Eagle's Nest Feasibility Study NORONT RESOURCES LTD. NI 43-101 TECHNICAL REPORT FEASIBILITY STUDY McFAULDS LAKE PROPERTY EAGLE’S NEST PROJECT JAMES BAY LOWLANDS ONTARIO, CANADA Harry Burgess, P.Eng. Richard Gowans, P.Eng. Christopher Jacobs, C.Eng., MIMMM Charley Murahwi, M.Sc., P.Geo., MAusIMM Bogdan Damjanović, P.Eng. Effective Date: September 4, 2012 Signing Date: October 19, 2012 Table of Contents Page 1.0 SUMMARY .................................................................................................................... 1 1.1 INTRODUCTION ....................................................................................................... 1 1.2 TERMS OF REFERENCE .......................................................................................... 2 1.2.1 Qualified Persons and Site Visits ......................................................................... 2 1.3 PREVIOUS TECHNICAL REPORTS ........................................................................ 2 1.4 LOCATION ................................................................................................................. 3 1.5 CLAIMS ...................................................................................................................... 5 1.6 HISTORY .................................................................................................................... 5 1.7 GEOLOGY AND MINERALIZATION ..................................................................... 5 1.8 EXPLORATION ......................................................................................................... 6 1.9 SAMPLING METHOD AND APPROACH, SAMPLE PREPARATION, ANALYSES AND SECURITY ..................................................... 6 1.10 DATA VERIFICATION ............................................................................................. 6 1.11 MINERAL PROCESSING AND METALLURGICAL TESTWORK ...................... 6 1.12 MINERAL RESOURCE ESTIMATE ......................................................................... 7 1.13 MINERAL RESERVE ESTIMATE ............................................................................ 7 1.14 MINING METHODS .................................................................................................. 8 1.15 RECOVERY METHODS ............................................................................................ 9 1.16 PROJECT INFRASTRUCTURE .............................................................................. 10 1.17 MARKET STUDIES AND CONTRACTS ............................................................... 10 1.18 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT .......................................................................................... 10 1.19 CAPITAL AND OPERATING COSTS .................................................................... 11 1.19.1 Capital Costs ...................................................................................................... 11 1.19.2 Operating Costs .................................................................................................. 11 1.20 ECONOMIC ANALYSIS ......................................................................................... 12 1.21 INTERPRETATION AND CONCLUSIONS ........................................................... 14 1.22 RECOMMENDATIONS ........................................................................................... 15 1.22.1 Budget for Further Work ................................................................................... 16 2.0 INTRODUCTION........................................................................................................ 17 2.1 TERMS OF REFERENCE ........................................................................................ 18 2.2 QUALIFIED PERSONS ............................................................................................ 19 2.2.1 Site Visits ........................................................................................................... 19 2.2.2 Use of Report ..................................................................................................... 19 2.2.3 Sources of Information ...................................................................................... 19 2.3 PREVIOUS TECHNICAL REPORTS ...................................................................... 20 2.3.1 Eagle’s Nest ....................................................................................................... 20 2.3.2 Other Properties ................................................................................................. 21 2.4 UNITS AND CURRENCY ....................................................................................... 21 3.0 RELIANCE ON OTHER EXPERTS ........................................................................ 26 i 4.0 PROPERTY DESCRIPTION AND LOCATION .................................................... 27 4.1 LOCATION ............................................................................................................... 27 4.2 CLAIMS .................................................................................................................... 28 5.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY ....................................................... 31 5.1 ACCESS .................................................................................................................... 31 5.2 CLIMATE AND PHYSIOGRAPHY ........................................................................ 31 5.3 INFRASTRUCTURE ................................................................................................ 