Route 9A Promenade Project PROJECT UPDATE World Financial Center
Total Page:16
File Type:pdf, Size:1020Kb
Route 9A Promenade Project PROJECT UPDATE World Financial Center World Trade Center Site Presentation to the WTC Committee of CB#1 December 13, 2010 NEW YORK STATE STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION David A. Paterson Stanley Gee Phillip Eng, P.E. Marie A. Corrado, Esq. Joseph T. Brown, P.E. Governor Acting Commissioner Regional Director Director, Major Projects Project Director, 9A 1 Presentation Outline . Route 9A at the World Trade Center Site . NYSDOT Pending Work adjacent to the WTC & WFC Site - Cedar to Vesey Street Eastside Frontage - Memorial Access & Egress on Route 9A on 9/11/2011 - Pedestrian Bridges (West Thames & Vesey Street) - WTC Project Impact Zones - Traffic Shifts for WTC Projects . Current Route 9A and WTC Site Schedule . The Two Components of the Route 9A Promenade Project . World Financial Center Frontage . NYSDOT Completed Work South of Liberty Street - South Promenade - West Thames Park - Temporary Liberty Street Pedestrian Bridge Extension - 90 West Street Frontage . NYSDOT Completed Work North of Vesey Street . NYSDOT Pending Work North & South of WTC Site . Route 9A Promenade Project Status NEW YORK STATE DEPARTMENT OF TRANSPORTATION 2 12/13/2010 Route 9A at the World Trade Center Site Aerial Photo 1 WFC 2 WFC 3 WFC GOLDMAN SACHS ROUTE 9A SB ROUTE 9A NB VSC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM VERIZON 1 WTC NEW YORK STATE DEPARTMENT OF TRANSPORTATION 3 12/13/2010 Route 9A at the World Trade Center Site Pending Route 9A Curblines with Permanent & Temporary Pavement 1 WFC 2 WFC 3 WFC GOLDMAN ROUTE 9A SB SACHS ROUTE 9A NB 90 WEST ST. VSC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM VERIZON 1 WTC Legend: = Pending 9A Curblines = Permanent 9A Pavement = Temporary 9A Pavement NEW YORK STATE DEPARTMENT OF TRANSPORTATION 4 12/13/2010 NYSDOT Route 9A Pending Work adjacent to WTC & WFC Sites 1 WFC 2 WFC 3 WFC Pavilion RWL Discharge BPC Pile Rehab 8 14 2 WFC Driveway 22 2 7 19 25 ROUTE 9A 15 20 21 25 12 17 25 18 9 4 3 South 16 North 5 11 11 10 Projection 11 Projection 24 CONCOURSE 13 Plant 23 Bridge Vesey 1 Chiller 13 6 VSC NATIONAL SEPTEMBER 11 1 WTC VERIZON MEMORIAL & MUSEUM 1) BPCA Liberty Bridge Extension 11) Temporary or Permanent Utilities for 17) Vesey Sewer, Utilities, POEs (on-going) 2) Temp. Pedestrian Bridge Removal 9/11 Memorial 10th Anniversary 18) Vesey North Crosswalk Opening 3) Liberty Bridge Pier Removal 12) Undercut, Lightweight Fill, Utilities, POE’s, 19) Vesey Bridge Removal 4) VSC Frontage / NB Roadway Raise Grade, Paving etc. at Memorial Frontage 20) North Chamber Slab Lowering 5) 90 West Street Frontage 13) Memorial Frontage (bollards, irrigation, 21) 9A – All Features 6) Memorial Access trench drains, trees, pavers) 22) 3 WFC Frontage 7) 9A Crosswalk at Liberty Street 14) 2 WFC Driveway Removal & 2 WFC Frontage 23) 1 WTC Frontage 8) 1 WFC Frontage (on-going) 15) 9A (All features) and Fulton Sewer at 24) Vesey Street Intersection Tie-In 9) Cedar St. Intersection Tie-In Concourse Crossing 25) 78” Interceptor Sewer Lining 10) Liberty St. Intersection