JHIRIA UNDERGROUND PROJECT

vtttAGEs Dumar Kachhar lM.P.l OFFICE AND INFRASTRUCTURE IN MATGA RF TEHSIT KOTMA KOTMA DISTRICT ANUPPUR

STATE MADHYA PRADESH

PARTICUTARS EXTSTING ADDITIONAT TOTAL

PROJECT AREA 557.00 HA Ntt ss7.00 HA PEAK PRODUCTION 0.33 MTY Ntt 0.33 MW CAPACITY

PRODUCTION CAPACIW OF 0.33 MTPA

SOUTH EASTERN COATFIETDS TIMITED (A MrNt RATNA COMPANYI BTLASPUR (CHHATTTSGARH)

-7- ilrlK e l't-* ^ "+,r$i .'aa* ilptdlt#i 'r ;f (... f-t+b e" i':'| 'i: 'n' APPENDIX.! FORM.I (i) BAS|C TNFORMATTON s.N Item Details 1. Name of the Proiect/s Jhiria Underground Proiect 2. Sl. No. in the schedule 1(A) 3. Proposed capacity/area/length/ton nage to Production 0.33 MTPA. be handled/command are /lease Area- - 557-00 Ha. area/number of wells to be drilled Bore holes - 97 numbers of boreholes already drilled. 4. New/Exoansion/Modernization Extension of validity of EC. 5. Existins caoacitv/Area etc. Existing caoacitv- 0.33 MTY and Lease area 557.00 Ha. ,A' 6. Categorv of oroiect Le. 'A' or'B' 7. Does it attract the general condition? if Yes yes, please specify 8. Does it attract the specific condition? lf No ------l__-- _,-_-:I. Ye5, pr€dse spec||y. 9. Location The Jhiria underground is located to the immediate west of the SoWh Jhimar mine. The geological block is about 14 KM south west of Manendragarh township, Korea district, C.G. The block is bounded by latitudes 23" 08' 06" to 23" 09'47" N and longitudes 82" 06' 02" to 82" M' (8" F in Anuppur District of M.P. Plot/survey/Khasra no. Survey of Topo Sheet No. 64 l/4 {RF 1:50000) Village Dumar Kachhar (M.P.) Office and infrastructure in Malea RF Tehsil Kotma District Anuppur State Madhva Pradesh 10. Nearest Railway Station/airport along with Manendragarh Rly Station -1.4.0 Km from the mine. distance in Kms. 11. Nearest Town, city, Distict Headquarter a) Nearest Town Manendragarh:- 14.0Km aiong with distance b) City/District H/Q:- Anuppur 55 Km Madhya Pradesh. L2. Vif lage, Panchayat, Alla parishad, S.no. Gram Panchayat, Tel./Mob. No. Municipal corporation, Local body L. Tehsil- Kotma 07658-233274 (complete postal Address with telephone 9669155076 nr rmhar tn ha oirrenl 't Zilla Parisad- Anuppur a7659-222979 9754166040 3. Collectorate Dist.- Anuppur 07659-222400 4. Panchayat Dumar Kachhar 9424702409 13. Name of the applicant Ashok Kumar Udeniva t4. Registered address OFFICE OF THE AREA GENERAL MANAGER, SECL HASDEO AREA, P.O.: South Colliery Distt.: Korea (C.G.)- 49748 15. Address for correspondence Name Ashok Kumar Udeniya Designation (owner/Pa rtner/CEO) AREA GENERAT MANAGER, SECL HASDEO AREA -2-

