Governance Oshawa Executive Airport

Total Page:16

File Type:pdf, Size:1020Kb

Governance Oshawa Executive Airport ACLC Town Hal l Presentation Supporting Business & Building Community, One Flight at a Time. ACLC Town Hall - Agenda 1. December 2017 – ACLC Town Hall Lessons Learned 2. Updated Communications Plan 3. Aircraft Movements & Growth – Past, Current & Forecast 4. Current Noise & Traffic Management Plan 5. Consultation for the update to the Airport Business Plan and the Noise and Traffic Management Plan to begin in 2019. 6. Questions 7. Suggestions for Improvement regarding the airport. ACLC Town Hall Dec 2017 – Lessons Learned 1. Aircraft noise continues to be an important issue; 2. Communication between the airport & the community needs to improve; 3. Safety of the surrounding communities is also a concern particularly as it relates to height of aircraft departing or arriving. Updated Communications Plan New & Improved Airport Website: • What was added: • New Landing / Opening Page • What was improved: • Frequently Asked Question Page • Airport Business Plan Tab includes direct • Airport Safety Policy Tab link to Federal Agreement • Tree Removal and Management Tab • Airport Zoning Map direct link • Air Quality and Climate Change Tab • Airport Zoning Regulations direct link • Emergency Management Tab • 2015 Air Quality Assessment direct link • Airport Twitter Carousel • Noise & Traffic Management Plan direct • ACLC Meeting Minutes & Agenda’s link • Questions for the Airport Manager YouTube series • Noise Berm Information and Photo • Airport News Feed Subscription Carousal • Link to airport construction application Implementation of Airport Social Media Implementation of Airport Twitter: Oshawa Executive Airport Questions with the Airport Manager YouTube series: Oshawa Executive Airport Latest New and Information Subscription: June Town Hall Distribution Airport Direct Mailing: • Bulk email to 278 emails on our distribution lists • Newspaper adds • Canada Post mailing drop to 11,289 homes (Ritson, Conlin, Garden, Rossland) ($3700) Aircraft Movements Oshawa Executive Airport - Historical Movements 1974 – 2017 (Stats Canada) 160,000 Local Movement Itinerant Movement Annual Movement 143,200 140,000 120,000 Annual Movement 100,300 100,000 105,900 97,856 83,679 80,000 82,500 76,396 70,666 70,690 60,000 63,760 59,418 51,758 40,000 40,678 40,644 29,988 30,046 20,000 Local Movement Total Movements Itinerant Movement 0 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 100,000 120,000 140,000 160,000 20,000 40,000 60,000 80,000 0 1974 1975 1976 Airport Executive Oshawa 1977 1978 1979 1980 1981 1982 1983 Movements Aircraft 1984 1985: Delcan Report 1985 1986 1987 1988 1989 – 1990 Important 1974 Dates 1991 1992 1993 1994 1995 1996 1997: O&O Agreement 1997 1998 1999 2000 2001 – 2017 Canada)(Stats 2002 2003 2004 2005 2006: TAAS Ltd. 2006 2007 2008 2009 2008: 08-12 Business Plan 2010 2011 2012 2013 2014 2015 2016 2015: 15-19 Business Plan 2017 Aircraft Movements • January 2017 – March 2017: 11,437 total aircraft movements; • January 2018 – March 2018: 11,951 total aircraft movements (4% increase); • 2018 Yearly Movement Forecast: 80,000 total aircraft movements; • 102,000 total aircraft movements expected within the next 3 to 10 years. Airport Growth 2008 – 2017 • New Nav Canada Control Tower (Opened TODAY) • Total Aircraft 80 to 250 • Corporate Aircraft 5 to 50 • Aviation Businesses 6 to 18 • Hangar Space 50,000 to 400,000 sq.ft • Aviation Fuel Sales 500,000 to 1.5m litres/year • GDP $58m to $80-100m annually • Corporate Flights 350 to 5000 annually • Circuit Movements 40,678 to 30,045 • Total Movements 70,666 to 70,690 Noise & Traffic Management Plan The airport is required to work within the requirements and limitations of the Canadian Aviation Regulations (CAR’s). The CAR’s do not permit any airport to limit the type of aircraft, volume of traffic, hours of use or runway used. (AC 302-001, CAR 602.105) All Noise and Traffic Management measures at the Oshawa Executive Airport have been established with the support and cooperation of our tenants and airport users. Noise & Traffic Management Plan • All airport related activity and development has been relocated to the airports Northfield. • Residential development along Thornton Rd south of the airport golf course was not permitted. • Area north of the airport was designated and zoned for industrial development. • All new site plans within 4km of airport are circulated