The City of Lowell • Department of Planning and Development JFK Civic Center • 50 Arcand Drive • Lowell, MA 01852 P: 978.674-4252 • F: 978.970.4262 www.LowellMA.gov
Diane Nichols Tradd Assistant City Manager/DPD Director
MEMORANDUM Craig Thomas Deputy Director TO: Eileen M. Donoghue, City Manager
FROM: Diane N. Tradd, Assistant City Manager/DPD Director
DATE: July 28, 2020
SUBJECT: MOTION OF 3/10/20 BY COUNCILOR MERCIER/ELLIOTT REQUEST CITY MANAGER PROVIDE A REPORT REGARDING CONSTRUCTION PLANS FOR LHS AND PROCEDURES IN WHICH TO INFORM BUSINESSES AND RESIDENTS DOWNTOWN AS TO ANY TRAFFIC MITIGATION, CONGESTION, PARKING ETC. DURING ALL PHASES OF CONSTRUCTION AT THE LHS PROJECT
Suffolk Construction provided a detailed phased Traffic Management Plan with an accompanying narrative for the LHS construction project. See attached. The TMP includes an overview of each of the four phases, parking for construction staff, pedestrian paths, location of student access to LHS, ingress/egress points for construction vehicles during each phase, swept path analyses for a WB-50 truck (Interstate semi-trailer) and the planned route to the site from the Lowell Connector and the Cawley Stadium staging area. The narrative provides the duration of the phase, clarifies the intent of the TMP and how student drop-off and pick up will occur in each phase. The Transportation Engineer reviewed and approved the TMP plan, as submitted.
For each phase, once vehicles reach the LHS site, they will be staged and unloaded within the site, which will be surrounded by construction fencing. In addition, deliveries will not occur during arrival and dismissal (7:15-8:15am and 2:00-3:00pm). This will have the effect of minimizing the impact on local traffic. There will be short term lane closures and street occupancies throughout the duration of the project on Father Morissette Boulevard and Kirk Street. LPD details and traffic control measures will be used, as needed to direct vehicular and pedestrian traffic.
Notification for each phase will be multi-pronged: • VMBs on site 2 weeks prior to a change in TMP construction phase • Press release through the City Manager’s office • Updates to the LHS website (button on the City website) • City Social media • Civic Send/list serv emails from the Transportation Engineer
NV/ns Attachment cc: Kara Keefe-Mullin, Assistant City Manager Natasha Vance, Transportation Engineer
LOWELL HIGH SCHOOL Traffic Management Plan
Abstract The Traffic Management Plan has been prepared with the goal to promote elements of public safety and accessibility around the Lowell High School Project.
Introduction
The Traffic Management Plan (TMP) is divided up for each phase of the Project (detailed below). Temporary modifications to vehicle and pedestrian travel routes along Arcand Drive, Father Morissette Boulevard, French Street and Kirk Street will be necessary to support construction activities and maintain the safety of the surrounding Community. The following sections provide a general overview of each plan.
Phase Approx. Time Period Duration
1 - Gymnasium Oct. 2020 – Mar. 2022 74 Weeks
2 - Freshman Academy Apr. 2022 – Dec. 2023 84 Weeks
3 - 1980’s and North 1922 Bld. Renovation Dec. 2023 – Mar. 2025 68 Weeks
4 - South 1922 Building Renovation Apr. 2025 – July 2026 66 Weeks
Phase 1 – New Gymnasium (October 2020 – March 2022 ) Current vehicle and pedestrian traffic patterns will not be impacted. The sidewalk along Arcand Drive will be maintained and student drop-off along Father Morissette Boulevard will remain unchanged. Primary access to the construction site will be provided by two gates along Arcand Drive and a rear access gate will installed along Dutton Street.
Phase 2 – Freshman Academy (April 2022 – December 2023 )
Student drop-off will be relocated east of the construction site entrance and school access will be provided through the north and southeast entrance of the 1980’s Building. The sidewalk along Father Morissette Boulevard will be closed and replaced with a 7’ wide pedestrian pathway adjacent to its curbline. This temporary pathway will be protected by a precast concrete barrier which will reduce the eastbound traffic lane to 16’.
