Final Report Drawings MININFRA EASTERN PROVINCE REPUBLIC OF RWANDA THE STUDY ON IMPROVEMENT OF RURAL WATER SUPPLY IN THE EASTERN PROVINCE IN THE REPUBLIC OF RWANDA FINAL REPORT DRAWINGS November 2010 JAPAN INTERNATIONAL COOPERATION AGENCY JAPAN TECHNO CO., LTD. NIPPON KOEI CO., LTD. GED JR 11-022 TABLE OF CONTENTS Drg 1. Master Plan Scheme Location Map Drg 2. Master Plan Scheme Layout Drawings 2-1 Nyagatare District 2-2 Gatsibo District 2-3 Kayonza District and Rwamagana District 2-4 Ngoma District and Kirehe District 2-5 Bugesera District Drg 3. Priority Project Layout Drawings 3-1 PP01 Mushikiri 3-2 PP02 Rukira 3-3 PP03 Gashanda 3-4 PP04 Mukarange 3-5 PP05 Kageyo 3-6 PP06 Kigina 3-7 PP07 Katabagemu 3-8 PP08 Rwimbogo 3-9 PP09 Remera 3-10 PP10 Mahama Drg 4. Facilities Drawings (Reference) 4-1 Spring Intake Facility 4-2 Water Storage Tank 4-3 Break Pressure Tank 4-4 Public Tap stand i Drg 2. Master Plan Scheme Layout Drawings 2-1 Nyagatare District 2-2 Gatsibo District 2-3 Kayonza District and Rwamagana District 2-4 Ngoma District and Kirehe District 2-5 Bugesera District Eastern Province 6 NYAGATARE NyPs07 GATSIBO 9 0 5 10 25 km MUSHELI KAYONZA 9 9 RWAMAGANA MATIMBA NyPs08 9 6 NGOMA Legend 12 BUGESERA KIREHE Planned Pipe Line (New Installation) 9 Planned Pipe Line (Replace existing pipe) Planned Pipe Line : Bulk Water Line 12 Existing Pipe Line (Out of scope) 13 13 Intake Facilities (Spring, River) RWEMPASHA 13 13 Storage Tank (Recieving and/or Distribution) 13 T Water Treatment Plant Reciev.&Dist. 50m3 Existing Facilities (Out of scope) 12 13 13 3 6 9 Handpump (Borehole) RWIMIYAGA 13 13 3-7 NyPs02 13 TABAGWE Reciev.200m3 13 T Dist. 200m3 13 13 NyPs03 14 図 NYAGATARE 3 3-4 Piped Scheme NyPs04 M/P Scheme Code No. Served Secteur Intake Facilities Pump Station Storage Tank Public Tap Stand Intake (Spring) 計画給水スキーム配置図:ニャガタレ郡 KARAMA RUKOMO NyPs01 Kiyombe, Gatunda, Rukomo, Mukama, Mimuli 0 0 0 233 Nyagatare, Rwempasha, Rwimiyaga, NyPs02 Karangazi, Katabagemu 0 0 1 352 Tovu Plant Reciev.