DIRECTIONS to 50 MILK STREET Google Maps Link

Total Page:16

File Type:pdf, Size:1020Kb

DIRECTIONS to 50 MILK STREET Google Maps Link DIRECTIONS TO 50 MILK STREET Google Maps Link: https://www.google.com/maps/place/50+Milk+St,+Boston,+MA+02109/@42.357004,- 71.0554303,17z/data=!4m2!3m1!1s0x89e37084760558db:0x206840278228b95b **Important to Note** • Contrary to our Milk Street address, our main entrance is on Devonshire St, directly off of Milk St. All provided directions will direct you to our Devonshire entrance. • We are located on the 8th floor of the building; in order to access the elevator/stairs, you must check in with security at the main desk at the Devonshire entrance. • If you are looking for our public meeting room, you will go up the elevators, get off on the 8th floor, and turn down the hallway that is on your far left when facing away from our reception area. The meeting room will be at the end of the hallway on your right. MBTA Orange Line State Street Station: (Walk, 1 minute) 1. Exit onto Devonshire St 2. Turn Right 3. Entrance to 50 Milk St will be on your right halfway up the block on Devonshire Haymarket Station: (Walk, 8 minutes) 1. Head Southeast on Congress St toward Hanover St (walk towards Faneuil Hall and the Old State House) 2. Turn Right on Devonshire St 3. Entrance to 50 Milk St will be on your right on Devonshire Downtown Crossing Station: (Walk, 4 minutes) 1. Head northeast on Washington St toward Bromfield St (walk towards the Old State House and Old South meeting House) 2. Turn Right on to Milk St 3. Turn Left onto Devonshire St, the entrance will be on your left immediately after you turn the corner MBTA Green Line Haymarket Station: (See above) Government Center Station: (Walk, 6 minutes) 1. Head northeast, walk towards Starbucks 2. Turn Left onto Court St 3. Turn Right onto Washington St 4. Turn Left onto Devonshire Pl 5. Turn Right onto Devonshire Place and the entrance will be on your right 1.5 blocks up MBTA Commuter Rail North Station: (Walk, 16 min, OR Orange/Green Line, See Above) 1. Head Southwest on Causeway St toward Friend St 2. Turn Left on Friend St 3. Turn Right onto Market St/New Chardon St 4. Sharp Left onto Congress St/Merrimac St 5. Turn Right onto Devonshire St, the entrance will be 3 blocks up on your right DRIVING DIRECTIONS **Parking is very limited in the area, so we encourage you take public transportation; however we have provided a list of the closest parking garages following the driving directions. ** FROM THE NORTH: 1. Take I-93 South 2. Take Exit 24-A-B toward Government Center 3. Turn Left onto John F. Fitzgerald Surface Rd 4. Turn Right onto State St 5. Slight left onto Devonshire St, destination will be on your right FROM THE SOUTH: 1. Take I-93 North 2. Take Exit 23 for Aquarium toward Quincy Market 3. Keep Left at the fork, follow signs for Gov’t Ctr/Financial Dist 4. Continue onto North St 5. Turn left onto Congress St 6. Turn Right on to Devonshire, the destination will be on your right 3 blocks up FROM LOGAN AIRPORT: 1. Follow Signs for Massachusetts 1A/S/Interstate 93 N/Sumner Tunnel 2. Continue onto State Hwy 1A S 3. Turn left to stay on State Highway 1A S 4. Exit on left towards Government Center 5. Turn left onto market St/New Chardon St 6. Turn left onto Congress St/Merrimac St 7. Turn Right onto Devonshire St, destination will be on your right 3 blocks up FROM I-90 EAST (MASSACHUSETTS TURNPIKE): 1. From Route 90 East take exit 24 A-B-C on left for Interstate 93 N/S toward Quincy 2. Keep right at the fork and continue on Exit 24B, follow signs for Concord NH/Interstate 93 N 3. Continue onto the I-93 N/Thomas P. O’Neill Jr. Tunnel 4. Take exit 23 for Aquarium toward Quincy Market 5. Keep left at the fork, follow signs for Gov’t Ctr/Financial Dist 6. Continue onto North St 7. Turn left onto Congress St 8. Turn Right onto Devonshire St, the destination will be on your right 3 blocks up NEARBY PARKING GARAGES 1. Icon Parking LLC Located at 1 Devonshire St, Boston, MA 2. One Parking Located at 1 Federal St, Boston, MA 3. Central Parking System Located at 1 Federal St, Boston, MA 4. 33 Arch St Garage Located at 33 Arch St, Boston, MA 5. Pi Alley Parking Located at 275 Washington St, Boston, MA 6. Garage at Post Office Square Located at 0 Post Office Square, Boston, MA .