to airport. • Restricted application from Seneca College to move its flight school to the airport. • No new land sales for a flight school use. • Will not grant APM approval for any new flight schools. (TC Requirement) • Not to pursue scheduled passenger service. • Any new passenger service will need to undertake a study to determine the noise impacts. Noise & Traffic Management Plan Night Operational Limitations: Between the hours of 10:30pm and 6:30am, only police, medical and industrial emergency flights are permitted to land and take off from the Oshawa Executive Airport. Airport tenants with aircraft based at the Oshawa Executive Airport are permitted to land between the hours above, but are not permitted to take off, independent from police, medical and industrial emergency flights. Noise & Traffic Management Plan Preferential Runway Use, Departure Procedures & Arrival Procedures * NAV Canada reserves the right to deviate from these procedures for safety and traffic volume considerations Right Hand Circuits RWY 12 & RWY 23: Aircraft will use a right hand circuit for runways 30 and runway 23. Preferential Runway Use: Runway 30 is the preferential runway at the Oshawa Executive Airport. Aircraft will use this runway when the winds are calm. (5kts) Departure Procedures: Aircraft leaving the Oshawa Executive Airport will continue to fly on the Runway heading until they reach 1,000 ft above sea level (ASL) (540 ft above ground level (AGL)) before they turn. Arrival Procedures: Aircraft flying into the Oshawa Executive Airport will remain at least 1,000 ft above sea level (540ft above ground level) before making the turn for their final approach for landing. Noise & Traffic Management Plan Noise & Traffic Management Plan * NAV Canada reserves the right to deviate from these procedures for safety and traffic volume considerations • Prior permission by the Airport Manager is required for all flight training including private and commercial pilot recurrent training. • A maximum of 12 aircraft are permitted in the circuit for training purposes at any given time. • Flight training aircraft will not utilize a touch-and-go circuit pattern on all runways after 4:00pm on any Saturday or Sunday. • During the holiday long weekends, circuit training is not permitted on the Sunday or Monday on all runways. (No touch and go or full stop circuits) • Taxiway Charlie was established to facilitate the efficient use of Runway 05/23 particularly during periods when touch-and-go departures are not permitted. Noise & Traffic Management Plan • An earthen noise berm was constructed at the north east corner of the airport to mitigate ground based noise associated with the new Hangarminium development. • Two earthen noise berms were constructed at the south limit of the airport to mitigate ground based noise affecting the new Stephenson Road housing development. • An earthen noise berm was constructed at the south east limit of the airport to mitigate ground based noise affecting the Jane Street area residents. Flight Training & Simulator Use • Integrated Airline Transport Pilot License (IATPL) program: • Students are required to follow a stringent set of lesson plans where they meet skill and proficiency levels in the simulators before completing similar exercises in the aircraft. • This reduces the amount of time students spend in the aircraft and particularly in the circuit pattern practicing their landings. Additionally, Transport Canada provides greater credit for simulator time towards the licencing requirements for those enrolled in a IATPL program. The minimum aircraft time for an IATPL program graduate is 162.5 flight hours versus 200 hours for the modular Commercial Pilot Licence (CPL) graduate. This is almost 20% less aircraft time to acquire the same licence. • A typical modular program candidate will create 900-1200 aircraft movements (take-offs & landings) throughout the course of their training. The same IATPL student will create approximately 350 movements. This reduction in movements is a direct result of the use of the simulators. Flight Training & Simulator Use • Durham Flight Centre (DAS) has added 1 full motion flight simulator for use in their career flight training program. • Canadian Flight Academy (CFA) has added 3 full motion flight simulators for use in their career flight training program. • Starting in January 2019 CFA will also be offering a Transport Canada approved Integrated Airline Transport License (IATPL). Transport Canada allows for a higher utilization of flight simulators. • Standard pilot career training to a multi-engine commercial pilot license without the use of a simulator typically generates between 900-1200 aircraft movements. • Standard pilot career training to a multi-engine commercial pilot license with the use of a simulator typically generates between 700-850 aircraft movements. • An Integrated Airline Transport License (IATPL) with high simulator utilization typically generates approximately 350 aircraft movements
