Airport Station

Total Page:16

File Type:pdf, Size:1020Kb

Airport Station MBTA ATM/Branding Opportunities 43 ATM Locations Available Line City Station Available Spaces Station Entries Blue East Boston Airport 1 7,429 Blue Revere Revere Beach 1 3,197 Blue Revere Wonderland 1 6,105 Blue East Boston Maverick 1 10,106 Blue Boston Aquarium 1 4,776 Green Boston Prudential 2 3,643 Green Boston Kenmore 1 9,503 Green Newton Riverside 1 2,192 Green Boston Haymarket 1 11,469 Green Boston North Station 1 17,079 Orange Boston Forest Hills 2 15,150 Orange Boston Jackson Square 2 5,828 Orange Boston Ruggles 1 10,433 Orange Boston Stony Brook 2 3,652 Orange Malden Oak Grove 1 6,590 Orange Medford Wellington 1 7,609 Orange Charlestown Community College 1 4,956 Orange Somerville Assembly 1 * Red Boston South Station 1 23,703 Red Boston Charles/MGH 1 12,065 Red Cambridge Alewife 2 11,221 Red Cambridge Harvard 1 23,199 Red Quincy Quincy Adams 3 4,785 Red Quincy Wollaston 2 4,624 Red Boston Downtown Crossing 2 23,478 Red Somerville Davis Square 2 12,857 Red Cambridge Kendall/MIT 1 15,433 Red Cambridge Porter Square 1 8,850 Red Dorchester Ashmont 2 9,293 Silver Boston World Trade Center 1 1,574 Silver Boston Courthouse 1 1,283 Commuter Boat Hingham Hingham Intermodal Terminal 1 ** * Assembly Station opened September 2, 2014. Ridership numbers are now being established ** The Hingham Intermodal Terminal is scheduled to open December 2015 . ATM proposals /branding are subject to MBTA design review and approval. Blue Line- Airport Station K-2 Blue Line- Revere Beach Station Map K-1 Charlie Card Machine Charlie Card Collectors Machines Exit to Booth Exit Street to Street Collectors Booth Elevator Elevator Down to platform Down to platform K-1 Outbound Inbound Tracks Tracks Blue Line- Wonderland Station K-1 K-1 Blue Line- Maverick Station Street Level Entrance K - 1 Payphones Elevator Downstairs Escalator to all trains K-1 Non- Working payphones shall be removed by MBTA prior to ATM installation Blue Line- Aquarium Station Outbound Inbound Trains to Wonderland Elevator Escalator Collectors Vendors at Booth Turnstiles Gate Street Level Turnstiles Unpaid Lobby Stairs to Train State Street Escalator K-2 Green Line- Prudential Center Station Up to street Vending Escalato (Huntington Ave) Machines r Escalato Down from street r Elevator to street Vending Machines Charlie Card Machine Doors Green Line- Kenmore Station K-1 Charlie Card Machine K-1 MBTA System Map to be relocated to underneath Exit Sign by the MBTA prior to ATM installation. Green Line- Riverside Station Inbound Platform Bus Terminal K-1 Busway Crosswalk Crosswalk Crosswalk Busway Parking Parking K-1 Green and Orange Line- Haymarket Station Elevator Charlie Card Machine K-1 Charlie Card Collectors Machines Booth Exit Entrance Door Door Congress Street K-1 Green and Orange Line- North Station K-3 Orange Line- Forrest Hills Station K-4 Orange Line- Jackson Square Station K-2 K-3 Orange Line, Commuter Rail- Ruggles Station K-3 Orange Line- Stony Brook Station Orange Line- Oak Grove Station 1 - K Primary Booth F - 1 K-1 Non- Working payphones shall be removed by MBTA prior to ATM installation Orange Line- Wellington Station K-3 K-3 Orange Line- Community College Station K-1 Phones Entrance Collectors Booth To all trains K-1 Orange Line- Assembly Square Station K-1 Schedule Box shall be removed and returned to the MBTA Sign Shop by the MBTA prior to ATM installation. Red and Silver Line, Commuter Rail- South Station Red Line- Charles/MGH Station K-1 K-1 Red Line- Alewife Station K-3 Red Line- Harvard Square Station K-1 Red Line- Quincy Adams Station Red Line- Wollaston Station K-1 K-2 K-1 K-2 Red, Orange, Silver Lines- Downtown Crossing Station K-1 K-3 Red Line- Davis Square Station- Lower Level K-1 Red Line- Davis Square Station- Upper Level K-2 Phone Phone F-1 Plaza/Sidewalk K-2 Red Line- Kendall Square Station K-2 K-2 Pepsi machine shall be removed by the MBTA prior to ATM installation Red Line- Porter Square Station Phones K-1 K-1 Non- Working payphones shall be removed by MBTA prior to ATM installation Red Line- Ashmont Station- North Lobby K-3 K-3 Red Line- Ashmont Station- South Lobby K-4 K-4 Silver Line- World Trade Center Station Elevator Escalator To all trains Elevator Escalator Charlie Card Machines Ticket Booth Charlie Card Machines Security Desk or Escalat Column To second level K-1 Elevator Entrance Doors Congress Street Entrance K-1 Silver Line- Courthouse Station K-1 Commuter Boat- Hingham Intermodal Terminal K-1 Branding 6’ Branding 4’ 4’ Station expected to open December 2016 .