Recommended publications
  • Haymarket Station Redevelopment Analysis February 6, 2020
    ON REG ST IO O N B BOSTON REGION METROPOLITAN PLANNING ORGANIZATION M Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair E N T R O I Tegin L. Teich, Executive Director, MPO Staff O T P A O IZ LMPOI N TA A N G P OR LANNING WORK PROGRAM HAYMARKET STATION REDEVELOPMENT ANALYSIS FEBRUARY 6, 2020 Proposed Motion The Boston Region Metropolitan Planning Organization (MPO) votes to approve this work program. Project Identification Unified Planning Work Program (UPWP) Classification Not listed in federal fiscal year 2020 UPWP Project Number 11492 Client Massachusetts Bay Transportation Authority (MBTA) Client Supervisor: Greg Thompson Project Supervisors Principal: Ed Bromage Manager: Scott Peterson Funding Source MBTA Contract Schedule and Budget Schedule: 12 months from notice to proceed Budget: $65,000 Schedule and budget details are shown in Exhibits 1 and 2, respectively. Relationship to MPO Work This study is supported in full with non-MPO funding. Committing MPO staff to this project will not impinge on the quality or timeliness of MPO-funded work. State Transportation Building • Ten Park Plaza, Suite 2150 • Boston, MA 02116-3968 Tel. (857) 702-3700 • Fax (617) 570-9192 • TTY (617) 570-9193 • www.bostonmpo.org Haymarket Station Redevelopment Analysis 2 February 6, 2020 Background The HYM Investment Group (HYM) is in the process of developing the Bulfinch Crossing project. The Bulfinch Crossing project is a transformation of the Government Center garage into a six building, 2.9 million square foot mixed-use project. The area, known as Bulfinch Triangle, has a total lot area of 4.8 acres spread across two parcels and more than 40,000 square feet of Merrimac and Congress Streets.
    [Show full text]
  • Inner Harbor Connector Ferry
    Inner Harbor Connector Ferry Business Plan for New Water Transportation Service 1 2 Inner Harbor Connector Contents The Inner Harbor Connector 3 Overview 4 Why Ferries 5 Ferries Today 7 Existing Conditions 7 Best Practices 10 Comprehensive Study Process 13 Collecting Ideas 13 Forecasting Ridership 14 Narrowing the Dock List 15 Selecting Routes 16 Dock Locations and Conditions 19 Long Wharf North and Central (Downtown/North End) 21 Lewis Mall (East Boston) 23 Navy Yard Pier 4 (Charlestown) 25 Fan Pier (Seaport) 27 Dock Improvement Recommendations 31 Long Wharf North and Central (Downtown/North End) 33 Lewis Mall (East Boston) 34 Navy Yard Pier 4 (Charlestown) 35 Fan Pier (Seaport) 36 Route Configuration and Schedule 39 Vessel Recommendations 41 Vessel Design and Power 41 Cost Estimates 42 Zero Emissions Alternative 43 Ridership and Fares 45 Multi-modal Sensitivity 47 Finances 51 Overview 51 Pro Forma 52 Assumptions 53 Funding Opportunities 55 Emissions Impact 59 Implementation 63 Appendix 65 1 Proposed route of the Inner Harbor Connector ferry 2 Inner Harbor Connector The Inner Harbor Connector Authority (MBTA) ferry service between Charlestown and Long Wharf, it should be noted that the plans do not specify There is an opportunity to expand the existing or require that the new service be operated by a state entity. ferry service between Charlestown and downtown Massachusetts Department of Transportation (MassDOT) Boston to also serve East Boston and the South and the Massachusetts Port Authority (Massport) were Boston Seaport and connect multiple vibrant both among the funders of this study and hope to work in neighborhoods around Boston Harbor.