' i :+L-..'4 ,. :{-- Vts I i# 'r''i SECL,, ie'1 Address OFFICE OF THE AREA GENERAL MANAGER, SECL HASDEO AREA, P.O.: South Jhagrakhand Colliery Distt.: Korea (C.G.) Pin code 497448 E-mail gmhsd.secl @coalindia.in, [email protected], gm e nvtse cl @ gmail. ^com Telephone No. 07 7 7 t-243O35 / +91-942553 3 5 0 1 Fax No. 07777-24L3s9 t6. Details of alternative sites examined if The mine is operational. Coal mining is a site specific any. Location of these site should be activity. shown on a tooo Sheet t7. Interlink Projects Not Applicable 18. Whether separate application of Not Applicable interlinked oroiect has been submitted? 19. lf Yes, date of Submission Not Applicable 20. lf no, reason Not Apolicable 2r. Whether the proposal involves approval / clearance under if yes, details of same a) The Stage l/ Principal approval of 747.92 Ha of and their status to be given Forest Land in Madhya Pradesh already obtained vide a) Forest conservation Act 1980. letter no. F. No. 8-72I2OA2-FC Dated 13.11.2003 b) Wildlife protection AcI.. t972. b) Not applicable c) CRZ Notification 1991. cl Not aoplicable 22. Whether there is any government No order/policy relevant/relating to site? 23. Forest land involved 557.00 Ha 24. Whether there is any litigation pending No against the project and or land in which the project i5 proposed to be set up? a) Name of the court b) Case No. c) Orders /direction of the court, if any and its relevance with the proposed project. 25. Project Cost (in Lakh) 3206.80 Lakh

(ii! Aetivity: 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.)

-3- s.N InformationlCheckl ist Yes/ Details of thereof {with approximate confirmation No quantities/rates, wherever possiblef lMth sources of information data. 1.1 Permanent or temporary change in land Yes Total land involved in the project (Mining area) use, land cover or topography including '- 557.00 ha inerpase in intpnsitv of land rrse lwith Break-up as follows:- respect to local land use plan) X..Forest - 557.00 ha 2. Tenancy/Agriculture Land - NIL 3. (Govt. Land) - Nlt Total = 557.00 Ha As this is an Underground mine, only a very small portion of surface area of the land gets disturbed for its use in infrastructure/town ship development. t.2 Clearance of existing land, vegetation and No Not Applicable buildings? 1? t\tn rrv\I\ln* A nnliashla Creaticn of neur land uses? ^FPr.esu.s L.4 Pre-construction investigation e.g. bore No Not Applicable houses, soil testing? 1.5 Construction Work? Yes To be taken up within mine lease area 1.6 Demolition Work No Not Applicable 7.7 Temporary sites used for construction No Not Applicable works or cut and fill or excavation. 1.8 Above ground buildings, structures or Yes To be taken up within mine lease area earthworks including linear structures, cut and fill or excavations. 1.9 Under works including mining or Yes Mining is being done in UG by Bord & Pillar tunneline? method. 1.10 Reclamation Works? No Not Applicable 1.11 Dredeins? No Not Applicable r.t2 Offshore structures? No Not Apolicable 1.13 Production and manufacturing processes? Yes Production is being done by Bord & Pillar method of undergrcund coa! mining as per DGMS euidelines. L.t4 Facilities for storage of goods or Yes Mine entrance and surface infrastructure of an materials? old adjoining underground mine i.e. South Jhimar is being used for coal production. 1.15 Facilities for treatment or disposal of solid Yes Mine is UIC- Mine sump water is being waste or liquid effluents? discharged at surface settling tanks having capacity 2.00 lakh gallons. Part of settled mine water is used in dust suppression, green belt development/gardening etc. within mine premises. Balance quantity of settled mine water is further treated through pressure filter and supplied to SECL Colonies and nearby area for drinking and other domestic purposes Hence complete utilization of mined out water is ensured. -.L?^zn-rO{ 4,t;'i ^, t r..15 Facilities for long term housing of Yes The residential buildings are available in the operational workers? colony of Ramnagar sub area. The colony is well equipped with water supply system and having colony road network. t.t7 New road, rail or sea traffic during No Not Applicable, Existing Mine construction or operation? 1.18 New road, rail, air waterborne or other No Not Applicable, Existing Mine transport infrastructure including new or altered routes and stations, pofu, airports etc. 1.19 Closure or diversion of existing trans- port No Not Applicable. routes or infrastructure leading to changes in traffic movements. 1.20 New or diverted transmission lines or No Not Applicable. pipelines? L.27 lmpoundment, damming culverting No Not Applicable. realignment or other changes to the hydrology of watercourses or aquifers? t.22 Stream crossings? No Not Applicable- Abstraction or transfers of water form No There is no abstraction or transfers of water t.23 ground or surface waters? form ground or surface water sources however mine intersect the water table and to ensure safety of men and machinery, water has to be pumped out of the mine. Mine water is stored in sumps which act as primary settling tanks where coal particles and silt get settled down. They also act as underground water harvesting structures. Only supernatant waler is pumped out into surface settling tanks. After passing througlr settling tank clear water is being utilized to meet the mine industrial water use (i.e. for dust suppression, workshop & green belt developmenVgardening etc). Balance quantity of scttlcd minc watci is fi:rthcr trcatcd through presswe filter and supplied to SECL Colonies and nearby area for drinking and other domestic purposes Hence complete utilization of mined out water is ensured. L.24 Changes in water bodies or the land No Not Applicablb surface aftecting drainage or run -off? 1.25 Transport of personnel or materials for Yes Coal is being transported from underground construction, operation or face to Surface Bunker through Series of Belt decommissioning? conveyor after that the coal is being transported by tippers to Rajnagar R.O. siding for Rail dispatch. Manpower travel by their own vehicles. L.26 Long-term dismantling or No All Long term dismantling or decommissioning decommissioning or restoration works? or restoration works will be dealt at the time of final Mine closure as per approved MCP. L.27 Ongoing activity during decommissioning No All decommissioning of machinery and which could have an impact on the -5- i/1;'-1t4..'"1 V environment? Mine closure as per approveci MCP.