32 5.4 FLORA AND FAUNA .............................................................................................. 32 6.0 HISTORY ..................................................................................................................... 33 7.0 GEOLOGICAL SETTING AND MINERALIZATION .......................................... 35 7.1 REGIONAL GEOLOGY ........................................................................................... 35 7.2 LOCAL GEOLOGY .................................................................................................. 36 7.3 LOCAL DEPOSITS AND MINERAL OCCURRENCES ....................................... 37 7.3.1 Eagle’s Nest Deposit .......................................................................................... 38 7.3.2 Blackbird Deposit .............................................................................................. 38 7.3.3 Triple J Gold Mineral Occurrence ..................................................................... 38 7.3.4 AT12 Nickel-Copper Mineral Occurrence ........................................................ 38 7.3.5 Thunderbird Vanadium-Titanium-Iron Mineral Occurrence ............................. 39 7.4 MINERALIZATION ................................................................................................. 39 7.4.1 MASSIVE SULPHIDES ................................................................................... 39 7.4.2 NET-TEXTURED AND DISSEMINATED SULPHIDES ............................... 39 8.0 DEPOSIT TYPES ........................................................................................................ 41 9.0 EXPLORATION .......................................................................................................... 42 9.1 AIRBORNE GEOPHYSICS ..................................................................................... 42 9.1.1 2003 Fugro Airborne Survey ............................................................................. 42 9.1.2 2007 Noront AeroTEM III Helicopter Survey................................................... 43 9.1.3 2008 VTEM Airborne Survey ........................................................................... 43 9.1.4 2009 Gravity Gradiometry Airborne Survey ..................................................... 43 9.1.5 2009 Z-Axis tripper Electromagnetic Geophysical Survey – Airborne Survey ................................................................................................ 44 9.1.6 2009 High Resolution Aeromagnetic Gradient and VLF-EM Airborne Surveys ............................................................................................... 44 9.2 GROUND GEOPHYSICS ......................................................................................... 44 9.2.1 2004 Ground Magnetic and Horizontal Loop EM Survey ................................. 45 9.2.2 2006 Condor Diamond Corp. In-fill Ground Magnetic Survey ......................... 45 9.2.3 2007 Magnetics, HLEM and Gravity Surveys over Eagle’s Nest Deposit ............................................................................................................... 45 9.2.4 2007 Gravity Survey .......................................................................................... 46 9.2.5 2008 Magnetic, VLF, HLEM, Gravity and Large Loop TDEM Surveys .............................................................................................................. 46 ii 9.2.6 2010 Surface EM – Crone SQUID system ........................................................ 46 9.2.7 2010 Surface EM – Lamontagne UTEM system ............................................... 46 9.2.8 2011 and 2012 Insight IP and Resistivity Surveys ............................................ 47 9.3 DIAMOND DRILLING ............................................................................................ 47 9.3.1
Recommended publications
  • Chapter 28 Eagle's Nest: a Magmatic Ni-Sulfide Deposit in the James Bay
    © 2010 Society of Economic Geologists, Inc. Special Publication 15, pp. 539–557 Chapter 28 Eagle’s Nest: A Magmatic Ni-Sulfide Deposit in the James Bay Lowlands, Ontario, Canada JAMES E MUNGALL,†,1,2 JOHN D HARVEY,2 STEVEN J BALCH,3 BRONWYN AZAR1,2 JAMES ATKINSON,2 AND MICHAEL A HAMILTON1 1 Department of Geology, University of Toronto, 22 Russell St, Toronto, Ontario, Canada M5S 3B1 2 Noront Resources Ltd, 105 Adelaide St West, Ste 110, Toronto, Ontario, Canada M5H 1P9 3 Canadian Mining Geophysics Ltd, 11500 Fifth Ln, Rockwood, Ontario, Canada N0B 2K0 Abstract The Eagle’s Nest Ni-Cu-PGE deposit was discovered in the McFaulds Lake area of the James Bay lowlands of northern Ontario, Canada, in 2007 by Noront Resources Ltd. It is a magmatic sulfide deposit hosted by mafic and ultramafic rocks interpreted to be a feeder conduit beneath an extensive complex of sills and related volcanic rocks, which range in composition from dunite through ferrogabbro to rhyolite. The complex, called the Ring of Fire, has been dated at 2734.5 ± 1.0 Ma and it was emplaced into 2773.37 ± 0.9 Ma felsic plutonic rocks. The felsic rocks form a sill complex structurally beneath metasedimentary and metavolcanic rocks con- sidered to have formed along a passive margin at ca. 2800 Ma within the Oxford-Stull domain of the North Caribou superterrane in the Archean Superior province. In its original configuration, the Eagle’s Nest deposit formed in a shallowly plunging or subhorizontal keel structure at the base of a dike-like chonolith, but subsequent deformation has turned it into a vertically plung- ing rod of sulfide mineralization along the northwestern margin of a north-south–striking dike.