Recommended publications
  • Medford Square - Davis Station
    Route 94 Medford Square - Davis Square Station via West Medford & Medford Hillside Chestnut St. 95 Wyman St. WEST MEDFORD 134 325 100 t. Weekends only 94 Pkwy. Lowell Commuter Rail 94 3 High St. 60 10195 Charles St. 326 High St. Garden St High St. Forest St. 96 Oakland St. Boston Ave. Forest S 101 Valley Salem St. 60 94 710 134 Brookside Blvd. Mystic St. Exit 32 Exit 32 SPRING March 21, 2009 - June 19, 2009 Central St.354 Mystic 355N Fellsway Express to/from 326 Mystic 710 Medford St. 80 High St.BostonSalem Haymarket St. City Medford St. Medford station Hall Valley Square Medford Square - Arlington Center Harvard Ave. River St. 354 Riverside Ave. ClippershipRiverside Dr. Ave. 93 Pkwy. 80 WinthropGeorge St. St. 94 Clippership Dr. City Hall Mall 94 95 95 Davis Square Station 96 96 Exit 31 96 96 Parking 100 Main St. Main 101 Lot Main St. 101 River St. 354 134 16 355 326 101 Mystic Valley Pkwy. 87 N. Union St 354 Mystic River Serving: Medford City Hall, Winthrop Circle, 95 710 134 Cross St. Spy Broadway 355 134 Fellsway West Medford, Medford Hillside, Tufts 94 710134 710 Pond 77 Pkwy. University Stop & Tufts University, Powder House Sq. and connections to the Red Line College Ave. Shop Minuteman Commuter Bikeway Brook 79 350 Waldo Rd. Clarendon Hill Main St. 93 Mystic Meadow Mass. Ave. JohnnieJohnniess Foodmaster CollegeAve. ValleyGlen Mall Mystic Ave. Herbert Rd. 87 Powder Pkwy. St. Alewife Lake House Harvard St. Packard Ave. Square 88 62 Holland St 89 67 90 SStoretore 24 89 76 Broadway RED LINE 96 7-Eleven 84 .
