Allston Yards

Allston Yards May 29, 2018

Allston Yards – Allston, Allston Yards

 Site Plan Enhancements

 MBTA • Commuter Rail • Busses

 Shuttles

 Parking

Allston Yards – Allston, Massachusetts Allston Yards – April 30, 2018 plan

Braintree Street Extension

Building 4 Building 3 Building 1 East Street East West Street West Arthur Arthur Extension Street

Lantera (residential)

52 Everett Street Building 2

38 Everett Street

Allston Yards – Allston, Massachusetts Allston Yards – April 30, 2018 plan

Car drop-off area 5-foot wide sidewalk

Building 4 Building 3 Building 1 East Street East West Street West

Allston Yards – Allston, Massachusetts Allston Yards – May 29, 2018 plan

Car / shuttle bus 10-foot wide sidewalk drop-off area 8-foot wide landscaping

Curb extensions Curb extensions

Building 4 Building 3 Building 1 East Street East West Street West

Allston Yards – Allston, Massachusetts Allston Yards – MBTA Outreach

 April 30, 2018 meeting

 Request for Landing Station access enhancements

 Request for MBTA Route 64 modifications

 May 21, 2018 – four new stops added at Boston Landing:

• Inbound #500 – approx. 6:04 AM

• Outbound #511 – flag stop; approx. 10:31 PM

• Outbound #513 – flag stop; approx. 12:11 PM

• Outbound #515 – flag stop; approx. 2:16 PM

Allston Yards – Allston, Massachusetts MBTA – Update

Boston Landing

2013 2 AM inbound / 2 PM outbound (planned)

2017 May 22, 2017 opening

2017 October 2017 700 – 900 daily riders Tuesday April 24, 2018 = 1,153 riders

2018 19 inbound / 15 outbound stops 20 inbound / 18 outbound stops

Yawkey Station 2012 795 daily riders

2014 March 2014 new station opening (937 projected daily riders)

2018 28 inbound / 27 outbound stops

Allston Yards – Allston, Massachusetts Allston Yards – Bus Access

Allston Yards – Allston, Massachusetts Allston Yards – Public Transportation

Harvard Watertown/ Waltham

Central Square

Kenmore

Oak Square

Allston Yards – Allston, Massachusetts The Arsenal on the Charles shuttles

Red Line –

Orange Line – Back Bay & Red Line –

Green Line (B) – Green Line (C) – Chestnut Hill Avenue

Allston Yards – Allston, Massachusetts The Arsenal on the Charles shuttles

7:00 AM – 10:00 AM departures every 7-15 minutes South Boston: 4:00 PM – 7:30 PM 7:00 AM – 9:46 AM departures every 7-15 minutes departures every 25-40 minutes

4:00 PM – 6:40 PM departures every 25-40 minutes

7:20 AM – 6:56 PM Back Bay: 11 daily stops at Boston Landing 7:00 AM – 10:00 AM departures every 10-15 minutes

4:00 PM – 7:00 PM departures every 10-15 minutes

Allston Yards – Allston, Massachusetts Allston Yards – Parking

Braintree Street Extension

Building 4 Building 3 Building 1 East Street East West Street West Arthur Street Extension Street Arthur

Lantera (residential) Building 1:  230 Stop & Shop spaces  180 residential spaces (0.5 space/unit) 52 Everett Street Building 2  Buildings 2-4 locations available for interim parking Later project phases: 38 Everett Street  2 spaces / 1,000 sf office  0.5 spaces residential unit Allston Yards – Allston, Massachusetts Allston Yards – Parking

 20% – 50% of residents live within walking distance of office (Source: development team data from comparable properties.)

 MBTA commuter rail, bus network, taxi/Uber, shuttles, etc. all limit need for private automobile ownership

 Office/retail/residential shared parking potential

 Initial phase adjustment period – additional on-site parking available prior to subsequent building construction

Allston Yards – Allston, Massachusetts Allston Yards – Comparable Residential Parking

Cars/ Transit MBTA Line Station Unit Distance

Allston Yards 0.5 0.0 Commuter Rail Boston Landing

Comparable properties: Location #1 0.3 0.3 Commuter Rail Yawkey Location #2 0.7 0.0 Red Alewife Location #3 0.8 0.3 Blue Wonderland

By others: 125 Guest Street 0.5 0.1 Commuter Rail Boston Landing 40 Rugg Road 0.6 0.2 Commuter Rail Boston Landing 1550 Soldier’s Field Road 0.7 0.7 Commuter Rail Boston Landing

Allston Yards – Allston, Massachusetts Allston Yards

Conclusions:

 MBTA coordination to allow station access improvements

 Bus Access

 MBTA bus service improvements request

 Shuttle opportunities

 Appropriate parking

Allston Yards – Allston, Massachusetts 5

3

PERGOLA

AMPHITHEATRE/ INTERACTIVE FOUNTAIN

43,000 SF PLAZA/ COMMUNITY FESTIVAL STREET GREEN 1

125 23,000 SF LAWN GUEST STREET

2 BUILDING 2

VOLVO

4

New England Development + Stop & Shop + Bozzuto + Southside LANDSCAPE SITE PLAN - COMMUNITY GREEN