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • Airport Station
    MBTA ATM/Branding Opportunities 43 ATM Locations Available Line City Station Available Spaces Station Entries Blue East Boston Airport 1 7,429 Blue Revere Revere Beach 1 3,197 Blue Revere Wonderland 1 6,105 Blue East Boston Maverick 1 10,106 Blue Boston Aquarium 1 4,776 Green Boston Prudential 2 3,643 Green Boston Kenmore 1 9,503 Green Newton Riverside 1 2,192 Green Boston Haymarket 1 11,469 Green Boston North Station 1 17,079 Orange Boston Forest Hills 2 15,150 Orange Boston Jackson Square 2 5,828 Orange Boston Ruggles 1 10,433 Orange Boston Stony Brook 2 3,652 Orange Malden Oak Grove 1 6,590 Orange Medford Wellington 1 7,609 Orange Charlestown Community College 1 4,956 Orange Somerville Assembly 1 * Red Boston South Station 1 23,703 Red Boston Charles/MGH 1 12,065 Red Cambridge Alewife 2 11,221 Red Cambridge Harvard 1 23,199 Red Quincy Quincy Adams 3 4,785 Red Quincy Wollaston 2 4,624 Red Boston Downtown Crossing 2 23,478 Red Somerville Davis Square 2 12,857 Red Cambridge Kendall/MIT 1 15,433 Red Cambridge Porter Square 1 8,850 Red Dorchester Ashmont 2 9,293 Silver Boston World Trade Center 1 1,574 Silver Boston Courthouse 1 1,283 Commuter Boat Hingham Hingham Intermodal Terminal 1 ** * Assembly Station opened September 2, 2014. Ridership numbers are now being established ** The Hingham Intermodal Terminal is scheduled to open December 2015 . ATM proposals /branding are subject to MBTA design review and approval. Blue Line- Airport Station K-2 Blue Line- Revere Beach Station Map K-1 Charlie Card Machine Charlie Card Collectors Machines
    [Show full text]
  • Welcome Guide for the International Community at Tufts University & Affiliated Hospitals
    Welcome Guide For the International Community at Tufts University & Affiliated Hospitals Tufts International Center. https://global.tufts.edu/tufts-international-center 617-627-3458 | [email protected] Welcome Message The International Center at Tufts University is excited to have you as a member of our community, and we hope that you have a very rewarding experience at Tufts and in the United States. The International Center provides services for international scholars and students from the Medford/Somerville campus, the School of the Museum of Fine Arts, the Health Sciences campuses in Boston and Grafton, and their affiliated hospitals including but not limited to Tufts Medical Center and Lahey Hospital. Some of these services include advising on immigration, cultural adjustment, and getting settled at Tufts. We currently have a population of about 2,000 international students and scholars. We have prepared a Welcome Guide to help you and your dependents navigate some of the many resources available to you in the state of Massachusetts; and the cities where our population of students, visiting faculty and scholars welcome reside during their stay at Tufts. We hope that you can take advantage of this information to help you settle into your new home. Moreover, we invite you to check our “Things to Do” section and motivate yourself to see New England while experiencing its people and their cultural heritage. Do not hesitate to reach out to us if you need support with your transition and cultural adjustment in the U.S. We are
    [Show full text]
  • Sha 2020 Access Package
