Umass Lowell Campus Transportation Update MEPA Notice of Project Change for the Strategic Development Plan

Total Page:16

File Type:pdf, Size:1020Kb

Umass Lowell Campus Transportation Update MEPA Notice of Project Change for the Strategic Development Plan 65 Glenn Street 169 Ocean Blvd. Lawrence, MA 01843 Unit 101, PO Box 249 Hampton, NH 03842 T:978.794.1792 T:603.601.8154 TheEngineeringCorp.com MEMORANDUM TO: Mr. Adam Baacke, Director DATE: October 17, 2016 University of Massachusetts Lowell Campus Planning & Development Wannalancit 4th Floor, Facilities Planning Lowell, MA 01854 FROM: Kevin R. Dandrade, P.E., PTOE, Principal PROJECT NO.: T0653 Samuel W. Gregorio, P.E. PTOE, Senior Engineer RE: UMass Lowell Campus Transportation Update MEPA Notice of Project Change for the Strategic Development Plan TEC, Inc. (TEC) has been retained by the University of Massachusetts Lowell (UMass Lowell) to update the transportation-related findings and recommendations associated with the implementation of the University’s Strategic Development Plan (SDP) for 2011-2016. These updated findings and recommendations are associated with a Notice of Project Change (NPC) for the University’s next five-year development horizon and requires review by the Massachusetts Environmental Policy Act (MEPA) office. Chapter 2 of UMass Lowell’s previous SDP for 2011–20161 focused on the role of transportation in efforts to reduce commuter- related Green House Gas (GHG) Emissions by promoting sustainable modes of transportation, introducing additional Transportation Demand Management (TDM) programs, and reducing the number of single occupant vehicle (SOV) trips to the several campuses. A copy of the compiled University’s SDP for 2011-2016 can be viewed via the link below: (https://www.uml.edu/docs/FINAL-UML-SDP-Press-PDF-August-2012_tcm18-197882.pdf) Over the next five years, UMass Lowell will expand upon the successful completion of the 2011-2016 SDP, including an expansion of its campus enrollment, further expanding TDM programs, and rehabilitating and acquiring new facilities within the three UMass Lowell campuses. This memorandum summarizes the estimated new Average Daily Traffic (ADT) volumes at key locations surrounding the three UMass Lowell campuses since the SDP’s inception and forecasts the change in ADT resulting from the further campus development plan through 2020. Based on the conservative trip generation analysis as summarized in this memorandum, the UMass Lowell SDP is anticipated to contribute up to 2,200 additional ADT per day from the 2015 to 2020. These new trips are anticipated to be spread over the major arterial corridors and local roadways leading to and from the three UMass Lowell campuses. As reported on Page 13 of this memorandum, the analysis of the recent 2011-2016 SDP and the supplemental SDP through 2020 indicates that traffic volumes immediately surrounding the UMass Lowell campuses will increase by approximately 0.41 percent per year through 2020, a negligible increase in daily traffic within the urban fabric of Lowell. 1 University of Massachusetts Lowell Strategic Development Plan 2011-2016; UMass Lowell; Lowell, Massachusetts, August 2012. T:\T0653\Docs\Memos & Trans\T0653_UML MEPA Tech Memo_FINAL DRAFT.docx Plan │ Permit │ Design │ Construct UMass Lowell Campus Transportation Update MEPA Notice of Project Change for the Strategic Development Plan October 17, 2016 Page 2 of 14 2016-2021 UMass Lowell Projects Planned As part of the SDP, UMass Lowell has constructed multiple projects across all three campuses between the years 2011-2016. A summary of these projects is provided in Table 1. These projects do not include renovations of existing space, which did not increase or decrease the total gross square footage (GSF) of the building, impervious area, or parking counts. Table 1 – UMass Lowell Projects Completed 