The midblock crossing connecting the George Ayotte Garage to the school will be closed and replaced with a temporary pedestrian crossing 100’ northeast. The existing signal will be temporarily taken out of service and a police detail will present to direct pedestrian traffic.
Page | 1
Access to the construction site will be provided by two gates along Arcand Drive and Father Morissette Boulevard. The median at Father Morissette Boulevard will be modified to allow left turns out of the construction site.
Phase 3 – 1980 West Building/1922 East Building (December 2023 – March 2025 ) Student drop-off will occur along Father Morissette Boulevard and access will be provided through the new Freshman Academy and southern end of the 1922 Building. Access to the northern end of the 1922 Building will be closed due to construction activities.
The sidewalk at French Street and Kirk Street will be partially closed and replaced with a 6’ wide pedestrian pathway adjacent to its curbline. This temporary pathway will be protected by a precast concrete barrier which will reduce the French Street and Kirk Street lanes to 11’ and 15’ respectively.
Access to the construction site will be provided by multiple gates along Father Morissette Boulevard, French Street and Kirk Street.
Phase 4 – 1892/1922 East Building (Apr. 2025 – July 2026 ) Student drop-off will occur along Father Morissette Boulevard and access will be provided through the new Freshman Academy and northern end of the 1922 Building. Access to the southern end of the 1922 Building will be closed due to construction activities.
The southern half of the sidewalk at Kirk Street will be closed and replaced with a 6’ wide pedestrian pathway adjacent to its curbline. This temporary pathway will be protected by a precast concrete barrier which will reduce the Kirk Street lane to 15’.
Access to the construction site will be provided by multiple gates along Kirk Street.
Street Occupancy
Periodic and short-term street occupancies and lane closures will be limited to Father Morissette Boulevard and Kirk Street. This work will consist of utility connections, concrete pours, and special deliveries. A police detail will be present for each closure to direct traffic.
Prior to each closure, Suffolk will hold a pre-construction meeting with the Owners Project Manager (Skanska) to review the closure plan and address all comments and concerns prior to commencing work.
Page | 2
Truck Movement During Construction
Truck access to the site will be restricted during peak school arrival and dismissal periods. Trucks coming to and from the site are required to use major arterial roadways and not local streets. To prevent trucks from idling in nearby neighborhoods, Cawley Memorial Stadium will be used for trucks to temporarily park.
Perimeter Protection & Signage
Secure fencing and barricades will be used to separate construction areas from pedestrian traffic around the site. These measures will be designed to meet all Occupational Safety and Health Administration (OSHA) safety standards. Signs will be installed around the outside perimeter of the construction site to direct pedestrian and construction traffic. The main construction sign will be installed in a visible public spot and will provide contact information for all questions or concerns.
Emergency Vehicle Access
Emergency vehicle access into the construction site will be through the primary gates as mentioned prior. All other points of access will be maintained for secondary access as needed. Existing fire hydrants will be kept accessible to Lowell’s Fire Department.
Construction Worker and Staff Parking
Subcontractors will not be permitted to park on-site or within the surrounding neighborhoods. Parking at the George Ayotte Parking Facility and at the Tsongas Arena Surface Lot (tentatively) will be available for Subcontractor parking.