Recommended publications
  • Flying Together: the Southern Ontario Airport Network May 2017
    Flying Together: The Southern Ontario Airport Network May 2017 FLYING TOGETHER: THE SOUTHERN ONTARIO AIRPORT NETWORK 1 1 INTRODUCTION Southern Ontario is set to experience significant growth over the next three decades and is one of the fastest growing regions in North America. Not surprisingly, demand for air travel across the region will follow suit, rising to approximately 110 million passengers over the same timeframe. This growth presents significant opportunities for the region, local communities and their airports. As growth comes to Southern Ontario it is critical that we are ready for it. By working together, our region’s airports will be better placed to support local economic development, and in doing so increase the competitiveness of the region, the province and the country. Successful cities and regions around the world have reaped the benefits of a network approach to supporting air service needs, and by better using the available airport infrastructure in Southern Ontario, our region can benefit as well. This approach will ensure that Southern Ontario is well placed to keep the jobs and economic benefits of growth in air service demand in the region. 2 FLYING TOGETHER: THE SOUTHERN ONTARIO AIRPORT NETWORK 2 UNPRECEDENTED AIR TRAVEL DEMAND IS COMING TO SOUTHERN ONTARIO As the most densely populated and economically productive region in Canada, Southern Ontario is an engine of the Canadian economy. The region is Canada’s export powerhouse, accounting for 37 per cent of the Canadian economy overall, 39 per cent of the goods exports and 48 per cent of the services exports. 88 per cent of Southern Ontario’s The region is also home to several Fortune population lives in the metropolitan areas 500 companies, 28 universities and colleges, of the Greater Toronto Area, Hamilton, and an innovation corridor that features the second-largest concentration of tech Kingston, Kitchener-Waterloo, London, companies in North America.
    [Show full text]
  • Response to the KPMG Study: Pickering Lands Aviation Sector Analysis
    Response to the KPMG Study: Pickering Lands Aviation Sector Analysis Land Over Landings April 18, 2020 (rev. April 26, 2020) © Land Over Landings, 2020 1 Contents Overview and General Observations / 3 Extracts and Detailed Comments on the Reports / 5 The Supply and Demand Report / 6 The Contextual Bridge Report / 27 The Airport Type and Role Report / 28 The Revenue Generation and Economic Impact Assessment Report / 47 End Note / 49 2 Overview and General Observations In 2016, Transport Canada tasked KPMG to forecast capacity and demand in the southern Ontario airport system for the 20-year period 2016 to 2036. Following completion of the supply and demand study, KPMG conducted an additional three studies, which took so long to produce that some details of the December 2016 forecast report are now significantly out of date, and the later, newer sections diverge from the first report in tone, intent, and perspective. Because of the disjointed structure (four separate reports purporting to be one) and the extended timeline, a lot of material is repeated – and even contradicted – in subsequent reports. Regardless, the essential conclusion is clear, and is expressed frequently and unequivocally in the Supply and Demand Report (December 2016) – in fact, it is repeated no fewer than eighteen times, not counting five times in the executive summary. No additional airport in southern Ontario will be needed to meet 2036 demand. The report shows that, with modest capacity expansions of some existing airports, southern Ontario airport capacity will not only meet forecasted demand but will exceed it by a huge margin. The report further states that adequate runway and terminal building capacity exists within the system as a whole, with the introduction of high-speed rail services in the region.