2011-2016 Campus Projects Saab ETIC – 84,000 SF Research Facility (LEED Gold Certified) North North Campus Garage – 650 new Spaces Health & Social Sciences Building – 69,000 SF Academic Building (LEED Silver Certified) South Campus Garage -760 Spaces Wilder Parking Lot Expansion – Net increase of 80 spaces (to 455 total) South McGauvran Addition/Renovation – 52,000 SF (LEED Silver Certified) South Dining Demolition South Campus Mall University Suites – 500 Beds University Crossing – 230,000 SF Academic Building (LEED Silver Certified) East University Crossing Parking Lots – Net increase of 156 spaces (to 368 total) 225 Aiken Street Acquisition – 4.5 Acre site Continuing the UMass Lowell SDP to the 2020/2021 academic year, the University is currently planning additional construction and renovation projects at the three campuses. The focus of the future campus projects is to enhance the campus experience, utilizing existing facilities. UMass Lowell is anticipating the following projects summarized in Table 2. Table 2 – UMass Lowell Projects Planned 2016-2021 Campus Projects Pulichino Tong Business Center – 54,000 SF Academic Building North Quad Pods Addition North Southwick Courtyard Landscape Perry Hall Renovation/Addition Olsen/Life Sciences Coburn Addition Central Services and Facilities Operations Buildings Acquisition (1485 & 1499 Middlesex South Street) Pawtucket Street Pedestrian and Bicycle improvements Fox Elevator Addition Perkins Properties Acquisition East Aiken Street Recreation Fields – Existing P-Lot Removed Pawtucket Street Riverfront Park Although the list of new projects is extensive, most of the projects are generally related to property acquisition, building rehabilitation, and environmental/multi-modal improvements. Therefore, the future campus projects, as identified, are not anticipated to contribute directly UMass Lowell Campus Transportation Update MEPA Notice of Project Change for the Strategic Development Plan October 17, 2016 Page 3 of 14 to new campus related vehicle trips. In order to estimate new campus related vehicle trips as part of the UMass Lowell SDP, TEC focused on the projections for student enrollment and faculty population. UMass Lowell Enrollment and Population Growth As part of the UMass Lowell SDP, the university has grown its student and faculty populations since 2010 and forecasts continued growth through 2020. The UMass Lowell 2016 Report Card, which highlights the immediate past enrollment populations and the anticipated projections, defined the projected student and faculty growth through 2020. A summary of the student enrollment growth is provided in Table 3. A copy of the UMass Lowell 2016 Report Card is provided in Attachment A. As of August 2015, UMass Lowell enrollment was approximately three percent lower than the 2015 projected headcount for student enrollment (includes all student categories), when compared to the 2012 MEPA submittal. The projected net new student population between 2015 and 2020 is expected to increase by 14.6 percent to approximately 20,000 students. UMass Lowell is also projecting a 13.4 percent increase in total faculty by 2020. No notable growth is expected for administrative positions while academic and student services staff positions are expected to grow proportionally to student enrollment, which yields a 6.0 percent increase in total staff by 2020. (a) Table 3 – Projected vs. Actual Student / Faculty Enrollment % % Fall 2010 Fall 2015 Fall 2015 Increase Fall 2020 Increase Enrollment Actual(b) Projection(c) Actual(b) 2010-2015 Projection(b) 2015-2020 Undergraduate 8,675 10,000 10,457 20.5% 12,400 18.6% Graduate / NDD 3,426 5,000 4,184 22.1% 4,700 12.3% Cont. Ed / Online 2,585 3,000 2,809 8.7% 2,900 3.2% Total 14,686 18,000 17,450 18.8% 20,000 14.6% Faculty(d) 1,014 - 1,116 10.1% 1,266 13.4% a Enrollment values are approximate as enrollment