Tie-In 16) Fulton Street Intersection Tie-In NEW YORK STATE DEPARTMENT OF TRANSPORTATION 12/13/2010 Cedar to Liberty Street Eastside Frontage 1 WFC 2 WFC 9A R.O.W. 1) BPCA Liberty Bridge Extension 8 2) Temp. Pedestrian Bridge Removal 3) Liberty Bridge Pier Removal 4) VSC Frontage / NB Roadway 5) 90 West Street Frontage 9A Southbound 7 6) Memorial Access 2 7) 9A Crosswalk at Liberty Street 8) 1 WFC Frontage (on-going) 9) Cedar St. Intersection Tie-In 10) Liberty St. Intersection Tie-In 9A Northbound 3 4 9 10 5 1 9A R.O.W. 6 VSC 90 West Street National September (Liberty Park) 11 Memorial & Museum NEW YORK STATE DEPARTMENT OF TRANSPORTATION 6 12/13/2010 Liberty to Fulton Street Eastside Frontage 2 WFC 9A R.O.W. 9A R.O.W. 14 15 12 11 16 11 11 9A R.O.W. 9A R.O.W. 13 11) Temporary or Permanent Utilities for 9/11 Memorial 10th Anniversary 12) Undercut, Lightweight Fill, Utilities, POE’s, Raise Grade, Paving etc. at Memorial Frontage 13) Memorial Frontage (bollards, irrigation, trench drains, trees, pavers) National September 14) 2 WFC Driveway Removal & 2 WFC Frontage 1 WTC 11 Memorial & 15) 9A (All features) and Fulton Sewer at Concourse Crossing Museum 16) Fulton Street Intersection Tie-In NEW YORK STATE DEPARTMENT OF TRANSPORTATION 7 12/13/2010 Fulton to Vesey Street Eastside Frontage 2 WFC 3 WFC GOLDMAN SACHS 9A R.O.W. 9A R.O.W. 22 19 9A Southbound 20 21 9A Northbound 17 18 25 25 25 Vesey Street Pedestrian Bridge Vesey 24 9A R.O.W. 17) Vesey Sewer, Utilities, POEs (on-going) 23 18) Vesey North Crosswalk Opening 19) Vesey Bridge Removal 9A R.O.W. 20) North Chamber Slab Lowering 21) 9A – All Features 22) 3 WFC Frontage National September 1 WTC 23) 1 WTC FrontageVERIZON 11 Memorial & 24) Vesey Street Intersection Tie-In Museum 25) 78” Interceptor Sewer Lining NEW YORK STATE DEPARTMENT OF TRANSPORTATION 8 12/13/2010 Memorial Access & Egress on Route 9A on September 11, 2011 MURRAY ST. MURRAY ALBANY ST. ALBANY NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM MURRAY ST. MURRAY GREENWICH ST. NEW YORK STATE Access and Egress Zones in Route 9A to be determined DEPARTMENT OF TRANSPORTATION 9 12/13/2010 West Thames Pedestrian Bridge (BPCA/LMDC) NEW YORK STATE DEPARTMENT OF TRANSPORTATION 10 12/13/2010 Vesey Street Pedestrian Bridge View North from Liberty Street NEW YORK STATE DEPARTMENT OF TRANSPORTATION 11 12/13/2010 WTC Projects Impact Zones in Route 9A 1 WFC 2 WFC 3 WFC RWL Discharge BPCA Pile Cap Rehab PAVILION GOLDMAN 2 WFC Driveway SACHS 78” Sewer ROUTE 9A Blast Protection BPCA Bridge South North Extension Projection Projection Bridge Vesey Chiller Plant CONCOURSE MEMORIAL PLAZA VSC WTC VERIZON STREETS 1 WTC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM WTC Site/BPCA Projects Working in Route 9A Legend: = Pending 9A Curblines = Concourse & = Memorial = WTC Streets = Other Projects Vesey Bridge = VSC = 1 WTC = Chiller Plant/RWL Note: Pending Route 9A work requires continuous coordination with WTC Site Projects for staging and construction access. NEW YORK STATE DEPARTMENT OF TRANSPORTATION 12 12/13/2010 Traffic shifts for WTC Projects Current NB & SB 9A Detour Locations 1 WFC 2 WFC 3 WFC 9A SB 9A NB Vesey Bridge Vesey VSC MEMORIAL 