    [Show full text]
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • Massachusetts Bay Transportation Authority
    y NOTE WONOERLAND 7 THERE HOLDERS Of PREPAID PASSES. ON DECEMBER , 1977 WERE 22,404 2903 THIS AMOUNTS TO AN ESTIMATED (44 ,608 ) PASSENGERS PER DAY, NOT INCLUDED IN TOTALS BELOW REVERE BEACH I OAK 8R0VC 1266 1316 MALOEN CENTER BEACHMONT 2549 1569 SUFFOLK DOWNS 1142 ORIENT< NTS 3450 WELLINGTON 5122 WOOO ISLANC PARK 1071 AIRPORT SULLIVAN SQUARE 1397 6668 I MAVERICK LCOMMUNITY college 5062 LECHMERE| 2049 5645 L.NORTH STATION 22,205 6690 HARVARD HAYMARKET 6925 BOWDOIN , AQUARIUM 5288 1896 I 123 KENDALL GOV CTR 1 8882 CENTRAL™ CHARLES^ STATE 12503 9170 4828 park 2 2 766 i WASHINGTON 24629 BOYLSTON SOUTH STATION UNDER 4 559 (ESSEX 8869 ARLINGTON 5034 10339 "COPLEY BOSTON COLLEGE KENMORE 12102 6102 12933 WATER TOWN BEACON ST. 9225' BROADWAY HIGHLAND AUDITORIUM [PRUDENTIAL BRANCH I5I3C 1868 (DOVER 4169 6063 2976 SYMPHONY NORTHEASTERN 1211 HUNTINGTON AVE. 13000 'NORTHAMPTON 3830 duole . 'STREET (ANDREW 6267 3809 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY ricumt inoicati COLUMBIA APFKOIIUATC 4986 ONE WAY TRAFFIC 40KITT10 AT RAPID TRANSIT LINES STATIONS (EGLESTON SAVIN HILL 15 98 AMD AT 3610 SUBWAY ENTRANCES DECEMBER 7,1977 [GREEN 1657 FIELDS CORNER 4032 SHAWMUT 1448 FOREST HILLS ASHMONT NORTH OUINCY I I I 99 8948 3930 WOLLASTON 2761 7935 QUINCY CENTER M b 6433 It ANNUAL REPORT Digitized by the Internet Archive in 2014 https://archive.org/details/annualreportmass1978mass BOARD OF DIRECTORS 1978 ROBERT R. KILEY Chairman and Chief Executive Officer RICHARD D. BUCK GUIDO R. PERERA, JR. "V CLAIRE R. BARRETT THEODORE C. LANDSMARK NEW MEMBERS OF THE BOARD — 1979 ROBERT L. FOSTER PAUL E. MEANS Chairman and Chief Executive Officer March 20, 1979 - January 29.
    [Show full text]
  • St. Marks Area (Ashmont/Peabody Square), Dorchester
    Commercial Casebook: St Marks Area Historic Boston Incorporated, 2009-2011 St. Marks Area (Ashmont/Peabody Square), Dorchester Introduction to District St. Mark's Main Street District spans a mile-long section of Dorchester Avenue starting from Peabody Square and running north to St. Mark’s Roman Catholic Church campus. The district includes the residential and commercial areas surrounding those two nodes. The area, once rural farmland, began to develop after the Old Colony railroad established a station here in the 1870s. Subsequent trolley service and later electrified train lines, now the MBTA's red line, transformed the neighborhood district into first a “Railroad Suburb” and then a “Streetcar Suburb.” Parts of the area are characterized as “Garden Districts” in recognition of the late 19th century English-inspired development of suburban districts, which included spacious single-family houses built on large lots and the commercial district at Peabody Square. Other areas reflect Boston’s general urban growth in the late 19th and early 20th centuries with densely clustered multi-family housing, including Dorchester’s famous three-deckers, found on the streets surrounding St. Mark’s Church. The district, particularly in Peabody Square, features many late 19th-century buildings, including the landmark All Saints’ Episcopal Church, the Peabody Apartments, a fire station, and a distinctive market building. These surround a small urban park with a monument street clock. The St. Mark’s campus, established a few decades later, mostly in the 1910s and 1920s, is a Commercial Casebook: St Marks Area Historic Boston Incorporated, 2009-2011 collection of ecclesiastical buildings set upon a large, airy parcel.