    [Show full text]
  • KWG Resources Inc. Risk Rating: Speculative
    July 10, 2013 Equity Research Initiating Coverage KWG:TSX-V $0.055 (07/09/14) Recommendation: Speculative BUY Target Price: $0.20 KWG Resources Inc. Risk Rating: Speculative A New Technology for a New Chromite District: KWG Stock Chart The New King of the Ring? Highlights: We are initiating our coverage on KWG Resources with a $0.20 target price and Speculative BUY rating. KWG is an exploration company with interests in the highly-prospective Black Horse and Big Daddy chromite deposits in the McFaulds Lake area of the Ring of Fire ("ROF") district in northwestern Ontario. More importantly, KWG recently secured control of two provisional U.S. patent applications and underlying intellectual property for the production of chromium- iron alloys directly from chromite ores and concentrates (“the Chromium IP”), which we believe represents a potential breakthrough technology that could be the key to unlocking the ROF. The Chromium IP process uses natural gas as its energy source which compares favourably to existing ferrochrome technology that is more energy-intensive as it uses electricity as its energy source and operates at higher temperatures. We believe that KWG’s most important initiative should be advancing the commercialization of this new Chromium IP process. We believe that KWG should bring in an existing ferrochrome or integrated steel producer with a strong balance sheet as a strategic partner to more quickly advance the commercialization process. Secondly, the Company needs to rationalize its option to acquire an 80% interest in the Black Horse chromite deposit into a clear path to owning 100% in order to negotiate with potential strategic partners.
    [Show full text]
  • Webequie Supply Road DETAILED PROJECT DESCRIPTION
    Webequie Supply Road DETAILED PROJECT DESCRIPTION Webequie First Nation The Picture is a Placeholder Only Prepared by: Prepared for: Submitted to: SNC-Lavalin Inc. Webequie First Nation Impact Assessment Agency of Canada 195 The West Mall Toronto, Ontario, M9C 5K1 www.snclavalin.com November 2019 661910 Webequie Supply Road Detailed Project Description PREFACE This Detailed Project Description for the Webequie Supply Road Project (“the Project”) has been prepared in accordance with subsection 15(1) of the Impact Assessment Act (“IAA”) and Schedule 2 of the Act’s Information and Management of Time Limits Regulations (“the Regulations”) of the Impact Assessment Act - Information Required in Detailed Description of Designated Project. In addition, the Detailed Project Description reflects the Webequie Supply Road Project Team’s recognition of issues identified in the Summary of Issues prepared by the Impact Assessment Agency of Canada (the Agency) as a result of the Agency’s invitation to Indigenous groups, federal and provincial authorities, the public and other participants to provide their perspective on any issues that they consider relevant in relation to the Project. Information provided by the Agency (posted on the Canadian Impact Assessment Registry) for this purpose included the Initial Project Description. The document that was accepted by the Agency to serve as the Initial Project Description was prepared to comply with the requirements of the Canadian Environmental Assessment Act, 2012 and was initially released for public review under the CEAA, 2012 process in July 2019, during the period when the Government of Canada was preparing to bring into force and transition to the new Impact Assessment Act.
    [Show full text]
  • 6 Existing Environmental Conditions in the Study Area 6.1 Study Area
    Webequie Supply Road Environmental Assessment Draft Terms of Reference 6 Existing Environmental Conditions in the Study Area 6.1 Study Area The Project is located in Northwestern Ontario, with the northern end of the road approximately 525 km northeast of Thunder Bay (refer to Figure 1.1). The Project is located on provincial Crown land, Webequie First Nation Reserve land under federal jurisdiction), and the traditional territories of Indigenous communities (refer also to Section 6.4.6 Land and Resource Use). Figure 6.1 illustrates the location of the alternative routes in relation to project area features and sensitivities. Due to confidentiality constraints (including those imposed by Webequie First Nation and Government of Ontario ministries), and the need to respect the wishes of potentially affected Indigenous communities with respect to divulging certain information on the use of lands in the project area, it is not possible to illustrate the location or bounds of a number of features and sensitivities, including First Nations’ traditional territories, individual camps/cabins, species at risk (e.g., caribou ranges), and government-regulated hunting areas (e.g., trapline licences). However, sensitive features and resources are described in general terms in this section of the ToR. The EA will summarize past investigations and analyses of alternative road alignments between Webequie and the mineral deposit area near McFaulds Lake, and will assess the potential impacts of alternative alignments in the preferred corridor for the Webequie Supply Road. The significance of an environmental impact partially depends on the geographic extent. As such, the impact assessment will be conducted on the basis of specific study areas related to the project development, adopting a multi-scale approach for describing baseline conditions (existing environment) and predicting effects from the Project.