L.28 Influx of people to an area in either No Not Applicable temporarily or permanently?

L.29 Introduction of alien species or genetic No Not Applicable diversiW? 1.30 Loss of native species or genetic diversity? No Not Aoolicable 1.31 Any other action? No Not Applicable

2. Use of Natural resources for construstion or operation of the Project (such as land, water, materials or energy, especiatly any resources which are iron- ienewable in or in short supply):-

(with s.N I nformation/Checklist Yes/ Details of thereof approximate confirmation No quantities/rates, wherever possiblel With sources of information data. 2.7 Land especially undeveloped or Yes Total land involved in the project {Mining area) agricultural land (ha) - 557.00 Ha Break-up as follows:- 1. Forest - 557.00 Ha 2. Tenancy/Agriculture Land - NIL 3. (Govt. Land) - NIL Total- 557.00 Ha 2.2 Water (expected source & competing Yes Source- Mined out water users) unit: KLD 1000 KLD- industrial use 5500 KLD- domestic use. 2.3 Minerals (MT) Yes Total Extractable reserve-15.89 MT Coal extracted till 31.03.2O18: M.O77 MT Mineable Reserve(as on 01.04.2018)- 11.813 MT 2.4 Construction material stone, aggregate, Yes Construction material is used for surface sand/soil (expected source)- in MT infrastructure works as well as in UG for making Sectionalisation/lsolation and Ventilation stoppings & other works. Sources of construction materials :- Local suppliers. 2.5 Forests and timber (source-MT) Yes Timber is being purchased from Forest Department as and when required. )A Energy including electricity and Yes El ectricity:- 2000 KV.A fuels(source, competing users) Unit: fuel POL - 23 KL approx in year 2OL7-18 (MT), energy (MW) 2.7 Any other natural resources No Not applicable ( use appropriate standard units)

-6- 3. Use, storage, transport, handling or production of substances ot materials, which could be harmful to human health orthe environment or raise concerns about actual or perceived rillks to human health.

s.N I nformation/Checkl ist Yes/ Details of thereof (with approximate Confirmation No quantities/rates, wherever possible) With sources of information data. 3.1 Use of substances or materials, which are No Not Applicable hazardous (as per MSIHC rules) to human health or the environment (flora, fauna and water supplies) 3.2 Changes in occurrence of disease or affect No Not applicable disease vector ie.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No Not applicable changing living condition. 3.4 Vulnerable groups of people who could be No Not applicable affected by the project e.g. hospital parents, children, the elderly etc. 3.5 Any other causes. No Not applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month):