    [Show full text]
  • Medevac – Cargo
    CHARTER – MEDEVAC – CARGO From our base at Oshawa Executive Airport to across North America, Caribbean & Europe. Skycraft welcomes you aboard our historical relaunch in the simulator world. About Skycraft VAC: | CALLSIGN: Skycraft | ICAO: SKG | IATA: SF | Skycraft is a corporate charter and regional airline service based out of Oshawa Executive CYOO that also offers medevac and cargo contracts. With the spike of COVID-19, it has become incredibly harder to travel with the airlines in all the cut in services. We let you charter our aircraft from any airport in Ontario to wherever your personal or business needs require. Skycraft Virtual Air Charter officially started operations on January 7th, 2021. Nearly 27 years after Skycraft Air in real life ceased operations in 1994. www.skycraftva.com History of the real life Skycraft Air Transport: Skycraft Air Transport Inc. was a Canadian airline based at Oshawa Municipal Airport. Skycraft Air Transport was created as a charter airline targeting the express air freight needs of the North American automotive industry. It was based in Oshawa, Ontario, where its biggest customer, General Motors Canada, operated two large car assembly plants. Its principal competitive advantages were its diverse fleet, with different aircraft that could economically carry different sized loads, and its ability to dispatch aircraft to virtually any North American destination within one hour of a customer request. By the late 1980s the airline was operating a flying school and had diversified into the air ambulance, passenger charter and scheduled service markets. Its scheduled services included flights from Oshawa Municipal Airport to Ottawa; Montreal; Windsor, Ontario; and Detroit.
    [Show full text]
  • WAAS PAN Report (January 2021)
    Satellite Navigation Branch, ANG-E66 NSTB/WAAS T&E Team WIDE AREA AUGMENTATION SYSTEM PERFORMANCE ANALYSIS REPORT January 2021 Report #75 Reporting Period: October 01 to December 31, 2020 http://www.nstb.tc.faa.gov FAA William J. Hughes Technical Center Atlantic City International Airport, NJ 08405 WAAS Performance Analysis Report January 2021 DOCUMENT VERSION CONTROL VERSION DESCRIPTION OF CHANGE DATE 0.1 Initial Version of Document 01/27/2021 0.2 Technical Edit 01/28/2021 0.3 Peer Review 02/05/2021 1.0 Final Report 02/10/2021 Report 75 ii WAAS Performance Analysis Report January 2021 Executive Summary Since 1999, the Wide Area Augmentation System (WAAS) Test Team at the FAA William J. Hughes Technical Center has reported GPS performance as measured against the GPS Standard Positioning Service (SPS) Signal Specification in quarterly GPS Performance Analysis Network (PAN) Reports. In addition to the GPS PAN reports, the WAAS Test Team has provided quarterly reports on WAAS performance. The current WAAS PAN Report #75 provides WAAS performance data from the October 01 through December 31, 2020 reporting period. This report provides the following results: accuracy, availability, coverage, safety index, range accuracy, WAAS broadcast message rates, geostationary satellite ranging availability, WAAS airport availability, WAAS Code Noise and Multipath analysis, WAAS reference station survey validation, and WAAS Signal Quality Monitoring. The following table shows observations for accuracy and availability made during the reporting period for Continental United States (CONUS) and Alaska sites (the international sites are presented in the body of this report). Localizer Performance (LP) service is available when the calculated horizontal protection level (HPL) is less than 40 meters.