&Dist. 100m3 NyPs03 Kiyombe, Karama, Tabagwe 0 0 0 149 NyPs04 Karama 1 (Spring) 0 0 20 Intake (River) NyPs05 KIYOMBE GATUNDA NyPs05 Karangazi 0 0 1 55 3 NyPs06 Katabagemu 0 0 0 96 NyPs09 NyPs07 Matimba 0 0 0 66 Bulk Water Line Plan KARANGAZI NyPs08 Musheri 0 0 0 95 Kiyonbe Plant NyPs09 Bulk Water Line w/ Treatment plant 1 (River) 0 2 0 MIMULI Handpump Scheme M/P Scheme Code No. Served Secteur Replace NyPs01 KATABAGEMU 3 NyHp01 Karangazi 2 NyPs06 6 NyHp02 Matimba 2 MUKAMA 9 NyHp03 Musheri 5 12 NyHp04 Rwempasha 3 Water from Nyagihanga 13 NyHp05 Rwimiyaga 13 Water from 14 NyHp06 Tabagwe 1 2009.7 Gicumbi The Study on Improvement of Rural Water Supply in the Eastern Province Water Supply Plan for NYAGATARE District Water Supply Schemes for Master Plan Japan International Cooperation Agency JAPAN TECHNO Co., Ltd. NIPPON KOEI Co., Ltd. Eastern Province NYAGATARE 0 5 10 25 km GATSIBO KAYONZA RWAMAGANA NGOMA BUGESERA KIREHE GaPs09 GaPs02 Dist.Tank 100m3 NGARAMA Dist.100m3 RWIMBOGO NYAGIHANGA GaPs10 P T Intake (River) 4 Pump Station KABARORE GaPs04 RecievingTank100m3 Treatment Plant GATSIBO Dist.Tank 200m3 14 GaPs03 14 Dist.Tank 100m3 14 GITOKI KAGEYO GaPs05 14 Dist.100m3 P Piped Scheme GaPs01 P REMERA RUGARAMA M/P Scheme Code No. Served Secteur Intake Facilities Pump Station Storage Tank Public Tap Stand GaPs01 Remera 1 2 3 75 Intake (Spring) GaPs01A Muhura, Gasange 0 1 9 71 P GaPs02 Nyagihanga, Gatsibo 0 0 0 90 P GaPs01A MUHURA GaPs03 Gatsibo 0 0 0 40 GaPs04 Kageyo, Gitoki, Kabarore 0 0 0 81 GaPs06 KIZIGURO GaPs05 Kageyo 0 0 0 62 Legend GaPs06 Kiziguro 1 (spring) 1 0 31 Pump&Generator Replace Muhura, Kiziguro, Remera, Rugarama, GaPs07 Kiramuruzi 2 (spring) 0 0 259 Planned Pipe Line (New Installation) GaPs08 Murambi 0 2 (replace p.& g.) 0 43 Planned Pipe Line (Replace existing pipe) P GASANGE P GaPs09 Nyagihanga, Ngarama 0 0 0 80 Planned Pipe Line : Bulk Water Line MURAMBI GaPs07 GaPs10 Bulk Water Line w/ Treatment plant 1 (river) 1 8 246 Existing Pipe Line (Out of scope) (Nyagihanga, Ngarama, Gatsibo, Kabarore, Gitoki, Rwimbogo) Intake Facillities KIRAMURUZI Storage Tank (Recieving and/or Distribution) DistributionTank 5m3 Handpump Scheme T Water Treatment Plant x9 M/P Scheme Code No. Served Secteur Replace P Pump Station 4 GaHp01 Kabarore 1 Existing Facilities (Out of scope) GaPs08 14 GaHp02 Rwimbogo 4 4 14 Handpump 2009.7 The Study on Improvement of Rural Water Supply in the Eastern Province Water Supply Plan for GATSIBO District Water Supply Schemes for Master Plan Japan International Cooperation Agency JAPAN TECHNO Co., Ltd. NIPPON KOEI Co., Ltd. 0 5 10 25 km 6 Piped Scheme (Kayonza District) M/P Scheme Code No. Served Secteur Intake Facilities Pump Station Storage Tank Public Tap Stand Legend KaPs01 Gahini, Mwiri 0 1 (replace p.