Ntt Ss7.00 HA PEAK PRODUCTION 0.33 MTY Ntt 0.33 MW CAPACITY
Total Page:16
File Type:pdf, Size:1020Kb
JHIRIA UNDERGROUND PROJECT vtttAGEs Dumar Kachhar lM.P.l OFFICE AND INFRASTRUCTURE IN MATGA RF TEHSIT KOTMA KOTMA DISTRICT ANUPPUR ANUPPUR STATE MADHYA PRADESH MADHYA PRADESH PARTICUTARS EXTSTING ADDITIONAT TOTAL PROJECT AREA 557.00 HA Ntt ss7.00 HA PEAK PRODUCTION 0.33 MTY Ntt 0.33 MW CAPACITY PRODUCTION CAPACIW OF 0.33 MTPA SOUTH EASTERN COATFIETDS TIMITED (A MrNt RATNA COMPANYI BTLASPUR (CHHATTTSGARH) -7- ilrlK e l't-* ^ "+,r$i .'aa* ilptdlt#i 'r ;f (... f-t+b e" i':'| 'i: 'n' APPENDIX.! FORM.I (i) BAS|C TNFORMATTON s.N Item Details 1. Name of the Proiect/s Jhiria Underground Proiect 2. Sl. No. in the schedule 1(A) 3. Proposed capacity/area/length/ton nage to Production 0.33 MTPA. be handled/command are /lease Area- - 557-00 Ha. area/number of wells to be drilled Bore holes - 97 numbers of boreholes already drilled. 4. New/Exoansion/Modernization Extension of validity of EC. 5. Existins caoacitv/Area etc. Existing caoacitv- 0.33 MTY and Lease area 557.00 Ha. ,A' 6. Categorv of oroiect Le. 'A' or'B' 7. Does it attract the general condition? if Yes yes, please specify 8. Does it attract the specific condition? lf No ---- --l__-- _,-_-:I. Ye5, pr€dse spec||y. 9. Location The Jhiria underground is located to the immediate west of the SoWh Jhimar mine. The geological block is about 14 KM south west of Manendragarh township, Korea district, C.G. The block is bounded by latitudes 23" 08' 06" to 23" 09'47" N and longitudes 82" 06' 02" to 82" M' (8" F in Anuppur District of M.P. Plot/survey/Khasra no. Survey of India Topo Sheet No. 64 l/4 {RF 1:50000) Village Dumar Kachhar (M.P.) Office and infrastructure in Malea RF Tehsil Kotma District Anuppur State Madhva Pradesh 10. Nearest Railway Station/airport along with Manendragarh Rly Station -1.4.0 Km from the mine. distance in Kms. 11. Nearest Town, city, Distict Headquarter a) Nearest Town Manendragarh:- 14.0Km aiong with distance b) City/District H/Q:- Anuppur 55 Km Madhya Pradesh. L2. Vif lage, Panchayat, Alla parishad, S.no. Gram Panchayat, Tel./Mob. No. Municipal corporation, Local body L. Tehsil- Kotma 07658-233274 (complete postal Address with telephone 9669155076 nr rmhar tn ha oirrenl 't Zilla Parisad- Anuppur a7659-222979 9754166040 3. Collectorate Dist.- Anuppur 07659-222400 4. Panchayat Dumar Kachhar 9424702409 13. Name of the applicant Ashok Kumar Udeniva t4. Registered address OFFICE OF THE AREA GENERAL MANAGER, SECL HASDEO AREA, P.O.: South Jhagrakhand Colliery Distt.: Korea (C.G.)- 49748 15. Address for correspondence Name Ashok Kumar Udeniya Designation (owner/Pa rtner/CEO) AREA GENERAT MANAGER, SECL HASDEO AREA -2- ' i :+L-..'4 ,. :{-- Vts I i# 'r''i SECL,, ie'1 Address OFFICE OF THE AREA GENERAL MANAGER, SECL HASDEO AREA, P.O.: South Jhagrakhand Colliery Distt.: Korea (C.G.) Pin code 497448 E-mail gmhsd.secl @coalindia.in, [email protected], gm e nvtse cl @ gmail. ^com Telephone No. 07 7 7 t-243O35 / +91-942553 3 5 0 1 Fax No. 07777-24L3s9 t6. Details of alternative sites examined if The mine is operational. Coal mining is a site specific any. Location of these site should be activity. shown on a tooo Sheet t7. Interlink Projects Not Applicable 18. Whether separate application of Not Applicable interlinked oroiect has been submitted? 19. lf Yes, date of Submission Not Applicable 20. lf no, reason Not Apolicable 2r. Whether the proposal involves approval / clearance under if yes, details of same a) The Stage l/ Principal approval of 747.92 Ha of and their status to be given Forest Land in Madhya Pradesh already obtained vide a) Forest conservation Act 1980. letter no. F. No. 8-72I2OA2-FC Dated 13.11.2003 b) Wildlife protection AcI.. t972. b) Not applicable c) CRZ Notification 1991. cl Not aoplicable 22. Whether there is any government No order/policy relevant/relating to site? 23. Forest land involved 557.00 Ha 24. Whether there is any litigation pending No against the project and or land in which the project i5 proposed to be set up? a) Name of the court b) Case No. c) Orders /direction of the court, if any and its relevance with the proposed project. 25. Project Cost (in Lakh) 3206.80 Lakh (ii! Aetivity: 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) -3- s.N InformationlCheckl ist Yes/ Details of thereof {with approximate confirmation No quantities/rates, wherever possiblef lMth sources of information data. 1.1 Permanent or temporary change in land Yes Total land involved in the project (Mining area) use, land cover or topography including '- 557.00 ha inerpase in intpnsitv of land rrse lwith Break-up as follows:- respect to local land use plan) X..Forest - 557.00 ha 2. Tenancy/Agriculture Land - NIL 3. (Govt. Land) - Nlt Total = 557.00 Ha As this is an Underground mine, only a very small portion of surface area of the land gets disturbed for its use in infrastructure/town ship development. t.2 Clearance of existing land, vegetation and No Not Applicable buildings? 