    [Show full text]
  • Fall Board of Directors Meetings
    Host Airport AIRPORTS COUNCIL INTERNATIONAL - NORTH AMERICA FALL BOARD OF DIRECTORS MEETINGS SEPTEMBER 16, 2017 // FORT WORTH, TEXAS 2017 FALL BOARD MEETING Table of Contents ACTION ITEMS Consent Agenda July 2017 Minutes .......................................................................................................................................................... 6 Membership Report ....................................................................................................................................................14 New Business 2017 and 2018 Downes Award ............................................................................................................................. 44 ACI World Governing Board Appointments ..................................................................................................45 Financial Report FY 2017 Financial Review ....................................................................................................................................... 46 Acceptance of FY 2017 Audit ...............................................................................................................................52 REPORTS Chair's Report .............................................................................................................................................. 73 President and CEO's Report .................................................................................................................... 75 Canadian Policy Council Report .............................................................................................................77
    [Show full text]
  • Airport Business Plan Working Team Table of Contents Executive Summary
    Prepared by Development Services and Total Aviation & Airport Solutions in cooperation with the Airport Business Plan Working Team Table of Contents Executive Summary .............................................................................. 6 1.0 Introduction ................................................................................ 9 2.0 Methodology .............................................................................. 12 3.0 Purpose ..................................................................................... 13 4.0 Background ................................................................................ 14 5.0 Economic Impact ....................................................................... 18 6.0 SWOT Analysis ........................................................................... 20 6.1 Strengths ................................................................................................................ 21 6.2 Weaknesses ........................................................................................................... 21 6.3 Opportunities .......................................................................................................... 22 6.4 Threats ................................................................................................................... 22 7.0 Role Statement .......................................................................... 23 8.0 City Commitment to Operate Airport .......................................... 26 9.0 Noise and Traffic Management
    [Show full text]
  • Athabasca Airport Committee Athabasca County Thursday, October 4, 2018 - 9:30 A.M
    A G E N D A Athabasca Airport Committee Athabasca County Thursday, October 4, 2018 - 9:30 a.m. County Office - Chambers Athabasca Airport Committee Athabasca County Thursday, October 4, 2018 - 9:30 a.m. Page 1. CALL TO ORDER 2. APPROVAL OF AGENDA 2.1 October 4, 2018, Airport Committee 3. APPROVAL OF MINUTES 3.1 July 5, 2018, Airport Committee Minutes 3 - 6 4. BUSINESS ARISING FROM THE MINUTES 4.1 2018 Fly-In BBQ Summary 7 4.2 Runway Markings Update 8 5. FINANCIAL 5.1 September 30, 2018 9 6. NEW BUSINESS 6.1 Budget 2019-2021 10 - 13 6.2 Lease Agreement 14 6.3 Husky Energy Wells 15 - 17 6.4 Fuel Sales and Movement 18 - 20 6.5 Lease Extension 21 - 22 6.6 6.7 7. INFORMATION 7.1 Manager's Report 23 7.2 AAMA Newsletters 24 - 49 7.3 8. IN CAMERA ITEMS 8.1 9. NEXT MEETING 9.1 January 10, 2019 10. ADJOURNMENT Page 2 of 49 AGENDA ITEM # 3.1 Athabasca Airport Committee Meeting Athabasca County July 05, 2018 - 9:30 AM Council Chambers PRESENT: Chair Brent Murray; Members Christi Bilsky, Dwayne Rawson, Derrick Woytovicz, Kevin Haines (alternate), Health Safety & Facilities Coordinator Norm De Wet; and Recording Secretary Iryna Kennedy. ABSENT: Member Travais Johnson. CALL TO ORDER: Chair Murray called the meeting to order at 9:30 a.m. APPROVAL OF AGENDA: July 5, 2018, Athabasca Airport Agenda Resolution Moved by Member Haines that the agenda be adopted, as AP 18-15 amended, with the following additions: 6.3 - AAMA Seminar 6.4 - Runway Markings.