    [Show full text]
  • Directions to Boston - Local Parking
    Directions to Boston - Local Parking GENERAL INFORMATION Logan Express (Recommended) The Back Bay Logan Express runs from all airport terminals directly to St. James Street in Copley Square in Back Bay diagonally across the street from the hotel. Departures occur at :00, :20, and :40 from 5am to 9pm daily. Fares are $7.50 per passenger – payment is by Visa, MasterCard, American Express and Diners Club (NO CASH). All buses are wheelchair accessible. Subway The closest subway stations are Copley Station (on the Green Line) and Back Bay Station (on the Orange Line). Both stations are within 1 block of the hotel. The MBTA runs daily from 6:00 AM to 1:00 AM. The schedule varies based on line, day of week, and reliability of the service. The cost is $2.75 per ride. Cab Transportation Green transportation is available through Lifestyle Transportation International (LTI) and Boston Cabs. Both transportation companies offer hybrid and Flex-Fuel vehicles in their fleet. Taxi fares from the airport to the hotel range from $40-50. PUBLIC TRANSPORTATION From Airport via Subway From airport terminal take a MassPort shuttle bus to the Airport subway station. Take the inbound Blue Line train to Government Center. Then, transfer to any outbound Green Line train to go to Copley station. Make a right onto Dartmouth Street - the hotel is 300 feet down the block on the same side of the street. The fare is $2.75. OR From airport terminal take any Silver Line bus to South Station. Change to an “Alewife” bound Red Line to Park Street.
    [Show full text]
  • MBTA Red Line Repairs
    Ana Torres November 3, 2011 Assignment 5: Basic queries MBTA Red Line Repairs Starting next Saturday (November 5, 2011) and until March 4, 2012, the MBTA will close the Red Line north of Harvard Square on weekends to complete $80 million in repairs designed to keep trains from derailing due to eroded tracks and power lines caused by leaks in the tunnel. The service will be replaced with shuttle buses. According to an article from the Boston Globe by Eric Moskowitz on October 22, 2011, about 21,200 riders on Saturday and 14,200 on Sunday board the Red Line at Porter, Davis and Alewife stations, meaning over 35,000 commuters will be affected weekly in the five-month shutdown period. The MBTA has come up with its next commuter nightmare. On weekends starting November 5, Red Line trains north of Harvard Square due to tunnel repairs. According to an article from the Boston Globe, the $80 million project will serve to keep trains from derailing These events are a perfect opportunity to reanalyze the profile of the users of the MBTA. Having a clearer idea of the sociodemographic profile and the patterns of use of transportation of the people that will be affected by this project will help to have a better assessment of the true cost of the project, that it, not only the monetary cost of the infrastructure but counting the social cost of the project as well. For this, a map that relates different characteristics of the population and their transportation information will result extremely useful.
    [Show full text]
  • Building a Better T in the Era of Covid-19
    Building a Better T in the Era of Covid-19 MBTA Advisory Board September 17, 2020 General Manager Steve Poftak 1 Agenda 1. Capital Project Updates 2. Ridership Update 3. Ride Safer 4. Crowding 5. Current Service and Service Planning 2 Capital Project Updates 3 Surges Complete | May – August 2020 Leveraged low ridership while restrictions are in place due to COVID-19 directives May June July August D Branch (Riverside to Kenmore) Two 9-Day Closures C Branch (Cleveland Circle to Kenmore) E Branch (Heath to Symphony) Track & Signal Improvements, Fenway Portal Flood 28-Day Full Closure 28-Day Full Closure Protection, Brookline Hills TOD Track & Intersection Upgrades Track & Intersection Upgrades D 6/6 – 6/14 D 6/20 – 6/28 C 7/5 – 8/1 E 8/2 – 8/29 Blue Line (Airport to Bowdoin) Red Line (Braintree to Quincy) 14-Day Closure Harbor Tunnel Infrastructure Upgrades On-call Track 2, South Shore Garages, Track Modernization BL 5/18 – 5/31 RL 6/18 -7/1 4 Shuttle buses replaced service Ridership Update 5 Weekday Ridership by Line and Mode - Indexed to Week of 2/24 3/17: Restaurants and 110 bars closed, gatherings Baseline: limited to 25 people Average weekday from 2/24-2/28 100 MBTA service reduced Sources: 90 3/24: Non-essential Faregate counts for businesses closed subway lines, APC for 80 buses, manual counts at terminals for Commuter Rail, RIDE 70 vendor reports 6/22: Phase 2.2 – MBTA 6/8: Phase 2.1 60 increases service Notes: Recent data preliminary 50 5/18-6/1: Blue Line closed for 40 accelerated construction Estimated % of baseline ridership