fluctuates throughout school year and by semester b Data from UMass Lowell 2016 Report Card; UMass Lowell; Lowell, Massachusetts; 2016 c UMass Lowell Strategic Development Plan Trip Generation Analysis Technical Memorandum; Vanasse Hangen Brustlin, Inc.; Watertown, MA; August 29, 2012. d Full-time faculty headcounts from UMass Lowell 2016 Report Card; UMass Lowell; Lowell, Massachusetts; 2016; Part-time faculty headcounts from UMass Lowell IR faculty/staff data NDD = Non-Degree Day Student The increases in both student and faculty populations will understandably increase the number of vehicle trips to/from the several UMass Lowell campuses. However, the increase in area traffic volumes is expected to be marginal based on the trends that have been witnessed over the past five years. To assess the potential effect of the UMass Lowell Strategic Plan, TEC estimated the net new ADT to/from the campus consistent with the methodology presented in the 2012 MEPA submittal. Table 4 depicts the net new average daily vehicle trip generation for 2015 to 2020. UMass Lowell Campus Transportation Update MEPA Notice of Project Change for the Strategic Development Plan October 17, 2016 Page 4 of 14 Table 4 – 2016 to 2021 - Net New Average Daily Vehicle Trip Generation Analysis Auto Mode Share Ownership / Multi Weekly Fall 2015 Fall 2020 Net Net Modal Net Weekday Trips Daily Weekday Enrollment Actual(a) Projection(b) Increase Increase(c) Increase per Vehicles Trips Undergraduate 10,457 12,400 1,943 On-Campus 4,238 5,306(d) 1,068 320 288 6 346 Off-Campus 6,207 7,094 887 541 487 10 974 Graduate 4,184 4,700 516 M.S. or Ph.D. 3,275 3,750 475 475 428 6 513 Non-Degree Day 909 950 41 41 37 4 30 Other 2,809 2,900 91 Cont. Education 1,405 1,450 45 45 41 4 33 Online 1,404 1,450 46 - - - Faculty 1,116 1,266 150 Full Time 565 661 96 91 82 10 164 Part Time 551(e) 605(e) 54 35 32 4 26 Staff 1,443(f) 1,530(g) 87 Full Time 1,071 1,129 58 55 50 10 100 Part Time 372 401 29 19 17 4 14 New Daily Traffic 2,200 a Enrollment values are approximate as enrollment fluctuates
Recommended publications
  • 'The Wall That Heals' Hits Nahant
    MONDAY JULY 19, 2021 By Tréa Lavery Swampscott Conservancy ITEM STAFF SWAMPSCOTT — The Swampscott Conservancy is advocating for a ban on balloons in the town, saying that they have a detrimental effect on the airing out its case environment and on animals that may ingest them. In a post on the Conservancy’s website, President Toni Bandrowicz ac- knowledged that balloons are a bright and fun way of celebrating happy against balloons events, but asked residents to consider the negative impacts as well as the positive. “To protect nature in our neighborhood, perhaps it’s time for Swamp- scott to consider such a by-law — or at least a policy that bans balloons at town-sponsored events, on town-owned properties, or for any events requir- ing town approval,” Bandrowicz said. “The town should promote the use of non-disposable, reusable decorations for such events, not balloons and other single-use plastic decorations.” A handful of communities in Massachusetts have already enacted similar rules, including Chatham, Everett, Nantucket and Provincetown. In 2019, State Representative Sarah Peake of Provincetown introduced a bill that would ban “the sale, distribution and release of any type of balloon, includ- ing, but not limited to, plastic, latex or mylar, lled with any type of lighter BALLOONS, A3 Lynn, Revere and MBTA mapping out transit plan By Allysha Dunnigan ITEM STAFF The Massachusetts Bay Transporta- tion Authority (MBTA) announced its collaboration with municipal partners, including Revere and Lynn, for a series of bus priority projects that will construct up to 4.8 miles of bus lanes — and other pro-transit infrastructure upgrades — to improve bus speed and reliability as the region re-opens from COVID-19-related regulations.