    [Show full text]
  • An Assessment of the Groundwater Resources of Northern Ontario
    Hydrogeology of Ontario Series (Report 2) AN ASSESSMENT OF THE GROUNDWATER RESOURCES OF NORTHERN ONTARIO AREAS DRAINING INTO HUDSON BAY, JAMES BAY AND UPPER OTTAWA RIVER BY S. N. SINGER AND C. K. CHENG ENVIRONMENTAL MONITORING AND REPORTING BRANCH MINISTRY OF THE ENVIRONMENT TORONTO ONTARIO 2002 KK PREFACE This report provides a regional assessment of the groundwater resources of areas draining into Hudson Bay, James Bay, and the Upper Ottawa River in northern Ontario in terms of the geologic conditions under which the groundwater flow systems operate. A hydrologic budget approach was used to assess precipitation, streamflow, baseflow, and potential and actual evapotranspiration in seven major basins in the study area on a monthly, annual and long-term basis. The report is intended to provide basic information that can be used for the wise management of the groundwater resources in the study area. Toronto, July 2002. DISCLAIMER The Ontario Ministry of the Environment does not make any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed in this report. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply endorsement, recommendation, or favoring by the ministry. KKK TABLE OF CONTENTS Page 1. EXECUTIVE SUMMARY 1 2. INTRODUCTION 7 2.1 LOCATION OF THE STUDY AREA 7 2.2 IMPORTANCE OF SCALE IN HYDROGEOLOGIC STUDIES 7 2.3 PURPOSE AND SCOPE OF THE STUDY 8 2.4 THE SIGNIFICANCE OF THE GROUNDWATER RESOURCES 8 2.5 PREVIOUS INVESTIGATIONS 9 2.6 ACKNOWLEDGEMENTS 13 3.
    [Show full text]
  • NORONT RESOURCES LTD. ANNUAL INFORMATION FORM For
    NORONT RESOURCES LTD. ANNUAL INFORMATION FORM For the Year Ended December 31, 2016 April 10, 2017 1 2016 Annual Information Form for Noront Resources Limited – April 10, 2017 TABLE OF CONTENTS FORWARD-LOOKING INFORMATION .......................................................................................................... 3 NOTE TO UNITED STATES INVESTORS ....................................................................................................... 4 OTHER IMPORTANT INFORMATION ........................................................................................................... 4 CORPORATE STRUCTURE ............................................................................................................................... 5 INCORPORATION AND REGISTERED OFFICE ............................................................................................................................ 5 INTERCORPORATE RELATIONSHIPS ........................................................................................................................................ 5 DEVELOPMENT OF THE BUSINESS ............................................................................................................... 5 STRATEGY .............................................................................................................................................................................. 5 THREE YEAR HISTORY ..........................................................................................................................................................