&g.) 0 87 Planned Pipe Line (New Installation) KaPs02 Kabare 0 0 0 6 MURUNDI Planned Pipe Line (Replace existing pipe) KaPs03 Kabare, Rwinkwavu 1 1 1 57 KaPs04 Kabare, Ndego 1 1 1 40 Existing Pipe Line (Out of scope) 50m3 6 KaPs12 KaPs05 Kabare 0 0 0 17 Intake Facilities (Spring) KaPs13 6 KaPs06 Kabare 2 1 1 16 Storage Tank (Recieving and/or Distribution) P 50m3 KaPs07 Kabarondo 0 0 0 69 P Pump Station P Intake (Spring) KaPs08 Mukarange 0 0 0 98 Existing Facilities (Out of scope) Intake (Spring) 6 KaPs09 Murama 0 0 0 55 1 6 7 Handpump (Borehole) KaPs10 Murama 1 1 1 28 KaPs11 Rukara, Murundi 0 1 1 119 Piped Scheme (Rwamagana District) KaPs12 Murundi 1 1 1 2 M/P Scheme Code No. Served Secteur Intake Facilities Pump Station Storage Tank Public Tap Stand KaPs11 KaPs13 Muriundi 1 1 1 70 RwPs01 Gahengeri, Fumbwe 1 1 2 161 KaPs14 Mwiri, Rwinkwavu, Gahini 0 0 0 83 Gishari, Kigabiro, Muhazi, RwPs02 0 0 0 155 KaPs15 Nyamirama, Mukarange 0 2 (replace pumps) 0 122 Munyiginya RUKARA KaPs16 Ruramira 2 0 0 69 RwPs03 Mwulire, Rubona, Munyiginya 0 1 (replace pump) 0 330 GAHINI Pump&Generator RwPs04 Musha 0 2 2 80 P Handpump Scheme (Kayonza District) 1 P MWIRI 100m3 M/P Scheme Code No. Served Secteur Replace KaPs01 7 1 KaHp01 Gahini 1 6 KaHp06 Murundi 4 FUMBWE 7 KaHp07 Mwiri 1 MUHAZI 3-9 RwPs04 KAYONZA MUKARANGE MUSHA GISHARI KaPs08 KaPs14 図 200m3 RwPs01 3-6 50m3 P P MUNYIGINYA KaPs15 Pump Replace 100m3 200m3 Intake (Spring) P P 計画給水スキーム配置図:カヨンザ、ルワマガナ郡 GAHENGERI NYAMIRAMA RWINKWAVU RwPs02 Pump Replace KIGABIRO P KaPs03 Intake (Spring) 50m3 NDEGO KaPs16 MWULIRE P MUYUMBU Intake (Spring) KaPs10 RWAMAGANARwPs03 Pump Replace P Eastern Province Intake (Spring) Intake (Spring) P RURAMIRA 50m3 NZIGE KABARONDO KaPs02 NYAGATARE MUNYAGA Intake (Spring) NYAKARIRO MURAMA P GATSIBO KaPs07 50m3 KaPs04 RUBONA KAYONZA KaPs09 KABARE RWAMAGANA KARENGE Intake (Spring) NGOMA 50m3 KaPs05 P BUGESERA KIREHE KaPs06 2009.7 The Study on Improvement of Rural Water Supply in the Eastern Province Water Supply Plan for KAYONZA District and RWAMAGANA District Water Supply Schemes for Master Plan Japan International Cooperation Agency JAPAN TECHNO Co., Ltd. NIPPON KOEI Co., Ltd..