Page | 3
Transportation Management Plan
MERRIMACK RIVER
TSONGAS Lowell High CENTER BRIDGE STREET
School FRENCH STREET vhb.com PROJECT SITE
50 Father Morissette Boulevard ARCAND DRIVE
FATHER MORISSETTE BLVD Lowell, Massachusetts MERRICMACK STREET
Issued for Discussion and Approvals 99 High Street Date Issued July 22, 2020 Boston, MA 02110 617.728.7777 Latest Issue July 22, 2020 DUTTON STREET
0 150 300 600 Feet
Sheet Index Project Schedule No. Drawing Title Phase Start Finish Duration
TMP-1 Construction Phasing Overview 1 - Gym October 13, 2020 March 18, 2022 74 Weeks TMP-2 Construction Parking Sites 2 - Freshman Academy April 18, 2022 November 29, 2023 84 Weeks TMP-3 Phase 1 Overview 3 - Renovate East/West (North) November 30, 2023 March 21, 2025 68 Weeks TMP-4 Phase 2 Overview 4 - Renovate West (South) April 21, 2025 July 24, 2026 66 Weeks TMP-5 Phase 3 Overview Total: October 13, 2020 July 25, 2026 301 Weeks TMP-6 Phase 4 Overview TMP-7 Phase 1 Truck Turns TMP-8 Phase 2 Truck Turns TMP-9 Phase 3 Truck Turns 22 July 2020
TMP-10 Phase 4 Truck Turns TMP-11 Truck Routes \\VHB\GBL\PROJ\BOSTON\14565.00 LOWELL HIGH COUNTS\CAD\LD\PLANMISC\TMP\TMP 07172020 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg vhb.com
99 High Street Boston, MA 02110 FrenchFRENCH Street STREET 58' Right of Way U 617.728.7777
PHASE 3 80' Right of Way
Father Morissette Boulevard RENO KIRK STREET KIRK S
U PaigePAIGE STREET Street FATHER MORISSETTE BOULEVARD PH 3
RENO CANAL MERRIMACK
LUCY LARCOM PARK LARCOM LUCY KIRK STREET KIRK PHASE 4
S CANAL MERRIMACK MERRIMACK RENO
U LEE STREETLee Street PHASE 2
ARCAND DRIVE KIRK STREET KIRK PHASE 1
Arcand Drive NEW GYM Merrimack Canal 75' Right of Way 0 30 60 120 Feet
Lowell High School TMP 50 Father Morissette Boulevard Kirk Street LUCY LARCOM PARK LARCOM LUCY Lowell, Massachusetts ARCAND DRIVE
No. Revision Date Appvd.
MERRIMACK CANAL MERRIMACK (DISCONTINUED)
FORMERLY ANNE STREET ANNE FORMERLY MERRIMACK STREET White, Ryan Designed by Checked by
Issued for Date July 22, 2020
Dutton Street Discussion and Approvals Only NOT FOR CONSTRUCTION Drawing Title Construction Phasing MERRIMACK STREET
Wednesday, July 22, 2020 2:48:19 PM Overview Plotted PROGRESS 07/22/2020 Drawing Number RYANWHITE TMP-1
Sheet of 1 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg
UMASS LOWELL vhb.com TSONGAS ARENA SURFACE PARKING LOT
99 High Street GEORGE AYOTTE Boston, MA 02110 617.728.7777 PARKING FACILITY
FrenchFRENCH Street STREET 58' Right of Way U
PHASE 3 80' Right of Way
Father Morissette Boulevard RENO KIRK STREET KIRK S
U PaigePAIGE STREET Street FATHER MORISSETTE BOULEVARD PH 3
RENO CANAL MERRIMACK
LUCY LARCOM PARK LARCOM LUCY KIRK STREET KIRK PHASE 4
S CANAL MERRIMACK MERRIMACK RENO
Parking Facility U LEE STREETLee Street PHASE 2
Pedestrian Routing
ARCAND DRIVE KIRK STREET KIRK 0 30 60 120 Feet PHASE 1 Arcand Drive NEW GYM Lowell High School 75' Right of Way Merrimack Canal TMP 50 Father Morissette Boulevard Lowell, Massachusetts
No. Revision Date Appvd.