    [Show full text]
  • Webequie Supply Road Project Description
    Webequie Supply Road PROJECT DESCRIPTION Webequie First Nation The Picture is a Placeholder Only July 2019 661910 Webequie Supply Road Project Description Table of Contents 1 General Information and Contacts .......................................................................... 1 1.1 Nature of Designated Project and Proposed Location ............................................................. 1 1.2 Proponent Contact Information ................................................................................................. 1 1.3 List of Parties Consulted During Preparation of the Project Description .................................. 2 1.4 Information Regarding Whether the Designated Project is Subject to Environmental Assessment/Regulatory Requirements of Another Jurisdiction ............................................... 5 1.5 Information Regarding Whether the Designated Project is Taking Place in a Region that has Been the Subject of an Environmental Study ........................................................................... 5 2 Project Information .................................................................................................. 7 2.1 General Description of the Project ............................................................................................ 7 2.2 Relevant Provisions in Regulations Designating Physical Activities Subject to CEAA .......... 10 2.3 Components and Activities of the Designated Project ........................................................... 10 2.4 Emissions, Discharges
    [Show full text]
  • FRESHWATER FISH in ONTARIO's BOREAL: STATUS, CONSERVATION and POTENTIAL IMPACTS of Development David R
    WCS CANADA CONSERVATION REPORT NO. 2 | AUGUST 2007 FRESHWATER FISH IN ONTARIO'S BOREAL: STATUS, CONSERVATION AND POTENTIAL IMPACTS OF dEVELOPMENT David R. Browne WCS CANADA CONSERVATION REPORT #2 AUGUST 2007 FRESHWATER FISH IN ONTARIO'S BOREAL: STATUS, CONSERVATION AND POTENTIAL IMPACTS OF DEVELOPMENT David R. Browne WCS Canada Conservation Reports: ISSN 1719-8941 Conservation Report (Print) ISSN 1719-8968 Conservation Report (Online) ISBN 978-0-9784461-1-6 Conservation Report (Print) ISBN 978-0-9784461-2-3 Conservation Report (Online) Copies of WCSC Conservation Reports are available at: www.wcscanada.org/publications Suggested citation: Browne, D.R. 2007. Freshwater fish in Ontario's bore- al: Status, conservation and potential impacts of development. Wildlife Conservation Society Canada Conservation Report No. 2. Toronto, Ontario, Canada. Cover photographs: Fish from top: northern pike – Engbretson Underwater Photography; stur- geon – Rob Criswell; brook trout – Mary Edwards; lake whitefish – © Shedd Aquarium, photo by Edward G. Lines; walleye – Engbretson Underwater Photography. Front cover landscape: Justina Ray; back cover: Carrie Sadowski, OMNR Copyright: The contents of this paper are the sole property of the authors and cannot be reproduced without permission of the authors. About Wildlife Conservation Society Canada (WCS Canada) WCS Canada's mission is to save wildlife and wildlands by improving our understanding of — and seeking solutions to — critical issues that threaten key species and large wild ecosystems throughout Canada. It both implements and supports comprehensive field studies that gather information on wildlife needs and seeks to resolve key conservation problems by working with a broad array of stakeholders, including local community members, conservation groups, reg- ulatory agencies, and commercial interests.
    [Show full text]
  • 1 Introduction
    Webequie Supply Road Environmental Assessment Draft Terms of Reference 1 Introduction The purpose of this document is to present the Terms of Reference (ToR) for the Webequie First Nation Supply Road Project (“Webequie Supply Road”, “WSR”, “the Project”) to meet the requirements of the Ontario Environmental Assessment Act (EA Act). The ToR is a document that establishes the framework for the planning and decision-making process during the Environmental Assessment (EA) and is submitted by the proponent to the Minister of the Environment, Conservation and Parks (MECP) for review and approval. Alongside the ToR document, material to be submitted for the public record includes the Record of Consultation, which is a stand-alone written record that documents the engagement of and consultation with Indigenous (First Nation and Métis) communities, government agencies, the public, and stakeholders during the development of the ToR, including feedback received (comments, concerns, questions) and project team responses. The proposed Webequie Supply Road is a new all-season road of approximately 107 km in length from Webequie First Nation to the mineral deposit area near McFaulds Lake (also referred to as the Ring of Fire). A Location Plan for the Project is shown on Figure 1.1. The preliminary corridor for the road consists of a northwest-southeast segment running 51 km from Webequie First Nation to a 56 km segment running east before terminating near McFaulds Lake. A total of 17 km of the corridor is within Webequie First Nation Reserve lands. Based on the scale and complexity of the Project, and the potential for significant environmental effects, an Individual Environmental Assessment must be completed for approval under the EA Act.