Recommended publications
  • Bugesera District Burera District Gakenke District Gasabo District
    Progress, but more effort Target achieved / on track Not on track N/A No data required Increase from last period Decrease from last period Proportion of Measles & Percentage of Proportion of Percentage of women Percentage of Rubella 2nd Delivery in Percentage of Newborn who new-born not Neonatal teenage receiving ANC 1 during ANC 4th mothers who dose (MR2) facility mother who received PNC 4 breathing service case delivery (19 postpartum 1st trimester standard visit Penta 3 received coverage, all coverage (w/ received PNC 4 Visit at 6 weeks successfully fatality years and Family coverage coverage BCG coverage coverage Iron+folic acid ages (BCG census-based Visit at 6 weeks after birth_new resuscitated rate_new under) planning (based on CBR) (based on CBR) (census-based) (census-based) during ANC denominator) target) 51.7 52.7 50.3 7.9 7.2 41.4 52 42.3 117 118.4 91.5 112.8 108 Bugesera District 76 75.3 84.3 5.3 8.3 71.6 51.7 40.5 84.8 87.4 96.7 121.2 69 Burera District 59.2 59.5 60.3 6.7 10.4 39.6 55.4 37.8 78.7 81.9 99.9 116.8 83 Gakenke District 24.4 24.5 70.7 4.4 3.3 28.3 52.8 35.7 123.2 117 59.6 87.7 124 Gasabo District 78.6 78 73.4 9.1 9.1 55 41.1 38 86.5 98.5 89.7 107.6 84 Gatsibo District 63.1 64.1 82 17.1 6.8 85.4 48.2 39.3 87.4 90.7 99 110.4 91 Gicumbi District 78.4 78.3 85.4 10.5 5.5 46.3 70.2 53.1 100.3 108.7 100 114.4 94 Gisagara District 61.6 63.2 68.2 15 4.4 64.5 50.8 36.1 91.5 89.8 100 101.1 95 Huye District 56 57.2 82.2 14.6 6.9 73.2 34.6 26.4 74.2 79.9 75.7 122.5 59 Kamonyi District 52.9 53 74.4 2.7 5.6 61.2 33.1 24
    [Show full text]
  • Baseline Study Report
    MINISTRY OF INFRASTRUCTURE KIGALI, RWANDA National Domestic Biogas Programme Rwanda Baseline Study Report Final Version November 2007 Authors: Elisabeth-Maria Huba Eva Paul MINISTRY OF INFRASTRUCTURE KIGALI, RWANDA NDBP Rwanda Baseline Study Report 2007 Baseline Study NDBP Rwanda CONVERSION UNITS 5 ACRONYMS AND ABBREVIATIONS 6 1. EXECUTIVE SUMMARY 9 1.1 Background 9 1.2 Survey methodology 9 1.3 Main survey results 10 1.4 Lessons learned and challenges 12 2. INTRODUCTION 14 2.1 The country 14 2.1.1 Geography and administration 14 2.1.2 Economy 15 2.1.3 Poverty 16 2.1.4 Environment concerns and energy supply 20 2.2 The National Domestic Biogas Programme 21 3. OBJECTIVES, APPROACHES AND METHODOLOGIES 25 3.1 Objectives of the Baseline Study 25 3.2 Approaches 26 3.3 Methodologies 28 3.3.1 Questionnaire development 29 3.3.2 Survey process 29 3.3.3 Data analysis 31 4. DISTRICT PROFILES 33 4.1 Kamonyi 33 4.2 Gasabo 34 4.3 Ruhango and Nyanza 34 4.4 Rulindo 36 2 MINISTRY OF INFRASTRUCTURE KIGALI, RWANDA NDBP Rwanda Baseline Study Report 2007 4.5 Gatsibo 37 4.6 Overview on district and country data 38 5. ANALYSIS OF THE SURVEY RESULTS 41 5.1 Household characteristics 44 5.1.1 Current Situation of Households 44 5.1.2 Aimed Impact of the NDBP on Household Situation 57 5.1.3 Lessons learned about challenges and opportunities for the NDBP 57 5.2 Energy demand and supply 61 5.2.1 Current situation 61 5.2.2.
    [Show full text]
  • Analysis of the Causes of Financial And
    ANALYSIS OF THE CAUSES OF FINANCIAL AND NON- FINANCIAL WEAKNESSES IDENTIFIED IN THE AUDITOR GENERAL’S REPORTS OF DECENTRALIZED ENTITIES FOR THE FINANCIAL YEAR ENDING 30 JUNE 2014 www.tirwanda.orgwww.tirwanda.org Transparency International Rwanda is a local chapter of a global movement with one vision: a world in which government, business, civil society and the daily lives of people are free of corruption. Since 2004, we are contributing to the fight against corruption in Rwanda to turn this vision into reality. www.tirwanda.org 2 © 2015 Transparency International Rwanda. All rights reserved. Every effort has been made to verify the accuracy of the information contained in this report. All information was believed to be correct as of December 2015. Nevertheless, Transparency International Rwanda cannot accept responsibility for the consequences of its use for other purposes or in other contexts. www.tirwanda.orgwww.tirwanda.org EXECUTIVE SUMMARY Transparency International Rwanda (TI-Rw) analyses expenditure- and non-expenditure related weaknesses of decentralized entities as highlighted in the Auditor General’s Report since 2012. The present analysis, a third of its kind, has focused on the reports for the financial year ending June, 2014 for all districts and the City of Kigali. This report is intended to broad audience including both interested public and public finance and local government stakeholders. The total monetary value related to the identified weaknesses in districts reached 112,650,524,574 RWF in the financial year 2013/14. This is a slight improvement to the year 2012/13. Still, this decrease marks only a marginal improvement equivalent to 1% of all identified weaknesses.