Kirk Street LUCY LARCOM PARK LARCOM LUCY
ARCAND DRIVE
MERRIMACK CANAL MERRIMACK (DISCONTINUED)
FORMERLY ANNE STREET ANNE FORMERLY MERRIMACK STREET White, Ryan Designed by Checked by
Issued for Date July 22, 2020 Discussion and Approvals Only NOT FOR CONSTRUCTION Drawing Title Construction Parking Sites Dutton Street Wednesday, July 22, 2020 2:49:59 PM Plotted
MERRIMACK STREET Drawing Number RYANWHITE PROGRESS 07/12/2020 TMP-2
Sheet of 2 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg FATHER MORISSETTE BOULEVARD
TURNAROUND AT vhb.com
JOHN F. COX CIRCLE
MERRIMACK CANAL MERRIMACK LUCY LARCOM PARK LARCOM LUCY
99 High Street MAINTAIN EXISTING Boston, MA 02110 DROP-OFF AREA 617.728.7777
S NO CONSTRUCTION CANAL ACTIVITY ALONG FATHER MERRIMACK MORISSETTE BLVD
NOTES: 1. UTILITY WORK, DEMOLITION, FOUNDATION WORK AND NEW GYM BUILDING ERECTION WILL OCCUR DURING THIS PHASE 2. THE DURATION OF THIS PHASE IS EXPECTED TO BE 74 WEEKS CONSTRUCTION FENCE (10/13/2020 - 3/18/2022) 3. APPROXIMATELY 2 TRUCKS PER DAY WILL BE EXPECTED AT THE SITE DURING THIS PHASE 4. NO CONSTRUCTION DELIVERIES DURING MORNING AND EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU GATE B FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM) 6' 5. EMERGENCY VEHICLE ACCESS WILL BE RETAINED DURING AND AFTER WORK HOURS
G20-2
64' Entrance
ARCAND DRIVE
Pedestrian Routing R7-4R WHEEL WASH MAINTAIN EXISTING Construction Site Access 6' SIDEWALK
LHS Loading Access PRECAST CONCRETE BARRIER WITH FENCE MINIMUM 3' 0 15 30 60 Feet BETWEEN TRACK Lowell High School TEMP. REMOVE 2 AND SITE FENCE TMP PARKING SPACES 50 Father Morissette Boulevard Lowell, Massachusetts
GATE A No. Revision Date Appvd. LUCY LARCOM PARK LARCOM LUCY
ARCAND DRIVE MERRIMACK CANAL MERRIMACK
R7-4L (DISCONTINUED) White, Ryan Designed by Checked by
FORMERLY ANNE STREET ANNE FORMERLY Issued for Date July 22, 2020 W20-1 Discussion and Approvals Only NOT FOR CONSTRUCTION GATE C Drawing Title (LIMITED USE) Phase 1 Overview
MAINTAIN EXISTING SIDEWALK Dutton Street Wednesday, July 22, 2020 2:51:22 PM Plotted
Drawing Number RYANWHITE TMP-3
Sheet of 3 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00
MERRIMACK STREET \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg
ERADICATE EXISTING RELOCATED CROSSWALK vhb.com CROSSWALK AND w/ TEMP. ADA RAMPS 47' STOP BAR STRIPING W11-2 34' W16-9P 35'
84'
100' 99 High Street W11-2 Boston, MA 02110 M4-9bL 200' TEMP. W16-7P 617.728.7777 BAG EX. SIGNAL HEADS R9-9(MOD) DROP-OFF AREA AND DEACTIVATE TRAFFIC SIGNAL G20-2 MODIFY MEDIAN TO ALLOW TRUCK TURN 100' RETAIN HCP SPACES 7' TEMP. SIDEWALK NOTES: S M4-9bR 1. UTILITY WORK; LIBRARY, FIELD HOUSE, AND SOUTH SKY BRIDGE DEMOLITION; FOUNDATION WORK; AND BUILDING AND NEW SOUTH SKY BRIDGE ERECTION WILL OCCUR DURING THIS LEVEL AND PAVE PHASE 2. THE DURATION OF THIS PHASE IS EXPECTED TO BE 84 WEEKS (4/18/2022 - 11/29/2023) EXISTING BUS STOP MULTCHED AREA 3. APPROXIMATELY 3 TRUCKS PER DAY WILL BE EXPECTED AT THE SITE DURING THIS PHASE 4. NO CONSTRUCTION DELIVERIES DURING MORNING AND AND SIGNAGE TO EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM) 5. GATE B NOT ACTIVE DURING ARRIVAL AND DISMISSAL PRECAST CONCRETE 7' R7-4 BE RELOCATED 6. EMERGENCY VEHICLE ACCESS WILL BE RETAINED DURING AND 16' BARRIER FATHER MORISSETTE BOULEVARD AFTER WORK HOURS IMPACT ATTENUATOR MAINTAIN SKY BRIDGE OPERATION Entrance