ALLSTON YARDS Allston, MA PAGE 1 MAY 29, 2018 AUGUST MOON FESTIVAL - BOSTON, MA AGITAGUEDA FESTIVAL - PORTUGAL

ASSEMBLY ROW - BOSTON, MA CHALK ART FESTIVAL - DENVER, CO ST ANTHONY’S FEAST - BOSTON, MA

OPEN - BOSTON, MA ALLSTON VILLAGE STREET FAIR - ALLSTON, MA

STREET DELIVERY FESTIVAL - BUCHAREST, ROMANIA OPEN NEWBURY STREET - BOSTON, MA GRACIA FESTIVAL - BARCELONA, SPAIN

New England Development + Stop & Shop + Bozzuto + Southside PRECEDENT IMAGERY - FESTIVAL STREETS

ALLSTON YARDS Allston, MA PAGE 2 MAY 29, 2018 INTERACTIVE FOUNTAIN

COMMUNITY PERGOLA

COMMUNITY LAWN

New England Development + Stop & Shop + Bozzuto + Southside PRECEDENT IMAGERY - COMMUNITY PARK ELEMENTS

ALLSTON YARDS Allston, MA PAGE 3 MAY 29, 2018 ICE RINK DOG PARK

FARMER’S AND ART MARKET

OUTDOOR MUSIC, YOGA AND MOVIES

New England Development + Stop & Shop + Bozzuto + Southside PRECEDENT IMAGERY - COMMUNITY PARK ELEMENTS

ALLSTON YARDS Allston, MA PAGE 4 MAY 29, 2018 1

CONTEXT

New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 1 - VIEW FROM BUILDING 2 AT FOUNTAIN AND LAWN

ALLSTON YARDS Allston, MA PAGE 5 MAY 29, 2018 2

CONTEXT

New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 2 - VIEW EAST INTO COMMUNITY GREEN FROM ARTHUR STREET

ALLSTON YARDS Allston, MA PAGE 6 MAY 29, 2018 3

CONTEXT

New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 3 - VIEW EAST - GUEST STREET SIDEWALK

ALLSTON YARDS Allston, MA PAGE 7 MAY 29, 2018 4

CONTEXT

New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 4 - VIEW NORTH - ARTHUR BOULEVARD

ALLSTON YARDS Allston, MA PAGE 8 MAY 29, 2018 5

CONTEXT

New England Development + Stop & Shop + Bozzuto + Southside PERSPECTIVE 5 - VIEW NORTH - KISS + RIDE, BUILDING 4

ALLSTON YARDS Allston, MA PAGE 9 MAY 29, 2018 KEY PLAN

4,500 SF DOG PARK INCLUDES: PLANTING, LEASH ZONE, LARGE AND SMALL DOG ENCLOSURES

New England Development + Stop & Shop + Bozzuto + Southside LANDSCAPE SITE PLAN - DOG PARK

ALLSTON YARDS Allston, MA PAGE 10 MAY 29, 2018 BUILDING 3 BUILDING 2

7’-9” 5‘-10” 5‘ 3’ 8’ 22’ 11’ 8’ 3’ 5‘ 4’-9” 6’-5”

PEDESTRIAN CYCLE PARKING PARKING CYCLE PEDESTRIAN GUEST STREET GUEST STREET ZONE TRACK TRACK ZONE EXTENSION EXTENSION FURNISHING PERMEABLE PERMEABLE FURNISHING ZONE PAVING PAVING ZONE

TOTAL TOTAL

21‘-7” 19’-2” BUILDING 2

COMMUNITY GREEN

New England Development + Stop & Shop + Bozzuto + Southside STREETSCAPE SECTION

ALLSTON YARDS Allston, MA PAGE 11 MAY 29, 2018 BUILDING 3 BUILDING 1 BUILDING 3 BUILDING 4

7’-2” 5’ 6’ 12’-8” 12’-8” 5’-8” 9’-6” 3’-6” 5’-0” 4’-10” 14’-10” 11’-2” 5’ 5’-6”

FRONTAGE FURNISHING EAST STREET FRONTAGE FRONTAGE FURNISHING WEST STREET FRONTAGE ZONE ZONE PEDESTRIAN PEDESTRIAN PEDESTRIAN PEDESTRIAN ZONE ZONE ZONE ZONE

TOTAL TOTAL TOTAL TOTAL

18‘-2” 15‘-2” 13‘-3” 10’-0” BUILDING 4

5’-6” 11’-6” 15’ 5’ 5’-10” 10’-6” 10’-6” 5’ 5’

ARTHUR STREET PARKING PEDESTRIAN ARTHUR STREET EXTENSION/ ZONE KISS AND RIDE PERMEABLE FRONTAGE PAVING

New England Development + Stop & Shop + Bozzuto + Southside STREETSCAPE SECTION

ALLSTON YARDS Allston, MA PAGE 12 MAY 29, 2018