    [Show full text]
  • Annual Report of the Town of Chelmsford
    ANNUAL TOWN REPORT CHELMSFORD 1986 Photograph of Center Common by Jean Sougnez IN MEMORIAM JANET LOMBARD ASSESSOR 1974-1986 BRUCE N. FREEMAN STATE REPRESENTATIVE 16th MIDDLESEX DISTRICT 1968-1986 GENERAL INFORMATION Incorporated May, 1655 Type of Government Town Meeting Location Eastern Massachusetts, bordered by Lowell and Tyngsboro on the North, Billerica on the East, Carlisle on the South, and Westford on the West. It is 24 miles from Boston, 40 miles from Worcester, and 225 miles from New York City. County Middlesex Land Area: 22.54 Square Miles Population 1986: 29,843 Assessed Valuation 1986 $1,341,689,860.00 (Real Estate) $30,577,252.00 (Personal Property) Tax Rate: $14.90 United States Representative in Congress: 5th Congressional District Chester G. Atkins, Concord State Senator Carol C. Amick, Bedford Representative in General Court: Bruce N. Freeman, Chelmsford — deceased 16th Middlesex District Carol C. Cleven, Chelmsford - Nov. 1986 Accounting Department Monday thru Friday 8:30 a.m. -5:00 p.m. Assessors Office Monday thru Friday 8:30 a.m. -5:00 p.m. Monday Evenings 7:00 p.m. -8:00 p.m. (Except June, July & August) Board of Health Monday thru Friday 8:30 a.m. -5:00 p.m. Highway Department Office Monday thru Friday 8:00 a.m. -4:30 p.m. Garage Monday thru Friday 7:00 a.m. -3:30 p.m. Public Libraries Adams Library Monday 1:00 p.m. -9:00 p.m. Tuesday thru Thursday 9:00 a.m. -9:00 p.m. Friday and Saturday 9:00 a.m. -5:30 p.m.
    [Show full text]
  • Middlesex 3 Community Compact Transportation Study
    MIDDLESEX 3 COMMUNITY COMPACT TRANSPORTATION STUDY PREPARED BY: NORTHERN MIDDLESEX COUNCIL OF GOVERNMENTS METROPOLITAN AREA PLANNING COUNCIL CENTRAL TRANSPORTATION PLANNING STAFF CONTENTS EXECUTIVE SUMMARY .............................................................................................................................. 1 1. INTRODUCTION ..................................................................................................................................... 3 2. INPUT FROM THE BUSINESS COMMUNITY AND STUDY AREA MUNICIPALITIES .................................. 4 Written Survey .......................................................................................................................................... 5 Responses From Businesses .................................................................................................................. 5 Survey Question: Where do your employees reside? .......................................................................... 6 Survey Question: When do your employees arrive for work? .............................................................. 6 Survey Question: How do employees get to/from work? .................................................................... 7 Question: Does your business provide any transportation assistance, incentives or services for employees? ........................................................................................................................................... 7 Question: Has your business been affected by a lack
    [Show full text]
  • Lowell Connector Bridge BR# L-15-080 and Extending Northeasterly to the River Meadow Brook in Lowell, Massachusetts
    COMMONWEALTH OF MASSACHUSETTS CITY OF LOWELL In City Council VOTE Authorizing the City Manager to execute a Maintenance Agreement with the Massachusetts Department of Transportation Highway Division (“MassDOT”), granting the City of Lowell permission to install a shared-use path within the State Highway Layout (SHLO), located below the Lowell Connector bridge BR# L-15-080 and extending northeasterly to the River Meadow Brook in Lowell, Massachusetts. The project passes through the MassDOT State Highway Layout as it passes under the Lowell Connector highway. In addition, the project would add a crosswalk and repair the sidewalk on the Industrial Avenue Bridge over the River Meadow Brook, which is owned by MassDOT. To construct the trail through these areas, the City must formally agree to maintain the trail and keep it free from hazardous conditions. A Maintenance Agreement for such purpose is needed. ------- BE IT VOTED BY THE CITY COUNCIL OF THE CITY OF LOWELL, as follows: That the City Manager be and is hereby authorized to execute a Maintenance Agreement with the Massachusetts Department of Transportation Highway Division (“MassDOT”), granting the City of Lowell permission to install a shared-use path within the State Highway Layout (SHLO), located below the Lowell Connector bridge BR# L-15-080 and extending northeasterly to the River Meadow Brook in Lowell, Massachusetts. V:agreement/massdot_lowellconnectortrail AGREEMENT MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION AND CITY OF LOWELL, MASSACHUSETTS AGREEMENT, made this _________ day of _________, 2021 by and between the Massachusetts Department of Transportation Highway Division, hereinafter called “MassDOT”, and the City of Lowell, hereinafter called the “City”.