I nform ation/Checld ist Yes/ Details of thereof (with approximate s.N confirmation No quantities/rates, whelever possiblef With sources of information data. 4.L Spoil, overburden or mine waste No Not aoolicable 4.2 Municipal waste (domestic and or Yes Door to door collection by the TA department commercial wastes) of Ramnapar subs area. 4.3 Hazardous wastes (as per Hazardous waste Yes Small quantity of used oil generated from management Rule) machineries. Authorization obtained from MPPCB to operate a facility for generation, collection, reception, storage and transport of hazardous waste {under catesory 5.1& 5.2}. 4.4 Other lndustrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from Yes Cleaning of Sludge from settling tank is being effluent treatment- done regularly. Set of septic tanks and soak pits provided to dispose off domestic sewage. 4.7 Construction or demolition wastes No Not applicable 4.8 Redundant machinery or equipment Yes Machinery/equipments Surveyed off as and when necessary. 4.9 Contaminated soils or other materials No Not applicable 4.10 Agriculture vJastes No Not applicable ^ A 4.t7 Other solid wastes. No Not applicable {ifi,{rrllq\K ' ..'-;i3(V-d

, 5. Release of pollutants or any hazardous, toxic or noxious substances to air {lq/hr}:

s.N I nformation/Checklist Yes/ Details of thereof (with approximate confirmation No quantities/rates, wherever possible) Whh sources of information data. 5.1 Emission from combustion of fossil fuels Yes Emissions due to burning of fossif fuels from from stationary or mobile sources. vehicles deployed are in negligible quantity & within permissible limit. 5.2 Emissions from production processes Yes Within permissible limit. 5.3 Emissions from materials handling Yes Within permissible limit. including storage or transport. 5.4 Emissions from construction activities Yes Within permissible limit. includine plant and equipment. 5.5 Dust or odors from handling of materials, Yes The generation of coal dust within permissible sewaee and waste. limit. 5.6 Emissions from incineration of waste. No Not applicable J.tra Emissions from burning of waste in open No Not applicable air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources. No Not applicable

6. Generation of Noise and vibration and emissions of Light and Heat:

s.N I nformation/Checkl ist Yesl Details of thereof (with approximate confirmation No quantlties /rates, wherever possiblef With sources of information data. 5.1 From operation of equipment e.8. Yes Within permissible limit. eneines/ventilation olant/crushers. 6.2 From lndustrial or similar processes Yes Within permissible limit. 6.3 From construction and demolition No Not applicable 6.4 From blasting or piling Yes Within permissible limit as specified by DGMS. 6.5 From construction or operational traffic Yes Within oermissible limit. 5.6 Froin lieiitins, or cooling svsterr. Yes Within permissible limit. 6.7 From any other sources No Not Applicable

7. Risk sf contamination of land or water from releases of polfutants in to the ground or into sewers, surface waters, ground ufaters, cutstal waters or the sea:

s.N Information/Checkl ist Yes/ Details of thereof (with approximate confirmation No quantities/rates, wherever possible) With sources of information data. 7.L From handling, storage, use or spillage of No Small quantity of used oil generated from hazardous materials. machineries stored safely in closed containers

I l/ 7.2 From discharge of sewage or other No Complete utilization of mined out water. effluents to water or the land (expected Septic tanks with soak pits provided for mode and olace of discharee) domestic sewage. 7.3 By deposition of pollutants emitted to air No Not applicable into the land into water. 7.4 From anv other sources No Not applicable 7.5 ls there a risk of long term build up or No Not applicable pollutants in the environment from these sources?