    [Show full text]
  • Eastern Province Gatsibo District Development Plan 2013/2014-2017/2018
    REPUBLIC OF RWANDA GATSIBODISTRICT EASTERN PROVINCE DISTRICT DEVELOPMENT PLAN (2013-2018) Table of Contents List of Tables .............................................................................................................................................. vi LIST OF ABBREVEIATIONS/ACRONYMS ....................................................................................... vii EXECUTIVE SUMMARY ....................................................................................................................... ix CHAPTER ONE: Introduction ................................................................................................................. 1 1.1 Background and Justification ............................................................................................ 1 1.2 Purpose of Gatsibo District Development Plan ............................................................ 2 1.4 Actors in the Gatsibo District ......................................................................................... 3 1.5 General contents/structure of Gatsibo DDP ................................................................. 4 CHAPTER TWO: Overview of the District ............................................................................................. 5 2.1 Location of Gatsibo District ........................................................................................... 5 2.1.1 District Demography ........................................................................................................ 5 2.1.2 Relief
    [Show full text]
  • Republic of Rwanda
    REPUBLIC OF RWANDA EASTERN PROVINCE GATSIBO DISTRICT FINAL REPORT FOR GATSIBO DISTRICT TOWN LUDP IMPLEMENTATION STUDIES SEPTEMBER 2014 Timely and Practical Solutions GEOINFO AFRICA LTD P.O.Box 1804, TEL+250-788484141, 0788308853 1 Implementation Study of Gatsibo District LUDP LIST OF ABBREVIATIONS Table of Contents CAD: Computer Aided Design LIST OF ABBREVIATIONS ............................................................................................... 2 CBD: Central Business District DDP: District Development Plan EXECUTIVE SUMMARY ................................................................................................... 6 DTM: Digital Terrain Model 1 BACKGROUND AND METHODOLOGY OF THE STUDY .................................... 7 RNRA: Rwanda Natural Resource Authority Reduction Strategy 1.1 Background ................................................................................................................................................................... 7 ESEFP: Environment and Social Economic Framework Plan 1.1.1 Objectives of the Study ............................................................................................................................................... 7 EICV3: Integrated Household Living Conditions Survey 1.1.2 Historical Concept ........................................................................................................................................................ 8 FGD: Focus Group Discussion 1.1.3 Location of Gatsibo District and Kabarore Town in the National and Local
    [Show full text]
  • January 1‐ March 31, 2017
    Maternal and Child Survival Program Quarter 2 Report – January 1‐ March 31, 2017 Submission Date: April 30, 2017 Cooperative Agreement Number: AID-OAA-A-N-00028 [COR/AOR/Activity Manager] Name: AOR (Dr. Nahed Matta) Activity Manager Name: (Dr. Mary Kabanyana) Submitted by: Dr. Stephen Mutwiwa, Chief of Party Jhpiego Corporation KN 8 Avenue, Kacyiru Rwanda National Police Road Kigali, Rwanda Tel: +250-78-830-8191 Email: [email protected] 1 PROGRAM OVERVIEW Program Name: MCSP Start Date And End Date: April 2015-September 30, 2018 Name of Prime Implementing Jhpiego Corporation Partner: [Contract/Agreement] AID-OAA-A-N-00028 Number: Jhpiego (lead) – maternal health, family planning/reproductive health, quality improvement and gender; JSI – child health; Save the Children – newborn health, Partner Organizations adolescent sexual and reproductive health, and community mobilization; ICF – community mobilization; R4D – health systems strengthening Ministry of Health – Rwanda Biomedical Center (RBC) including the Maternal Child and Community Health (MCCH) Division, the Malaria and Other Parasitic Key Partners Diseases Division (Mal&OPDD), Rwanda Health Communication Center (RHCC); WHO/AFRO, UNICEF, and other USAID implementing partners Reporting Period: January 1 to March 31, 2017 RMNCH districts- Nyaruguru, Nyamagabe, Huye, Musanze, Nyabihu, Kamonyi, Nyagatare, Gatsibo, Rwamagana and Ngoma. Geographical coverage ICCM districts - Kayonza, Kirehe, Ngoma, Gasabo, Kicukiro, Nyarugenge and Ruhango IST Districts- Huye and Kamonyi 2 CONTENTS
    [Show full text]
  • Organic Law No 29/2005 of 31/12/2005 Determining The
    Year 44 Special Issue of 31st December 2005 OFFICIAL GAZETTE OF THE REPUBLIC OF RWANDA Nº 29/2005 of 31/12/2005 Organic Law determining the administrative entities of the Republic of Rwanda. Annex I of Organic Law n° 29/2005 of 31/12/2005 determining the administrative entities of the Republic of Rwanda relating to boundaries of Provinces and the City of Kigali. Annex II of Organic Law n° 29/2005 of 31/12/2005 determining the administrative entities of the Republic of Rwanda relating to number and boundaries of Districts. Annex III of Organic Law n° 29/2005 of 31/12/2005 determining the administrative entities of the Republic of Rwanda relating to structure of Provinces/Kigali City and Districts. 1 ORGANIC LAW Nº 29/2005 OF 31/12/2005 DETERMINING THE ADMINISTRATIVE ENTITIES OF THE REPUBLIC OF RWANDA We, KAGAME Paul, President of the Republic; THE PARLIAMENT HAS ADOPTED AND WE SANCTION, PROMULGATE THE FOLLOWING ORGANIC LAW AND ORDER IT BE PUBLISHED IN THE OFFICIAL GAZETTE OF THE REPUBLIC OF RWANDA THE PARLIAMENT: The Chamber of Deputies, in its session of December 2, 2005; The Senate, in its session of December 20, 2005; Given the Constitution of the Republic of Rwanda of June 4, 2003, as amended to date, especially in its articles 3, 62, 88, 90, 92, 93, 95, 108, 118, 121, 167 and 201; Having reviewed law n° 47/2000 of December 19, 2000 amending law of April 15, 1963 concerning the administration of the Republic of Rwanda as amended and complemented to date; ADOPTS: CHAPTER ONE: GENERAL PROVISIONS Article one: This organic law determines the administrative entities of the Republic of Rwanda and establishes the number, boundaries and their structure.
    [Show full text]
  • University of Rwanda
    UNIVERSITY OF RWANDA COLLEGE OF ARTS AND SOCIAL SCIENCES MASTER OF ARTS IN DEVELOPMENT STUDIES PROGRAM DEVELOPMENT BENEFITS OF SHIFTING FROM PASTORALISM TO SEDENTARY CATTLE KEEPING IN RURAL AREAS: “POLICY FRAMEWORK AND PRACTICE IN RWANDA” Prepared by NTIRENGANYA Boniface REG No: 218014335 A DISSERTATION SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF MASTER OF ARTS DEGREE IN DEVELOPMENT STUDIES OF UNIVERSITY OF RWANDA (UR) October 2019 i Dedication I dedicate this research project to the Lord Almighty for his grace that enabled me to go through the course successfully, and my Wife, Sons, and Daughters for their understanding, moral support, and encouragement throughout the entire process and preparation of writing this research paper. ii Acknowledgment I take this opportunity to express my sincere thanks to my supervisor, Dr. UWIZEYE Dieudonné for his guidance, patience and tireless efforts that played an important role in the completion of this project. I would also like to acknowledge the support provided by the Local Government Authorities and Government Officials in identifying the respondents in Nyagatare and Gatsibo districts. Special thanks go to the respondents for sacrificing their time to avail the information I needed for the study. Over and above all, I wish to record my sincere gratitude to my father, God Almighty for the wisdom and understanding of the intricate issues of writing a research paper and all those who assisted in correcting the grammatical errors, thus improving the readability and academic worth of this research. iii Abstract The research sought to assess development benefits of shifting from Pastoralism to Sedentary Cattle keeping in rural areas: “Policy framework and Practice in Rwanda”.