    [Show full text]
  • Haymarket Station Redevelopment Analysis February 6, 2020
    ON REG ST IO O N B BOSTON REGION METROPOLITAN PLANNING ORGANIZATION M Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair E N T R O I Tegin L. Teich, Executive Director, MPO Staff O T P A O IZ LMPOI N TA A N G P OR LANNING WORK PROGRAM HAYMARKET STATION REDEVELOPMENT ANALYSIS FEBRUARY 6, 2020 Proposed Motion The Boston Region Metropolitan Planning Organization (MPO) votes to approve this work program. Project Identification Unified Planning Work Program (UPWP) Classification Not listed in federal fiscal year 2020 UPWP Project Number 11492 Client Massachusetts Bay Transportation Authority (MBTA) Client Supervisor: Greg Thompson Project Supervisors Principal: Ed Bromage Manager: Scott Peterson Funding Source MBTA Contract Schedule and Budget Schedule: 12 months from notice to proceed Budget: $65,000 Schedule and budget details are shown in Exhibits 1 and 2, respectively. Relationship to MPO Work This study is supported in full with non-MPO funding. Committing MPO staff to this project will not impinge on the quality or timeliness of MPO-funded work. State Transportation Building • Ten Park Plaza, Suite 2150 • Boston, MA 02116-3968 Tel. (857) 702-3700 • Fax (617) 570-9192 • TTY (617) 570-9193 • www.bostonmpo.org Haymarket Station Redevelopment Analysis 2 February 6, 2020 Background The HYM Investment Group (HYM) is in the process of developing the Bulfinch Crossing project. The Bulfinch Crossing project is a transformation of the Government Center garage into a six building, 2.9 million square foot mixed-use project. The area, known as Bulfinch Triangle, has a total lot area of 4.8 acres spread across two parcels and more than 40,000 square feet of Merrimac and Congress Streets.
    [Show full text]
  • The Newsletter of the Cambridge Council On
    Newslines The Newsletter of the Cambridge Council on Aging 806 Massachusetts Ave., Cambridge, MA 02139 Office: (617) 349-6220 Senior Center: (617) 349-6060 North Cambridge Senior Center (617) 349-6320 January 2012 www.cambridgema.gov/DHSP2 2012 Mall Destinations pg 2 806 Happenings pg 3 Calendars centerfold Save the Date: Thursday January 12 Over the Counter Medications 1:00-2:00 p.m. Citywide Senior Center North Cambridge Senior Center Closed Monday, January 2, 2012 Happy New Year From the Cambridge Council on Aging, Citywide and North Cambridge Senior Centers Here's to health and happiness! **************************** A toast to the New Year! Weather Forecast Peace and joy to all of us! Prosperity and cheer! When Cambridge Public Schools Years come and go, some bad, some good. are closed due to snow conditions, New years provide the space, the Cambridge Senior Centers are Each to fill with what one would, open for meals and drop-in only. Classes are cancelled and our Senior Windows onto grace. Shuttle bus does not operate. Years come and go, yet still we toast Each one, for each one seems If you have questions on a snowy As though it were a new-found coast, day about our hours of operation or Rich with hope and dreams. classes, call 617-349-6060 to find out more information. (by Nicholas Gordon) Mall Destinations 2012 January 2012 Arsenal/ Watertown Malls February 2012 Cambridgeside Galleria March 2012 Assembly Square Mall April 2012 Meadow Glen Mall May 2012 Arsenal/ Watertown Malls June 2012 Cambridgeside Galleria July 2012 Assembly Square Mall August 2012 Meadow Glen Mall September 2012 Arsenal/ Watertown Malls October 2012 Cambridgeside Galleria November 2012 Assembly Square Mall December 2012 Meadow Glen Mall Listed below is a brief description of what stores are at the individual malls.