GATE B CANAL MERRIMACK (SEE NOTE 5)
W20-1 PARK LARCOM LUCY Pedestrian Routing
IMPACT ATTENUATOR WHEEL WASH Construction Site Access DEMOLISH/REPLACE SKY BRIDGE LHS Loading Access
S CANAL MERRIMACK MERRIMACK MAINTAIN EX. M4-9SL 0 15 30 60 Feet ADA RAMPS IMPACT ATTENUATOR Lowell High School TMP 50 Father Morissette Boulevard Lowell, Massachusetts CLOSE EAST No. Revision Date Appvd. SIDE OF GATE A W20-1 BRIDGE TO
White, Ryan PEDESTRIANS Designed by Checked by
PRECAST CONCRETE WHEEL WASH Issued for Date July 22, 2020 BARRIER WITH FENCE Discussion and Approvals Only ARCAND DRIVE OVERHEAD PROTECTION NOT FOR CONSTRUCTION Drawing Title TO GYM AS NEEDED Phase 2 Overview MAINTAIN EXISTING Wednesday, July 22, 2020 2:53:07 PM 6' SIDEWALK
Plotted NEW 100' GYM Drawing Number RYANWHITE
W20-1 TMP-4 NEW LOADING DOCK Sheet of 4 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00 LUCY LARCOM PARK LARCOM LUCY \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg PRECAST CONCRETE
BARRIER vhb.com MAINTAIN EXISTING CROSSWALKS W11-2 W11-2 W20-1 W16-9P R7-4R W16-7P R7-4 100'
32' FRENCH STREET R7-4 6' U 99 High Street IMPACT Boston, MA 02110 11' RESTORE CROSSWALK ATTENUATOR 617.728.7777 STRIPING AND 100' GATE B SIGNAL OPERATION W11-2 TEMP. W16-9P M4-9bR GATE A CROSSWALK R9-9(MOD)
RAISE MEDIAN M4-9b ON TYPE III ERADICATE 6' 28' BARRICADE WHEEL WASH STRIPING R7-4 MAINTAIN EXISTING NOTES: TEMP. REMOVE 5 1. NORTH BRIDGE DEMOLITION, NEW NORTH SKY BRIDGE SIDEWALK STREET KIRK ERECTION, AND 1980 WEST BUILDING AND 1922 EAST 100' BUILDING RENOVATIONS WILL OCCUR DURING THIS PHASE PARKING SPACES 12' MIN 2. THE DURATION OF THIS PHASE IS EXPECTED TO BE 68 WEEKS (11/30/2023 - 3/21/2025) 3. APPROXIMATELY 2 TRUCKS PER DAY WILL BE EXPECTED AT THE S RETAIN HCP W20-1 SITE DURING THIS PHASE 4. NO CONSTRUCTION DELIVERIES DURING MORNING AND 9' EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU SPACES FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM) 5. EMERGENCY VEHICLE ACCESS WILL BE RETAINED DURING AND AFTER WORK HOURS PRECAST CONCRETE PRECAST CONCRETE PAIGE BARRIER WITH FENCE U STREET FATHER MORISSETTE BOULEVARD BARRIER Entrance 200' DEMOLISH/REPLACE 5' TEMP. PEDESTRIAN 5' W20-1 SKY BRIDGE PATHWAY Pedestrian Routing M4-9b MERRIMACK CANAL MERRIMACK IMPACT ATTENUATOR 12'
Construction Site Access
LUCY LARCOM PARK LARCOM LUCY GATE C EXISTING BUS STOP BUILD NEW
AND SIGNAGE TO TEMP. ADA RAMP STREET KIRK DROP-OFF AREA SKY BRIDGE 0 15 30 60 Feet BE RELOCATED TEMP. REMOVE 5 Lowell High School MINIMUM 3' R7-4 PARKING SPACES TMP CANAL BETWEEN TRACK 50 Father Morissette Boulevard
Lowell, Massachusetts MERRIMACK MERRIMACK
AND SITE FENCE No. Revision Date Appvd.