    [Show full text]
  • Transport Sector Support Project- Base-Gicumbi-Nyagatare Road
    Executive Summary-Base-Nyagatare road project PROJECT: TRANSPORT SECTOR SUPPORT PROJECT: BASE-GICUMBI-NYAGATARE ROAD (SECTION BASE - GICUMBI-RUKOMO: 51.5KM) COUNTRY: REPUBLIQUE DU RWANDA SUMMARY OF THE RESETLEMENT ACTION PLAN Philippe MUNYARUYENZI, Senior Transport Engineer, OITC.2/RWFO MODESTE L. KINANE, Senior Environmental Specialist, ONEC.3 Justin MURARA, Chief Socio-Economist, OSHD1 J.P MEGNE EKONGA, Transport Economist, OITC.1/CDFO A.M DIALLO , Procurement Officer, ORPF.1/RWFO Project A.DIOMANDE, Financial Management expert, EARC/ORPF2 Team E.ISIMBI, Disbursement Assistant Sectorial Director : G. NEGATU, EARC Regional Director : A. OUMAROU, OITC Division Manager : A. BABALOLA, OITC-2 Executive Summary-Base-Nyagatare road project Project Title: TRANSPORT SECTOR SUPPORT PROJECT: BASE-GICUMBI-NYAGATARE ROAD (SECTION BASE - GICUMBI-RUKOMO: 51.5KM) Project Number: P-RW-DB0-014 Country: Republic of Rwanda Department: OITC Introduction The strategy of the Ministry of Infrastructure supports the overall objectives of Vision 2020 of the Government of Rwanda (GoR) with an action on the upgrading of transport infrastructure, particularly roads, by planning a number of action of rehabilitation, modernization and maintenance. In this context, the proposed Base –Byumba- Nyagatare road to be rehabilitated is part of the policy of GoR strategy in improving transport infrastructure to promote integration among the regions in the national economic space and stimulate exchanges between regions, the ultimate objective being income growth of the population, poverty reduction and improvement of living conditions. GoR, in line with vision 2020 and the transport sector policy has applied for a loan from the African Development Fund (ADF) towards the cost of this project.