    SHA 2020 ACCESS PACKAGE Society for Historical Archaeology Conference on Historical and Underwater Archaeology January 8-11, 2020 Compiled by SHA 2020 Boston Accessibility and Inclusion Committee Chair Liz M. Quinlan October 2019 1 QUICK LINKS Please click on the images below to go to the indicated section. Full table of contents to follow. Travelling Around Boston SHA Sexual Harassment Policy Conference Venue and Hotel 2 Accessible Presentations Key Contact Information Targeted Resources Guide 3 TABLE OF CONTENTS 1. SHA 2020 Boston Conference Committee Information………….. Pg. 3 Key Contact Information…………………………………………….. Pg. 3 Ethics Principles…………………………………………………….. Pg. 4 Statement on Sexual Assault and Harassment…………………... Pg. 5 2. Travel & Necessities……………………………………………….... Pg. 7 Travel to Boston…………………………………………………….... Pg. 7 - Air Travel - Bus and Train Travel - Car Travel Travel in the Greater Boston Area………………………………….. Pg. 10 - MBTA Subway, Buses and Commuter Rail - Blue Bikes - Taxis - Ridesharing 3. Accomodations………………………………………………………. Pg. 21 - Conference Hotel - Airbnb - Hostels - Other Hotels 4. Conference Venue and Events…………………………………….... Pg. 24 - Conference Venue Guide - External Events Guide - Presenter Guide - Accessibility and Inclusion 5. Targeted Resources………………………………………………….. Pg. 30 Medical Resources…………………………………………………… Pg. 30 Spiritual Resources…………………………………………………… Pg. 34 LGBTQ+ Resources………………………………………………….. Pg. 37 Resources for Refugees, Undocumented & Documented Immigrants………………………………………….............................
    [Show full text]
  • Subway Spaces As Public Places: Politics and Perceptions of Boston's T
    Subway Spaces as Public Places: MASSACHUSETTS INSTITUTE Politics and Perceptions of Boston's T OF TEC HNO10LOGY by JUN 3 0 2011 Holly Bellocchio Durso Submitted to the Department of Urban Studies and Planning ARCHIVES in partial fulfillment of the requirements for the degrees of Bachelor of Science in Planning and Master in City Planning at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY June 2011 @2011 Holly Bellocchio Durso. All Rights Reserved. The author hereby grants to MIT the permission to reproduce and to distribute publicly paper and electronic copies of the thesis document in whole or in part. Author C Department of Urban Studies and Planning May 19, 2011 Certified by Associate Professor Annette M. Kim Department of Urban Studies and Planning Thesis Supervisor Accepted by Professor Joseph Ferreira Chair, MCP Committee r Department of Urban Studies and Planning Subway Spaces as Public Places: Politics and Perceptions of Boston's T by Holly Bellocchio Durso Submitted to the Department of Urban Studies and Planning on May 19, 2011 in partial fulfillment of the requirements for the degrees of Bachelor of Science in Planning and Master in City Planning ABSTRACT Subways play crucial transportation roles in our cities, but they also act as unique public spaces, distinguished by specific design characteristics, governed by powerful state-run institutions, and subject to intense public scrutiny and social debate. This thesis takes the case of the United States' oldest subway system-Boston's T-and explores how and why its spaces and regulations over their appropriate use have changed over time in response to public perceptions, political battles, and broader social forces.