100'
LEE STREETLEE STREET White, Ryan NEW SKY BRIDGE U NEW PHASE 2 OPEN Designed by Checked by
Issued for Date BUILDING July 22, 2020 Discussion and Approvals Only NOT FOR CONSTRUCTION Drawing Title Phase 3 Overview
100' W20-1 Wednesday, July 22, 2020 3:14:02 PM Plotted RYANWHITE
ARCAND DRIVE Drawing Number W5-1
KIRK STREET KIRK TMP-5 GYM Sheet of 5 11 Wednesday, July 22, 2020 3:09:16 PM Project Number
Saved 14565.00 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg vhb.com FRENCH STREET U
99 High Street Boston, MA 02110 617.728.7777 RESTORE CROSSWALK STRIPING
M4-9bL ON TYPE STREET KIRK III BARRICADE S GATE B NOTES: 1. 1892/1922 EAST BUILDING RENOVATIONS WILL OCCUR DURING THIS PHASE TEMP. REMOVE 5 2. THE DURATION OF THIS PHASE IS EXPECTED TO BE 66 WEEKS (4/21/2025 - 7/24/2026) PAIGE 3. APPROXIMATELY 1 TRUCK PER DAY WILL BE EXPECTED AT THE PARKING SPACES SITE DURING THIS PHASE GATE C STREET 4. NO CONSTRUCTION DELIVERIES DURING MORNING AND U EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM) FATHER MORISSETTE BOULEVARD (LIMITED USE) 5. EMERGENCY VEHICLE ACCESS WILL BE RETAINED DURING AND AFTER WORK HOURS PHASE 3 FINISHED 5' TEMP. PEDESTRIAN
RENOVATIONS CANAL MERRIMACK PATHWAY R7-4 Entrance LUCY LARCOM PARK LARCOM LUCY
DROP-OFF AREA 5' Pedestrian Routing KIRK STREET KIRK
Construction Site Access R7-4 M4-9b
CANAL 0 15 30 60 Feet 12' MERRIMACK MERRIMACK PRECAST CONCRETE Lowell High School BARRIER 9' TMP R7-4 50 Father Morissette Boulevard LEE STREETLowell, Massachusetts
U No. Revision Date Appvd. NEW PHASE 2 TEMP. REMOVE 5 BUILDING PARKING SPACES White, Ryan
Designed by Checked by
IMPACT ATTENUATOR Issued for Date July 22, 2020 Discussion and Approvals Only NOT FOR CONSTRUCTION GATE A Drawing Title ARCAND DRIVE Phase 4 Overview Wednesday, July 22, 2020 3:15:30 PM Plotted RYANWHITE
M4-9bR ON TYPE Drawing Number GYM III BARRICADE TMP-6
100'
Sheet of W5-1 6 11
100' Wednesday, July 22, 2020 3:09:16 PM W20-1 Project Number
Saved 14565.00 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg FATHER MORISSETTE BOULEVARD
TURNAROUND AT vhb.com
JOHN F. COX CIRCLE
MERRIMACK CANAL MERRIMACK LUCY LARCOM PARK LARCOM LUCY
99 High Street Boston, MA 02110 617.728.7777
7.50 42.50 S CANAL
MERRIMACK MERRIMACK 3.00 35.50 0.00
3.00 12.50
WB-50 feet Tractor Width : 8.00 Lock to Lock Time : 6.0 Trailer Width : 8.50 Steering Angle : 17.7 Tractor Track : 8.00 Articulating Angle : 70.0
Trailer Track : 8.50 WB-50 - Intermediate Semi-Trailer Intermediate - WB-50
GATE B
ARCAND DRIVE WB-50 - Intermediate Semi-Trailer
NOTE: NO CONSTRUCTION DELIVERIES DURING MORNING AND EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM)
0 15 30 60 Feet
Lowell High School WB-50 - Intermediate Semi-Trailer TMP 50 Father Morissette Boulevard Lowell, Massachusetts
GATE A No. Revision Date Appvd. LUCY LARCOM PARK LARCOM LUCY
ARCAND DRIVE
MERRIMACK CANAL MERRIMACK (DISCONTINUED) White, Ryan Designed by Checked by