    [Show full text]
  • Transit Administration Under Contract #MA-80-0006 with the Executive Office of Transportation Planning
    CENTRAL MASSACHUSETTS METROPOLITAN PLANNING ORGANIZATION (CMMPO) CMMPO Endorsed 2013-2016 Transportation Improvement Program (TIP) Prepared by the transportation staff of the June 13, 2012 The preparation of this document has been financed in part through a grant from the U.S. Department of Transportation, Federal Highway Administration, under Contract #69650 with the Massachusetts Department of Transportation and through a grant from the Federal Transit Administration under Contract #MA-80-0006 with the Executive Office of Transportation Planning. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. Central Massachusetts Metropolitan Planning Organization Endorsement Sheet • Endorsement of the FFY 2013-2016 Transportation Improvement Program & Air Quality Conformity Determination Whereas, the 1990 Clean Air Act Amendments (CAAA) require Metropolitan Planning Organizations within non-attainment areas and/or attainment areas with maintenance plans to perform air quality conformity determinations prior to the approval of transportation plans and transportation improvement programs, and at such other times as required by regulation; Whereas, the air quality conformity analysis prepared for the 2013-2016 Transportation Improvement Program also demonstrates air quality conformity of the Central Massachusetts 2012 Regional Transportation Plan, and that all regionally significant transportation projects in the 2013-2016 Transportation Improvement Program are contained in the 2012 Regional Transportation Plan, and that all regionally significant projects in the 2015 to 2035 timeframe of the Regional Transportation Plan are modeled in the 2013-2016 Transportation Improvement Program’s air quality conformity analyses; Whereas, the CMMPO has completed its review accordance with Section 176(c) (4) of the Clean Air Act as amended in 1990 [42 U.S.C.
    [Show full text]
  • Functional Design Report.Doc I
    CONTENTS CONTENTS .................................................................................................................................. I FIGURES ...................................................................................................................................... II TABLES ........................................................................................................................................ III APPENDICES ............................................................................................................................... IV I. INTRODUCTION ..................................................................................................................... 1 Purpose of Study .......................................................................................................... 1 II. EXISTING CONDITIONS ...................................................................................................... 3 Traffic Study Area ......................................................................................................... 3 Geometry ....................................................................................................................... 3 Public Transportation ................................................................................................... 6 Environmental and Historical Concerns ..................................................................... 6 III. TRAFFIC VOLUMES ............................................................................................................
    [Show full text]
  • July 28, 2020
    The City of Lowell • Department of Planning and Development JFK Civic Center • 50 Arcand Drive • Lowell, MA 01852 P: 978.674-4252 • F: 978.970.4262 www.LowellMA.gov Diane Nichols Tradd Assistant City Manager/DPD Director MEMORANDUM Craig Thomas Deputy Director TO: Eileen M. Donoghue, City Manager FROM: Diane N. Tradd, Assistant City Manager/DPD Director DATE: July 28, 2020 SUBJECT: MOTION OF 3/10/20 BY COUNCILOR MERCIER/ELLIOTT REQUEST CITY MANAGER PROVIDE A REPORT REGARDING CONSTRUCTION PLANS FOR LHS AND PROCEDURES IN WHICH TO INFORM BUSINESSES AND RESIDENTS DOWNTOWN AS TO ANY TRAFFIC MITIGATION, CONGESTION, PARKING ETC. DURING ALL PHASES OF CONSTRUCTION AT THE LHS PROJECT Suffolk Construction provided a detailed phased Traffic Management Plan with an accompanying narrative for the LHS construction project. See attached. The TMP includes an overview of each of the four phases, parking for construction staff, pedestrian paths, location of student access to LHS, ingress/egress points for construction vehicles during each phase, swept path analyses for a WB-50 truck (Interstate semi-trailer) and the planned route to the site from the Lowell Connector and the Cawley Stadium staging area. The narrative provides the duration of the phase, clarifies the intent of the TMP and how student drop-off and pick up will occur in each phase. The Transportation Engineer reviewed and approved the TMP plan, as submitted. For each phase, once vehicles reach the LHS site, they will be staged and unloaded within the site, which will be surrounded by construction fencing. In addition, deliveries will not occur during arrival and dismissal (7:15-8:15am and 2:00-3:00pm).