    [Show full text]
  • Final Report Photographs
    MININFRA EASTERN PROVINCE REPUBLIC OF RWANDA THE STUDY ON IMPROVEMENT OF RURAL WATER SUPPLY IN THE EASTERN PROVINCE IN THE REPUBLIC OF RWANDA FINAL REPORT PHOTOGRAPHS November 2010 JAPAN INTERNATIONAL COOPERATION AGENCY JAPAN TECHNO CO., LTD. NIPPON KOEI CO., LTD. GED JR 11-022 TABLE OF CONTENTS P1. Related Administrative Organizations P2. Scenery and Water Resources of Eastern Province P3. Water Use Conditions P4. Existing Water Supply Facilities P5. Operation and Maintenance Situation P6. Sanitation Facilities P7. Surveys and Conferences i Photographs P1. Related Administrative Organizations (1/3) MININFRA MINIRENA Eastern Province (Temporary Office) Eastern Province/Rwamagana District Office (under construction) PNEAR PDRCIU REMA RWASCO Photographs P1. Related Administrative Organizations (2/3) Nyagatare District Gatsibo District Kayonza District Rwamagana District (Temporary Office) Ngoma District Kirehe District Bugesera District Secteur Panel (Gashahanda Secteur, Ngoma District) Photographs P1. Related Administrative Organizations (3/3) Secteur Office (Ngarama Secteur, Gatsibo District) Secteur Office (Mahama Secteur, Kirehe District) Secteur Office (Munyaga Secteur, Rwamagana District) Secteur Office (Mukarange Secteur, Kayonza District) Cell Office (Rwikiniro Cell, Rwimbogo Secteur, Cell Office (Kayumba Cell, Nyamata Secteur, Gatsibo District) Bugesera District) Photographs P2. Scenery and Water Resources of Eastern Province A Land of Thousand Hills Umudugudu Resettlement Spring Water Fall used for Power Generation Stream Akagera River (Turbid) Lake Valley Dam for Cattle Watering and Irrigation Photographs P3. Water Use Conditions Children carrying water up steep hill Family transporting water Children carrying water from far mountains Woman fetching water from unprotected spring Girl fetching water from unprotected spring Children fetching water from stream Women and children using river water Fetching water from valley dam for livestock Photographs P4.
    [Show full text]
  • 3 Districts 660,311 €
    © Andrea Andrea © Signori CARE (Comprehensive solutions for increased Access to mental health Rooted in communities and Enhancing public services) 2020 - 2023 Carried out by AVSI Rwanda in collaboration with its action partners (Neuropsychiatric hospital of Ndera and University of Rwanda through its mental health department). This project’s activities are based in Gicumbi district and Nyanza district under the funds of Fondation d’Harcourt and also in Areas involved Gatsibo district under the funds of ▪ Follow-up visits for people with 3 Districts mental health problems, their EKFS. The project aims to enhance Nyanza, Gicumbi, and caregivers and families the resilience of people with MNS Gatsibo ▪ Helping people with mental health conditions and of their families problems find employment or Beneficiaries through a community-based productive work to develop new skills people at risk or approach. ▪ Conducting Participatory Action 719 Research with a mental health Activities Objectives disorder, 400 teen- ▪ Adaptation of the mhGAP component ▪ To support the development of ▪ Training of staff in mhGAP mothers with their competent, sensitive and adequate ▪ Preparation of clinical and children human resources to provide mental administrative supervision health services and reduce stigma and ▪ Ensuring Clinical and Administrative Budget discrimination at family, school and Supervision community level 660,311 € ▪ Improve Access to Psychological ▪ To foster equitable access to Interventions affordable and comprehensive mental ▪ Providing treatment
    [Show full text]
  • S3.5 Results of Geophysical Survey
    S3.5 Results of Geophysical Survey Geophysical surveys were carried out during the first fiscal year field survey and the second fiscal year field survey for different survey objectives and by changing survey methods. During the first fiscal year field survey, with objectives of identifying the thicknesses and depths to basements of alluvium layers distributed along valleys having well developed groundwater, vertical electrical sounding (VES) was carried out. On the other hand, during the second fiscal year field survey, to select candidate sites for new borehole drillings in areas where piped water supply is difficult, electromagnetic prospecting and vertical sounding were conducted. Periods of conducting these surveys were from January to February 2009 for the first survey and from July to August 2009 for the second survey. S3.5.1 First Fiscal Year Field Survey (1) Survey Method In the study area of the Eastern Province, Rwamagana and Bugesera Districts, where water supply is covered by existing piped water schemes and in the future, extensions of these schemes and other piped schemes are expected, were excluded as target areas for the survey. At the remaining the 4 districts of Nyagatare, Gatsibo, Kayonza and Kirehe, geoelectrical surveys were carried out at 84 locations distributed over 18 secteurs along alluvium distributed valleys where groundwater pumping has high possibilities. For electrode configuration, survey depths were relatively shallow at 100m and the Wenner method was used in which interpretations of survey results can