FORMERLY ANNE STREET ANNE FORMERLY Issued for Date July 22, 2020 GATE C Discussion and Approvals Only NOT FOR CONSTRUCTION (LIMITED USE) Drawing Title Phase 1 Truck Turns
Wednesday, July 22, 2020 3:04:23 PM WB-50 - Intermediate Semi-Trailer Intermediate - WB-50 Plotted
Drawing Number RYANWHITE TMP-7
Sheet of 7 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00
MERRIMACK STREET \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg vhb.com
99 High Street Boston, MA 02110 617.728.7777 BRING MEDIAN TO
GRADE 7.50 42.50
3.00 35.50 0.00
3.00 12.50
WB-50 feet Tractor Width : 8.00 Lock to Lock Time : 6.0 Trailer Width : 8.50 Steering Angle : 17.7 S Tractor Track : 8.00 Articulating Angle : 70.0 GATE B Trailer Track : 8.50 SU-30 - Single Unit Truck (SEE NOTE 2) 30.00 TURNAROUND AT JOHN F. COX CIRCLE
7'
16' FATHER MORISSETTE BOULEVARD Truck Unit Single - SU-30
4.00 20.00
SU-30 feet Width : 8.00 Track : 8.00 Lock to Lock Time : 6.0
MERRIMACK CANAL MERRIMACK Steering Angle : 31.8 LUCY LARCOM PARK LARCOM LUCY
NOTE: 1) NO CONSTRUCTION DELIVERIES DURING MORNING AND EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM) 2) GATE B NOT ACTIVE DURING ARRIVAL AND DISMISSAL
S CANAL MERRIMACK MERRIMACK
0 15 30 60 Feet
Lowell High School TMP
50 Father Morissette Boulevard WB-50 - Intermediate Semi-Trailer Intermediate - WB-50 Lowell, Massachusetts
No. Revision Date Appvd. GATE A
WB-50 - Intermediate Semi-Trailer White, Ryan WB-50 - Intermediate Semi-Trailer Designed by Checked by
Issued for Date July 22, 2020 Discussion and Approvals Only ARCAND DRIVE NOT FOR CONSTRUCTION Drawing Title Phase 2 Truck Turns Wednesday, July 22, 2020 3:05:11 PM
Plotted NEW GYM Drawing Number RYANWHITE TMP-8
Sheet of
8 11 WB-50 - Intermediate Semi-Trailer Intermediate - WB-50 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00 LUCY LARCOM PARK LARCOM LUCY \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg vhb.com
WB-50 - Intermediate Semi-Trailer FRENCH STREET 99 High Street SU-30 - Single Unit Truck U Boston, MA 02110 617.728.7777 GATE B
7.50 42.50 SU-30 - Single Unit Truck Unit Single - SU-30 3.00 35.50 0.00
3.00 12.50 SU-30 - Single Unit Truck WB-50 feet Tractor Width : 8.00 Lock to Lock Time : 6.0 Trailer Width : 8.50 Steering Angle : 17.7 Tractor Track : 8.00 Articulating Angle : 70.0 Trailer Track : 8.50
SU-30 - Single Unit Truck
30.00
SU-30 - Single Unit Truck Unit Single - SU-30 SU-30 - Single Unit Truck Unit Single - SU-30 KIRK STREET KIRK S 12' MIN 4.00 20.00 9' GATE A SU-30 feet Width : 8.00 Track : 8.00 Lock to Lock Time : 6.0 PAIGE Steering Angle : 31.8 U STREET FATHER MORISSETTE BOULEVARD
5'
MERRIMACK CANAL MERRIMACK 12'
NOTE: NO CONSTRUCTION DELIVERIES DURING MORNING AND EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM)
LUCY LARCOM PARK LARCOM LUCY GATE C KIRK STREET KIRK 0 15 30 60 Feet
Lowell High School TMP
CANAL 50 Father Morissette Boulevard
Lowell, Massachusetts MERRIMACK MERRIMACK
No. Revision Date Appvd.