1? t\tn rrv\I\ln* A nnliashla Creaticn of neur land uses? ^FPr.esu.s L.4 Pre-construction investigation e.g. bore No Not Applicable houses, soil testing? 1.5 Construction Work? Yes To be taken up within mine lease area 1.6 Demolition Work No Not Applicable 7.7 Temporary sites used for construction No Not Applicable works or cut and fill or excavation. 1.8 Above ground buildings, structures or Yes To be taken up within mine lease area earthworks including linear structures, cut and fill or excavations. 1.9 Under works including mining or Yes Mining is being done in UG by Bord & Pillar tunneline? method. 1.10 Reclamation Works? No Not Applicable 1.11 Dredeins? No Not Applicable r.t2 Offshore structures? No Not Apolicable 1.13 Production and manufacturing processes? Yes Production is being done by Bord & Pillar method of undergrcund coa! mining as per DGMS euidelines. L.t4 Facilities for storage of goods or Yes Mine entrance and surface infrastructure of an materials? old adjoining underground mine i.e. South Jhimar is being used for coal production. 1.15 Facilities for treatment or disposal of solid Yes Mine is UIC- Mine sump water is being waste or liquid effluents? discharged at surface settling tanks having capacity 2.00 lakh gallons. Part of settled mine water is used in dust suppression, green belt development/gardening etc. within mine premises. Balance quantity of settled mine water is further treated through pressure filter and supplied to SECL Colonies and nearby area for drinking and other domestic purposes Hence complete utilization of mined out water is ensured. -.L?^zn-rO{ 4,t;'i ^, t r..15 Facilities for long term housing of Yes The residential buildings are available in the operational workers? colony of Ramnagar sub area. The colony is well equipped with water supply system and having colony road network. t.t7 New road, rail or sea traffic during No Not Applicable, Existing Mine construction or operation? 1.18 New road, rail, air waterborne or other No Not Applicable, Existing Mine transport infrastructure including new or altered routes and stations, pofu, airports etc. 1.19 Closure or diversion of existing trans- port No Not Applicable. routes or infrastructure leading to changes in traffic movements. 1.20 New or diverted transmission lines or No Not Applicable. pipelines? L.27 lmpoundment, damming culverting No Not Applicable. realignment or other changes to the hydrology of watercourses or aquifers? t.22 Stream crossings? No Not Applicable- Abstraction or transfers of water form No There is no abstraction or transfers of water t.23 ground or surface waters? form ground or surface water sources however mine intersect the water table and to ensure safety of men and machinery, water has to be pumped out of the mine. Mine water is stored in sumps which act as primary settling tanks where coal particles and silt get settled down. They also act as underground water harvesting structures. Only supernatant waler is pumped out into surface settling tanks. After passing througlr settling tank clear water is being utilized to meet the mine industrial water use (i.e. for dust suppression, workshop & green belt developmenVgardening etc). Balance quantity of scttlcd minc watci is fi:rthcr trcatcd through presswe filter and supplied to SECL Colonies and nearby area for drinking and other domestic purposes Hence complete utilization of mined out water is ensured. L.24 Changes in water bodies or the land No Not Applicablb surface aftecting drainage or run -off? 1.25 Transport of personnel or materials for Yes Coal is being transported from underground construction, operation or face to Surface Bunker through Series of Belt decommissioning? conveyor after that the coal is being transported by tippers to Rajnagar R.O. siding for Rail dispatch. Manpower travel by their own vehicles. L.26 Long-term dismantling or No All Long term dismantling or decommissioning decommissioning or restoration works? or restoration works will be dealt at the time of final Mine closure as per approved MCP. L.27 Ongoing activity during decommissioning No All decommissioning of machinery and which could have an impact on the -5- i/1;'-1t4..'"1 V environment? Mine closure as per approveci MCP. L.28 Influx of people to an area in either No Not Applicable temporarily or permanently? L.29 Introduction of alien species or genetic No Not Applicable diversiW? 1.30 Loss of native species or genetic diversity? No Not Aoolicable 1.31 Any other action? No Not Applicable 2.