    [Show full text]
  • Inner Harbor Connector Ferry
    Inner Harbor Connector Ferry Business Plan for New Water Transportation Service 1 2 Inner Harbor Connector Contents The Inner Harbor Connector 3 Overview 4 Why Ferries 5 Ferries Today 7 Existing Conditions 7 Best Practices 10 Comprehensive Study Process 13 Collecting Ideas 13 Forecasting Ridership 14 Narrowing the Dock List 15 Selecting Routes 16 Dock Locations and Conditions 19 Long Wharf North and Central (Downtown/North End) 21 Lewis Mall (East Boston) 23 Navy Yard Pier 4 (Charlestown) 25 Fan Pier (Seaport) 27 Dock Improvement Recommendations 31 Long Wharf North and Central (Downtown/North End) 33 Lewis Mall (East Boston) 34 Navy Yard Pier 4 (Charlestown) 35 Fan Pier (Seaport) 36 Route Configuration and Schedule 39 Vessel Recommendations 41 Vessel Design and Power 41 Cost Estimates 42 Zero Emissions Alternative 43 Ridership and Fares 45 Multi-modal Sensitivity 47 Finances 51 Overview 51 Pro Forma 52 Assumptions 53 Funding Opportunities 55 Emissions Impact 59 Implementation 63 Appendix 65 1 Proposed route of the Inner Harbor Connector ferry 2 Inner Harbor Connector The Inner Harbor Connector Authority (MBTA) ferry service between Charlestown and Long Wharf, it should be noted that the plans do not specify There is an opportunity to expand the existing or require that the new service be operated by a state entity. ferry service between Charlestown and downtown Massachusetts Department of Transportation (MassDOT) Boston to also serve East Boston and the South and the Massachusetts Port Authority (Massport) were Boston Seaport and connect multiple vibrant both among the funders of this study and hope to work in neighborhoods around Boston Harbor.
    [Show full text]
  • 2013-0583-3S Massachusetts Bay Transportation Authority (MBTA)
    Official Audit Report – Issued June 16, 2014 Massachusetts Bay Transportation Authority For the period January 1, 2005 through December 31, 2012 State House Room 230 Boston, MA 02133 [email protected] www.mass.gov/auditor June 16, 2014 Dr. Beverly Scott, General Manager Massachusetts Bay Transportation Authority State Transportation Building 10 Park Plaza, Suite 3910 Boston, MA 02116 Dear Dr. Scott: I am pleased to provide this performance audit of the Massachusetts Bay Transportation Authority (MBTA). This report details the audit objectives, scope, methodology, findings, and recommendations for the audit period, January 1, 2005 through December 31, 2012. My audit staff discussed the contents of this report with management of the MBTA, and their comments are reflected in this report. I would also like to express my appreciation to the MBTA for the cooperation and assistance provided to my staff during the audit. Sincerely, Suzanne M. Bump Auditor of the Commonwealth 2013-0583-3A TABLE OF CONTENTS TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................................... 1 OVERVIEW OF AUDITED AGENCY ........................................................................................................................... 3 AUDIT OBJECTIVES, SCOPE, AND METHODOLOGY ................................................................................................. 4 DETAILED AUDIT RESULTS AND FINDINGS WITH AUDITEE’S RESPONSE ................................................................
    [Show full text]
  • Transportation & Infrastructure Presentation
    Trends in Somerville: Transportation & Infrastructure Report September 2009 Mayor Joseph A. Curtatone City of Somerville Office of Strategic Planning and Community Development Transportation & Infrastructure Trends Report City of Somerville Comprehensive Plan Report Introduction Technical Report #3 I. REPORT INTRODUCTION use in Somerville declined by roughly 20% during the approximate same time period. The City of Somerville depends upon its infrastructure which • The majority of Somerville’s home heating comes from utility provides the fundamental systems needed for residents to undertake gas (62%), significantly more than many of its neighboring their daily routines and employment, for businesses to thrive, and cities: Boston (48%), Brookline (41%), Cambridge (63%), new development to proceed. The transportation network within Chelsea (41%), Everett (50%), and Medford (43%). Somerville allows the population to be mobile and brings people and • Due to the commuter and freight rail lines that run through business into and out of the city. The history and patterns of the city much of Somerville is divided, or connected, by development for both the transportation and infrastructure network bridges. affects the City’s ability to reach economic development and land use • Somerville has made significant investments in its roadways – goals. By understanding the historical patterns and current paving 100 streets in the last four years and completing four capabilities and functionalities of these systems, and comparing our major road reconstruction projects. current conditions with surrounding communities, Somerville can • Somerville's public urban forest comprises over 11,000 better prepare itself to meet future demands and desires. trees, which provide an estimated $16 million in annual ecological, economic, and social benefits to the city.
    [Show full text]