8. Rlsk of accldents during construction or operaUon of the Proiect, which could affect Human health or the environment contamination of land or water from releases of pollutants into the ground or into sewe6, surface wate6, ground water, coastal waters or the sea:

s.N I nf ormatlon/Checkl lst Yes/ Ibtalls of thereof (wlth approxlmate confirmation No quantities/rates, wherever possible) With sources of informatioa data. 8.1 From explosions, spillages, fires Etc. from Yes For safe handling and storage of Explosives, storage, handling, use or production of all the safety precautions are taken up as per hazardous substances. Explosives Rules under lndian Explosives act and DGMS guidelines. 8.2 From any other causes. Yes (i) Blasting in UG (ii) Roof fallin UG (iii) Electricity Code of practice & Emergency organization plan has been prepared as per stipulation of DGMS. 8.3 Could the project be affecteci by natural No Not applicable disasters causing environmental damage (e.9. floods, earth quakes, landslides, cloudburst etc?

9. Factor whlch should be considered (such as consequential developmentl which could lead to environmental affects or the potential for cumulative impacts with other existing or planned activities in the locality:

s.N I nformation/Checkl ist Yes/ Details of thereof (with approximate confirmation No quantities/rates, wherever possible) With sources of information data. 9.1 Lead to development of supporting Yes Project led to development of ancillary facllitles, ancillary development or industries & an overall economlc grovrtth of development stimulated by the project nearby towns to supplement the population of which could have impact on the the area along with semi Urban development errviluril|rtsrrL^-,.i----^-+ c.6,.^ - in infrastructure of the towns & supportin6 *Supporting infrastructure (roads, power mining and other industries. supply, waste or waste water treatment etc.) *housing development *extractive industries *suoolv industries &nur{ -9- ;1'1:-;-y'dr*d" l/ C'.lwt?fl i'F g +H 'll{(ll.,rrlstr{'}i * Others

9.2 Lead to after use of the site, which could Yes Land will be used for developing green beh. have an impact on the environment. 9.3 Set a precedent for later development Yes Economic development in the entire i'egion leading to over all socio economic growth. 9.4 Have cumulative affects due to proximity Yes Operating, old underground/OC mines led to to other existing or planned projects with economic development in the entire region & similar affects- over all socio economic growth.

{iil Environmentalsensitivity:

s.N Areas Name/ Aerial distance {within 15Xm proposed ldentity oroiect location boundarv. L. Areas protected under international No Not applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2. Areas which are important or sensitive for No Not applicable ecological reasons-Wetlands, water courses or other water bodies, coastal Zone, biosphere, mountains, forests. 3. Area used by protected, important or No Not applicable sensitive species of flora or fauna for breeding, nesting foraging resting over wintering, migration. 4. lnland, coastal, marine or underground No Not applicable water 5. State, national Boundaries Yes M.P. and C.G. State Boundary is about 2 Km from mine area. 5. Routes or facilities used by the public for No Not applicable access to recreation or other tourist, pilgrim areas. 7. Defense installations. No Not aoplicable f. Densely populated or built-up area. Yes Mining commercia! and residential establishment of mines of SECL and villages are situated within 10 Km of the Mine. 9. Areas occupied by sensitive man-made land Yes Hospitals, Schools, Places of worship etc. are uses (hospitals, schools, places of worship, situated within 10 Km of the Mine. community facilities) 10. Areas containing important, high quality or Yes Except coal reserve, no other high quality scarce resources {ground water resoLlrces, reserves are found in the area. Surface resources, forestry agriculture, fisheries, tourism, mineral) 11. Areas already subjected to pollution or No Not applicable environmental damage. (those where existing legal environmental standards are exceeded)

; - 70- l-l"re- i]ttr ;:irn*' aFr" f is, it{.fi... 5;,t*t-,* ,-'.-i'l g:9ir.4' ':r t2 Areas susceptible to natural hazard which No Not applicable could cause the project to Present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or e)ftreme or adverse climatic conditions.

Undertaking: t hereby given undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Signature of the aPPlicant

Date:02.fff.2018 Place; Hasdeo Area dstorts^n Area General Manager 2