    [Show full text]
  • North South Rail Link Feasibility Reassessment Chapter 5
    Photo Source: Anthony Delanoix / Unsplash Photo Source: Charlotte / Unsplash 60 North South Rail Link Feasibility Reassessment Final Report January 2019 | Service Planning 5. Potential Alignments and Schematic Design Potential Alignments and Schematic Design | January 2019 North South Rail Link Feasibility Reassessment Final Report 61 5. Potential Alignments and Schematic Design 5.1 2003 Alignments and Alternatives All potential alignments to connect the northern The build alternatives consisted of the following four Each of the four alternatives was envisioned as and southern MBTA Commuter Rail lines that were confgurations: one or more 41-foot-diameter deep tubes, with evaluated in the 2003 DEIR followed the Central mined approaches and underground junctions • Two-Track / Two-Station (Back Bay OR South Artery/Tunnel project corridor between South but otherwise constructed primarily with tunnel Bay portals) Station and North Station. While a Congress Street boring machines along the length of the alignment alternative was initially considered, the alignment • Two-Track / Three-Station (Back Bay OR South underneath Central Boston. did not advance past the 2003 screening process Bay portals) All 2003 alternatives included tracks descending because of anticipated construction and operational • Four-Track / Two-Station (Back Bay AND South from a new Back Bay portal at a 3% grade constraints in the limited rights-of-way underneath Bay portals) (towards the new underground South Station). This narrower downtown streets. In addition to a No
    [Show full text]
  • Directions to 101 Merrimac Street
    Women’s Health Associates DIRECTIONS TO: Women’s Health Associates 101 Merrimac Street, 10th Floor Suite 1000, Boston, MA 02114 The parking at new Women’s Health location at 101 Merrimac Street has limited parking. We encourage our patients to please utilize public transportation or park in one of the surrounding parking garages. If able the garages at MGH offer a substantial discount and free shuttle service close to our location. Garage Parking: 101 Merrimac garage fee is $25/day. Please note that Mass General does not operate this garage and discount parking may not be available. Parking is available at Mass General garages. MGH Parking Guide: https://www.massgeneral.org/visit/maps-and-directions/locations-and-parking- guide BY MGH SHUTTLE BUS: The MGH Spaulding Parking Lot shuttle will make stops at 101 Merrimac Street. This shuttle departs the MGH from the Gray Building doors on Blossom Street between shuttle bus stops 4 and 5. From MGH it proceeds to stop at Haymarket followed by 101 Merrimac Street. This shuttle runs approximately every 20 minutes. For exact shuttle times or any shuttle bus questions, please call 617-726-2250 or visit http://www.partners.org/ourhosp/shuttleschedule/mgh_parklots.html Walking directions from MGH main building to 101 Merrimac Street Women’s Health Associates Walking directions from North Station Walking directions from Government Center Garage Women’s Health Associates B Y M B T A : We are conveniently located close to North Station (MBTA Commuter Rail, Green Line and Orange Line) as well as Bowdoin (MBTA Blue Line) and Haymarket (MBTA Orange Line, Green Line) Stations.
    [Show full text]
  • North South Rail Link Feasibility Reassessment June 2018 Agenda
    North South Rail Link Feasibility Reassessment June 2018 Agenda Update and present key findings on the North South Rail Link Feasibility Reassessment: • Project Background / Scope • Tunnel Alignments, Portals and Stations • Service Plans • Ridership • Cost Estimates • Questions 2 PROJECT BACKGROUND + PROJECT SCOPE What is the North South Rail Link (NSRL)? The North South Rail Link is a concept to connect the MBTA’s north and south commuter rail networks through the construction of a rail tunnel under downtown Boston. The potential benefits of such a connection could be: • Increase commuter rail capacity • Improve access to employment • Relieve rapid transit crowding • Improve maintenance flexibility through easier access to facilities • Reduce highway congestion and emissions • Create redevelopment opportunities by