LEE STREETLEE STREET WB-50 - Intermediate Semi-Trailer Intermediate - WB-50 U White, Ryan NEW PHASE 2 Designed by Checked by
Issued for Date BUILDING July 22, 2020 Discussion and Approvals Only NOT FOR CONSTRUCTION Drawing Title Phase 3 Truck Turns Wednesday, July 22, 2020 3:07:03 PM Plotted
ARCAND DRIVE Drawing Number RYANWHITE TMP-9
GYM Sheet of 9 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg vhb.com FRENCH STREET U
99 High Street Boston, MA 02110 617.728.7777
7.50 42.50
WB-50 - Intermediate Semi-Trailer 3.00 35.50 PHASE 3 FINISHED 0.00
RENOVATIONS 3.00 12.50
WB-50 feet Tractor Width : 8.00 Lock to Lock Time : 6.0
Trailer Width : 8.50 Steering Angle : 17.7 KIRK STREET KIRK Tractor Track : 8.00 Articulating Angle : 70.0 S Trailer Track : 8.50 GATE B PAIGE GATE C U STREET FATHER MORISSETTE BOULEVARD (LIMITED USE) PHASE 3 FINISHED
RENOVATIONS CANAL MERRIMACK LUCY LARCOM PARK LARCOM LUCY
5' KIRK STREET KIRK NOTE: NO CONSTRUCTION DELIVERIES DURING MORNING AND EVENING SCHOOL PICK-UP/DROP-OFF HOURS (MONDAY THRU FRIDAY 7:15 AM TO 8:15 AM AND 2:15 PM TO 3:15 PM)
CANAL 0 15 30 60 Feet
12' MERRIMACK MERRIMACK
9' Lowell High School TMP 50 Father Morissette Boulevard LEE STREETLowell, Massachusetts
U No. Revision Date Appvd. NEW PHASE 2 BUILDING White, Ryan Designed by Checked by
Issued for Date July 22, 2020 Discussion and Approvals Only NOT FOR CONSTRUCTION Drawing Title
ARCAND DRIVE Phase 4 Truck Turns Wednesday, July 22, 2020 3:07:41 PM
Plotted GATE A
Drawing Number RYANWHITE GYM TMP-10
WB-50 - Intermediate Semi-Trailer Intermediate - WB-50 Sheet of 10 11 Friday, July 17, 2020 11:59:39 AM Project Number
Saved 14565.00 \\vhb\gbl\proj\Boston\14565.00 Lowell High Counts\cad\ld\Planmisc\TMP\TMP 07172020.dwg vhb.com
99 High Street Boston, MA 02110 617.728.7777
DUTTON ST.
DUTTON ST.
THORNDIKE ST. THORNDIKE ST.
LOWELL CONNECTOR
LOWELL CONNECTOR
From Lowell Connector (Phases 1,2) From Lowell Connector (Phases 3,4) N.T.S. Source: Google Maps N.T.S. Source: Google Maps
E MERRIMACK ST. ALTERNATIVE ROUTE
DUTTON ST.
NESMITH ST. THORNDIKE ST. Lowell High School TMP 50 Father Morissette Boulevard Lowell, Massachusetts
No. Revision Date Appvd.
DUTTON ST. White, Ryan
Designed by Checked by
Issued for Date July 22, 2020 THORNDIKE ST. Discussion and Approvals Only NOT FOR CONSTRUCTION Drawing Title
LOWELL CONNECTOR INTERSTATE 495 WEST Truck Routes Wednesday, July 22, 2020 3:15:49 PM Plotted
LOWELL CONNECTOR RYANWHITE
Drawing Number
To Lowell Connector From Cawley Memorial Stadium TMP-11 N.T.S. Source: Google Maps N.T.S. Source: Google Maps Sheet of 11 11 Wednesday, July 22, 2020 3:09:16 PM Project Number
Saved 14565.00