    [Show full text]
  • Spider Resources Inc. and Kwg Resources Inc
    SPIDER RESOURCES INC. AND KWG RESOURCES INC. TECHNICAL REPORT ON THE MINERAL RESOURCE ESTIMATE FOR THE BIG DADDY CHROMITE DEPOSIT McFAULDS LAKE AREA, JAMES BAY LOWLANDS, NORTHERN ONTARIO, CANADA. NTS 43D16S½ 86° 14' 11" W 52° 45' 32" N Effective Date: March 30, 2010 Signing Date: June 4, 2010 Richard Gowans, P. Eng. Jane Spooner, M.Sc., P. Geo. Ing. Alan J. San Martin, MAusIMM Charley Murahwi, M.Sc., P. Geo., MAusIMM SUITE 900 - 390 BAY STREET, TORONTO ONTARIO, CANADA M5H 2Y2 Telephone (1) (416) 362-5135 Fax (1) (416) 362 5763 Table of Contents Page 1.0 SUMMARY ....................................................................................................................1 1.1 TERMS OF REFERENCE, PROPERTY DESCRIPTION AND OWNERSHIP ..............................................................................................................1 1.1.1 Terms of Reference..............................................................................................1 1.1.2 Property Description............................................................................................1 1.1.3 Property................................................................................................................1 1.1.4 Underlying Agreements and Ownership..............................................................1 1.2 LOCATION AND TENURE.......................................................................................2 1.2.1 Location and tenure..............................................................................................2
    [Show full text]
  • 6 Existing Environmental Conditions
    Webequie Supply Road Environmental Assessment Terms of Reference 6 Existing Environmental Conditions This section describes the existing environmental conditions in the project area (refer to Figure 1.1) and the proposed approach to data collection to develop a fulsome understanding of the existing (or baseline) natural, socio-economic and cultural conditions for the Project. The EA will adopt a multi-scale approach for describing existing environmental conditions and predicting effects from the Project. As such, study areas will be used to define the geographic extent within which to capture the potential direct and indirect effects of the Project. The preliminary study area definitions for the purposes of the EA are provided in Section 8.1. 6.1 General Environmental Setting The Project is located in Northwestern Ontario, with the northern end of the road approximately 525 km northeast of Thunder Bay (refer to Figure 1.1). The Project is located on provincial Crown land, Webequie First Nation Reserve land under federal jurisdiction, and the traditional territories of Indigenous communities (refer also to Section 6.4.6 Land and Resource Use). Figure 6.1 illustrates the location of the alternative routes in relation to project area features and sensitivities. Due to confidentiality constraints (including those imposed by Webequie First Nation and Government of Ontario ministries), and the need to respect the wishes of potentially affected Indigenous communities with respect to divulging certain information on the use of lands in the project area, it is not possible to illustrate the location or bounds of a number of features and sensitivities, including First Nations’ traditional territories, individual camps/cabins, species at risk observations and government-regulated hunting areas (e.g., trapline licences).
    [Show full text]
  • Ring of Fire”) Area Lake Sediment Geochemistry Pilot Study, Northern Ontario; Ontario Geological Survey, Open File Report 6269, 26P
    THESE TERMS GOVERN YOUR USE OF THIS DOCUMENT Your use of this Ontario Geological Survey document (the “Content”) is governed by the terms set out on this page (“Terms of Use”). By downloading this Content, you (the “User”) have accepted, and have agreed to be bound by, the Terms of Use. Content: This Content is offered by the Province of Ontario’s Ministry of Northern Development and Mines (MNDM) as a public service, on an “as-is” basis. Recommendations and statements of opinion expressed in the Content are those of the author or authors and are not to be construed as statement of government policy. You are solely responsible for your use of the Content. You should not rely on the Content for legal advice nor as authoritative in your particular circumstances. Users should verify the accuracy and applicability of any Content before acting on it. MNDM does not guarantee, or make any warranty express or implied, that the Content is current, accurate, complete or reliable. MNDM is not responsible for any damage however caused, which results, directly or indirectly, from your use of the Content. MNDM assumes no legal liability or responsibility for the Content whatsoever. Links to Other Web Sites: This Content may contain links, to Web sites that are not operated by MNDM. Linked Web sites may not be available in French. MNDM neither endorses nor assumes any responsibility for the safety, accuracy or availability of linked Web sites or the information contained on them. The linked Web sites, their operation and content are the responsibility of the person or entity for which they were created or maintained (the “Owner”).