    [Show full text]
  • Road Safety Audit
    ROAD SAFETY AUDIT Thorndike Street City of Lowell May 15, 2016 Prepared For: MassDOT On Behalf Of: Client Prepared By: VHB 101 Walnut Street Watertown, MA Road Safety Audit—Thorndike Street, Lowell MA VHB Final Table of Contents Contents Background ................................................................................................................................. 1 Project Data ................................................................................................................................. 1 Project Location and Description .............................................................................................. 2 Audit Observations and Potential Safety Enhancements........................................................ 8 Summary of Road Safety Audit ................................................................................................. 8 List of Appendices Appendix A. RSA Meeting Agenda Appendix B. RSA Audit Team Contact List Appendix C. Detailed Crash Data Appendix D. Additional Information List of Figures Figure 1: Locus Map .................................................................................................................................. 7 List of Tables Table 1: Participating Audit Team Members ............................................................................................. 2 Table 2: Estimated Time Frame and Costs Breakdown ........................................................................... 17 Table 3: Potential Safety Enhancement Summary ..................................................................................
    [Show full text]
  • Endorsed FFY 2021-2025 Transportation Improvement Program
    Route 113 Improvements in Dunstable: Funding for construction of roadway improvements are programmed in FFY 2021. Northern Middlesex Regional Transportation Improvement Program Federal Fiscal Years 2021-2025 May 2020 Prepared for the Northern Middlesex Metropolitan Planning Organization by the Northern Middlesex Council of Governments FFY 2021-2025 TRANSPORTATION IMPROVEMENT PROGRAM (OCTOBER 1, 2020 – SEPTEMBER 30, 2025) Federal Title VI/Nondiscrimination Protections The Northern Middlesex Metropolitan Planning Organization (NMMPO) operates its programs, services and activities in compliance with federal nondiscrimination laws including Title VI of the Civil Rights Act of 1964 (Title VI), the Civil Rights Restoration Act of 1987, and related statutes and regulations. Title VI prohibits discrimination in federally assisted programs and requires that no person in the United States of America shall, on the grounds of race, color or national origin (including limited English proficiency) be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity receiving federal assistance. Related federal nondiscrimination laws administrated by the Federal Highway Administration, the Federal Transit Administration, or both prohibit discrimination on the basis of age, sex, and disability. These protected categories are contemplated with NMMPO’s Title VI Programs consistent with federal interpretation and administration. Additionally, NMMPO provides meaningful access to its programs,
    [Show full text]
  • LAGMP Supplemental Information
    Corey Schutzman Environmental Permitting New England Environmental Department January 4, 2021 Lowell Conservation Commission Attention: Louisa Varnum, Chair Lowell City Hall 375 Merrimack Street Lowell, MA 01852 RE: Boston Gas Company - Lowell Area Gas Modernization Project DEP File Number 206-0804 Members of the Conservation Commission: This letter responds to requests for information made by the Conservation Commission at its December 9, 2020 hearing regarding Boston Gas Company’s (“BGC”) Notice of Intent (“NOI”) concerning the Lowell Area Gas Modernization Project (the “Project”). In advance of the Commission’s upcoming January 13, 2021 meeting, BGC responds to questions on the following five topics: 1. Written responses to questions from the Lowell Sustainability Council; 2. Further explanation of potential wetlands impacts compared to the Project’s safety and reliability benefits; 3. Further description of BGC’s efforts to avoid and minimize wetlands impacts, specifically regarding the Project’s necessary 75 foot temporary work space width; 4. Potential modifications to the preferred alternative to minimize wetlands impacts; and 5. Engineering Plans. As described in BGC’s NOI and at the Commission’s December 9th hearing, the Project is the product of several years of extensive study, engineering and regulatory review. The Order of Conditions is the last permit required for the Project and the Commission’s jurisdiction is limited by the Wetlands Protection Act, the Department of Environmental Protection’s implementing regulations (the “DEP Regulations”) and the jurisdiction of other agencies, including the Massachusetts Energy Facilities Siting Board (EFSB or “Siting Board”). The Project’s purpose, need, route and potential impacts have been thoroughly reviewed, certified and approved by the Executive Office of Energy and Environmental Affairs under Massachusetts Environmental Policy Act (MEPA) and by the EFSB.