    [Show full text]
  • Community Risk Assessment Final Report
    Corporation of the City of Oshawa Community Risk Assessment Final Report November 2020 – 19-1064 Table of Contents i Table of Contents 1.0 Introduction 1 1.1 Methodology ................................................................................................ 2 2.0 Geographic Profile 6 2.1 Geographical Snapshot of Oshawa ............................................................. 6 2.2 Roads, Transit, Bridges and Rail ................................................................. 9 2.2.1 Road Network ............................................................................... 9 2.2.2 Bridges ....................................................................................... 14 2.2.3 Rail ............................................................................................. 14 2.3 Waterways and Conservation Areas ......................................................... 17 2.3.1 Waterways .................................................................................. 17 2.3.2 Conservation Areas .................................................................... 19 2.4 Wildland-Urban Interface ........................................................................... 19 3.0 Building Stock Profile 21 3.1 Ontario Building Code Occupancy Classifications ..................................... 21 3.2 O.F.M.E.M. Fire Risk Sub-Model Occupancy Classifications .................... 22 3.2.1 City of Oshawa Existing Major Building Classification Summary ...................................................................................
    [Show full text]
  • January 1, 2019 Newsletter
    January 2019 NEWSLETTER “A national organization dedicated to promoting the viability of Regional and Community Airports across Canada” www.rcacc.ca JJul RCAC MEMBER AIRPORT PROFILE: History of Fort St. John Airport (CYXJ) – Part 2 Jj Under the National Airports Policy, announced by Transport Canada in 1994, the North Peace Regional Airport became eligible for ownership by local interests. In January of 1997 the North Peace Airport Society signed documents transferring ownership from Transport Canada to the Society. As of March 18, 1997, the airport is operated by North Peace Airport Services Ltd., a wholly owned subsidiary of Vancouver Airport Services. The North Peace Airport Society introduced an Airport Improvement Fee September 01, 1998 to raise funds for the renovation and construction of the Air Terminal Building. The new terminal building was completed in the fall of 2005. The North Peace Airport Society continues to work diligently to ensure that the airport is able to meet the needs of local industry and commerce. Planning for Fort St. John Air Show is Well Underway – by Scott Brooks, energeticcity.ca The planning for the 2019 Fort St. John Air Show is well underway. Fort St. John Air Show Events Organizer, Lana Neitz, says the 2019 event will be packed with talent and performers. “We’re looking at some really neat warbirds. We’re bringing the Kitty Hawk; we’re bringing in the Harvard’s of the Harmon Rockets… we were talking with some many performers down at the ICAS airshow convention. The Snowbirds will be here, and we’ve put in a request to the military to see if they will bring any other shows to do some tactical exercises.” According to Neitz, there will also be a huge fireworks display, and there will be some more performers added to the lineup as the show date draws near.
    [Show full text]
  • Cornwall Regional Airport – Development Plan
    Cornwall Regional Airport Development Opportunity Assessment June 2017 Nicolas Plante Partner T +1 514-954-4633 E [email protected] Louise Leclerc Senior Manager T +1 514-390-4165 E [email protected] Jérôme Côté Senior Consultant T +1 514-878-2692, ext.2322 E [email protected] Anne Julie Goupil Analyst T +1 514-878-2692, ext. 2391 E [email protected] © 2017 Raymond Chabot Grant Thornton LLP | Cornwall Regional Airport Development Opportunity Assessment | June 2017 Contents Section Page 1. Executive Summary 4 2. Introduction 7 3. Context 11 4. Market Trends and Opportunities 16 5. Governance Review 31 6. Financial and Operational Assessment 40 7. Recommendations 56 Appendices A. Airport benchmarking 61 B. Stakeholder interviews 67 C. Potential customer interviews 68 D. Required take-off length per type of aircraft 69 E. NAV Centre / OAS project 70 © 2017 Raymond Chabot Grant Thornton LLP | Cornwall Regional Airport Development Opportunity Assessment | June 2017 2 Private and Confidential June 20, 2017 Raymond Chabot Grant Thornton & Co Mr. Leslie O'Shaughnessy Mr. Ian McLeod LLP Mayor Mayor Suite 2000 National Bank Tower City of Cornwall Township of Glengarry 600 De La Gauchetière Street West 360 Pitt Street 6 Oak Street Montréal, Québec H3B 4L8 Cornwall, Ontario K6J 3P9 Lancaster, Ontario K0C 1N0 T +1 514 878 2691 F +1 514 878 2127 www.rcgt.com Dear Sirs, Subject: 287174-001 – Development Opportunity Assessment We are pleased to present our report in connection with the above- Should you require any additional information, please feel free to contact mentioned matter.
