaces to create an ǩ3XEOLFWUDQVSRUW policies. More importantly they are tested and a course is set - all with a exciting, viable neighborhood fabric. instrumental in shaping the identity single goal in mind – creating places Through careful planning and analy- ǩArchitecture and city of the city. These metro maps repre- where people make memories. sis, our urban projects are designed sent not only the structure of the to provide optimal benefits to the CONTACT urban fabric but reflect the paths of surrounding community while milions of people and their design addressing the complexities and and appearence is the most com- intricate relationships that tie our monly shared representation of the cities together.
    [Show full text]
  • The World Bank Public Disclosure Authorized Report No: 28792-SAM for OFFICIAL USE ONLY
    Document of The World Bank Public Disclosure Authorized Report No: 28792-SAM FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT Public Disclosure Authorized ON A PROPOSED CREDIT IN THE AMOUNT OF SDR 37.5 MILLION (US$55 MILLION EQUIVALENT) TO SERBIA AND MONTENEGRO FOR A Public Disclosure Authorized TRANSPORT REHABILITATION PROJECT FOR SERBIA April 27,2004 Infrastructure and Energy Department Europe and Central Asia Region [This document has a restricted distribution and may be used by recipients only in the performance of I Public Disclosure Authorized ltheir official duties. Its contents may not otherwise be disclosed without World Bank authorization. 1 CURRENCY EQUIVALENTS (Exchange Rate Effective April 5,2004) Currency Unit = Yugoslavian New Dinar 1 New Dinar = US$0.01748 US$1 = 56.2034 New Dinar FISCAL YEAR July 1 -- June 30 ABBREVIATIONS AND ACRONYMS AADT Annual Average Daily Traffic CAS Country Assistance Strategy EA Environment Appraisal EAR European Agency for Reconstruction EBRD European Bank for Reconstruction and Development EC European Commission EIB European Investment Bank EMP Environmental Management Plan EIRR Economic Intemal Rate of Retum ERTP Economic Recovery and Transitional Program FSU Former Soviet Union HDM Highway Design and Management Model ICB International Competitive Bidding IDA International Development Association IF1 International Financing Institution MFRS Ministry ofFinance of the Republic of Serbia MOCI Ministry of Capital Investments NPV Net Present Value OHR Office ofthe High Representative PIP Project Implementation Plan PIU Project Implementation Unit SIDA Swedish International Development Agency SNRA Swedish National Road Administration SRD Republic of Serbia Road Directorate TSS Transitional Support Strategy Vice President: Shigeo Katsu, ECAVP Country ManagerDirector: Rory O'SullivadOrsalia Kalantzopoulos, ECCU4 Sector Managermirector: Motoo KonishikIossein Razavi, ECSIE Task Team Leader/Task Manager: Cesar Queiroz, ECSIE FOR OFFICIAL, USE ONLY SERBIA AND MONTENEGRO TRANSPORT REHABILITATION PROJECT CONTENTS A.
    [Show full text]
  • TEM and TER Master Plan Backbone Networks Identified in 2005
    ECE ECONOMIC COMMISSION FOR EUROPE TEM and TER revised Master Plan - TEM and TER revised Final Report - Volume II: Annexes Final Report - Volume Master Plan Final Report Volume II: Annexes Trans-European Motorway (TEM) Trans-European Railway (TER) Projects United Nations 2011 Printed by the Publishing Service, United Nations, Geneva — GE.12.20691 — February 2012 — ECE/TRANS/183/Rev.2 (Vol. II) ECONOMIC COMMISSION FOR EUROPE Trans-European Motorway (TEM) project Trans-European Railway (TER) project TEM and TER revised Master Plan Final report Volume II : Annexes UNITED NATIONS New York and Geneva, 2011 1 UNECE TEM AND TER PROJECTS’ MASTER PLAN – 2011 ACKNOWLEDGEMENTS This Volume was produced as a companion to the TEM and TER revised Master Plan final report. The International Road Union (IRU) provided a grant to the TEM Master Plan revision project for one part of this Volume, and this contribution was greatly appreciated. The authors of the annexes deserve a special mention: Annex III — Professor Dimitrios Tsamboulas, National Technical University of Athens, Greece; Annex IV — Professor András Timar, University of Pecs, Hungary; Annex V — Professor Gerd Sammer, Institute for Transport Studies, University of Natural Resources and Life Sciences, Vienna, Austria; Annex VI — Professor Enes Covrk, IPSA Institute, Sarajevo, Bosnia and Herzegovina. The work of Mr. Peter Pospisil in the preparation of Annexes I, II, VII and VIII, based on inputs provided by all the TEM and TER National Coordinators, was also very much appreciated. ECE/TRANS/183/Rev.2 (Vol. II) 2 ECONOMIC COMMISSION FOR EUROPE TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................. 11 ANNEX I TEM Master Plan revision questionnaires — Summary of national road forecasts ...............................................................................................
    [Show full text]