repurposing property no longer needed for rail layover Scope of Feasibility Reassessment Project is charged with: • Identifying changes in the urban form, demographics, and transportation choices since the DEIR era • Identifying a right of way envelope • Estimating order of magnitude cost • Summarizing high level benefits (ridership, reductions in VMT, air quality benefits, development potential along the project corridor) Scope does not: • Identify potential financing options • Evaluate impacts on development potential beyond the project corridor • Develop a full operations simulation model • Include a health impact assessment Tunnel Alignments, Portals and Stations Tunneling – TBM Technology Given the complexities of tunneling
    [Show full text]
  • Memorandum Dci Job No
    Civil Engineering Transportation/Traffic Water/Wastewater Geotechnical Land Surveying Environmental Design Consultants, Inc. Planning MEMORANDUM DCI JOB NO. 2015-129 TO: Robert Gregory North East Harvest Select Corp. 23 Chester Street Somerville, MA 02144 FROM: Wayne Keefner, P.E., PTOE Design Consultants, Inc. SUBJECT: Trip Generation Memorandum 378 Highland Avenue Somerville, MA DATE: November 14, 2019 Introduction As requested by the client, North East Select Harvest (“Proponent”), Design Consultants, Inc. (DCI) has prepared this report to analyze the proposed trip generation for the project located at 378 Highland Avenue (“Project”) in Somerville. Currently, the building houses five retail spaces, with two currently operational. It is our understanding that the Proponent is proposing to convert the three non-operational retail spaces into one Adult-Use Marijuana Establishment (“Dispensary”). The basement of theses spaces will also be part of the Dispensary and be used for storage and security. The property will be a regulated facility operating in compliance with the requirements and regulations of the Commonwealth of Massachusetts and the City of Somerville. Project Description Currently, the proposed Project site includes a 1-story building with three retail spaces. The retail spaces previously operated as an apparel store, bakery, and an office totaling 1,542 square feet of space. The three retail spaces will be combined and converted into a 1,542 square foot Dispensary. The basement will be used as storage space that will only be used by the facility owner and employees of the Dispensary. Existing Transportation Conditions Roadways Highland Avenue is classified as an Urban Minor Arterial under City of Somerville jurisdiction.
    [Show full text]
  • MBTA 2009 Blue Book
    Ridership and Service Statistics Twelfth Edition 2009 Massachusetts Bay Transportation Authority BLANK PAGE YEAR 2009, TWELFTH EDITION - CONTENTS Chapter 1 - Introduction About This Book 1 . 1 Service and Infrastructure Profile 1 . 2-7 Accessibility of Subway and Commuter Rail Stations 1 . 8-9 Chapter 2 - Subway Service Operations Overview and Statistical Highlights 2 . 1 Rapid Transit System "Spider" Map With Typical Weekday Station Entries 2 . 2 Green Line Route Map 2 . 3 Ranked Station Entires Downtown Transfers 2 . 4 Rapid Transit Downtown Transfers Map 2 . 5 Subway Operations Line Statistics 2 . 6 Subway Operations Fleet Roster 2 . 7 Scheduled Round Trips and Train Miles by Schedule Rating 2 . 8 Rapid Transit Schedule and Span of Service Summary 2 . 9 Red Line Station Entries 2 . 10 Red Line Track Schematic Cambridge-Dorchester Segment 2 . 11 Red Line Track Schematic South Shore Segment 2 . 12 Red Line Route Description 2 . 13 Red Line Location of Stations 2 . 14 Mattapan-Ashmont Trolley: Ridership, Route Description, Station Locations 2 . 15 Mattapan-Ashmont High Speed Trolley Track Schematic 2 . 16 Green Line Subway Station Entries and Surface Ridership 2 . 17-18 Green Line Track Schematic 2 . 19 Green Line Route Description 2 . 20 Green Line Location of Stations 2 . 21 Orange Line Station Entries 2 . 22 Orange Line Track Schematic 2 . 23 Orange Line Route Description 2 . 24 Orange Line Location of Stations 2 . 25 Blue Line Station Entries 2 . 26 Blue Line Track Schematic 2 . 27 Blue Line Route Description 2 . 28 Blue Line Location of Stations 2 . 25 Equipment at Stations (Red/Green, Orange/Blue Lines) 2 .
    [Show full text]