    [Show full text]
  • Route 3 Corridor Infrastructure Analysis for the Towns of Bedford, Billerica, Burlington and Chelmsford and the City of Lowell
    Route 3 Corridor Infrastructure Analysis for the Towns of Bedford, Billerica, Burlington and Chelmsford and the City of Lowell Report February 2010 Route 3 Infrastructure Analysis - Bedford, Billerica, Burlington, Chelmsford, and Lowell, Massachusetts Contents Acknowledgements . .1, 2 Evaluate Infrastructure . .3-2 Assess Site Challenges and Executive Summary Opportunities . .3-2 Wastewater Disposal Capacity . .ES-1 Compile Site Inventories . .3-3 Transportation . .ES-2 Identify 43D Sites . .3-3 Development Sites . .ES-2 Section 4: Community Overview Section 1: Introduction The Corridor Communities . .4-1 Project Purpose . .1-1 Route 3 Corridor Funding . .1-1 Overview of Each Community . .4-1 Study Objectives . .1-1 Bedford . .4-1 Billerica . .4-2 Section 2: Project Context Burlington . .4-2 Project Area . .2-1 Chelmsford . .4-3 Transportation . Network Background . .2-2 Lowell . .4-3 Corridor Branding . .2-2 Community Utility Summaries . .4-4 Bedford . .4-4 Section 3: Methodology Billerica . .4-5 Facilitate Meeting with Local Burlington . .4-7 Officials . .3-1 Chelmsford . .4-8 Collect, Compile, Assemble, & Analyze Locally Provided Data .3-2 Lowell . .4-10 Review and Analyze Transportation . .4-10 Mass GIS Data Sets . .3-2 Existing Conditions . .4-11 Identify Potential Traffic Volume Counts . .4-11 Sites for Consideration . .3-2 Hot Spots-Congestion Areas/Times .4-11 Conduct Field Visits . .3-2 Future Projects - On Tip . .4-13 TOC-1 Route 3 Infrastructure Analysis - Bedford, Billerica, Burlington, Chelmsford, and Lowell, Massachusetts Public Transportation . .4-13 Section 6: Implementation Strategies Safety Issues . .4-14 Public and Private Funding Sources . .6-1 Transportation Improvements . .4-14 Funding Opportunities and Roadway/Intersection Improvements4-14 State Programs .
    [Show full text]
  • Alternatives Analysis Report
    ALTERNATIVES ANALYSIS REPORT Project No. 604694 Intersection Improvements to Gorham Street at Lowell Connector Lowell, MA Prepared for and submitted to: Commonwealth of Massachusetts Department of Transportation 10 Park Plaza, Suite 3170 Boston, MA 02116 Prepared by: CDR Maguire, Inc. 2 Granite Avenue, Suite 150 Milton, MA 02186 March 20, 2017 KEY FINDINGS OF THE STUDY This report summarizes the results of an alternatives analysis study conducted by CDR Maguire to evaluate options for improving safety and traffic operations at the intersection of Gorham Street and the Lowell Connector in Lowell, Massachusetts. Key findings of the study are listed below. • Recommended improvements: 1) Based on a comprehensive evaluation of the intersection geometrics and traffic safety and operational analyses performed as part of this study, a multi-lane roundabout option was determined to be the preferred alternative for the Gorham Street/Lowell Connector intersection (Alternative 4B). The capacity analysis indicates that a roundabout would service traffic with nominal delay (Level of Service A) on all approaches, greatly reducing the existing congestion issues at the intersection. 2) Roadway improvements are recommended for Gorham Street from the Lowell Connector intersection north to just beyond the Gorham Street/Highland Street/Elm Street intersection to accommodate a second northbound travel lane (Alternatives 12 and 23). These roadway improvements would include restriping and minor roadway widening, as well as signal improvements at the northern
    [Show full text]