    [Show full text]
  • LAKE SIMCOE REGIONAL AIRPORT ECONOMIC IMPACT STUDY MAY 2019 – FINAL REPORT Schedule 1 Economic Development Sub-Committee EDS 2019-316 2
    Schedule 1 Economic Development Sub-Committee EDS 2019-316 1 LAKE SIMCOE REGIONAL AIRPORT ECONOMIC IMPACT STUDY MAY 2019 – FINAL REPORT Schedule 1 Economic Development Sub-Committee EDS 2019-316 2 Executive Summary Lake Simcoe Regional Airport (CYLS) began operations in 1991 with a 3,500 ft. runway and a small apron located north of the runway. The airport was expanded in 1993 with the lengthening of the runway to 5,000 ft. and the addition of a terminal building. Subsequent developments brought the runway to its current length of 6,000 ft. and added further support services and infrastructure to the airport. From that simple beginning, CYLS has developed into a regional airport facility that significantly contributes to the economies of the City of Barrie, Simcoe County, and the Province of Ontario. The airport supports area businesses’ ongoing operations and development activities by providing access to air travel facilities and infrastructure for general aviation and corporate jet aircraft. Globally, commercial and general aviation are major economic generators. Air transportation facilitates business in other sectors of the economy. Through the connectivity provided, airports facilitate employment and economic development in the national economy through trade of goods and services, investment, tourism, education and increased productivity. This study quantifies the economic impacts generated by CYLS’ 2018 operations and development activities. The report also examines the airport’s potential future impacts, considering the proposed runway expansion and related projects that were announced in July 2018. These projects have been endorsed, in principal, by the airport’s shareholders. This potential expansion is proposed in response to increases in the region’s population, economic activity, and demand for air travel.
    [Show full text]
  • Billy Bishop Airport Master Plan
    2018 Airport Master Plan LEANER REENER UIETER Table of Contents INVESTING IN BALANCE: 3.5 Landside 50 AN EXECUTIVE SUMMARY 6 3.5.1 Ground Access 51 3.5.2 Ferry Terminus 52 1 INTRODUCTION 17 3.5.3 Pedestrian Tunnel 53 1.1 Preface 18 3.5.4 Arrival Departure Curbs 54 1.2 Governance 19 3.5.5 Taxi Corral 54 1.3 Social and Environmental Responsibility 20 3.5.6 Parking 54 80 YEARS 1.4 Vision, Mission and Guiding Principles 21 3.6 Air Terminal Building 55 1.4.1 Vision Statement 21 3.7 General Aviation Activity 57 OF MAKING CONNECTIONS 1.4.2 Mission Statement 21 3.8 Airport Support 58 1.4.3 Guiding Principles 22 3.8.1 Fire Station 58 On September 8, 1939, Billy Bishop Toronto City Airport welcomed its first 1.5 Planning Objectives 24 3.8.2 Airport Maintenance Garage 58 commercial flight—an aircraft from the U.S. carrying renowned conductor Tommy Dorsey and his swing band who were performing at the Canadian 1.5.1 The Purpose of an Airport Master Plan 24 3.8.3 Materials Storage 58 National Exhibition. In the 80 years since that flight the airport has grown 1.5.2 The 2018 Airport Master Plan 25 3.8.4 Field Electrical Centre 59 into an important transportation gateway connecting Toronto to the world 1.5.3 Planned Upgrades Recommended 3.8.5 NAV CANADA Control Tower 59 and welcoming more than 2.8 million passengers each year. in the 2012 Airport Master Plan 25 3.8.6 Fuel Farm 59 1.5.3.1 Implementation of 2012 Master Plan 3.8.7 Non-Passenger Screening Facility Providing service to more than 20 destinations in Canada and the U.S.
    [Show full text]