1 WTC VERIZON Roadway Element Traffic/Access Estimated TOTALS Shifts since April Beyond 2010 2008 to end of 2010 Northbound Route 9A 9 16 25 Southbound Route 9A 7 15 22 Access 21 25 46 TOTAL 37 56 93 NEW YORK STATE DEPARTMENT OF TRANSPORTATION 13 12/13/2010 Current Route 9A and WTC Site Schedule Based on the PANYNJ Master Schedule 52 (June 2010) and other sources NEW YORK STATE DEPARTMENT OF TRANSPORTATION 14 12/13/2010 The Two Components of the Route 9A Promenade Project WORLD FINANCIAL CENTER Route 9A Southbound Route 9A Northbound WTC MEMORIAL Landscape / Urban Design Plan WORLD FINANCIAL CENTER WTC MEMORIAL Utility Plan Busiest Utility Corridor in NYC NEW YORK STATE DEPARTMENT OF TRANSPORTATION 15 12/13/2010 World Financial Center Frontage Conceptual Plan & Aerial Photo 1 WFC 2 WFC 3 WFC 9A Southbound Conceptual Plan Existing Aerial Photo NEW YORK STATE DEPARTMENT OF TRANSPORTATION 16 12/13/2010 World Financial Center Frontage 1 WFC Conceptual Plan 1 WFC 2 WFC 3 WFC ROUTE 9A SOUTHBOUND NEW YORK STATE DEPARTMENT OF TRANSPORTATION 17 12/13/2010 World Financial Center Frontage 1 WFC (Perspective View South at Liberty Street) NEW YORK STATE DEPARTMENT OF TRANSPORTATION 18 12/13/2010 World Financial Center Frontage 1 WFC (Perspective View North at Albany Street) NEW YORK STATE DEPARTMENT OF TRANSPORTATION 19 12/13/2010 World Financial Center Frontage 1 WFC Current Conditions Proposed Rendering 3” Retaining Wall with 3” Cap Elevation NEW YORK STATE DEPARTMENT OF TRANSPORTATION 20 12/13/2010 World Financial Center Frontage 2 WFC Conceptual Plan 1 WFC 2 WFC 3 WFC ROUTE 9A SOUTHBOUND NEW YORK STATE DEPARTMENT OF TRANSPORTATION 21 12/13/2010 World Financial Center Frontage 2 WFC (Perspective View North at Liberty Street) NEW YORK STATE DEPARTMENT OF TRANSPORTATION 22 12/13/2010 World Financial Center Frontage 3 WFC Conceptual Plan 1 WFC 2 WFC 3 WFC ROUTE 9A SOUTHBOUND NEW YORK STATE DEPARTMENT OF TRANSPORTATION 23 12/13/2010 World Financial Center Frontage Overall Perspective View North 3 WFC 2 WFC WTC Site 1 WFC Albany Street NEW YORK STATE DEPARTMENT OF TRANSPORTATION 24 12/13/2010 South Promenade NEW YORK STATE DEPARTMENT OF TRANSPORTATION 25 12/13/2010 West Thames Park Playground Basketball Community Half-Courts Garden Dog Run ALBANY ST. ALBANY Lawn Walkway Walkway Bikeway Bikeway 9A SB NEW YORK STATE DEPARTMENT OF TRANSPORTATION 26 12/13/2010 Temporary Liberty Street Pedestrian Bridge Extension NEW YORK STATE DEPARTMENT OF TRANSPORTATION 27 12/13/2010 90 West Street Frontage NEW YORK STATE DEPARTMENT OF TRANSPORTATION 28 12/13/2010 Completed Route 9A North of Vesey Street 50 Year Roadway Pavement Southbound Roadway (View South) Northbound Roadway Southbound Roadway (View North) (View North) NEW YORK STATE DEPARTMENT OF TRANSPORTATION 29 12/13/2010 Completed Route 9A North of Vesey Street Planted Medians NEW YORK STATE DEPARTMENT OF TRANSPORTATION 30 12/13/2010 NYSDOT Route 9A Pending Work South and North of the WTC/WFC BATTERY PARK CITY 2 WFC GOLDMAN 1 3 1 4 SACHS ST. MURRAY 1 ROUTE 9A 5 VSC MEMORIAL VERIZON 1 WTC WTC SITE 1. S. Promenade Granite Crosswalk Removal/Replacement 5. Final Tree Planting in Median Areas 2. Outfall Pipe Cleaning 3.